CN207904735U - A kind of split type steel box girder - Google Patents

A kind of split type steel box girder Download PDF

Info

Publication number
CN207904735U
CN207904735U CN201820173953.1U CN201820173953U CN207904735U CN 207904735 U CN207904735 U CN 207904735U CN 201820173953 U CN201820173953 U CN 201820173953U CN 207904735 U CN207904735 U CN 207904735U
Authority
CN
China
Prior art keywords
plate
steel box
girder
top plate
split type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820173953.1U
Other languages
Chinese (zh)
Inventor
陈卫文
李慧莹
王辉
吴凯
肖为
俞瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Hengsheng Construction Engineering Co Ltd
Original Assignee
Guangzhou Hengsheng Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Hengsheng Construction Engineering Co Ltd filed Critical Guangzhou Hengsheng Construction Engineering Co Ltd
Priority to CN201820173953.1U priority Critical patent/CN207904735U/en
Application granted granted Critical
Publication of CN207904735U publication Critical patent/CN207904735U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a kind of split type steel box girders, including multi-disc steel box-girder, every steel box-girder includes top plate, partition board, web and bottom plate, and web includes middle pectoral plate and two end webs, and hoisting structure is removably connected between the upper end of middle pectoral plate and the top plate.The steel box-girder of the utility model by steel box-girder by carrying out split-type design, its weight and height is set to meet the requirement of transport, it is reinforced by the way that web and intermediate support plate is arranged simultaneously, ensure transport, it is indeformable in hoisting process, integral solder is carried out to each steel box-girder again after transporting to building site, be conducive to the needs for meeting transport, pass through top plate, partition board, the setting of web and bottom plate, be conducive to dispersive stress, strengthen support vertical rigidity, increase the service life of steel box-girder, the dismounting of hoisting structure can be carried out by hoisting structure, realize the simplicity of steel box-girder lifting, safety, it can be used in turn, improve installation effectiveness.

