CN207935625U - A plugging fixture - Google Patents
A plugging fixture Download PDFInfo
- Publication number
- CN207935625U CN207935625U CN201721560217.3U CN201721560217U CN207935625U CN 207935625 U CN207935625 U CN 207935625U CN 201721560217 U CN201721560217 U CN 201721560217U CN 207935625 U CN207935625 U CN 207935625U
- Authority
- CN
- China
- Prior art keywords
- chuck body
- dismounting
- hole
- clamp body
- pipeline
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Pipe Accessories (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及油气输送技术领域,特别涉及一种堵漏夹具。The utility model relates to the technical field of oil and gas transportation, in particular to a plugging clamp.
背景技术Background technique
在管道系统运行中,当绝缘接头的绝缘法兰根部处发生泄漏时,管输介质会从泄漏处渗出,对管道的安全运行造成较大的安全隐患,同时也对周边环境造成污染和安全隐患。一般采用堵漏夹具对泄露处进行抢修。During the operation of the pipeline system, when a leak occurs at the root of the insulating flange of the insulating joint, the pipeline medium will seep out from the leak, which will cause a large safety hazard to the safe operation of the pipeline, and also cause pollution and safety to the surrounding environment. Hidden danger. Generally, plugging fixtures are used to repair the leak.
目前,油田通常采用的堵漏夹具包括第一夹具本体和第二夹具本体,第一夹具本体包括两个相对设置且可拆卸连接的第一拆装本体,第二夹具本体包括两个相对设置且可拆卸连接的第二拆装本体;第一夹具本体的与第二夹具本体相对的端面上分别设置有多个环形凹槽,多个环形凹槽内分别设置有环形胶圈或密封圈。在使用时,将两个第一拆装本体分别套在靠近绝缘接头发生泄露一侧的管道上,将两个第一拆装本体连接;将两个第二拆装本体分别套在绝缘接头另一侧的管道上,将两个第二拆装本体连接;然后将第一拆装本体与对应的第二拆装本体连接,从而密封圈及环形胶圈紧贴绝缘接头而将泄露处密封。At present, the plugging clamps commonly used in oil fields include a first clamp body and a second clamp body. The first clamp body includes two oppositely arranged and detachably connected first disassembly bodies. The second detachable body is detachably connected; the end surface of the first fixture body opposite to the second fixture body is respectively provided with a plurality of annular grooves, and annular rubber rings or sealing rings are respectively arranged in the plurality of annular grooves. When in use, put the two first detachable bodies on the pipeline on the side close to the leaking side of the insulating joint, and connect the two first detachable bodies; put the two second detachable bodies on the other side of the insulating joint respectively. On one side of the pipeline, connect two second detachable bodies; then connect the first detachable body with the corresponding second detachable body, so that the sealing ring and the annular rubber ring are close to the insulating joint to seal the leakage.
在实现本实用新型的过程中,设计人发现现有技术至少存在以下问题:In the process of realizing the utility model, the designer finds that the prior art has at least the following problems:
采用现有的堵漏夹具时,由于两个第一拆装本体为钢铁材质,两者之间的密封性不好,管输介质可能从两个第一拆装本体之间流出。When the existing plugging jig is used, since the two first dismountable bodies are made of steel, the sealing performance between them is not good, and the pipeline medium may flow out from between the two first dismountable bodies.
实用新型内容Utility model content
为解决上述技术问题,本实用新型提供一种堵漏夹具,以提高两个第一拆装本体之间的密封性。In order to solve the above technical problems, the utility model provides a plugging fixture to improve the sealing performance between the two first detachable bodies.
具体而言,包括以下技术方案:Specifically, the following technical solutions are included:
本实用新型提供了一种堵漏夹具,包括第一夹具本体、第二夹具本体、胶条和第一环形胶圈,其中,The utility model provides a plugging fixture, which comprises a first fixture body, a second fixture body, a rubber strip and a first annular rubber ring, wherein,
所述第一夹具本体和所述第二夹具本体可拆卸连接,且被配置为在使用时所述第一夹具本体套设在绝缘接头发生泄漏的一侧的管道上,所述第二夹具本体套设在所述绝缘接头另一侧的管道上;The first clamp body and the second clamp body are detachably connected, and are configured such that, in use, the first clamp body is sleeved on the pipe on the side where the insulating joint leaks, and the second clamp body Set on the pipe on the other side of the insulating joint;
所述第一夹具本体包括两个相对设置且可拆卸连接的第一拆装本体;The first clamp body includes two oppositely arranged and detachably connected first detachable bodies;
所述第一夹具本体的与所述第二夹具本体相对的端面上设置有第一环形凹槽,所述第一环形胶圈设置在所述第一环形凹槽内;A first annular groove is provided on the end surface of the first clamp body opposite to the second clamp body, and the first annular rubber ring is disposed in the first annular groove;
两个所述第一拆装本体相对的端面上沿轴向方向设置有两端贯穿的开口槽,所述胶条被配置为当两个所述第一拆装本体连接时位于两个所述开口槽组成的通道内,且一端抵住所述第一环形胶圈。On the opposite end surfaces of the two first detachable bodies, there are open grooves through which both ends are arranged along the axial direction, and the rubber strip is configured to be located between the two first detachable bodies when the two first detachable bodies are connected. In the channel formed by the open groove, and one end is against the first annular rubber ring.
