CN207919763U - Assembled self- recoverage circular steel tube concrete combined joint - Google Patents

Assembled self- recoverage circular steel tube concrete combined joint Download PDF

Info

Publication number
CN207919763U
CN207919763U CN201721798961.7U CN201721798961U CN207919763U CN 207919763 U CN207919763 U CN 207919763U CN 201721798961 U CN201721798961 U CN 201721798961U CN 207919763 U CN207919763 U CN 207919763U
Authority
CN
China
Prior art keywords
plate
steel
column
steel pipe
pipe column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721798961.7U
Other languages
Chinese (zh)
Inventor
牟犇
王悦
王君昌
葛蓓蓓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao University of Technology
Original Assignee
Qingdao University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao University of Technology filed Critical Qingdao University of Technology
Priority to CN201721798961.7U priority Critical patent/CN207919763U/en
Application granted granted Critical
Publication of CN207919763U publication Critical patent/CN207919763U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to building structural element technical fields, disclose a kind of assembled self- recoverage circular steel tube concrete combined joint, it includes round steel tubing string and H profile steel beam, run through reinforcing bar in round steel tubing string, round steel tubing string includes epimere steel pipe column, center inserting column and hypomere steel pipe column, it is connected by upper bush connector between epimere steel pipe column and center inserting column, is connected by lower sleeve connector between center inserting column and hypomere steel pipe column;H profile steel beam is connect by upper and lower two sleeve connectors with round steel tubing string.All components can be completed in factory process in the utility model, and scene is all bolted, and realizes complete prefabricated construction, the quality problems that avoidable site welding may be brought, and accelerate construction progress, raise labour productivity;No damage in small earthquake, middle post-seismic deformation are realized by the design of node to restore rapidly, can precisely dismantle after big shake and realize quick-replaceable aseismic fortification objects.

