CN207892527U - The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod - Google Patents
The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod Download PDFInfo
- Publication number
- CN207892527U CN207892527U CN201721290170.3U CN201721290170U CN207892527U CN 207892527 U CN207892527 U CN 207892527U CN 201721290170 U CN201721290170 U CN 201721290170U CN 207892527 U CN207892527 U CN 207892527U
- Authority
- CN
- China
- Prior art keywords
- crawler
- motor
- drill pipe
- drill
- frame
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005553 drilling Methods 0.000 title claims abstract description 103
- 239000003245 coal Substances 0.000 title claims abstract description 35
- 239000003921 oil Substances 0.000 claims abstract description 37
- 239000010720 hydraulic oil Substances 0.000 claims abstract description 11
- 239000000725 suspension Substances 0.000 claims description 6
- 230000008014 freezing Effects 0.000 claims 5
- 238000007710 freezing Methods 0.000 claims 5
- 239000007788 liquid Substances 0.000 claims 2
- 239000007787 solid Substances 0.000 claims 1
- 239000003638 chemical reducing agent Substances 0.000 abstract description 18
- 238000005086 pumping Methods 0.000 abstract description 12
- 238000000034 method Methods 0.000 abstract description 10
- 238000010276 construction Methods 0.000 abstract description 7
- 238000003032 molecular docking Methods 0.000 abstract description 4
- 238000012423 maintenance Methods 0.000 abstract description 2
- 238000004519 manufacturing process Methods 0.000 description 6
- 230000008901 benefit Effects 0.000 description 3
- 238000004880 explosion Methods 0.000 description 3
- 239000002817 coal dust Substances 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
Landscapes
- Earth Drilling (AREA)
Abstract
本实用新型涉及一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达的履带,固定在履带架上的泵站平台,泵站平台上设置供电总开关、液压油箱、电机驱动的油泵、控制平台、座椅,特点在于:还包括固定在履带架上的升降油缸,升降油缸固定钻机架,钻机架固定有支撑油缸、固定贴板架、电机驱动的减速器、推移油缸放置钻杆的钻杆托辊,固定贴板架还固定带卡钻装置的卡钻装置架、钻杆拆装装置。还公开使用方法,可自移,适应性好,方便大型钻杆的拆装,保养便利安全,快速施工大直径煤层钻孔,降低人为搬运钻杆劳动强度,设置吊装伸缩架,对矿井下不同倾角地面的适应性强,对接钻杆准确,避免了因钻杆对接偏差造成的钻杆磨损。
The utility model relates to a coal mine crawler-type tunnel drilling rig with detachable drill rods, which mainly includes a crawler with a crawler hydraulic motor, a pumping station platform fixed on the crawler frame, and a power supply master switch and a hydraulic oil tank are arranged on the pumping station platform. , motor-driven oil pump, control platform, seat, characterized in that it also includes a lifting cylinder fixed on the crawler frame, the lifting cylinder fixes the drilling rig frame, and the drilling rig frame is fixed with a supporting cylinder, a fixed plate frame, and a motor-driven reducer. Push the oil cylinder to place the drill pipe idler for the drill pipe, fix the sticking plate frame and fix the drill clamping device frame with the drill clamping device, and the drill pipe dismounting device. It also discloses the method of use, self-moving, good adaptability, convenient disassembly and assembly of large drill pipes, convenient and safe maintenance, rapid construction of large-diameter coal seam drilling, and reduced labor intensity of manual handling of drill pipes. The adaptability to the inclined ground is strong, and the docking of the drill pipe is accurate, which avoids the wear of the drill pipe due to the deviation of the docking of the drill pipe.
Description
技术领域technical field
本实用新型涉及履带式坑道钻机及使用方法,特别涉及一种可拆装钻杆的煤矿用履带式坑道钻机及使用方法。The utility model relates to a crawler-type tunnel drilling machine and a use method thereof, in particular to a crawler-type tunnel drilling machine for coal mines with detachable drill rods and a use method thereof.
