A kind of integrating water route plate
Technical field
This application involves purifier field, espespecially a kind of integrating water route plate.
Background technology
It is usually managed by PE in the inside of traditional water purifier and is connected with various terminal, connected by connector and PE pipes between each filter core
It connects, and various control devices such as entering water electromagnetic valve, waste water solenoid valve, high and low voltage switch, check is installed on water stream channel
Valve etc..It is controlled to reach to be closed water stream channel.With the development of purifier, its function is more and more, only
Interlaced flow pipe network becomes increasingly complex inside wetting system.Since the water route of traditional water purifier is connect with connector by water pipe
Processing and fabricating forms, and causes there are two types of consequence:First, making, processing technology is complicated, and assembly process increases;Second is that piping connection point
It excessively eventually leads to the hidden danger for leak occur and risk greatly increases.And existing integrating water route plate also only realizes single water outlet mould
Block.
Utility model content
The application provides a kind of integrating water route plate, is reduced by the way that mutually matched first, second integrating water route module is arranged
Conventional tube setting, and realize a variety of mineral waters and two kinds of water exit modes of pure water.
A kind of integrating water route plate, including the first water route integration module and be connected to first water route integration module second
Water route integration module, first water route integration module include several runners and several filter cores on the runner, institute
It includes several by communication port and the one-to-one water channel of the runner to state the second water route integration module, and the water channel is respectively connected with
Interface is into and out for flow.
Preferably, first water route integration module includes the first main body and seals described first by hot plate welding mode
First cover board of main body, second water route integration module include the second main body and seal described second by hot plate welding mode
Second cover board of main body.
Preferably, the first to the 6th water channel is disposed in second main body, each water channel corresponds to a connection
Mouthful, first main body is equipped with the first to the 6th runner being connected to the described first to the 6th water channel by the communication port.
Preferably, the interface is set on second cover board, includes connection corresponding with the described first to the 6th water channel
First to the 6th interface.
Preferably, the back protrusion of second main body is formed with the first extension channel, and described first extends channel and institute
It states the first water channel to be connected to by perforating, first extension channel includes installing port and the connection installing port and first water
The slot structure in road, the installing port are equipped with water quality testing unit.
Preferably, second water channel is between described first and third water channel, and the length of the second water channel is less than institute
State first, third water channel.
Preferably, the first, second filter core is installed on the first flow of first water route integration module, second, third
Be connected to by third filter core between runner, the first flow side be equipped with the first transit space, the first flow with it is described
Transit space is connected to by solenoid valve, and first transit space, which is also connected to, is equipped with water pump interface, the third flow channel side
It is additionally provided with the second transit space, is connected to by the 4th filter core between second transit space and the third flow channel, described
Five runners are connected to the 4th runner by the 5th filter core.
Preferably, described first to third filter core be respectively PP cotton filter element, it is active carbon filter core, ultrafiltration membrane filter element, reverse osmosis
Membrane filter and post active carbon filter core, the 4th filter core concentration wastewater outlet are located in the 6th runner.
Preferably, set that there are two the be connected to the 4th water channel on the second cover board of second water route integration module
Four interfaces, the 4th interface are used to handle the outflow of water, and the 4th interface is for installing water quality testing unit.
The application is by the accessories such as installation filter core, solenoid valve in the first water route integration module, then coordinates the second water route collection
At the flow direction of several water channel control process water of module, reduces interface and PE pipelines, reduce leak risk, reduce assembling
Process can significantly improve speed.
By the combination application of the first, second water route integration module, complete machine is made to be compressed into 2 by traditional more than 20 PE pipe
PE pipe connects the PE pipes that water pump uses, one from water pump interface to water pump, an other water pump to third interface.
Description of the drawings
Fig. 1 is the three-dimensional combination figure of the application integrating water route plate.
Fig. 2 is the stereogram exploded view of the application integrating water route plate.
Fig. 3 is the stereogram exploded view of the second integration module of the application integrating water route plate.
Fig. 4 is the stereogram of the substrate of the second integration module of the application integrating water route plate.
Fig. 5 is sectional view of the application along A-A dotted lines shown in Fig. 4.
Fig. 6 is the vertical view of the pedestal of the first integration module of the application integrating water route plate.
Fig. 7 is the bottom view of the pedestal of the first integration module of the application integrating water route plate.
Specific implementation mode
To keep the purpose, technical scheme and advantage of the application clearer, below in conjunction with the application specific embodiment pair
Technical scheme is clearly and completely described.Obviously, described embodiment is only some embodiments of the present application,
Instead of all the embodiments.Based on the embodiment in the application, those of ordinary skill in the art are not making creative labor
The every other embodiment obtained under the premise of dynamic, shall fall in the protection scope of this application.
It please refers to Fig.1, shown in Fig. 2, the application integrating water route plate includes the first water route integration module A and is assembled in described the
The second water route integration module B on one water route integration module A.The first water route integration module A includes the first main body 10 and leads to
Cross the first cover board 20 that hot plate welding manner seals first main body 10.The second water route integration module B includes the second master
Body 30 and the second cover board 40 that second main body 30 is sealed by hot plate welding mode.