Description

Assembled self- recoverage circular steel tube concrete combined joint
Technical field
The utility model is related to building structural element technical fields, in particular to a kind of assembled self- recoverage circle Concrete filled steel tube combined joint.
Background technology
Steel structure member is by connecting node composed structure system, and the selection of joint form is for structural integrity, reliable Degree, construction period and Accessory Members design and construction have direct influence.Rotational stiffness is pressed in the connection of frame structural beam and column Difference can be divided into rigid connection, flexible connection and varied rigid link.
For at present, the design that is rigidly connected is most widely used, and traditional frame beam column rigid joint can be divided into entirely again Welding node, bolted and welded connection and it is bolted three kinds of forms.Research finds that first two type of attachment is held when earthquake occurs Brittle break easily occurs because of beam-ends weldquality problem and cannot get effective protection due to, and conventional node form all exists and destroys After be difficult to repair, the problem of reinforcing, the problem of will necessarily thus causing node point reliability to be difficult to ensure either waste of material.
Self-recovering function structure is a kind of novel shockproof control structure, it can not only protect the life of people in earthquake Property safety can also help people after violent earthquake, reset normal life as early as possible, be that one of seismic design of structures is ideal New direction.Self- recoverage structural system includes mainly replaceable structural elements, swinging structure and automatic runback device etc..In recent years, Studies have shown that structure waves the Ductility Design demand that can reduce geological process and structure itself, reduce eaerthquake damage, saves Structural cost.It is constrained between constraint or component between loosening configuration and basis, structure is made only to be pressurized at basis or component contact surface Ability and without tension ability, then structure is waved under geological process, so that structure is resetted by prestressing force, forms Self-resetting knot Structure.This new structural systen effectively control structure " maximum distortion " and can reduce structure " residual deformation ".
Current many scholars realize ground at the frame structure system bean column node center place of setting a roof beam in place provided with prestressed cable The function that structure resets after shake, short beam Duan Yuzhu only need picture at the construction field (site) by completing connection in factory's stretch-draw prestressing force rope The common the same method of girder steel by bolting entirely or the intermediate beam section of bolted and welded connection installation, without stretch-draw prestressing force draw by scene Rope facilitates construction, improves construction quality and reduce the set-up time.But for using the steel pipe of high tensile reinforcement in intercolumniation Combined concrete node is required study and is developed in terms of realizing intercolumniation Self-resetting.
Utility model content
The main purpose of the utility model is that in view of the above-mentioned problems, providing a kind of novel assembled self- recoverage circular steel Pipe concrete combined joint.
To achieve the goals above, the assembled self- recoverage circular steel tube concrete combined joint of the utility model, including Round steel tubing string and H profile steel beam, round steel tubing string is interior to run through reinforcing bar, and round steel tubing string includes epimere steel pipe column, center inserting column and hypomere Steel pipe column is connected between epimere steel pipe column and center inserting column by upper bush connector, center inserting column and hypomere steel pipe column Between connected by lower sleeve connector;
The upper end of epimere steel pipe column and the lower end of hypomere steel pipe column are respectively and fixedly provided with reinforcing bar fixed plate, and reinforcing bar fixed plate center is set It is equipped with through-hole, through-hole surrounding is provided with reinforced hole, and reinforcing bar sequentially passes through the reinforcing bar fixed plate of epimere steel pipe column upper end, round steel tubing string With the reinforcing bar fixed plate of hypomere pipe column lower end, reinforcing bar both ends are fixed by fastener;
Upper bush connector includes pipe, connection ring flat-plate and plate, and the diameter of pipe is less than the diameter of round steel tubing string, pipe Centre position is provided with connection ring flat-plate, and connection ring flat-plate includes that at least two end plates, plate is fixed below end plate, with pipe, end The equal vertical connection of plate;The structure of lower sleeve connector and upper bush connector are symmetrical, and plate is fixed on above end plate;
Center inserting column upper end and lower end are both provided with the groove to match with plate;
The web centre position of one end that H profile steel beam is connect with round steel tubing string is provided with protrusive board, protrusive board top edge and H profile steel The distance between beam top flange is not less than the height of upper bush connector plate, between protrusive board lower edge and H profile steel lower flange of girder edge Distance be not less than lower sleeve connector plate height;
The top half pipe of upper bush connector is inserted into epimere steel pipe column, and plate is inserted into center inserting column upper end Groove in, the lower half portion pipe of lower sleeve connector is inserted into hypomere steel pipe column, and plate is inserted under the inserting column of center In the groove at end;The protrusive board of H profile steel beam is inserted between the plate of upper bush connector and the plate of lower sleeve connector, plate It is overlapped by web connecting plate with protrusive board both sides, under the top flange of H profile steel beam and the end plate of upper bush connector, H profile steel beam The edge of a wing and the end plate of lower sleeve connector are overlapped by edge of a wing connecting plate respectively.