可选择地,所述第一夹具本体的与所述第二夹具本体相对且与所述管道贴近的侧边形成倒角,所述倒角处设置有第一密封圈。Optionally, a side of the first clamp body opposite to the second clamp body and close to the pipe forms a chamfer, and a first sealing ring is provided at the chamfer.
可选择地,所述第一夹具本体与所述第二夹具本体相对的端面上还设置有第二环形凹槽,所述第一夹具本体的内壁上设置有第三环形凹槽,所述第二环形凹槽内设置有第二密封圈,所述第三环形凹槽内设置有第二环形胶圈。Optionally, a second annular groove is further provided on the end surface of the first clamp body opposite to the second clamp body, a third annular groove is provided on the inner wall of the first clamp body, and the first clamp body A second sealing ring is arranged in the second annular groove, and a second annular rubber ring is arranged in the third annular groove.
可选择地,所述第二密封圈和所述第一环形胶圈上分别设置有开口槽,所述胶条的另一端与所述第二环形胶圈相抵。Optionally, the second sealing ring and the first annular rubber ring are respectively provided with open grooves, and the other end of the rubber strip abuts against the second annular rubber ring.
可选择地,所述堵漏夹具还包括压环和端盖,所述压环设置在所述第一夹具本体的内壁与所述管道之间,所述端盖与所述第一夹具本体的背离所述第二夹具本体的端面连接;Optionally, the leakage plugging fixture further includes a pressure ring and an end cover, the pressure ring is arranged between the inner wall of the first clamp body and the pipe, the end cover and the end cover of the first clamp body an end face connection away from the second fixture body;
所述压环的一端与所述第二环形胶圈相抵,另一端与所述端盖相抵。One end of the pressure ring abuts against the second annular rubber ring, and the other end abuts against the end cap.
可选择地,所述压环包括两个半圆环。Optionally, the pressure ring includes two semicircular rings.
可选择地,所述第二夹具本体包括两个相对设置且可拆卸连接的第二拆装本体,其中当两个所述第二拆装本体连接时,相对的侧面配合夹持所述管道。Optionally, the second clamp body includes two oppositely disposed and detachably connected second detachable bodies, wherein when the two second detachable bodies are connected, the opposite sides cooperate to clamp the pipe.
可选择地,所述第一拆装本体的两端分别设置有第一连接件,所述第二拆装本体的两端分别设置有第二连接件;Optionally, both ends of the first detachable body are respectively provided with first connectors, and both ends of the second detachable body are respectively provided with second connectors;
所述第一连接件上设置有第一通孔和第二通孔,所述第二连接件上设置有第三通孔和第四通孔;The first connecting part is provided with a first through hole and a second through hole, and the second connecting part is provided with a third through hole and a fourth through hole;
其中,第一螺栓通过两个所述第一拆装本体的所述第一通孔将两个所述第一拆装本体连接,第二螺栓通过两个所述第二拆装本体的所述第三通孔将两个所述第二拆装本体连接,第三螺栓通过所述第二通孔和对应的所述第四通孔将所述第一拆装本和所述第二拆装本体连接。Wherein, the first bolt connects the two first detachable bodies through the first through holes of the two first detachable bodies, and the second bolt passes through the two second detachable bodies. The third through hole connects the two second detachable bodies, and the third bolt connects the first detachable book and the second detachable body through the second through hole and the corresponding fourth through hole. Ontology connection.
可选择地,所述第一拆装本体沿所述第一夹具本体的径向方向开设有两端贯穿的注胶通道。Optionally, the first disassembly body is provided with a glue injection channel penetrating through both ends along the radial direction of the first clamp body.
可选择地,所述注胶通道的注入口处设置有密封螺钉。Optionally, a sealing screw is provided at the injection port of the injection channel.
可选择地,所述第一夹具本体背离所述第二夹具本体的端面沿轴向开设有多个第五通孔,所述第二夹具本体背离所述第一夹具本体的端面沿轴向开设有与所述第五通孔一一对应的第六通孔,第四螺栓通过所述第五通孔及对应的所述第六通孔将所述第一夹具本体和所述第二夹具本体连接。Optionally, the end surface of the first clamp body facing away from the second clamp body is provided with a plurality of fifth through holes in the axial direction, and the end surface of the second clamp body facing away from the first clamp body is provided in the axial direction. There is a sixth through hole corresponding to the fifth through hole, and the fourth bolt connects the first clamp body and the second clamp body through the fifth through hole and the corresponding sixth through hole. connect.
