CN207994414U CN201721486473.2U CN201721486473U CN207994414U CN 207994414 U CN207994414 U CN 207994414U CN 201721486473 U CN201721486473 U CN 201721486473U CN 207994414 U CN207994414 U CN 207994414U
Authority
CN
China
Prior art keywords
heat
cabinet
sink unit
heat pipe
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721486473.2U
Other languages
Chinese (zh)
Inventor
李猛
汤清双
郑晓果
白维正
李豪
吴小钊
王廷华
宋晓生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xuji Delischer Electric Co ltd
Xuji Group Co Ltd
State Grid Corp of China
Original Assignee
XUCHANG XUJI DRIESCHER WEGBERG ELECTRIC CO Ltd
Xuji Group Co Ltd
State Grid Corp of China
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUCHANG XUJI DRIESCHER WEGBERG ELECTRIC CO Ltd, Xuji Group Co Ltd, State Grid Corp of China filed Critical XUCHANG XUJI DRIESCHER WEGBERG ELECTRIC CO Ltd
Priority to CN201721486473.2U priority Critical patent/CN207994414U/en
Application granted granted Critical
Publication of CN207994414U publication Critical patent/CN207994414U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

本实用新型涉及密闭式设备柜用散热装置和气体绝缘开关柜。气体绝缘开关柜包括柜体及散热装置,散热装置包括安装在柜体内的吸热单元以及安装在柜体外的散热单元,吸热单元和散热单元均包括传热体,吸热单元和散热单元的传热体导热连接,吸热单元还包括与其传热体导热连接的第一热管。本实用新型通过分别设在密封柜体内、外的吸热单元和散热单元实现将柜体内部热量的导出,吸热单元上设有热管,热管利用相变原理传热,传热效率高,同时其比热容较大,传热量较大,同时由于通过传热体的过渡传热,无需使热管直接经过柜体壁,因此也可避免热管破裂的风险,提高传热过程的安全性。

The utility model relates to a cooling device for an airtight equipment cabinet and a gas insulated switch cabinet. The gas insulated switchgear includes a cabinet body and a heat dissipation device. The heat dissipation device includes a heat absorption unit installed inside the cabinet and a heat dissipation unit installed outside the cabinet. Both the heat absorption unit and the heat dissipation unit include a heat transfer body, and the heat absorption unit and the heat dissipation unit The heat transfer body is thermally connected, and the heat absorption unit further includes a first heat pipe connected to the heat transfer body. The utility model realizes the export of the internal heat of the cabinet through the heat-absorbing unit and the heat-dissipating unit respectively arranged inside and outside the sealed cabinet. The heat-absorbing unit is provided with a heat pipe. It has a large specific heat capacity and large heat transfer capacity. At the same time, due to the transitional heat transfer through the heat transfer body, the heat pipe does not need to pass directly through the cabinet wall, so it can also avoid the risk of heat pipe rupture and improve the safety of the heat transfer process.

Description

密闭式设备柜用散热装置和气体绝缘开关柜Heat sinks for enclosed equipment cabinets and gas-insulated switchgear

技术领域technical field

本实用新型涉及密闭式设备柜用散热装置和气体绝缘开关柜。The utility model relates to a cooling device for an airtight equipment cabinet and a gas insulated switch cabinet.

背景技术Background technique

对于某些密闭式的设备柜,例如气体绝缘开关柜,其相对于空气绝缘开关柜来说,具有占地面积小、良好的绝缘性能和密封性能、高可靠、免维护、不受环境影响等优点,近年来逐渐被用户接受,得到普遍的应用。但气体绝缘开关柜因其一次主回路密封于密闭气箱内,相对于同等级的空气绝缘开关柜而言,气箱内的热量只能通过气箱壁散发到气箱外部空气中,这种散热方式相比空气绝缘开关柜发热元件的直接自然对流或散热风扇散热方式而言,其散热效果相差甚远。这也就造成了气体绝缘开关柜气箱内一次主回路元件温升很容易超标,过高的温升会加速气箱内绝缘材料的老化进而降低绝缘性能,影响开关设备整体可靠性和安全性。因此如何将气体绝缘开关柜气箱内部一次回路产生的热量高效的传递到气箱外部的空气中是目前气体绝缘开关柜技术领域的难题之一。For some closed equipment cabinets, such as gas-insulated switchgear, compared with air-insulated switchgear, it has a small footprint, good insulation and sealing performance, high reliability, maintenance-free, and free from environmental influences, etc. In recent years, it has been gradually accepted by users and widely used. However, because the primary main circuit of the gas insulated switchgear is sealed in the airtight air box, compared with the air insulated switchgear of the same level, the heat in the air box can only be dissipated to the outside air of the air box through the wall of the air box. Compared with the direct natural convection of the heating element of the air-insulated switchgear or the heat dissipation of the cooling fan, the heat dissipation method is far from the heat dissipation effect. This also causes the temperature rise of the primary main circuit components in the gas box of the gas insulated switchgear to easily exceed the standard. Excessive temperature rise will accelerate the aging of the insulating material in the gas box and reduce the insulation performance, affecting the overall reliability and safety of the switchgear. . Therefore, how to efficiently transfer the heat generated by the primary circuit inside the gas box of the gas insulated switchgear to the air outside the gas box is one of the difficult problems in the technical field of gas insulated switchgear at present.