Description

A kind of split type steel box girder
Technical field
The utility model is related to technical field of buildings more particularly to a kind of split type steel box girders.
Background technology
With the fast development of China's economic and transportation business, many urban municipal construction of China are to existing city bridge Beam is transformed, to meet growth requirement.The displacement technique of the existing bridge in city is the new technology developed in recent years, has construction The features such as period is short, economic and practical, building energy consumption is low, urban ecological environment quality is ensured, for this purpose, obtaining more and more extensive Application.With the expansion of highway in China construction scale, crossings on different level construction, is applied across busy highway during construction of the highway Work situation is more and more, and various large spans, the bridge structure of large-tonnage are also come into being.Currently, compared with the simply supported girder bridge of large span T section beam or box-girder are mostly used, the former is referred to as T beams, and the latter is referred to as box beam.Box beam include concrete box girder, Steel box-girder and compound section steel box girder.Because the T beam bridge lateral stiffness of T beams composition is smaller, anti-twisting property is poor, and stability when installation It is poor, it is used when being not suitable for compared with large span.Simply supported girder bridge compared with large span generally uses box beam.When span is larger, concrete The weight of box beam is very big, and difficulty is brought to pouring or setting up.Compound section steel box girder is by the steel case of lower part and on top flange plate Concrete slab be composed, by shear connector be connected.It is utilized that concrete anti-compression ability is strong and steel tensile capacity is high The characteristics of, take full advantage of material property.The anti-twisting property of steel box-girder is strong, and erection construction is easy, and is suitably applied highway and city City's bridge.With the fast development of China's steel and iron industry and long strands, the quantity of steel structure bridge is also being continuously increased, steel The characteristics of box-beam structure span is big, service life is long, box section torsional rigidity is big, depth of section is small, good integrity makes steel Box-beam structure is widely used in municipal administration and Design of Highway Bridge and building course, has become large-span girder form First choice.In science of bridge building field, for the requirement for meeting using function and bearing capacity, the application of large-scale steel box-girder is more and more wider It is general, and large-scale steel box-girder is due to bulky, big cross-sectional width is wider, height is higher, and piece weight surpasses hundred tons, for entirety The transport lifting of steel box-girder is a big problem, and existing steel box-girder is divided into multistage, will be according to lifting during fabrication and installation Lateral, longitudinal piecemeal is carried out to each segment with transport capacity, multiple lifting lugs can be set on each block, will be hung after the completion of lifting Ear is removed.If the pattern of lifting lug, installation position, intensity etc. are unreasonable, it will huge hidden danger is brought to entire work progress, Safety accident even can be brought to the later stage.
Utility model content
Based on the above the deficiencies in the prior art, the technical issues of the utility model is solved, is to provide a kind of split type steel Box-beam structure, simple structure and reasonable design, hoisting structure do not influence steel box-girder, can effectively improve the peace of Large-span Steel Box Beam Efficiency is filled, construction and installation are easy, using effect is good.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:The utility model provides A kind of split type steel box girder, including multi-disc steel box-girder, every steel box-girder include top plate, partition board, web and bottom plate, it is described every Plate and the top plate and bottom plate are vertical, and the web is arranged with the divider upright;The partition board includes intermediate internal partition, institute It includes middle pectoral plate and two end webs to state web;The upper end of the middle pectoral plate is described perpendicular to the lower surface of the top plate It is removably connected with hoisting structure between the upper end of middle pectoral plate and the top plate;WELDING STUDS is installed on the top plate, and The surface areas upper You Tong of top plate and steel fibre concrete area are equipped with anti-collision wall and flower trough in the concrete area and steel fibre concrete area; The end of the every steel box-girder is equipped with joints, and each section of steel box-girder is linked to be entirety by the welding of joints.
Embodiment as a preferred embodiment of the above technical solution, the split type steel box girder that the utility model embodiment provides Further comprise some or all of following technical characteristic:
As an improvement of the above technical solution, in one embodiment of the utility model, the hoisting structure includes setting In on the top plate base board, connect respectively with the top plate and middle pectoral plate by bolt connecting plate, be fixedly connected on The support plate of main platform sling, the reinforcing plate and the support reinforcing plate that are fixed on the main platform sling both sides on the base board, Lifting hole(eyelet) is offered in the main platform sling and reinforcing plate.
As an improvement of the above technical solution, in one embodiment mode of the utility model, the connecting plate is in L Two surfaces of shape, right angle are fitted in respectively on the surface of the middle pectoral plate and top plate;
The support plate is triangular in shape, and right angle both ends are fixed with the reinforcing plate and base board respectively.
In one embodiment of the utility model, there are four hoisting structure, the lifting knots for setting on every steel box-girder Structure is close to four angles of top plate, and the distance apart from the corner of top plate is 2000mm.
As an improvement of the above technical solution, intermediate support plate, the intermediate support plate are additionally provided with inside every steel box-girder It is obliquely installed and its both ends is connect with the middle pectoral plate and top plate respectively.
As an improvement of the above technical solution, in one embodiment of the utility model, the partition board is equipped with hole.
Further, two end web is obliquely installed with the top plate and bottom plate.
Compared with prior art, the technical solution of the utility model has the advantages that:The steel case of the utility model The structure type of beam carries out bearing to top plate and puts more energy into, and top plate is forward bearing plate, improves the stress performance of structure, reduces structure The complexity of construction has higher promotional value in aspects such as applicability, economy, processing quality, construction periods.It is logical It crosses and steel box-girder is subjected to split-type design, so that its weight and height is met the requirement of transport, while by the way that web and centre is arranged Support plate reinforces it, indeformable in guarantee transport, hoisting process, is carried out again to each steel box-girder after transporting to building site whole Body welds, this ensure that steel box-girder meets associated specifications in making, is conducive to the needs for meeting transport.Pass through The setting of the top plate, partition board, web and bottom plate of the utility model, is conducive to dispersive stress, strengthens support vertical rigidity, reduces The deformation generated by stress, increases the service life of steel box-girder, the dismounting of hoisting structure can be carried out by hoisting structure, Simplicity, the safety for realizing steel box-girder lifting, can be used in turn, and need not separately increase ancillary measure, can effectively improve The installation effectiveness of Large-span Steel Box Beam, and construction cost and risk can be reduced.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model Art means, and being implemented in accordance with the contents of the specification, and in order to allow the above and other purpose, feature of the utility model It can be clearer and more comprehensible with advantage, below in conjunction with preferred embodiment, and coordinate attached drawing, detailed description are as follows.