Further, round steel tubing string is connect with four H profile steel beams, and connection ring flat-plate includes four pieces of end plates, and four pieces of end plates are in ten Font.
Further, round steel tubing string is connect with three H profile steel beams, and connection ring flat-plate includes three pieces of end plates, and three pieces of end plates are in T words Shape.
Further, round steel tubing string is connect with two H profile steel beams, and connection ring flat-plate includes two end plates, and two end plates are in one Font is mutually perpendicular to.
Further, it is filled out in the gap between epimere steel pipe column and center inserting column, hypomere steel pipe column and center inserting column Filled with rubber material, to prevent concrete from overflowing.
Further, the protrusive board of plate and H profile steel beam is connect by high-strength bolt with web connecting plate.
Further, the flange plate up and down of end plate and H profile steel beam is connect by high-strength bolt with edge of a wing connecting plate.
Epimere steel pipe column, center inserting column, hypomere steel pipe column, upper and lower sleeve connector and H profile steel beam are in advance in factory Prefabricated, scene need to only assemble.
The installation method of above-mentioned assembled self- recoverage circular steel tube concrete combined joint, includes the following steps:
Upper bush connector and lower sleeve connector are inserted respectively into the inserting column of center by the first step;
Epimere steel pipe column is connect by second step with upper bush connector, and hypomere steel pipe column is connect with lower sleeve connector;
Third walk, by the protrusive board of H profile steel beam be inserted into upper bush connector plate and lower sleeve connector plate it Between, plate and protrusive board both sides are overlapped by web connecting plate;
4th step, the top flange of H profile steel beam connect with the end plate of upper bush connector, the lower flange of H profile steel beam and lower sleeve The end plate of fitting is overlapped by edge of a wing connecting plate respectively;
5th step:High tensile reinforcement is inserted into the reinforced hole reserved in the reinforcing bar fixed plate of epimere steel pipe column upper end, successively Across epimere steel pipe column, center inserting column and hypomere steel pipe column, eventually passes through and reserved in hypomere pipe column lower end reinforcing bar fixed plate Reinforced hole, reinforcing bar both ends tighten completion by nut and are fixedly connected;
6th step:By the through-hole reserved in reinforcing bar fixed plate into round steel tubing string casting concrete, keep connecting portion logical Interlocking is crossed to be fastenedly connected to form entirety.
The utility model has the advantages that:
(1) the assembled self- recoverage circular steel tube concrete combined joint of the utility model, all components can be in factory It machines, scene is all bolted, and realizes complete prefabricated construction, the matter that avoidable site welding may be brought Amount problem, and accelerate construction progress, raise labour productivity;
(2) the utility model effectively prevents passing by setting through the measures such as the reinforcing bar group of node and prestressed concrete The shortcomings of prefabricated construction globality, poor seismic behavior of uniting, the too early generation in crack in concrete is prevented, enhanced vertical The reliability of component connection, to enhancing structure globality so that this kind of node has good anti-seismic performance, effectively prevents The case where node first destroys in earthquake prior to component;
(3) the assembled self- recoverage circular steel tube concrete combined joint of the utility model small shake effect under with common beam The function of the affixed node of column is no different, and the aseismic fortification objects of " no damage in small earthquake " are realized by the design of node;Under middle shake effect, column The cast steel inner sleeve cartridge type connector of end connection provides rotational stiffness, and center inserting column and upper and lower section steel pipe column have the tendency that separation, But the prestressing force that the concrete in steel pipe column applies due to high tensile reinforcement group is without premature cracking, high tensile reinforcement in steel pipe column Tension is in elastic stage always, and post-seismic deformation can restore rapidly, continue to function;Under big shake effect, structure is likely to occur Large deformation, but since structural integrity will not collapse by force, after earthquake, the component of wanton destruction can be dismantled precisely and be realized fast Speed is replaced.
Description of the drawings
Fig. 1 is the utility model structural decomposition diagram;
Fig. 2 is the utility model round steel tubular column structure decomposition diagram;
Fig. 3 is partial exploded view at the utility model A;
Fig. 4 is the structural schematic diagram after the utility model is completed;
Wherein, above-mentioned attached drawing includes the following drawings label:1, round steel tubing string;2, H profile steel beam;3, epimere steel pipe column;4, in Heart inserting column;5, hypomere steel pipe column;6, upper bush connector;7, lower sleeve connector;8, reinforcing bar fixed plate;9, reinforcing bar;10, circle Pipe;11, ring flat-plate is connected;12, plate;13, end plate;14, groove;15, protrusive board;16, web connecting plate;17, edge of a wing connecting plate.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, 2, 3, a kind of assembled self- recoverage circular steel tube concrete combined joint of the utility model, including Round steel tubing string 1 and H profile steel beam 2, round steel tubing string is interior to run through reinforcing bar 9, and round steel tubing string includes epimere steel pipe column 3,4 and of center inserting column Hypomere steel pipe column 5 is connected between epimere steel pipe column and center inserting column by upper bush connector 6, center inserting column and hypomere It is connected by lower sleeve connector 7 between steel pipe column;