背景技术Background technique
在我国的能源构成中煤炭占有主体地位。但是,煤炭生产的环境极其恶劣,重大灾害事故频发。其中瓦斯、煤尘爆炸灾害是我国煤矿灾害的主要形式之一。其中瓦斯爆炸、煤尘爆炸产生的主要危害因素有冲击波、火焰锋面以及大量的有害气体。瓦斯一旦发生爆炸,将会造成大量井下人员伤亡和物质财产损失,严重制约着我国煤矿的安全生产。Coal occupies a dominant position in my country's energy composition. However, the environment of coal production is extremely harsh, and major disasters and accidents occur frequently. Among them, gas and coal dust explosion disasters are one of the main forms of coal mine disasters in my country. Among them, the main hazards of gas explosion and coal dust explosion are shock wave, flame front and a large amount of harmful gas. Once the gas explodes, it will cause a large number of underground casualties and material property losses, seriously restricting the safe production of coal mines in our country.
履带式坑道钻机是实现煤矿生产机械化和现代化的重要设备之一。机械化打钻可以减轻体力劳动、提高安全性,达到高产量、高效率、低消耗的目的。The crawler tunnel drilling rig is one of the important equipments to realize the mechanization and modernization of coal mine production. Mechanized drilling can reduce physical labor, improve safety, and achieve high output, high efficiency, and low consumption.
履带式坑道钻机适用于瓦斯及高瓦斯矿井。可以施工大直径瓦斯抽采钻孔,如本煤层预抽钻孔或采空区瓦斯抽采钻孔等,与同类机组相比具有生产效率高,可靠性强,故障率低,安全性好的优势。利用该履带式坑道钻机,可以提高瓦斯抽采效率,减少治理瓦斯的经济投入,可提升矿井的整体效益。具有较高的经济效益和社会效益,是施工大直径钻孔的推广产品。The crawler tunnel drilling rig is suitable for gas and high gas mines. It can construct large-diameter gas drainage boreholes, such as pre-drainage boreholes in the coal seam or gas drainage boreholes in goafs, etc. Compared with similar units, it has high production efficiency, strong reliability, low failure rate and good safety Advantage. Utilizing the crawler tunnel drilling rig can improve the efficiency of gas drainage, reduce the economic investment in gas control, and improve the overall benefit of the mine. It has high economic and social benefits, and is a popular product for large-diameter drilling.
履带式坑道钻机采用独头打钻的工艺,主机布置在顺槽中,利用液压推进装置带动旋转的钻具向侧帮煤层钻孔,钻头割煤,螺旋钻杆排煤,煤直接落在顺槽的刮板机上运出,实现安全打钻。The crawler tunnel drilling rig adopts the single-head drilling process. The main engine is arranged in the trough, and the hydraulic propulsion device is used to drive the rotating drilling tool to drill holes in the side coal seam. The drill bit cuts the coal, and the auger pipe discharges the coal. The groove is transported out on the scraper machine to realize safe drilling.
随着新工艺和新技术的发展,煤矿井下瓦斯钻机向着大型化,智能化和人性化方向发展,我国煤矿井下钻机的现状是一般的钻机打钻的直径一般在150mm以下,钻杆长度一般为1-2米,因为钻杆直径相对较小,所以钻杆整体重量较轻,一般1-2人即可搬运,但是随着煤矿生产要求的不断增强,大直径钻孔已成为钻机发展的必然趋势。With the development of new technology and new technology, coal mine underground gas drilling rigs are developing towards large-scale, intelligent and humanized directions. The current situation of my country's coal mine underground drilling rigs is that the diameter of ordinary drilling rigs is generally below 150mm, and the length of the drill pipe is generally 1-2 meters, because the diameter of the drill pipe is relatively small, the overall weight of the drill pipe is relatively light, and generally 1-2 people can carry it. However, with the continuous increase in coal mine production requirements, large-diameter drilling has become an inevitable development of drilling rigs trend.