针对上述散热问题,为了提高开关柜的散热效率,行业内常见有两种散热方式:一种是在柜体的内外两面贴装散热翅片,通过散热翅片吸热和散热,由于散热翅片吸热量有限,对热量的传递效率不如热管快,因此散热翅片传热存在传热效率低的问题,无法满足高发热量的散热要求;另一种是通过在柜体上穿装热管进行散热,其虽然散热效率高,但是由于需要在柜体上开设供热管插入的安装孔,因此需要增设一系列工序及结构件来保证安装孔处的密封,不仅工序复杂,而且在穿装热管的过程中还容易导致热管破裂而泄露工作液体的问题,造成柜体内绝缘性能受到影响。In view of the above heat dissipation problems, in order to improve the heat dissipation efficiency of the switchgear, there are two common heat dissipation methods in the industry: one is to install heat dissipation fins on the inside and outside of the cabinet, and absorb heat and dissipate heat through the heat dissipation fins. The heat absorption is limited, and the heat transfer efficiency is not as fast as that of the heat pipe, so the heat transfer efficiency of the heat dissipation fins is low, which cannot meet the heat dissipation requirements of high heat generation; the other is to dissipate heat by wearing heat pipes on the cabinet body , although its heat dissipation efficiency is high, but because it is necessary to open a mounting hole for the heat pipe on the cabinet body, it is necessary to add a series of processes and structural parts to ensure the sealing of the mounting hole. In the process, it is also easy to cause the heat pipe to rupture and leak the working fluid, which will affect the insulation performance of the cabinet.

实用新型内容Utility model content

本实用新型的目的在于提供一种即能利用热管的高效散热性能、又不存在上述安全隐患的密闭式设备柜用散热装置;本实用新型的目的还在于提供一种装有上述密闭式设备柜用散热装置的气体绝缘开关柜。The purpose of this utility model is to provide a heat dissipation device for a closed equipment cabinet that can utilize the high-efficiency heat dissipation performance of the heat pipe and does not have the above-mentioned safety hazards; the purpose of the present utility model is also to provide a Gas-insulated switchgear with heat sink.

为实现上述目的,本实用新型的密闭式设备柜用散热装置采用如下的技术方案:In order to achieve the above purpose, the cooling device for the airtight equipment cabinet of the present utility model adopts the following technical scheme:

技术方案1:密闭式设备柜用散热装置包括用于安装在柜体内的吸热单元以及安装在柜体外的散热单元,吸热单元和散热单元均包括传热体,吸热单元和散热单元的传热体导热连接,吸热单元还包括与其传热体导热连接的第一热管。本实用新型通过分别设在密封柜体内、外的吸热单元和散热单元实现将柜体内部热量的导出,吸热单元上设有热管,热管利用相变原理传热,传热效率高,同时其比热容较大,传热量较大,同时由于通过传热体的过渡传热,无需使热管直接经过柜体壁,因此也可避免热管破裂的风险,提高传热过程的安全性。Technical solution 1: The cooling device for a closed equipment cabinet includes a heat absorption unit installed in the cabinet and a heat dissipation unit installed outside the cabinet. Both the heat absorption unit and the heat dissipation unit include a heat transfer body, and the heat absorption unit and the heat dissipation unit The heat transfer body is thermally connected, and the heat absorption unit further includes a first heat pipe connected to the heat transfer body. The utility model realizes the export of the internal heat of the cabinet through the heat-absorbing unit and the heat-dissipating unit respectively arranged inside and outside the sealed cabinet. The heat-absorbing unit is provided with a heat pipe. It has a large specific heat capacity and large heat transfer capacity. At the same time, due to the transitional heat transfer through the heat transfer body, the heat pipe does not need to pass directly through the cabinet wall, so it can also avoid the risk of heat pipe rupture and improve the safety of the heat transfer process.

技术方案2:在技术方案1的基础上,所述散热单元还包括与其传热体导热连接的第二热管。散热单元上设置第二热管可使穿出柜体的热量更快的传递至远离柜体的位置,以便于尽快的散热。Technical solution 2: On the basis of technical solution 1, the heat dissipation unit further includes a second heat pipe thermally connected to the heat transfer body. The second heat pipe is arranged on the cooling unit so that the heat passing through the cabinet can be transferred to a position away from the cabinet faster, so as to dissipate heat as soon as possible.

技术方案3:在技术方案2的基础上,所述第二热管上设有散热结构。第二热管上散热结构的设置可提高热量的散发效率。Technical solution 3: On the basis of technical solution 2, a heat dissipation structure is provided on the second heat pipe. The arrangement of the heat dissipation structure on the second heat pipe can improve the heat dissipation efficiency.

技术方案4:在技术方案3的基础上,所述散热结构为散热翅片。散热翅片结构简单、散热效率高。Technical solution 4: On the basis of technical solution 3, the heat dissipation structure is a heat dissipation fin. The cooling fins have a simple structure and high cooling efficiency.