The upper end of epimere steel pipe column and the lower end of hypomere steel pipe column are respectively and fixedly provided with reinforcing bar fixed plate 8, reinforcing bar fixed plate center It is provided with through-hole, through-hole surrounding is provided with reinforced hole, and reinforcing bar sequentially passes through reinforcing bar fixed plate, the round steel pipe of epimere steel pipe column upper end The reinforcing bar fixed plate of column and hypomere pipe column lower end, reinforcing bar both ends are fixed by fastener;
Upper bush connector includes pipe 10, connection ring flat-plate 11 and plate 12, and the diameter of pipe is less than the straight of round steel tubing string Diameter, pipe centre position are provided with connection ring flat-plate, and connection ring flat-plate includes that at least two end plates 13, plate is fixed below end plate, With pipe, the equal vertical connection of end plate;The structure of lower sleeve connector and upper bush connector are symmetrical, and plate is fixed on end plate Side;
According to position of the node in building frame ring flat-plate packet is connected if round steel tubing string is connect with four H profile steel beams Four pieces of end plates are included, four pieces of end plates are in cross;If round steel tubing string is connect with three H profile steel beams, it includes three pieces to connect ring flat-plate End plate, three pieces of end plates are in T shape;If round steel tubing string is connect with two H profile steel beams, it includes two end plates to connect ring flat-plate, two Block end plate is in linear type or is mutually perpendicular to.
Center inserting column upper end and lower end are both provided with the groove 14 to match with plate;
The web centre position of one end that H profile steel beam is connect with round steel tubing string is provided with protrusive board 15, protrusive board top edge and H-type The distance between girder steel top flange is not less than the height of upper bush connector plate, protrusive board lower edge and H profile steel lower flange of girder edge it Between distance be not less than lower sleeve connector plate height;
When connection, the top half pipe of upper bush connector is inserted into epimere steel pipe column, and plate is inserted into center and inserts In the groove for connecing column upper end, the lower half portion pipe of lower sleeve connector is inserted into hypomere steel pipe column, and plate is inserted into center In the groove of inserting column lower end;The protrusive board of H profile steel beam is inserted into the plate of the plate and lower sleeve connector of upper bush connector Between, the connection of protrusive board and plate by overlapping therewith in plate and protrusive board both sides increase web connecting plate 16, plate, protrusive board It is connected by high-strength bolt with web connecting plate;Under the top flange of H profile steel beam and the end plate of upper bush connector, H profile steel beam The edge of a wing and the connection of the end plate of lower sleeve connector are overlapped by increasing edge of a wing connecting plate 17 therewith, and upper lower flange and end plate are equal It is connected by high-strength bolt.Structural schematic diagram after connection is as shown in Figure 4.
Epimere steel pipe column, center inserting column, hypomere steel pipe column, upper and lower sleeve connector and H profile steel beam are in advance in factory Prefabricated, scene need to only assemble.
The installation method of above-mentioned assembled self- recoverage circular steel tube concrete combined joint, includes the following steps:
Upper bush connector and lower sleeve connector are inserted respectively into the inserting column of center by the first step;
Epimere steel pipe column is connect by second step with upper bush connector, and hypomere steel pipe column is connect with lower sleeve connector;
Third walk, by the protrusive board of H profile steel beam be inserted into upper bush connector plate and lower sleeve connector plate it Between, plate and protrusive board both sides are overlapped by web connecting plate;
4th step, the top flange of H profile steel beam connect with the end plate of upper bush connector, the lower flange of H profile steel beam and lower sleeve The end plate of fitting is overlapped by edge of a wing connecting plate respectively;
5th step:High tensile reinforcement is inserted into the reinforced hole reserved in the reinforcing bar fixed plate of epimere steel pipe column upper end, successively Across epimere steel pipe column, center inserting column and hypomere steel pipe column, eventually passes through and reserved in hypomere pipe column lower end reinforcing bar fixed plate Reinforced hole, reinforcing bar both ends tighten completion by nut and are fixedly connected;
6th step:By the through-hole reserved in reinforcing bar fixed plate into round steel tubing string casting concrete, keep connecting portion logical Interlocking is crossed to be fastenedly connected to form entirety;Concrete overflows in order to prevent, in epimere steel pipe column and center inserting column, hypomere steel Rubber material is filled in gap between tubing string and center inserting column.
The above descriptions are merely preferred embodiments of the present invention, is not intended to limit the utility model, for this For the technical staff in field, various modifications and changes may be made to the present invention.It is all in the spirit and principles of the utility model Within, any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.