本实用新型实施例提供的技术方案的有益效果是:The beneficial effect of the technical scheme that the utility model embodiment provides is:
本实用新型实施例提供的堵漏夹具,在绝缘接头两端的管道上设置可拆卸连接的第一夹具本体和第二夹具本体,从而将绝缘接头的两端部夹持;通过设置第一夹具本体包括两个可拆卸连接的可拆装本体,便于第一夹具本体设置在管道上;通过在第一拆装本体连接时将胶条设置在两个第一拆装本体的两个开口槽组成的通道内,从而胶条提高了两个第一拆装本体之间的密封性,防止经绝缘接头的泄露处泄露的介质经两个第一拆装本体之间的缝隙流出。In the plugging fixture provided by the embodiment of the present invention, a first fixture body and a second fixture body that are detachably connected are arranged on the pipelines at both ends of the insulating joint, so as to clamp the two ends of the insulating joint; by setting the first fixture body Consisting of two removable bodies that can be detachably connected, it is convenient for the first fixture body to be placed on the pipeline; when the first removable body is connected, the rubber strip is arranged in the two opening grooves of the two first removable bodies In the channel, the rubber strip improves the sealing performance between the two first dismountable bodies, preventing the medium leaked through the leakage of the insulating joint from flowing out through the gap between the two first dismountable bodies.
附图说明Description of drawings
为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the present invention. For example, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.
图1为本实用新型实施例提供的堵漏夹具在使用时的示意图;Fig. 1 is the schematic diagram of the plugging fixture provided by the embodiment of the present invention when in use;
图2为本实用新型实施例提供的堵漏夹具的局部示意图;Fig. 2 is a partial schematic view of the leakage plugging fixture provided by the embodiment of the present invention;
图3为本实用新型实施例提供的堵漏夹具的侧视图。Fig. 3 is a side view of the leakage plugging fixture provided by the embodiment of the present invention.
图中的附图标记分别表示:The reference signs in the figure represent respectively:
1、第一夹具本体;1. The first fixture body;
101、第一拆装本体;101. The first disassembly and assembly of the main body;
1011、注胶通道;1011. Glue injection channel;
102、第一连接件;102. The first connector;
2、第二夹具本体;2. The second fixture body;
201、第二拆装本体;201, the second disassembly body;
202、第二连接件;202. The second connector;
3、胶条;3. Rubber strips;
4、第一密封圈;4. The first sealing ring;
5、第二密封圈;5. The second sealing ring;
6、第一环形胶圈;6. The first annular rubber ring;
7、第二环形胶圈;7. The second annular rubber ring;
8、压环;8. Pressure ring;
9、端盖;9. End cover;
10、第一螺栓;10. The first bolt;
11、第二螺栓;11. The second bolt;
12、第三螺栓;12. The third bolt;
13、密封螺钉;13. Sealing screw;
14、第四螺栓;14. The fourth bolt;
15、第一螺钉;15. The first screw;
16、第二螺钉;16. The second screw;
17、限位块。17, limit block.
具体实施方式Detailed ways
为使本实用新型的技术方案和优点更加清楚,下面将结合附图对本实用新型实施方式作进一步地详细描述。In order to make the technical solutions and advantages of the present utility model clearer, the implementation of the present utility model will be further described in detail below in conjunction with the accompanying drawings.
本实用新型一实施例提供了一种堵漏夹具,如图1所示,包括第一夹具本体1、第二夹具本体2、胶条3和第一环形胶圈6,其中,An embodiment of the utility model provides a plugging fixture, as shown in Figure 1, comprising a first fixture body 1, a second fixture body 2, a rubber strip 3 and a first annular rubber ring 6, wherein,
第一夹具本体1和第二夹具本体2可拆卸连接,且被配置为第一夹具本体1套设在绝缘接头发生泄漏的一侧的管道上,第二夹具本体2套设在绝缘接头另一侧的管道上;The first clamp body 1 and the second clamp body 2 are detachably connected, and are configured such that the first clamp body 1 is set on the pipeline on the side where the insulating joint leaks, and the second clamp body 2 is set on the other side of the insulating joint. on the side pipe;
第一夹具本体1包括两个相对设置且可拆卸连接的第一拆装本体101;The first fixture body 1 includes two first detachable bodies 101 that are oppositely arranged and detachably connected;
第一夹具本体1的与第二夹具本体2相对的端面上设置有第一环形凹槽(图中未用附图标记示出,位于第一环形胶圈6处),第一环形胶圈6设置在第一环形凹槽内;The end face of the first clamp body 1 opposite to the second clamp body 2 is provided with a first annular groove (not shown in the figure, located at the first annular rubber ring 6), the first annular rubber ring 6 set in the first annular groove;
两个第一拆装本体101相对的端面上沿轴向方向设置有两端贯穿的开口槽(图中未用附图标记示出,位于胶条3处),胶条3被配置为当两个第一拆装本体101连接时位于两个开口槽组成的通道内,且胶条3的一端抵住第一环形胶圈6。On the opposite end faces of the two first detachable bodies 101, an open slot (not shown in the figure, located at the rubber strip 3) through which both ends are arranged along the axial direction, the rubber strip 3 is configured to be used when the two When the first disassembly body 101 is connected, it is located in the channel formed by the two open grooves, and one end of the rubber strip 3 is against the first annular rubber ring 6 .