Description of the drawings
In order to illustrate more clearly of the technical solution of the utility model embodiment, the attached drawing of embodiment will be made below simple Ground introduction.
Fig. 1 is the structural schematic diagram of the split type steel box girder of the preferred embodiment in the utility model;
Fig. 2 is the structural schematic diagram of the hoisting structure of the split type steel box girder of the preferred embodiment in the utility model.
Specific implementation mode
The specific implementation mode that according to the present invention will be described in detail below with reference to the accompanying drawings, as part of this specification, Illustrate that the principles of the present invention, other aspect, feature and its advantages of the utility model are detailed by this by embodiment Illustrate to become apparent.In the attached drawing of institute's reference, same or analogous component uses identical attached in different figures Figure grade indicates.
Embodiment
The embodiments of the present invention, which are located at Guang Shen highways-, to be started main road grade separation and is located at Luogang District and Huangpu District intersection, Guang Shen highways are Class I highway, are in east-west, and it is city thoroughfare to start main road, are in south-north direction.Main road main line is started to adopt Guang Shen highways are crossed over overpass, the North connects with existing main road of starting, and the south connects with rich South Road.Wherein C ring roads are across extensively Deep highway, using 49.293+55.5+44m steel box-girders (girder), the long 148.793m of bridge, the wide 10.2-12.1m of bridge (broadening), babinet High 1.38-2.0m (getting higher), is divided into 12, the long 25.6m of maximum steel box-girder, width 5.04m, high 2m, weight 57.1t, C1-C4 crossbeams In maximum steel using amount be 31.2t, the total steel amount 673.9t of C ring roads.The ring road variation in moulding is big, and plane curve is transitional surface arc Line, facade curve are gradual change inclined-plane curve, and lifting installation difficulty is big.
As shown in Figure 1, the structural schematic diagram of the split type steel box girder of the preferred embodiment in the utility model, this practicality is new The split type steel box girder of type includes multi-disc steel box-girder, and the end of the every steel box-girder is equipped with joints, passes through splicing Each section of steel box-girder is linked to be entirety by the welding of connector.
The every steel box-girder of the utility model includes top plate 10, partition board 20, web 30 and bottom plate 40, the partition board 20 and institute It is vertical to state top plate 10 and bottom plate 40, the web 30 is vertically arranged with the partition board 20;The partition board 20 include in intermediate every Plate, the web 30 include middle pectoral plate 31 and two end webs 32;The partition board 20 is equipped with hole, is not influencing entire steel case Mitigate its weight in the case of girder construction intensity.Two end web 32 is obliquely installed with the top plate 10 and bottom 40.Every Be additionally provided with intermediate support plate inside steel box-girder, the intermediate support plate be obliquely installed and its both ends respectively with the middle pectoral plate 31 It is connected with top plate 10, the setting of intermediate support plate is conducive to dispersive stress, strengthens support vertical rigidity, reduce steel box-girder The deformation generated by stress.The structure type of the steel box-girder of the utility model carries out bearing to top plate and puts more energy into, and top plate is forward Bearing plate improves the stress performance of structure, reduces the complexity of structure construction, in applicability, economy, processing matter The aspects such as amount, construction period have higher promotional value.By the way that steel box-girder is carried out split-type design, make its weight and height Meet the requirement of transport, while it is reinforced by the way that web and intermediate support plate is arranged, ensures in transport, hoisting process not Deformation carries out integral solder, this ensure that steel box-girder meets related skill in making to each steel box-girder again after transporting to building site In the case of art requires, be conducive to the needs for meeting transport.
Wherein, the upper end of the middle pectoral plate 31 is perpendicular to the lower surface of the top plate 10, the middle pectoral plate 31 Hoisting structure 50 is removably connected between upper end and the top plate 10, as shown in Fig. 2, the hoisting structure 50 includes being placed in It is base board 51 on the top plate 10, the connecting plate 52 being connect with the top plate 10 and middle pectoral plate 31 respectively by bolt, solid Surely the main platform sling 53 that is connected on the base board 51, the reinforcing plate 54 for being fixed on 53 both sides of main platform sling and support institute The support plate 55 of reinforcing plate 54 is stated, lifting hole(eyelet) is offered in the main platform sling 53 and reinforcing plate 54.The connecting plate 52 is L-shaped, Two surfaces at right angle are fitted in respectively on the surface of the middle pectoral plate 31 and top plate 10;The support plate 55 is triangular in shape, Right angle both ends are fixed with the reinforcing plate 54 and base board 51 respectively.It can enhance lifting knot by reinforcing plate 54 and support plate 55 The overall structure performance of structure 50, and hoisting structure 50 is detachably connected with steel box-girder, to steel when can avoid dismantling after lifting The destruction of box beam extends its service life.There are four hoisting structure 50, the hoisting structure 50 is close for setting on every steel box-girder Four angles of top plate 10, and the distance apart from the corner of top plate 10 is 2000mm.It can also be arranged according to the weight of steel box-girder more A hoisting structure 50, the needs of hoisting structure 50 are uniformly distributed on steel box-girder, to keep balance when lifting.
In addition, install WELDING STUDS on the top plate 10, and in the surface areas upper You Tong of top plate 10 and steel fibre concrete area, Anti-collision wall and flower trough are installed in the concrete area and steel fibre concrete area, are conducive to the absorption to stress, reduce because external force and The fracture of generation or crack increase the service life of steel box-girder top plate.
The split type steel box girder reasonable design that above-described embodiment discloses, passes through the top plate 10, partition board of the utility model 20, the setting of web 30 and bottom plate 40, is conducive to dispersive stress, strengthens support vertical rigidity, reduces and generated because of stress Deformation, increase the service life of steel box-girder, the dismounting of hoisting structure can be carried out by hoisting structure 50, realizes steel box-girder Simplicity, the safety of lifting, can be used in turn, and need not separately increase ancillary measure, can effectively improve Large-span Steel Box Beam Installation effectiveness, and construction cost and risk can be reduced.
The above is preferred embodiments of the present invention, certainly cannot with this come limit the utility model it Interest field, it is noted that for those skilled in the art, before not departing from the utility model principle It puts, several improvement and variation can also be made, these are improved and variation is also considered as the scope of protection of the utility model.