Claims (7)

1. a kind of assembled self- recoverage circular steel tube concrete combined joint, including round steel tubing string (1) and H profile steel beam (2), round steel Run through reinforcing bar (9) in tubing string (1), which is characterized in that round steel tubing string (1) include epimere steel pipe column (3), center inserting column (4) and Hypomere steel pipe column (5) is connect between epimere steel pipe column (3) and center inserting column (4) by upper bush connector (6), and center is inserted It connects and is connect by lower sleeve connector (7) between column (4) and hypomere steel pipe column (5);
The upper end of epimere steel pipe column (3) and the lower end of hypomere steel pipe column (5) are respectively and fixedly provided with reinforcing bar fixed plate (8), reinforcing bar fixed plate (8) it is provided centrally with through-hole, through-hole surrounding is provided with reinforced hole, and reinforcing bar (9) sequentially passes through the reinforcing bar of epimere steel pipe column (3) upper end The reinforcing bar fixed plate (8) of fixed plate (8), round steel tubing string (1) and hypomere steel pipe column (5) lower end;
Upper bush connector (6) includes pipe (10), connection ring flat-plate (11) and plate (12), and the diameter of pipe (10) is less than round steel The diameter of tubing string (1), pipe (10) centre position are provided with connection ring flat-plate (11), and connection ring flat-plate (11) includes at least two end plates (13), plate (12) is fixed below end plate (13), with pipe (10), end plate (13) equal vertical connection;Lower sleeve connector (7) Structure and upper bush connector (6) symmetrically, plate (12) is fixed on above end plate (13);
Center inserting column (4) upper end and lower end are both provided with the groove (14) to match with plate (12);
The web centre position of one end that H profile steel beam (2) is connect with round steel tubing string (1) is provided with protrusive board (15), on protrusive board (15) The distance between edge and H profile steel beam (2) top flange are not less than the height of upper bush connector (6) plate (12), protrusive board (15) The distance between lower edge and H profile steel beam (2) lower flange are not less than the height of lower sleeve connector (7) plate (12);
The pipe (10) of the top half of upper bush connector (6) is inserted into epimere steel pipe column (3), during plate (12) is inserted into In the groove (14) of heart inserting column (4) upper end, the pipe (10) of the lower half portion of lower sleeve connector (7) is inserted into hypomere steel pipe In column (5), plate (12) is inserted into the groove (14) of center inserting column (4) lower end;The protrusive board (15) of H profile steel beam (2) is inserted into To between the plate (12) and the plate (12) of lower sleeve connector (7) of upper bush connector (6), plate (12) and protrusive board (15) Both sides are overlapped by web connecting plate (16), the top flange of H profile steel beam (2) and the end plate (13) of upper bush connector (6), H-type The lower flange of girder steel (2) is overlapped by edge of a wing connecting plate (17) respectively with the end plate (13) of lower sleeve connector (7).
2. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that round steel pipe Column (1) is connect with four H profile steel beams (2), and connection ring flat-plate (11) includes four pieces of end plates (13), and four pieces of end plates (13) are in cross.
3. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that round steel pipe Column (1) is connect with three H profile steel beams (2), and connection ring flat-plate (11) includes three pieces of end plates (13), and three pieces of end plates (13) are in T shape.
4. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that round steel pipe Column (1) is connect with two H profile steel beams (2), and connection ring flat-plate (11) includes two end plates (13), two end plates (13) in linear type or It is mutually perpendicular to.
5. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that epimere steel Rubber material is filled in gap between tubing string (3) and center inserting column (4), hypomere steel pipe column (5) and center inserting column (4) Material, to prevent concrete from overflowing.
6. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that plate (12) it is connect with web connecting plate (16) by high-strength bolt with the protrusive board of H profile steel beam (2) (15).
7. assembled self- recoverage circular steel tube concrete combined joint according to claim 1, which is characterized in that end plate (13) it is connect with edge of a wing connecting plate (17) by high-strength bolt with the flange plate up and down of H profile steel beam (2).
CN201721798961.7U 2017-12-21 2017-12-21 Assembled self- recoverage circular steel tube concrete combined joint Expired - Fee Related CN207919763U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721798961.7U CN207919763U (en) 2017-12-21 2017-12-21 Assembled self- recoverage circular steel tube concrete combined joint