下面就本实用新型实施例提供的堵漏夹具的工作原理进行描述:The working principle of the plugging fixture provided by the embodiment of the present invention is described below:
在使用时,首先将两个第一夹具本体1套在绝缘接头发生泄漏一侧的管道上,将第二夹具本体2套在绝缘接头另一侧的管道上。在将第一夹具本体1的两个第一拆装本体101时,将胶条3置于两个第一拆装本体101的两个开口槽组成的通道内,最后将第一夹具本体1和第二夹具本体2连接。When in use, first put the two first clamp bodies 1 on the pipeline on the side where the insulating joint leaks, and put the second clamp body 2 on the pipeline on the other side of the insulating joint. When the two first dismountable bodies 101 of the first clamp body 1 are assembled, the rubber strip 3 is placed in the channel formed by the two opening grooves of the two first dismountable bodies 101, and finally the first clamp body 1 and The second clamp body 2 is connected.
位于两个第一拆装本体101之间的胶条3可提高两个第一拆装本体101之间的密封性,阻止经绝缘接头的泄露处泄露的介质经两个第一拆装本体101之间的缝隙流出,因而可提高堵漏夹具的堵漏性更好。The rubber strip 3 located between the two first detachable bodies 101 can improve the sealing between the two first detachable bodies 101 and prevent the medium leaking through the leakage of the insulating joint from passing through the two first detachable bodies 101 The gap between them flows out, thus improving the plugging performance of the plugging fixture.
本实用新型实施例提供的堵漏夹具,在绝缘接头两端的管道上设置可拆卸连接的第一夹具本体1和第二夹具本体2,从而将绝缘接头的两端部夹持;通过设置第一夹具本体1包括两个可拆卸连接的可拆装本体101,便于第一夹具本体1设置在管道上;通过在第一拆装本体101连接时将胶条3设置在两个第一拆装本体101的两个开口槽组成的通道内,从而胶条3提高了两个第一拆装本体101之间的密封性,防止经绝缘接头的泄露处泄露的介质经两个第一拆装本体101之间的缝隙流出。In the plugging clamp provided by the embodiment of the present invention, the first clamp body 1 and the second clamp body 2 are arranged on the pipes at both ends of the insulating joint, so as to clamp the two ends of the insulating joint; by setting the first The fixture body 1 includes two detachably connected detachable bodies 101, which is convenient for the first fixture body 1 to be arranged on the pipeline; when the first detachable body 101 is connected, the rubber strip 3 is arranged on the two first detachable bodies In the channel formed by the two opening grooves of 101, the rubber strip 3 improves the sealing between the two first disassembly bodies 101, and prevents the medium leaking through the leakage of the insulating joint from passing through the two first disassembly bodies 101 gaps between.
如图3所示,当两个第一拆装本体101连接在一起时,其相对的端面之间设置有限位块17,以防止两个第一拆装本体101相对的端面贴合太紧使胶条3失去弹性,从而失去密封作用。As shown in Figure 3, when the two first detachable bodies 101 are connected together, a limit block 17 is provided between the opposite end faces to prevent the two first detachable bodies 101 from being too tightly fitted. The rubber strip 3 loses its elasticity, thereby losing its sealing effect.
为了便于将第二夹具本体2套在管道上,如图1所示,第二夹具本体2包括两个相对设置且可拆卸连接的第二拆装本体201,其中当两个第二拆装本体201连接时,相对的侧部配合夹持管道。In order to put the second clamp body 2 on the pipeline, as shown in FIG. When 201 is connected, the opposite sides cooperate to clamp the pipe.
如此设置,在安装堵漏工具时,分别将两个第二拆装本体201放置在绝缘接头一端的管道上,然后将两个第二拆装本体201相对的端面连接即可。In this way, when installing the plugging tool, place the two second detachable bodies 201 on the pipe at one end of the insulating joint, and then connect the opposite end faces of the two second detachable bodies 201 .