技术方案5:在技术方案4的基础上,所述散热翅片的片面垂直第二热管的轴线设置。散热翅片垂直第二热管的轴线设置可提高空气对流效率,从而提高散热效率。Technical solution 5: On the basis of technical solution 4, the surface of the heat dissipation fin is arranged perpendicular to the axis of the second heat pipe. The arrangement of the heat dissipation fins perpendicular to the axis of the second heat pipe can improve air convection efficiency, thereby improving heat dissipation efficiency.

技术方案6:在技术方案1-5任意一项的基础上,所述第一热管上设有吸热结构。Technical solution 6: On the basis of any one of technical solutions 1-5, the first heat pipe is provided with a heat absorbing structure.

技术方案7:在技术方案6的基础上,所述吸热结构为吸热翅片。Technical solution 7: On the basis of technical solution 6, the heat absorbing structure is a heat absorbing fin.

技术方案8:在技术方案7的基础上,所述吸热翅片的片面垂直第一热管的轴线设置。Technical solution 8: On the basis of technical solution 7, the surface of the heat absorbing fin is arranged perpendicular to the axis of the first heat pipe.

技术方案9:在技术方案1-5任意一项的基础上,吸热单元和散热单元用于安装在柜体的同一侧壁上,吸热单元和散热单元的传热体分别贴合在该侧壁的内、外侧面上并在垂直该侧壁的方向上的投影重叠。此方式无需在柜体上开孔,因此不会对柜体密封性能造成影响,同时节省了加工穿孔及对应密封结构所需的复杂工序。Technical solution 9: On the basis of any one of technical solutions 1-5, the heat absorption unit and the heat dissipation unit are installed on the same side wall of the cabinet body, and the heat transfer bodies of the heat absorption unit and the heat dissipation unit are respectively attached to the The projections on the inner and outer sides of the side wall and in the direction perpendicular to the side wall overlap. This method does not need to open holes in the cabinet body, so it will not affect the sealing performance of the cabinet body, and at the same time saves the complicated processes required for processing perforations and corresponding sealing structures.

技术方案10:在技术方案1-5任意一项的基础上,吸热单元和散热单元用于安装在柜体的穿孔上,散热单元和吸热单元的传热体相互贴合且两个传热体中的至少一个与穿孔的孔壁或孔口外沿密封连接。此方式的两个传热体直接相互贴合,可显著提高传热效率。Technical solution 10: On the basis of any one of technical solutions 1-5, the heat-absorbing unit and the heat-dissipating unit are installed on the through holes of the cabinet body, and the heat-transfer bodies of the heat-dissipating unit and the heat-absorbing unit are attached to each other and the two heat-conducting units At least one of the heating bodies is sealingly connected to the wall of the perforated hole or the outer edge of the hole. In this way, the two heat transfer bodies are directly attached to each other, which can significantly improve the heat transfer efficiency.

本实用新型的气体绝缘开关柜采用如下的技术方案:The gas insulated switchgear of the utility model adopts the following technical scheme:

技术方案1:气体绝缘开关柜包括柜体及散热装置,散热装置包括安装在柜体内的吸热单元以及安装在柜体外的散热单元,吸热单元和散热单元均包括传热体,吸热单元和散热单元的传热体导热连接,吸热单元还包括与其传热体导热连接的第一热管。本实用新型通过分别设在密封柜体内、外的吸热单元和散热单元实现将柜体内部热量的导出,吸热单元上设有热管,热管利用相变原理传热,传热效率高,同时其比热容较大,传热量较大,同时由于通过传热体的过渡传热,无需使热管直接经过柜体壁,因此也可避免热管破裂的风险,提高传热过程的安全性。Technical solution 1: The gas insulated switchgear includes a cabinet body and a heat dissipation device. The heat dissipation device includes a heat absorption unit installed inside the cabinet and a heat dissipation unit installed outside the cabinet. Both the heat absorption unit and the heat dissipation unit include a heat transfer body, and the heat absorption unit It is thermally connected to the heat transfer body of the heat dissipation unit, and the heat absorption unit further includes a first heat pipe connected to the heat transfer body. The utility model realizes the export of the internal heat of the cabinet through the heat-absorbing unit and the heat-dissipating unit respectively arranged inside and outside the sealed cabinet. The heat-absorbing unit is provided with a heat pipe. It has a large specific heat capacity and large heat transfer capacity. At the same time, due to the transitional heat transfer through the heat transfer body, the heat pipe does not need to pass directly through the cabinet wall, so it can also avoid the risk of heat pipe rupture and improve the safety of the heat transfer process.

技术方案2:在技术方案1的基础上,所述散热单元还包括与其传热体导热连接的第二热管。散热单元上设置第二热管可使穿出柜体的热量更快的传递至远离柜体的位置,以便于尽快的散热。Technical solution 2: On the basis of technical solution 1, the heat dissipation unit further includes a second heat pipe thermally connected to the heat transfer body. The second heat pipe is arranged on the cooling unit so that the heat passing through the cabinet can be transferred to a position away from the cabinet faster, so as to dissipate heat as soon as possible.

技术方案3:在技术方案2的基础上,所述第二热管上设有散热结构。第二热管上散热结构的设置可提高热量的散发效率。Technical solution 3: On the basis of technical solution 2, a heat dissipation structure is provided on the second heat pipe. The arrangement of the heat dissipation structure on the second heat pipe can improve the heat dissipation efficiency.