Claims (7)

1. a kind of split type steel box girder, including multi-disc steel box-girder, it is characterised in that:Every steel box-girder include top plate, partition board, Web and bottom plate, the partition board and the top plate and bottom plate are vertical, and the web is arranged with the divider upright;The partition board Including intermediate internal partition, the web includes middle pectoral plate and two end webs;
The upper end of the middle pectoral plate is perpendicular to the lower surface of the top plate, the upper end of the middle pectoral plate and the top plate Between be removably connected with hoisting structure;
WELDING STUDS is installed, and in the surface areas upper You Tong of top plate and steel fibre concrete area on the top plate, the concrete area and steel Fibrin tissue adhesive is equipped with anti-collision wall and flower trough in area;
The end of the every steel box-girder is equipped with joints, and each section of steel box-girder is linked to be entirety by the welding of joints.
2. split type steel box girder as described in claim 1, it is characterised in that:The hoisting structure includes being placed in the top Base board on plate, is fixedly connected on the pedestal at the connecting plate being connect respectively with the top plate and middle pectoral plate by bolt The support plate of main platform sling, the reinforcing plate and the support reinforcing plate that are fixed on the main platform sling both sides on plate, the master hang Lifting hole(eyelet) is offered in plate and reinforcing plate.
3. split type steel box girder as claimed in claim 2, it is characterised in that:The connecting plate is L-shaped, and the two of right angle Surface is fitted in respectively on the surface of the middle pectoral plate and top plate;
The support plate is triangular in shape, and right angle both ends are fixed with the reinforcing plate and base board respectively.
4. split type steel box girder as claimed in claim 2, it is characterised in that:There are four liftings for setting on every steel box-girder Structure, the hoisting structure is close to four angles of top plate, and the distance apart from the corner of top plate is 2000mm.
5. split type steel box girder as described in claim 1, it is characterised in that:Intermediate branch is additionally provided with inside every steel box-girder Fagging, the intermediate support plate is obliquely installed and its both ends is connect with the middle pectoral plate and top plate respectively.
6. split type steel box girder as described in claim 1, it is characterised in that:The partition board is equipped with hole.
7. split type steel box girder as described in claim 1, it is characterised in that:Two end web and the top plate and bottom Plate is obliquely installed.
CN201820173953.1U 2018-02-01 2018-02-01 A kind of split type steel box girder Expired - Fee Related CN207904735U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820173953.1U CN207904735U (en) 2018-02-01 2018-02-01 A kind of split type steel box girder