作为两个第一拆装本体101可拆卸连接的一种方式,两个第一拆装本体101的两端分别设置有第一连接件102,第一连接件102上沿第一夹具本体1的径向方向设置有第一通孔(图中未用附图标记示出,位于第一螺栓10处)。如此设置,如图3所示,采用第一螺栓10通过两个对应的第一连接件102上的第一通孔即可将两个第一拆装本体101连接。在拆卸时,将第一螺栓10从第一通孔中取出即可。该结构简单,且方便拆卸。As a way to detachably connect the two first detachable bodies 101, the two ends of the two first detachable bodies 101 are respectively provided with a first connecting piece 102, and the first connecting piece 102 is along the edge of the first fixture body 1. A first through hole (not shown in the figure, located at the first bolt 10 ) is provided in the radial direction. In this way, as shown in FIG. 3 , the two first detachable bodies 101 can be connected by using the first bolt 10 to pass through the first through holes on the two corresponding first connecting parts 102 . When disassembling, the first bolt 10 can be taken out from the first through hole. The structure is simple and easy to disassemble.
作为两个第二拆装本体201可拆卸连接的一种方式,两个第二拆装本体201的两端分别设置有第二连接件202,第二连接件202上沿第二夹具本体2的径向方向设置有第三通孔(图中未用附图标记示出,位于第二螺栓11处)。如此设置,如图3所示,采用第二螺栓11通过两个对应的第二连接件202上的第三通孔即可将两个第二拆装本体201连接。在拆卸时,将第二螺栓11从第三通孔中取出即可。该结构简单,且方便拆卸。As a way of the detachable connection of the two second detachable bodies 201, the two ends of the two second detachable bodies 201 are respectively provided with second connectors 202, and the upper edge of the second connector 202 is along the edge of the second fixture body 2. A third through hole (not shown in the figure, located at the second bolt 11 ) is provided in the radial direction. In this way, as shown in FIG. 3 , the two second detachable bodies 201 can be connected by using the second bolt 11 through the third through holes on the two corresponding second connecting parts 202 . When dismounting, just take out the second bolt 11 from the third through hole. The structure is simple and easy to disassemble.
作为第一夹具本体1与第二夹具本体2可拆卸连接的一种方式,第一连接件102上沿第一夹具本体1的轴向方向设置有第二通孔(图中未用附图标记示出,位于第三螺栓12处),第二连接件202上沿第二夹具本体2的轴向方向设置有第四通孔(图中未用附图标记示出,位于第三螺栓12处)。As a way for the detachable connection between the first clamp body 1 and the second clamp body 2, a second through hole is provided on the first connecting piece 102 along the axial direction of the first clamp body 1 (without reference numerals in the figure). shown, located at the third bolt 12), the second connecting member 202 is provided with a fourth through hole along the axial direction of the second fixture body 2 (not shown with reference numerals in the figure, located at the third bolt 12 ).
如此设置,采用第三螺栓12通过第三通孔及相对的第四通孔即可将第一夹具1与第二夹具本体2连接。In this way, the first clamp 1 and the second clamp body 2 can be connected by using the third bolt 12 through the third through hole and the opposite fourth through hole.
如图3所示,可在每一个第一夹具本体1上设置两个第三通孔,在每一个第二夹具本体2上对应设置两个第四通孔,可使第一夹具本体1与第二夹具本体2连接更牢固。该结构简单,且方便拆卸。As shown in Figure 3, two third through holes can be set on each first clamp body 1, and two fourth through holes can be correspondingly set on each second clamp body 2, so that the first clamp body 1 and The connection of the second clamp body 2 is more firm. The structure is simple and easy to disassemble.
为了进一步提高第一夹具本体1与第二夹具本体2的牢固性,如图3所示,第一夹具本体1背离第二夹具本体2的一端向背离管道的方向延伸出环形凸台,在环形凸台上沿第一夹具本体1的轴向开设有多个第五通孔(图中未用附图标记示出,位于第四螺栓14处),第二夹具本体2背离第二夹具本体2的一端向背离管道的方向延伸出环形凸台,环形凸台上沿第二夹具本体2的轴向方向开设有与第五通孔一一对应的第六通孔(图中未用附图标记示出,位于第四螺栓14处),第四螺栓14通过第五通孔及对应的第六通孔将第一夹具本体1和第二夹具本体2连接。In order to further improve the firmness of the first clamp body 1 and the second clamp body 2, as shown in FIG. A plurality of fifth through holes (not shown in the figure, located at the fourth bolt 14 ) are opened along the axial direction of the first clamp body 1 on the boss, and the second clamp body 2 is away from the second clamp body 2 An annular boss is extended from one end of one end to the direction away from the pipeline, and a sixth through hole corresponding to the fifth through hole is opened on the annular boss along the axial direction of the second fixture body 2 (no reference numerals are used in the figure). As shown, located at the fourth bolt 14), the fourth bolt 14 connects the first fixture body 1 and the second fixture body 2 through the fifth through hole and the corresponding sixth through hole.