技术方案4:在技术方案3的基础上,所述散热结构为散热翅片。散热翅片结构简单、散热效率高。Technical solution 4: On the basis of technical solution 3, the heat dissipation structure is a heat dissipation fin. The cooling fins have a simple structure and high cooling efficiency.

技术方案5:在技术方案4的基础上,所述散热翅片的片面垂直第二热管的轴线设置。散热翅片垂直第二热管的轴线设置可提高空气对流效率,从而提高散热效率。Technical solution 5: On the basis of technical solution 4, the surface of the heat dissipation fin is arranged perpendicular to the axis of the second heat pipe. The arrangement of the heat dissipation fins perpendicular to the axis of the second heat pipe can improve air convection efficiency, thereby improving heat dissipation efficiency.

技术方案6:在技术方案1-5任意一项的基础上,所述第一热管上设有吸热结构。Technical solution 6: On the basis of any one of technical solutions 1-5, the first heat pipe is provided with a heat absorbing structure.

技术方案7:在技术方案6的基础上,所述吸热结构为吸热翅片。Technical solution 7: On the basis of technical solution 6, the heat absorbing structure is a heat absorbing fin.

技术方案8:在技术方案7的基础上,所述吸热翅片的片面垂直第一热管的轴线设置。Technical solution 8: On the basis of technical solution 7, the surface of the heat absorbing fin is arranged perpendicular to the axis of the first heat pipe.

技术方案9:在技术方案1-5任意一项的基础上,吸热单元和散热单元安装在柜体的同一侧壁上,吸热单元和散热单元的传热体分别贴合在该侧壁的内、外侧面上并在垂直该侧壁的方向上的投影重叠。此方式无需在柜体上开孔,因此不会对柜体密封性能造成影响,同时节省了加工穿孔及对应密封结构所需的复杂工序。Technical solution 9: On the basis of any one of technical solutions 1-5, the heat absorption unit and the heat dissipation unit are installed on the same side wall of the cabinet body, and the heat transfer bodies of the heat absorption unit and the heat dissipation unit are respectively attached to the side wall The projections on the inner and outer sides of the side wall and in the direction perpendicular to the side wall overlap. This method does not need to open holes in the cabinet body, so it will not affect the sealing performance of the cabinet body, and at the same time saves the complicated processes required for processing perforations and corresponding sealing structures.

技术方案10:在技术方案1-5任意一项的基础上,所述柜体上设有穿孔,散热单元和吸热单元的传热体中的至少一个穿在穿孔处且两个相互贴合,两个传热体中的至少一个与穿孔的孔壁或孔口外沿密封连接。此方式的两个传热体直接相互贴合,可显著提高传热效率。Technical solution 10: On the basis of any one of technical solutions 1-5, the cabinet body is provided with perforations, at least one of the heat transfer bodies of the heat dissipation unit and the heat absorption unit is passed through the perforations and the two are attached to each other , at least one of the two heat transfer bodies is in sealing connection with the perforated hole wall or the outer edge of the hole. In this way, the two heat transfer bodies are directly attached to each other, which can significantly improve the heat transfer efficiency.

附图说明Description of drawings

图1为本实用新型的气体绝缘开关柜的实施例1的结构示意图;Fig. 1 is a schematic structural view of Embodiment 1 of the gas insulated switchgear of the present invention;

图2为本实用新型的气体绝缘开关柜的实施例2的结构示意图;Fig. 2 is a schematic structural view of Embodiment 2 of the gas insulated switchgear of the present invention;

图3为本实用新型的气体绝缘开关柜的实施例3的结构示意图;Fig. 3 is a schematic structural view of Embodiment 3 of the gas insulated switchgear of the present invention;

图4为本实用新型的气体绝缘开关柜的实施例4的结构示意图;Fig. 4 is a schematic structural view of Embodiment 4 of the gas insulated switchgear of the present invention;

图中:1-散热单元,11-散热翅片,12-第二热管,13-第二传热体,2-吸热单元,21-吸热翅片,22-第一热管,23-第一传热体,3-柜体。In the figure: 1-radiation unit, 11-radiation fin, 12-second heat pipe, 13-second heat transfer body, 2-heat absorption unit, 21-heat absorption fin, 22-first heat pipe, 23-second A heat transfer body, 3-cabinet body.

具体实施方式Detailed ways

下面结合附图对本实用新型的实施方式作进一步说明。Embodiments of the present utility model will be further described below in conjunction with the accompanying drawings.