大直径钻机普遍存在的缺点即钻杆较重,以直径为400mm,长度为800mm的螺旋钻杆为例,一根的总重量为120kg-200kg,两个人很难实现钻杆的装卸。目前井下一般采取在顶板安装吊挂锚杆的方式,用手动葫芦进行搬运和安装,这种方式的缺点是:顶板安装吊挂锚杆不方便,煤矿井下顶板一般都有支护,安装吊挂锚杆的地方很可能和原有的支护位置有冲突;采用手动葫芦不方便,因为手动葫芦受到工作环境的限制,需要频繁拆装,耽误生产进度;无法实现精确对接,受到吊挂锚杆位置和手动葫芦的限制,很难实现钻杆和钻杆的快速、精确对接。The common disadvantage of large-diameter drilling rigs is that the drill pipe is heavy. Taking the helical drill pipe with a diameter of 400mm and a length of 800mm as an example, the total weight of one piece is 120kg-200kg, and it is difficult for two people to load and unload the drill pipe. At present, the method of installing hanging anchors on the roof is generally adopted underground, and the manual hoist is used for handling and installation. The position of the anchor may conflict with the original support position; it is inconvenient to use a manual hoist, because the manual hoist is limited by the working environment, and it needs to be disassembled frequently, which delays the production progress; Due to the limitation of the position and the manual hoist, it is difficult to realize the fast and accurate docking of the drill pipe and the drill pipe.
发明内容Contents of the invention
本实用新型的目的是提供一种可拆装钻杆的煤矿用履带式坑道钻机及使用方法,克服现有技术缺陷,主要方便煤矿用履带式坑道钻机大型钻杆的拆装。The purpose of the utility model is to provide a crawler-type tunnel drilling rig for coal mines with detachable drill rods and its use method, which overcomes the defects of the prior art and mainly facilitates the disassembly and assembly of large drill rods for crawler-type tunnel drilling rigs for coal mines.
本实用新型解决其技术问题所采用的技术方案是:一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达的履带,固定在履带架上的泵站平台,泵站平台上设置供电总开关、液压油箱、电机驱动的油泵、控制平台、座椅,特点在于:还包括固定在履带架上的升降油缸,升降油缸固定钻机架,钻机架固定有支撑油缸、固定贴板架、电机驱动的减速器、推移油缸放置钻杆的钻杆托辊,固定贴板架还固定带卡钻装置的卡钻装置架、钻杆拆装装置。The technical solution adopted by the utility model to solve the technical problem is: a crawler tunnel drilling rig for coal mines with detachable drill rods, mainly including crawlers with crawler hydraulic motors, pumping station platforms fixed on the crawler frames, pumps, etc. The power supply main switch, hydraulic oil tank, motor-driven oil pump, control platform and seat are set on the station platform. Sticker frame, reducer driven by motor, drill pipe idler for placing drill pipe in pushing oil cylinder, fixed sticky plate frame and clamping device frame with drill sticking device, drill pipe dismounting device.
其中:钻杆拆装装置包括固定在卡钻装置架上部支撑套架,支撑套架套装固定有吊装导轨的吊装伸缩架,吊装导轨上设置带吊装液压马达的连有吊钩的吊装滑轮座。Among them: the drill pipe dismounting device includes a support sleeve frame fixed on the upper part of the clamping device frame, and the support sleeve frame is set with a hoisting telescopic frame fixed with a hoisting guide rail, and a hoisting pulley seat with a hoisting hydraulic motor and a hook is arranged on the hoisting guide rail.
其中:控制平台分别油管连接吊装液压马达、支撑油缸、推移油缸、升降油缸、履带液压马达、卡钻装置,供电总开关电连接供电电源、控制平台,控制平台分别电连接电机、电机驱动的油泵,液压油箱油管连接电机驱动的油泵。Among them: the oil pipes of the control platform are respectively connected to the hoisting hydraulic motor, supporting cylinder, pushing cylinder, lifting cylinder, crawler hydraulic motor, and drilling device, the main power switch is electrically connected to the power supply, and the control platform is electrically connected to the motor and the oil pump driven by the motor. , the oil pipe of the hydraulic oil tank is connected to the oil pump driven by the motor.