为了提高堵漏夹具的堵漏性能,如图1所示,第一夹具本体1的与第二夹具本体2相对且与管道贴近的侧边形成倒角,倒角处设置有第一密封圈4。当第一夹具本体1与第二夹具本体2连接时,紧固第三螺栓12和第四螺栓14,在二者的相互作用力下,第一夹具本体1的倒角压紧第一密封圈4,使第一夹具本体1与绝缘接头之间的密封性更好,防止经绝缘接头泄露处流出的介质通过第一夹具本体1与管道之间的缝隙流出。In order to improve the plugging performance of the leak-stopping clamp, as shown in Figure 1, the side of the first clamp body 1 opposite to the second clamp body 2 and close to the pipeline forms a chamfer, and a first sealing ring 4 is provided at the chamfer . When the first fixture body 1 is connected to the second fixture body 2, tighten the third bolt 12 and the fourth bolt 14, under the interaction force of the two, the chamfer of the first fixture body 1 presses the first sealing ring 4. Make the sealing between the first clamp body 1 and the insulating joint better, and prevent the medium flowing out through the leakage of the insulating joint from flowing out through the gap between the first clamp body 1 and the pipeline.
为了提高堵漏夹具与绝缘接头之间的密封性能,进一步增强堵漏夹具的堵漏性能,如图1所示,第一夹具本体1与第二夹具本体2相对的端面上还设置有第二环形凹槽(图中未用附图标记示出,位于第二密封圈5处),第二环形凹槽内设置有第二密封圈5。为了进一步提高堵漏夹具与管道之间的密封性能,第一夹具本体1的内壁上设置有第三环形凹槽(图中未用附图标记示出,位于第二环形胶圈7处),第三环形凹槽内设置有第二环形胶圈7,胶条3的另一端与第二环形胶圈7相抵。In order to improve the sealing performance between the leak-stopping fixture and the insulating joint, and further enhance the leak-stopping performance of the leak-stopping fixture, as shown in Figure 1, the first fixture body 1 is also provided with a second An annular groove (not shown in the figure, located at the second sealing ring 5 ), the second sealing ring 5 is arranged in the second annular groove. In order to further improve the sealing performance between the leak-stopping clamp and the pipeline, a third annular groove (not shown by reference numerals in the figure, located at the second annular rubber ring 7) is provided on the inner wall of the first clamp body 1, A second annular apron 7 is arranged in the third annular groove, and the other end of the rubber strip 3 abuts against the second annular apron 7 .
如此设置,当第一夹具本体1与第二夹具本体2套设在绝缘接头两端的管道上且连接时,第一夹具本体1的与第二夹具本体2相对的端面与绝缘接头的端面贴合,第二密封圈5及第一环形胶圈6与绝缘接头的端面贴紧,可提高第一夹具本体1与绝缘接头之间的密封性,阻止从绝缘接头的泄露处流出的介质经第一夹具本体1与绝缘接头之间流出。第一夹具本体1的内壁与管道的外壁贴合时,第二环形胶圈7紧贴管道的外壁,阻止从绝缘接头的泄露处流出的介质经第一夹具本体1与管道之间流出。因此,第二密封圈5、第一环形胶圈6及第二环形胶圈7可提高堵漏夹具的堵漏性能。In this way, when the first clamp body 1 and the second clamp body 2 are sleeved on the pipes at both ends of the insulating joint and connected, the end face of the first clamp body 1 opposite to the second clamp body 2 will be attached to the end face of the insulating joint , the second sealing ring 5 and the first annular rubber ring 6 are tightly attached to the end face of the insulating joint, which can improve the sealing performance between the first fixture body 1 and the insulating joint, and prevent the medium flowing out from the leakage of the insulating joint through the first Outflow between the fixture body 1 and the insulating joint. When the inner wall of the first clamp body 1 is attached to the outer wall of the pipeline, the second annular rubber ring 7 is tightly attached to the outer wall of the pipeline, preventing the medium flowing out from the leakage of the insulating joint from flowing out between the first clamp body 1 and the pipeline. Therefore, the second sealing ring 5 , the first annular rubber ring 6 and the second annular rubber ring 7 can improve the leak-stopping performance of the leak-stopping fixture.
在本实施例中,第二密封圈5和第一环形胶圈6上分别设置有开口槽。第二密封圈5和第一环形胶圈6受到挤压时,其受压变形而变长,形变量使开口槽填充,进而第二密封圈5和第一环形胶圈6各处均贴合绝缘接头的端面或者管道的外壁。开口槽的设置可防止第二密封圈5和第一环形胶圈6变形大而达不到密封作用。In this embodiment, the second sealing ring 5 and the first annular rubber ring 6 are respectively provided with opening grooves. When the second sealing ring 5 and the first annular rubber ring 6 are squeezed, they are compressed and deformed to become longer, and the deformation makes the opening groove filled, and then the second sealing ring 5 and the first annular rubber ring 6 are bonded everywhere Insulate the end face of the joint or the outer wall of the pipe. The setting of the opening groove can prevent the second sealing ring 5 and the first annular rubber ring 6 from deforming greatly and not achieving the sealing effect.