本实用新型的气体绝缘开关柜的实施例1:如图1所示,气体绝缘开关柜包括柜体3及安装在柜体3内的电气元件,还包括散热装置,散热装置包括散热单元1和吸热单元2。柜体3为现有技术的结构,为密闭的柜体3,内部充填绝缘气体等。散热单元1包括第二热管12,第二热管12包括蒸发端和冷凝端,第二热管12内充填有适量的低沸点液体,利用低沸点液体在蒸发端的加热而气化并吸热,在冷凝端液化并放热,实现热量传递。散热单元1还包括第二传热体13,第二传热体13是由高导热材料制成,整体呈矩形,沿其长度方向上开设有安装孔,用于供第二热管12的蒸发端插入,本实施例中第二热管12的蒸发端与第二传热体13上的安装孔的孔壁紧密贴合,以实现良好的传热,在其他实施例中,也可在第二热管12与第二传热体13的安装孔的孔壁之间涂抹导热剂而形成导热层。第二传热体13贴设在柜体3的上侧壁的外表面上,连接方式可以是压接或者焊接或者粘接等,粘接时需要使用高传热性能的粘接剂。第二热管12的冷凝端与蒸发端之间具有弯折,使得冷凝端上翘而向远离柜体3的方向延伸,以尽可能的将热量传递至较远的地方。第二热管12的冷凝端的外周上设有多片间隔设置的散热翅片11,散热翅片11的片面与第二热管12的冷凝端的轴线呈一定夹角设置,在其他实施例中该夹角可以是90度、45度等0-90°的范围内。Embodiment 1 of the gas insulated switchgear of the present utility model: as shown in Figure 1, the gas insulated switchgear includes a cabinet body 3 and electrical components installed in the cabinet body 3, and also includes a heat dissipation device, which includes a heat dissipation unit 1 and Heat-absorbing unit 2. The cabinet body 3 is a structure of the prior art, which is a closed cabinet body 3 filled with insulating gas and the like. The heat dissipation unit 1 includes a second heat pipe 12, the second heat pipe 12 includes an evaporation end and a condensation end, the second heat pipe 12 is filled with an appropriate amount of low-boiling point liquid, and is vaporized and absorbed by the heating of the low-boiling point liquid at the evaporating end. The end liquefies and releases heat to realize heat transfer. The heat dissipation unit 1 also includes a second heat transfer body 13. The second heat transfer body 13 is made of a high thermal conductivity material and has a rectangular shape as a whole. There are mounting holes along its length for the evaporation end of the second heat pipe 12. In this embodiment, the evaporation end of the second heat pipe 12 is in close contact with the hole wall of the installation hole on the second heat transfer body 13 to achieve good heat transfer. In other embodiments, it can also be placed on the second heat pipe 12 and the wall of the installation hole of the second heat transfer body 13 is coated with a heat conducting agent to form a heat conducting layer. The second heat transfer body 13 is pasted on the outer surface of the upper side wall of the cabinet body 3, and the connection method can be crimping, welding or bonding, etc., and an adhesive with high heat transfer performance needs to be used for bonding. There is a bend between the condensing end and the evaporating end of the second heat pipe 12 , so that the condensing end is upturned and extends away from the cabinet body 3 , so as to transfer heat to as far away as possible. The outer circumference of the condensing end of the second heat pipe 12 is provided with a plurality of radiating fins 11 arranged at intervals, and the surface of the radiating fins 11 is arranged at a certain angle with the axis of the condensing end of the second heat pipe 12. In other embodiments, the included angle It can be within the range of 0-90° such as 90°, 45°, etc.

吸热单元2包括第一热管22,第一热管22包括蒸发端和冷凝端,第一热管22内充填有适量的低沸点液体,利用低沸点液体在蒸发端的加热而气化并吸热,在冷凝端液化并放热,实现热量传递。吸热单元2还包括第一传热体23,第一传热体23是由高导热材料制成,整体呈矩形,沿其长度方向上开设有安装孔,用于供第一热管22的冷凝端插入,本实施例中第一热管22的冷凝端与第一传热体23上的安装孔的孔壁紧密贴合,以实现良好的传热,在其他实施例中,也可在第一热管22与第一传热体23的安装孔的孔壁之间涂抹导热剂而形成导热层。第一传热体23贴设在柜体3的上侧壁的内表面上,连接方式可以是压接或者焊接或者粘接等,粘接时需要使用高传热性能的粘接剂。第一传热体23在贴合时,应尽可能对准第二传热体13的位置设置,以确保在垂直柜体3上侧壁的方向上两者尽可能重叠,提高传热效率。第一热管22的冷凝端与蒸发端之间具有弯折,使得蒸发端下翘而向远离柜体3上侧壁的方向延伸,以尽可能的接触到柜体3内温度较高处的气体,达到更好的吸热效果。第一热管22的蒸发端的外周上设有多片间隔设置的吸热翅片21,吸热翅片21的片面与第一热管22的蒸发端的轴线呈一定夹角设置,在其他实施例中该夹角可以是90度、45度等0-90°的范围内。The heat absorbing unit 2 includes a first heat pipe 22, the first heat pipe 22 includes an evaporation end and a condensation end, the first heat pipe 22 is filled with an appropriate amount of low-boiling liquid, and the low-boiling liquid is vaporized and absorbed by heating at the evaporation end. The condensing end liquefies and releases heat to realize heat transfer. The heat-absorbing unit 2 also includes a first heat transfer body 23, the first heat transfer body 23 is made of a high thermal conductivity material, and has a rectangular shape as a whole, and there are mounting holes along its length direction for the condensation of the first heat pipe 22. In this embodiment, the condensing end of the first heat pipe 22 is in close contact with the hole wall of the installation hole on the first heat transfer body 23 to achieve good heat transfer. A heat conduction agent is applied between the heat pipe 22 and the wall of the installation hole of the first heat transfer body 23 to form a heat conduction layer. The first heat transfer body 23 is pasted on the inner surface of the upper side wall of the cabinet body 3, and the connection method can be crimping, welding or bonding, etc., and an adhesive with high heat transfer performance needs to be used for bonding. When the first heat transfer body 23 is attached, it should be aligned with the position of the second heat transfer body 13 as much as possible to ensure that the two overlap as much as possible in the direction perpendicular to the upper side wall of the cabinet body 3 and improve the heat transfer efficiency. There is a bend between the condensing end and the evaporating end of the first heat pipe 22, so that the evaporating end is bent down and extends away from the upper side wall of the cabinet 3, so as to contact the gas at a higher temperature in the cabinet 3 as much as possible , to achieve a better heat absorption effect. The outer circumference of the evaporating end of the first heat pipe 22 is provided with a plurality of heat-absorbing fins 21 arranged at intervals, and the surface of the heat-absorbing fins 21 is arranged at a certain angle with the axis of the evaporating end of the first heat pipe 22. In other embodiments, the The included angle can be within the range of 0-90° such as 90°, 45°, etc.