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721798961.7U CN207919763U (en) 2017-12-21 2017-12-21 Assembled self- recoverage circular steel tube concrete combined joint

Publications (1)

Publication Number Publication Date
CN207919763U true CN207919763U (en) 2018-09-28

Family

ID=63607393

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721798961.7U Expired - Fee Related CN207919763U (en) 2017-12-21 2017-12-21 Assembled self- recoverage circular steel tube concrete combined joint

Country Status (1)

Country Link
CN (1) CN207919763U (en)

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138179A (en) * 2018-10-17 2019-01-04 辽宁工程技术大学 A kind of assembled friction energy-dissipating Self-resetting partition perforation node
CN110331782A (en) * 2019-07-24 2019-10-15 青岛理工大学 A kind of round buss steel and wood composite node and its installation method
CN110805165A (en) * 2019-11-18 2020-02-18 西藏涛扬新型建材科技有限公司 Assembled row steel pipe concrete composite wall building structure
CN111733986A (en) * 2020-07-13 2020-10-02 青岛理工大学 Double-steel-pipe concrete beam column node with built-in FRP (fiber reinforced plastic) rib connecting device and installation method
CN112095790A (en) * 2020-09-24 2020-12-18 黑龙江八一农垦大学 Assembled steel construction beam column node connecting device
WO2021012390A1 (en) * 2019-07-24 2021-01-28 青岛理工大学 Square frp steel-wood combined node and mounting method therefor
CN114150765A (en) * 2021-11-12 2022-03-08 广州地铁设计研究院股份有限公司 Frame beam column connecting node structure and construction method thereof
CN114703965A (en) * 2022-06-06 2022-07-05 中国船舶重工集团国际工程有限公司 Steel structure quick-insertion connection node assembly and installation process thereof
CN114908870A (en) * 2022-05-13 2022-08-16 西安建筑科技大学 Novel assembled reinforced concrete beam column node
CN115434422A (en) * 2022-10-19 2022-12-06 秦皇岛市政建设集团有限公司 Central limb energy dissipation reset beam column node