如图1所示,堵漏夹具还包括压环8和端盖9,压环8设置在第一夹具本体1的内壁与管道之间,端盖9与第一夹具本体1的背离第二夹具本体2的端面连接。As shown in Fig. 1, the leak-stopping clamp also includes a pressure ring 8 and an end cover 9, the pressure ring 8 is arranged between the inner wall of the first clamp body 1 and the pipe, and the end cover 9 and the first clamp body 1 are away from the second clamp The end face of the body 2 is connected.
如图3所示,在第一夹具本体1的环形凸台上设置有螺纹孔(图中未用附图标记示出,位于第一螺钉15处),端盖9上开始又与环形凸台上的螺纹孔一一对应的螺纹孔(图中未用附图标记示出,位于第一螺钉15处),采用第一螺钉15分别通过环形凸台及端盖9上对应的螺纹孔将端盖9与第一夹具本体1连接。As shown in Figure 3, a threaded hole (not shown in the figure, located at the first screw 15) is provided on the annular boss of the first fixture body 1, and the end cap 9 starts to be connected with the annular boss again. The threaded holes on the top correspond to the threaded holes (not shown in the figure, located at the first screw 15), and the first screw 15 is used to pass the corresponding threaded holes on the annular boss and the end cover 9 to connect the end The cover 9 is connected with the first clamp body 1 .
如图3所示,端盖9上还设置有多个用于安装第二螺钉16的螺纹孔(图中未用附图标记示出,位于第二螺钉16处)。As shown in FIG. 3 , the end cover 9 is also provided with a plurality of threaded holes for installing the second screws 16 (not shown in the figure, located at the second screws 16 ).
如此设置,在将第二环形胶圈7置于第三环形凹槽内后,先将压环8设置在第一拆装本体101与管道之间,然后将端盖9与第一夹具本体1的环形凸台连接。紧固第三螺栓12和第四螺栓14,第二螺钉16挤压压环8,使压环8挤压第二环形胶圈7发生变形,从而提高堵漏夹具与管道之间的密封性。In this way, after the second annular rubber ring 7 is placed in the third annular groove, the pressure ring 8 is first arranged between the first disassembly body 101 and the pipe, and then the end cover 9 and the first clamp body 1 The ring boss connection. The third bolt 12 and the fourth bolt 14 are fastened, and the second screw 16 presses the pressure ring 8, so that the pressure ring 8 is pressed against the second annular rubber ring 7 to deform, thereby improving the sealing performance between the leakage plugging fixture and the pipeline.
如图1所示,压环8的数量可为两个。本实用新型实施例不对压环8的数量进行限定,可根据第二环形胶圈7与压盖9之间的距离确定设置的压环8的数量。As shown in FIG. 1 , there may be two pressure rings 8 . The embodiment of the present utility model does not limit the number of pressure rings 8 , and the number of pressure rings 8 provided can be determined according to the distance between the second annular rubber ring 7 and the gland 9 .
为了便于压环8的安装,压环8包括两个半圆环。在安装压环8时,将两个半圆环分别放置在管道与第一夹具本体1之间,使两个半圆环的两端分别对应贴合组成一个圆环。In order to facilitate the installation of the pressure ring 8, the pressure ring 8 includes two semicircular rings. When installing the pressure ring 8, place the two semi-circular rings between the pipe and the first fixture body 1, respectively, so that the two ends of the semi-circular rings fit together to form a circular ring.
为了进一步提高第一夹具本体1与绝缘接头的端面之间的密封性,如图2所示,在第一拆装本体101上沿第一夹具本体1的径向方向开设有两端贯穿的注胶通道1011。具体地,第一拆装本体101上设置的注胶通道1011的数量可为多个。In order to further improve the sealing performance between the first clamp body 1 and the end face of the insulating joint, as shown in FIG. Glue Channel 1011. Specifically, the number of glue injection channels 1011 provided on the first disassembly body 101 may be multiple.
如此设置,在将堵漏夹具安装完成后,向注胶通道1011内注射密封胶,使密封胶通过注胶通道1011进入到两个第一拆装本体101与管道外壁之间的容胶腔内,可进一步提高第一夹具本体1与绝缘接头的端面之间的密封性能。In this way, after the plugging fixture is installed, inject the sealant into the glue injection channel 1011, so that the sealant enters the glue chamber between the two first disassembly bodies 101 and the outer wall of the pipeline through the glue injection channel 1011 , the sealing performance between the first clamp body 1 and the end face of the insulating joint can be further improved.