本实用新型的气体绝缘开关柜在使用时:当开关设备大电流长时间运行时,柜体3内部的气体温度升高,高温气体与吸热单元2的第一热管22和吸热翅片21接触并进行热交换,并将热量传递给第一热管22的蒸发端,第一热管22的蒸发端内的低沸点液体气化吸热,当气体流动到第一热管22的冷凝端后液化放热,热量传递给第一传热体23,同时冷凝后的液体回流至第一热管22的蒸发端参与下一换热循环,第一传热体23的热量通过柜体3的上侧壁传递给与之接触的外部的第二传热体13,第二传热体13将热量传递给与之贴合的第二热管12的蒸发端,第二热管12内的低沸点液体气化吸热,气体流动至第二热管12的冷凝端液化放热,冷凝液回流至第二热管12的蒸发端参与下一换热循环,热量则传递给第二热管12的冷凝端外部的散热翅片11,并通过散热翅片11将热量散发到柜体3以外的空气中,实现柜内热量及时迅速的传递到柜体3以外,解决柜体3内部温升问题;在上述热量传递过程中,柜体3上并未开孔,因此不影响柜体3的气密性,同时也不会因为开设开孔且设置密封结构等而导致加工过程复杂的问题。When the gas insulated switchgear of the present utility model is in use: when the switchgear operates with a high current for a long time, the temperature of the gas inside the cabinet body 3 rises, and the high-temperature gas and the first heat pipe 22 and heat-absorbing fins 21 of the heat-absorbing unit 2 Contact and perform heat exchange, and transfer heat to the evaporation end of the first heat pipe 22, the low-boiling point liquid in the evaporation end of the first heat pipe 22 vaporizes and absorbs heat, and when the gas flows to the condensation end of the first heat pipe 22, it liquefies and releases heat. heat, the heat is transferred to the first heat transfer body 23, and the condensed liquid returns to the evaporation end of the first heat pipe 22 to participate in the next heat exchange cycle, and the heat of the first heat transfer body 23 is transferred through the upper side wall of the cabinet body 3 To the external second heat transfer body 13 in contact with it, the second heat transfer body 13 transfers heat to the evaporation end of the second heat pipe 12 attached to it, and the low boiling point liquid in the second heat pipe 12 vaporizes and absorbs heat , the gas flows to the condensation end of the second heat pipe 12 to liquefy and release heat, the condensate flows back to the evaporation end of the second heat pipe 12 to participate in the next heat exchange cycle, and the heat is transferred to the cooling fins 11 outside the condensation end of the second heat pipe 12 , and dissipate the heat to the air outside the cabinet 3 through the cooling fins 11, so as to realize the timely and rapid transfer of heat in the cabinet to the outside of the cabinet 3, and solve the problem of temperature rise inside the cabinet 3; during the above heat transfer process, the cabinet There is no hole in the body 3, so the airtightness of the cabinet body 3 is not affected, and at the same time, the processing process is not complicated due to opening holes and sealing structures.

实施例2:如图2所示,与实施例1的不同之处在于,第二热管12的冷凝端的延伸方向也可以更大的角度朝向斜上方延伸,此时可节省气体绝缘开关柜左右方向上的空间占用,同时也可提高散热翅片11的散热效率。Embodiment 2: As shown in FIG. 2, the difference from Embodiment 1 is that the extension direction of the condensation end of the second heat pipe 12 can also extend obliquely upward at a larger angle, and at this time, the left and right directions of the gas insulated switchgear can be saved. The upper space is occupied, and the heat dissipation efficiency of the heat dissipation fins 11 can also be improved.

实施例3:如图3所示,与实施例2的不同之处在于,第二热管12也可在第二传热体13的左侧进行安装,同时使第二热管12的冷凝端朝向左上方延伸。Embodiment 3: As shown in FIG. 3, the difference from Embodiment 2 is that the second heat pipe 12 can also be installed on the left side of the second heat transfer body 13, and at the same time make the condensation end of the second heat pipe 12 face to the upper left square extension.