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820173953.1U CN207904735U (en) 2018-02-01 2018-02-01 A kind of split type steel box girder

Publications (1)

Publication Number Publication Date
CN207904735U true CN207904735U (en) 2018-09-25

Family

ID=63562816

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820173953.1U Expired - Fee Related CN207904735U (en) 2018-02-01 2018-02-01 A kind of split type steel box girder

Country Status (1)

Country Link
CN (1) CN207904735U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042770A (en) * 2019-04-26 2019-07-23 南京工大桥隧与轨道交通研究院有限公司 A method of using the original bridge of external prestressing steel Shu Tuokuan in length and breadth
CN110117931A (en) * 2019-06-18 2019-08-13 中南大学 Prefabricated PC combined box beam
CN113026524A (en) * 2021-04-07 2021-06-25 中国铁路设计集团有限公司 Novel horizontal longitudinal connecting system for three-split steel box girder

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110042770A (en) * 2019-04-26 2019-07-23 南京工大桥隧与轨道交通研究院有限公司 A method of using the original bridge of external prestressing steel Shu Tuokuan in length and breadth
CN110117931A (en) * 2019-06-18 2019-08-13 中南大学 Prefabricated PC combined box beam
CN113026524A (en) * 2021-04-07 2021-06-25 中国铁路设计集团有限公司 Novel horizontal longitudinal connecting system for three-split steel box girder

Similar Documents

Publication Publication Date Title
CN207904735U (en) A kind of split type steel box girder
CN101078198B (en) Steel box beam erection method for self-anchored suspension bridge
CN205205635U (en) Stride footpath bailey frame steel suspension bridge structure greatly
CN109082998A (en) Integral prefabricated steel plate combination girder construction and construction method
CN108505405B (en) Combined construction structure of suspension type monorail and highway bridge
CN206538672U (en) Novel fabricated truss steel trestle
CN103938549A (en) Construction method for fabricated type corrugated steel inclined web combined beam
CN210797242U (en) Ultra-wide bridge supported by transverse tied arch
CN206328669U (en) The narrow composite beam of steel box of new concrete
CN106087711A (en) Antinode work beam-steel concrete top board-external prestressing combines T-shaped simply supported beam
CN108222051A (en) A kind of contact net upright post basic of railway steel reinforced concrete bondbeam and steel reinforced concrete combination bridge
CN107268417A (en) A kind of highway steel reinforced concrete combined beam structure based on assembling
CN102979033A (en) Steel truss girder all-welded joist slice and construction method thereof
CN206800165U (en) A kind of highway bridge
CN204418000U (en) A kind of Long span steel-concrete composite beam cable-stayed bridge ballast system
CN206591418U (en) A kind of hybrid beam for cable-stayed bridge
CN202913338U (en) Steel truss full-welded truss piece
CN211498430U (en) Stayed-cable steel truss through-center type arch bridge
CN206034265U (en) Steel reinforced concrete of bridge combines section
CN105088962B (en) A kind of integral hoisting method of Wavelike steel webplate part
CN204940144U (en) A kind of Wavelike steel webplate temporary reinforcing device
CN208072103U (en) A kind of simple oblique pull large span suspension type monorail system
CN108330810A (en) A kind of bridge structure that steel truss structure is combined with Frame Pier
CN208136703U (en) A kind of steel truss girder-Frame Pier bridge structure
CN208072176U (en) Chamfering enhances rigid frame formula steel diaphragm plate and Wavelike steel webplate combines skew bridge beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180925