在注胶完成后,如图3所示,向注胶通道1011内设置有密封螺钉13。密封螺钉13起到密封注胶通道1011的作用,防止密封胶从注胶通道1011流出。如图3所示,每一个第一拆装本体101上设置有四个密封螺钉13,每个密封螺钉13将对应的注胶通道1011密封。After the glue injection is completed, as shown in FIG. 3 , a sealing screw 13 is provided in the glue injection channel 1011 . The sealing screw 13 plays a role of sealing the glue injection channel 1011 to prevent the sealant from flowing out from the glue injection channel 1011 . As shown in FIG. 3 , four sealing screws 13 are provided on each first disassembly body 101 , and each sealing screw 13 seals the corresponding glue injection channel 1011 .
在密封胶注入到容胶腔后,在两个第一拆装本体101与管道外壁之间的容胶腔内形成密封胶圈,可进一步提高第一夹具本体1与管道之间的密封性。After the sealant is injected into the glue chamber, a sealing rubber ring is formed in the glue chamber between the two first detachable bodies 101 and the outer wall of the pipeline, which can further improve the sealing performance between the first fixture body 1 and the pipeline.
以上所述仅是为了便于本领域的技术人员理解本实用新型的技术方案,并不用以限制本实用新型。凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above description is only for those skilled in the art to understand the technical solution of the utility model, and is not intended to limit the utility model. Any modification, equivalent replacement, improvement, etc. made within the spirit and principles of the present utility model shall be included in the protection scope of the present utility model.
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721560217.3U CN207935625U (en) | 2017-11-21 | 2017-11-21 | A plugging fixture |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721560217.3U CN207935625U (en) | 2017-11-21 | 2017-11-21 | A plugging fixture |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207935625U true CN207935625U (en) | 2018-10-02 |
Family
ID=63644606
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721560217.3U Active CN207935625U (en) | 2017-11-21 | 2017-11-21 | A plugging fixture |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207935625U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109058580A (en) * | 2018-10-26 | 2018-12-21 | 山东南山铝业股份有限公司 | Needle valve device for plugging and needle-like valve module |
-
2017
- 2017-11-21 CN CN201721560217.3U patent/CN207935625U/en active Active
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109058580A (en) * | 2018-10-26 | 2018-12-21 | 山东南山铝业股份有限公司 | Needle valve device for plugging and needle-like valve module |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204459607U (en) | Conduit leak gripping device | |
| US4171142A (en) | Leak repair clamp | |
| CN205424190U (en) | Flange formula pipe fitting seal for pipe joints device | |
| CN203628145U (en) | A sealing clamp for leak plugging pipeline under pressure | |
| CN211525767U (en) | An easy-to-use mechanical seal | |
| CN202719329U (en) | Split-type welding-free glue injection fixture | |
| CN207935625U (en) | A plugging fixture | |
| CN108240522A (en) | Pipeline seal lap joint fixture and pipeline maintenance method | |
| CN203809950U (en) | A leak-trapping device under pressure for a pipeline | |
| CN108386629A (en) | The method of pipe jointer secondary seal | |
| CN205560117U (en) | Pipeline leaking stoppage clamping device | |
| CN206708600U (en) | A kind of outer fixed ring type HDPE Flange attachment means | |
| CN103291924A (en) | Magnetic steel sealing ring | |
| CN211059547U (en) | Quick coupling mechanism of pipeline based on municipal hydraulic engineering uses | |
| CN205424194U (en) | Flange formula seal for pipe joints device | |
| CN204328331U (en) | A kind of high pressure flange seal clamp | |
| CN208311721U (en) | Pipe jointer gasket | |
| CN204493983U (en) | A kind of plug-in type Pressurized plugging clamp of mismatch flange | |
| CN209855741U (en) | Hole pressure relief device is pulled to long stop well | |
| CN201517668U (en) | Pipeline connecting structure | |
| CN210034769U (en) | Flange root under-pressure sealing device | |
| CN221402211U (en) | Novel pressure pipeline pressurized plugging flange clamp | |
| CN221278753U (en) | Metal pipe fitting connection structure | |
| CN220623220U (en) | Novel plug valve external pressure plugging clamp | |
| CN223204319U (en) | A new type of steam generator |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| TR01 | Transfer of patent right | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20211108 Address after: Room 08-10, 6 / F, block a, No. 5, Dongtucheng Road, Chaoyang District, Beijing 100013 Patentee after: National Petroleum and natural gas pipeline network Group Co.,Ltd. Address before: 100007 Oil Mansion, 9 North Avenue, Dongcheng District, Beijing, Dongzhimen Patentee before: PetroChina Company Limited |