实施例4:如图4所示,与实施例1的不同之处在于,散热单元不再设置第二热管,而是通过散热翅片直接与第二传热体连接实现对传热体所传热量的散发。Embodiment 4: As shown in Figure 4, the difference from Embodiment 1 is that the heat dissipation unit is no longer provided with a second heat pipe, but is directly connected to the second heat transfer body through the heat dissipation fins to realize the heat transfer to the heat transfer body. Dissipation of heat.

在其他实施例中:散热装置也可安装在柜体的左、右、前、后侧壁上;柜体上可设置开孔,第一、第二传热体中的至少一个与开孔的孔壁或孔口外沿密封连接,且第一、第二传热体紧密贴合,或者第一、第二传热体通过导热胶、导热剂等导热连接。In other embodiments: the cooling device can also be installed on the left, right, front, and rear side walls of the cabinet; holes can be set on the cabinet, and at least one of the first and second heat transfer bodies is connected to the opening. The hole wall or the outer edge of the hole is sealed and connected, and the first and second heat transfer bodies are closely attached, or the first and second heat transfer bodies are connected by heat conduction glue, heat conduction agent, and the like.

本实用新型的密闭式设备柜用散热装置的实施例与本实用新型的气体绝缘开关柜的各实施例中的散热装置的各实施例基本相同,不同之处在于本实用新型的密闭式设备柜用散热装置可应用于任何需要散热且需要密封的设备柜上。The embodiments of the cooling device for the closed equipment cabinet of the present utility model are basically the same as the embodiments of the cooling device in the embodiments of the gas insulated switchgear of the present utility model, the difference lies in the closed equipment cabinet of the present utility model The heat dissipation device can be applied to any equipment cabinet that needs heat dissipation and needs to be sealed.

Claims (20)

1. a kind of closed equipment cabinet radiator, characterized in that include in cabinet heat absorbing units and Heat-sink unit outside cabinet, heat absorbing units and heat-sink unit include thermal conductor, the biography of heat absorbing units and heat-sink unit Hot body heat conduction connection, heat absorbing units further include leading hot linked first heat pipe with its thermal conductor.
2. closed equipment cabinet radiator according to claim 1, characterized in that the heat-sink unit further include with Its thermal conductor leads hot linked second heat pipe.
3. closed equipment cabinet radiator according to claim 2, characterized in that second heat pipe, which is equipped with, to be dissipated Heat structure.
4. closed equipment cabinet radiator according to claim 3, characterized in that the radiator structure is radiating fin Piece.
5. closed equipment cabinet radiator according to claim 4, characterized in that the unilateral of the radiating fin is hung down The axis of straight second heat pipe is arranged.
6. the closed equipment cabinet radiator according to claim 1-5 any one, characterized in that first heat Pipe is equipped with heat-absorbing structure.
7. closed equipment cabinet radiator according to claim 6, characterized in that the heat-absorbing structure is heat absorption fins Piece.
8. closed equipment cabinet radiator according to claim 7, characterized in that the unilateral of the heat absorbing fins is hung down The axis of straight first heat pipe is arranged.
9. the closed equipment cabinet radiator according to claim 1-5 any one, characterized in that heat absorbing units and The thermal conductor of same side wall of the heat-sink unit for being mounted on cabinet, heat absorbing units and heat-sink unit is fitted in the side wall respectively Inside and outside side on and the projection overlapping on the direction of the vertical side wall.
10. the closed equipment cabinet radiator according to claim 1-5 any one, characterized in that heat absorbing units The thermal conductor of perforation with heat-sink unit for being mounted on cabinet, heat-sink unit and heat absorbing units is bonded to each other and two heat transfers At least one of body is tightly connected with the hole wall of perforation or aperture outer.
11. gas insulation switch cabinet, including cabinet and radiator, characterized in that radiator includes being mounted in cabinet Heat absorbing units and the heat-sink unit outside cabinet, heat absorbing units and heat-sink unit include thermal conductor, heat absorbing units and The thermal conductor heat conduction of heat-sink unit connects, and heat absorbing units further include leading hot linked first heat pipe with its thermal conductor.
12. gas insulation switch cabinet according to claim 11, characterized in that the heat-sink unit further includes conducting heat with it Body leads hot linked second heat pipe.
13. gas insulation switch cabinet according to claim 12, characterized in that second heat pipe is equipped with heat dissipation and ties Structure.
14. gas insulation switch cabinet according to claim 13, characterized in that the radiator structure is radiating fin.
15. gas insulation switch cabinet according to claim 14, characterized in that unilateral vertical the second of the radiating fin The axis of heat pipe is arranged.
16. according to the gas insulation switch cabinet described in claim 11-15 any one, characterized in that on first heat pipe Equipped with heat-absorbing structure.
17. gas insulation switch cabinet according to claim 16, characterized in that the heat-absorbing structure is heat absorbing fins.
18. gas insulation switch cabinet according to claim 17, characterized in that unilateral vertical the first of the heat absorbing fins The axis of heat pipe is arranged.
19. according to the gas insulation switch cabinet described in claim 11-15 any one, characterized in that heat absorbing units and heat dissipation Unit is mounted on the same side wall of cabinet, and the thermal conductor of heat absorbing units and heat-sink unit is fitted in the inside and outside of the side wall respectively Projection overlapping on side and on the direction of the vertical side wall.
20. according to the gas insulation switch cabinet described in claim 11-15 any one, characterized in that the cabinet is equipped with At least one of the thermal conductor of perforation, heat-sink unit and heat absorbing units is through at perforation and two are bonded to each other, two heat transfers At least one of body is tightly connected with the hole wall of perforation or aperture outer.
CN201721486473.2U 2017-11-09 2017-11-09 Closed equipment cabinet radiator and gas insulation switch cabinet Active CN207994414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721486473.2U CN207994414U (en) 2017-11-09 2017-11-09 Closed equipment cabinet radiator and gas insulation switch cabinet