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109138179A (en) * 2018-10-17 2019-01-04 辽宁工程技术大学 A kind of assembled friction energy-dissipating Self-resetting partition perforation node
CN110331782B (en) * 2019-07-24 2023-01-03 青岛理工大学 Round sleeve steel-wood combined node and mounting method thereof
CN110331782A (en) * 2019-07-24 2019-10-15 青岛理工大学 A kind of round buss steel and wood composite node and its installation method
WO2021012390A1 (en) * 2019-07-24 2021-01-28 青岛理工大学 Square frp steel-wood combined node and mounting method therefor
CN110805165A (en) * 2019-11-18 2020-02-18 西藏涛扬新型建材科技有限公司 Assembled row steel pipe concrete composite wall building structure
CN111733986A (en) * 2020-07-13 2020-10-02 青岛理工大学 Double-steel-pipe concrete beam column node with built-in FRP (fiber reinforced plastic) rib connecting device and installation method
CN111733986B (en) * 2020-07-13 2021-04-20 青岛理工大学 Double-steel-pipe concrete beam column node with built-in FRP (fiber reinforced plastic) rib connecting device and installation method
US11155989B1 (en) * 2020-07-13 2021-10-26 Qingdao university of technology Double-steel tube concrete beam-column joint with internal fiber reinforced polymer (FRP) bar connectors and assembly method
CN112095790A (en) * 2020-09-24 2020-12-18 黑龙江八一农垦大学 Assembled steel construction beam column node connecting device
CN114150765A (en) * 2021-11-12 2022-03-08 广州地铁设计研究院股份有限公司 Frame beam column connecting node structure and construction method thereof
CN114150765B (en) * 2021-11-12 2023-01-20 广州地铁设计研究院股份有限公司 Frame beam column connecting node structure and construction method thereof
CN114908870A (en) * 2022-05-13 2022-08-16 西安建筑科技大学 Novel assembled reinforced concrete beam column node
CN114703965B (en) * 2022-06-06 2022-08-26 中国船舶重工集团国际工程有限公司 Steel structure quick-insertion connection node assembly and installation process thereof
CN114703965A (en) * 2022-06-06 2022-07-05 中国船舶重工集团国际工程有限公司 Steel structure quick-insertion connection node assembly and installation process thereof
CN115434422A (en) * 2022-10-19 2022-12-06 秦皇岛市政建设集团有限公司 Central limb energy dissipation reset beam column node
CN115434422B (en) * 2022-10-19 2023-03-21 秦皇岛市政建设集团有限公司 Central limb energy dissipation reset beam column node

Similar Documents

Publication Publication Date Title
CN107916726B (en) Assembled self- recoverage circular steel tube concrete combined joint
CN207919763U (en) Assembled self- recoverage circular steel tube concrete combined joint
CN108104273B (en) Assembled self- recoverage concrete filled steel tube combined joint and installation method and structural system
CN207919751U (en) Assembled self- recoverage concrete filled steel tube combined joint and structural system
CN103669650B (en) Easily steel shaped pile frame-steel plate shear force wall is repaired after a kind of shake
CN103696498B (en) Easily steel hetermorphiscal column-center support is repaired after a kind of shake
CN103669570B (en) A kind of novel shake easily repairs steel hetermorphiscal column-prestressing force center support afterwards
CN104895249B (en) It is a kind of can in-situ immobilization combination suspension column
CN103132602A (en) Self-resetting frame joint
CN105888058B (en) One kind damages recoverable assembled combination suspension column
CN103711215B (en) Easily steel shaped pile frame-accentric support frame is repaired after a kind of shake
CN110359633A (en) A kind of concrete foot joint of the replaceable energy consumption connection component containing high ductility
CN106869316A (en) The beam column edge of a wing is the group frame system and construction method of concrete filled steel tube
CN103669594B (en) Steel Framed Structure with Special-Shaped Columns node is easily repaired after a kind of shake
CN105780960A (en) Fully-prefabricated assembled concrete column-concrete beam buckling-restrained energy-consuming joint
CN106401018A (en) Assembled self-reset swing steel plate wall structure system
CN103669567B (en) Easily steel hetermorphiscal column-prestressing force accentric support frame is repaired after a kind of shake
CN206843941U (en) A kind of two-columned pier
CN103696503A (en) Novel post-earthquake easy-to-repair steel irregular column framework
CN113175106A (en) Corrugated steel web beam steel frame beam column connecting node and assembling method
CN108331258A (en) The double energy consumptions of assembled can reset concrete filled steel tube coupled column and its installation method
CN206267356U (en) A kind of assembled self-resetting swinging steel plate wall structural system
CN103306215B (en) The novel reinforced device of a kind of reinforced concrete bridge pier and construction method thereof
CN106869326A (en) Frame system and construction method that hollow steel tube concrete integral node is constituted
CN103669722B (en) Steel Framed Structure with Special-Shaped Columns suspension column is easily repaired after a kind of shake

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20181221