It please refers to shown in Fig. 3 to Fig. 5, first is disposed in the second main body 30 of the second water route integration module B
To the 6th water channel 311,312,313,314,315,316, each water channel corresponds to a communication port 34.Second water channel 312
Between described first and third water channel 311,313, and the length of the second water channel 312 is less than described first, third water channel
311,313.The back protrusion of second main body 30 is formed with the first, second extension channel 32,33, and described first extends channel
32 pass through perforation with first water channel 311(Non- label, as shown in Figure 4)Connection, described second extends channel 33 and described the
Two water channels 312 pass through perforation(Non- label, as shown in Figure 4).Described first extends channel 32 including described in installing port 322 and connection
The slot structure 321 of installing port 322 and first water channel 311, the installing port 322 is for installing water quality testing unit(Do not scheme
Show)To detect water quality.Second cover board 40 is equipped with the first of the described first to the 6th water channel 311,313 of corresponding connection to the
Six interfaces 411,412,413,414 (a)/414 (b), 415,416.
It please refers to shown in Fig. 6, Fig. 7, the first main body 10 of the first water route integration module A includes and second water route
Corresponding first to the 6th runners 111 of the first to the 6th water channel 311-316 of integration module B, 112,113,114,115,116,
Described first to the 6th runner 111-116 is docked with the described first to the 6th water channel 311-316 by the communication port 34 respectively
Connection.First, second filter core 121,122 is installed on the first flow 111, is passed through between second, third runner 112,113
Third filter core 123 is connected to.First, second, third filter core 121,122,123 be respectively PP cotton filter element, active carbon filter core and
Ultrafiltration membrane filter element.111 side of the first flow is equipped with the first transit space 13, and the first flow 111 is empty with the switching
Between 13 be connected to by solenoid valve 131, first transit space 13 is also connected to and is equipped with water pump interface 132.The third flow channel
113 sides are additionally provided with the second transit space 14, pass through the 4th filter between second transit space 14 and the third flow channel 113
Core 124 is connected to, and the 4th filter core 124 is reverse osmosis membrane filter element, and the concentration wastewater outlet of the 4th filter core 124 is positioned at described
In 6th runner 116.Second transit space 14 passes through non-return valve(It is not shown)It is connected to the 5th runner 115.Described
Five runners 115 are connected to the 4th runner 114 by the 5th filter core 125, and the 5th filter core 125 is filtered for post active carbon
Core.
It will be described in detail the operation principle of the application integrating water route plate below:
Tap water is entered by the first interface 411 of the second water route integration module B in first water channel 311, with
It is flowed into afterwards by communication port 34 in the first flow 111 of the second water route integration module A, and through being set to the first flow
Enter in the second flow channel 112 after the first, second, third filter core 121,122,123 filtering on 111, and through communication port 34
It flows into the second water channel 312 of the second water route integration module B, finally, by the second interface for being connected to second water channel 312
412 outflows obtain mineral water.And the described second outlet for extending channel 33 is to stopper to prevent water from flowing out by sealing-plug.
Further, above-mentioned tap water passes through institute in first flow 111 after first, second filter core 121,122
It states solenoid valve 131 to enter in first transit space 13, then booster pump is accessed by water pump interface 132(It is not shown)After supercharging
Enter the third water channel 313, communication port 34 and third flow channel by the third interface 413 of the second water route integration module B
313, in the third flow channel 313 second transit space 14 is flowed by being obtained by filtration for the 4th filter core 124
Pure water.The pure water flows into after non-return valve in the 5th runner 115 all the way, pure in the 5th runner 115
Water purification enters by communication port 34 in the 5th water channel 315 of the second water route integration module B, most afterwards through the 5th interface
415 outflows, the 5th interface 415 are equipped with high-voltage switch gear and connect pressure pot(It is not shown).The pure water passes through check
Another way after valve in the 5th runner 115 flows into after the 5th filter core 125 filtering in the 4th runner 114
And the 4th water channel 314 of the second water route integration module B is eventually entered into, and flowed out via the 4th interface 414a, it obtains
Purified pure water, the 4th interface 414b is for installing water quality testing unit to detect water quality.4th interface
414a, 414b are connected to the 4th water channel 314.
Enter the 6th runner 116 by the condensed water that the 4th filter core 124 comes out, and eventually by the second water route
The 6th interface 416 of integration module B flows out.
The application is by the accessories such as installation filter core, solenoid valve in the first water route integration module A, then coordinates the second water route collection
At the flow direction of several water channel control process water of module B, reduces interface and PE pipelines, reduce leak risk, reduce group
Process is filled, speed can be significantly improved.
By the first, second water route integration module A, the combination application of B makes complete machine be compressed by traditional more than 20 PE pipe
Managed at 2 PE, that is, connect the PE pipes that water pump uses, one from water pump interface 132 to water pump, an other water pump to third interface
413。
Above is only an example of the present application, it is not intended to limit this application.For those skilled in the art
For, the application can have various modifications and variations.It is all within spirit herein and principle made by any modification, equivalent
Replace, improve etc., it should be included within the scope of claims hereof.