其中:控制平台电连接设于吊轨上的电铃。Wherein: the control platform is electrically connected to the electric bell arranged on the suspension rail.
便于理解介绍一下一种可拆装钻杆的煤矿用履带式坑道钻机的使用方法,包括打开供电总开关,从控制平台操作履带液压马达,将钻机移至打钻位置,特点在于:从控制平台做以下操作,升降油缸调整钻孔角度,支撑油缸支撑固定在巷道两侧,①手动吊装滑轮座使吊钩到达钻杆位置,操作吊装液压马达,用吊钩吊起钻杆后,手动吊装滑轮座将钻杆吊到钻杆托辊位置,操作吊装液压马达将钻杆放在钻杆托辊上,操作卡钻装置卡住钻杆,启动电机驱动减速器,启动推移油缸将钻杆连接于钻机上,打开卡钻装置,启动钻机钻进到一根钻杆深度后,停止钻进,启动卡钻装置卡住钻杆,启动电机驱动减速器,启动推移油缸将钻杆从钻机上卸下,重复①操作,完成打钻到要求钻孔深度。It is easy to understand how to use a crawler tunnel drilling rig for coal mines with detachable drill pipes, including turning on the main power switch, operating the crawler hydraulic motor from the control platform, and moving the drilling rig to the drilling position. The characteristics are: from the control platform Do the following operations, lift the cylinder to adjust the drilling angle, and support the cylinder to support and fix it on both sides of the roadway. ①Manually lift the pulley seat so that the hook reaches the position of the drill pipe, operate the lifting hydraulic motor, and lift the drill pipe with the hook, then manually lift the pulley Lift the drill pipe to the position of the drill pipe idler, operate the hoisting hydraulic motor to place the drill pipe on the drill pipe idler, operate the clamping device to clamp the drill pipe, start the motor to drive the reducer, and start the pushing cylinder to connect the drill pipe to the On the drilling rig, open the sticking device, start the drilling rig and drill to the depth of a drill pipe, stop drilling, start the sticking device to lock the drill pipe, start the motor to drive the reducer, and start the pushing cylinder to remove the drill pipe from the drilling rig , repeat operation ① to finish drilling to the required drilling depth.
其中:当打钻到要求钻孔深度后,②启动电机驱动减速器,启动推移油缸将钻杆从钻孔中拉出一根钻杆深度后停止,启动卡钻装置将下一根钻杆卡住,卸下一根钻杆,手动推移吊装滑轮座至卸下一根钻杆的位置,启动吊装液压马达将此钻杆吊起后,手动推移吊装滑轮座至钻杆堆场,放下钻杆,重复②操作,完成所有钻杆拆卸后,从控制平台做以下操作,升降油缸复位,支撑油缸收起,完成一个钻孔施工。Among them: when drilling to the required drilling depth, ② start the motor to drive the reducer, start the pushing cylinder to pull the drill pipe out of the drill hole to a depth of one drill pipe and stop, start the clamping device to clamp the next drill pipe Stop, unload a drill pipe, manually push the hoisting pulley seat to the position where a drill pipe is unloaded, start the hoisting hydraulic motor to hoist the drill pipe, manually push the hoisting pulley seat to the drill pipe yard, and put down the drill pipe , repeat the operation ②, after dismantling all the drill pipes, do the following operations from the control platform, reset the lifting cylinder, retract the supporting cylinder, and complete a drilling construction.