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721486473.2U CN207994414U (en) 2017-11-09 2017-11-09 Closed equipment cabinet radiator and gas insulation switch cabinet

Publications (1)

Publication Number Publication Date
CN207994414U true CN207994414U (en) 2018-10-19

Family

ID=63803619

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721486473.2U Active CN207994414U (en) 2017-11-09 2017-11-09 Closed equipment cabinet radiator and gas insulation switch cabinet

Country Status (1)

Country Link
CN (1) CN207994414U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110767482A (en) * 2019-11-13 2020-02-07 许继集团有限公司 A gas-insulated metal-enclosed switch
CN111490469A (en) * 2020-04-23 2020-08-04 泉州市大西洋电力科技有限公司 High-voltage switch complete equipment
CN114243526A (en) * 2021-12-16 2022-03-25 湖北襄开电力设备有限公司 Insulating high tension switchgear
CN114554810A (en) * 2022-03-24 2022-05-27 天地(常州)自动化股份有限公司 Heat dissipation device of mining equipment and manufacturing method thereof
CN116979384A (en) * 2023-09-21 2023-10-31 苏州冠韵威电子技术有限公司 An electrical cabinet for semiconductor equipment that is easy to maintain and its control system

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110767482A (en) * 2019-11-13 2020-02-07 许继集团有限公司 A gas-insulated metal-enclosed switch
CN110767482B (en) * 2019-11-13 2022-01-11 许继集团有限公司 Gas-insulated metal-enclosed switch
CN111490469A (en) * 2020-04-23 2020-08-04 泉州市大西洋电力科技有限公司 High-voltage switch complete equipment
CN114243526A (en) * 2021-12-16 2022-03-25 湖北襄开电力设备有限公司 Insulating high tension switchgear
CN114554810A (en) * 2022-03-24 2022-05-27 天地(常州)自动化股份有限公司 Heat dissipation device of mining equipment and manufacturing method thereof
CN116979384A (en) * 2023-09-21 2023-10-31 苏州冠韵威电子技术有限公司 An electrical cabinet for semiconductor equipment that is easy to maintain and its control system
CN116979384B (en) * 2023-09-21 2023-12-05 苏州冠韵威电子技术有限公司 Semiconductor equipment electrical cabinet convenient to maintain and control system thereof

Similar Documents

Publication Publication Date Title
TWI801696B (en) Phase change cooling device
CN101751096B (en) Evaporation-cooled device attached to surface of super computer
CN107634164A (en) A kind of battery thermal management system combined based on microchannel thermotube and phase-change material
CN207381825U (en) A kind of hermetic type equipment cabinet radiator and gas insulation switch cabinet
WO2017215143A1 (en) Electric controller based on thermally superconductive heat dissipating plate and air conditioner outdoor unit
CN105845648A (en) Microelectronic device tree-shaped radiator
WO2020211416A1 (en) Air conditioner outdoor unit and air conditioner
CN104344641B (en) Semiconductor cooling refrigerator and hot-end heat exchange device for same
CN204286181U (en) Heat abstractor and semiconductor refrigerating equipment
CN106993393B (en) Heat dissipation equipment and terminal
CN201571152U (en) Radiating structure of liquid crystal display television
CN202549556U (en) Transformer heat pipe radiating device
CN204482211U (en) A kind of power amplifier radiator structure with capability of electromagnetic shielding
CN106253102A (en) The heat transfer system of gas insulation switch cabinet, switch cabinet air box and gas tank
CN203181484U (en) Outdoor intelligent termination rack
CN205960484U (en) Heat transfer system of gas insulation switch cabinet, cubical switchboard gas tank and gas tank
CN206314163U (en) Heat radiator for communication system
CN111935947A (en) Energy-concerving and environment-protective type cooling rack
CN216852940U (en) Anti-condensation electric cabinet
WO2025138347A1 (en) Enhanced heat dissipation structure of and heat dissipation method for high-power heating device
CN209592727U (en) A distribution cabinet
CN204560105U (en) heat pipe radiator
CN114364233A (en) Anti-condensation electric cabinet
CN115218296A (en) Ejector air outdoor unit and refrigeration equipment
CN108419416A (en) A kind of high heat dissipation capacity heat-pipe radiator of IGBT

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Patentee after: XJ Group Corp.

Patentee after: Xuji delischer Electric Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: No. 1298 Xuchang City, Henan province 461000 XJ Avenue

Patentee before: XJ Group Corp.

Patentee before: XUCHANG XUJI DRIESCHER WEGBERG ELECTRIC Co.,Ltd.

Patentee before: State Grid Corporation of China