其中:当打开供电总开关时,电铃响数秒钟时间,提醒钻孔钻进施工开始,当拆装钻杆时有角度影响时,手动推拉或撞击吊装导轨,使吊装伸缩架在支撑套架中滑动实现调整。Among them: when the main switch of the power supply is turned on, the electric bell will ring for a few seconds to remind the drilling and drilling construction to start. When the angle is affected when disassembling and assembling the drill pipe, manually push and pull or hit the lifting guide rail to make the lifting telescopic frame in the supporting sleeve frame Swipe to adjust.
本实用新型的有益效果是:本实用新型可自移,机动性、灵活性强,适应性好,方便煤矿用履带式坑道钻机大型钻杆的拆装,维修保养便利安全,快速施工大直径煤层钻孔,大幅降低人为搬运钻杆的劳动强度,设置了吊装伸缩架,对于煤矿井下不同倾角地面的适应性强,对接钻杆准确,避免了因钻杆对接偏差造成的钻杆磨损。The beneficial effects of the utility model are: the utility model can move by itself, has strong mobility and flexibility, good adaptability, facilitates disassembly and assembly of large drill pipes of crawler tunnel drilling rigs used in coal mines, convenient and safe maintenance, and fast construction of large-diameter coal seams Drilling greatly reduces the labor intensity of manual handling of drill pipes. The hoisting telescopic frame is set up, which has strong adaptability to ground with different inclinations in the coal mine, and the docking of drill pipes is accurate, avoiding the wear of drill pipes caused by the deviation of drill pipes.
附图说明Description of drawings
下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
图1. 本实用新型主视示意图;Fig. 1. The schematic diagram of the front view of the utility model;
图2. 本实用新型俯视示意图。Fig. 2. The schematic diagram of the top view of the utility model.
图中:1.履带架,2.支撑油缸,3.电机,4、钻杆,5.吊装滑轮座,6.吊装液压马达,7.吊装导轨,8.支撑套架,9.卡钻装置架,10.卡钻装置,11.控制平台,12.座椅,13.液压油箱,14.总开关,15.电机驱动的油泵,16.升降油缸,17.固定贴板架,18.减速机,19.钻杆托辊,20.吊钩,21.吊装伸缩架,22.泵站平台,23.推移油缸,24.履带液压马达,25.电铃,26.钻机架。In the figure: 1. Track frame, 2. Support cylinder, 3. Motor, 4. Drill pipe, 5. Hoisting pulley seat, 6. Hoisting hydraulic motor, 7. Hoisting guide rail, 8. Supporting sleeve frame, 9. Drill sticking device Frame, 10. Drill sticking device, 11. Control platform, 12. Seat, 13. Hydraulic oil tank, 14. Main switch, 15. Motor-driven oil pump, 16. Lifting cylinder, 17. Fixed plate frame, 18. Reducer Machine, 19. Drill pipe roller, 20. Hook, 21. Hoisting telescopic frame, 22. Pumping station platform, 23. Push cylinder, 24. Crawler hydraulic motor, 25. Electric bell, 26. Drill frame.
具体实施方式Detailed ways
第一实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达24的履带,固定在履带架1上的泵站平台22,泵站平台22上设置供电总开关14、液压油箱13、电机驱动的油泵15、控制平台11、座椅12,特点在于:还包括固定在履带架1上的升降油缸16,升降油缸16固定钻机架26,钻机架26固定有支撑油缸2、固定贴板架17、电机3驱动的减速器18、推移油缸23放置钻杆4的钻杆托辊19,固定贴板架17还固定带卡钻装置10的卡钻装置架9、钻杆拆装装置。The first embodiment, referring to Fig. 1 and Fig. 2, a crawler tunnel drilling rig for coal mines with detachable drill rods, mainly includes a crawler with a crawler hydraulic motor 24, a pumping station platform 22 fixed on the crawler frame 1, The power supply main switch 14, hydraulic oil tank 13, motor-driven oil pump 15, control platform 11, and seat 12 are arranged on the pumping station platform 22. Frame 26, the drilling rig frame 26 is fixed with support oil cylinder 2, fixed board frame 17, reducer 18 driven by motor 3, push cylinder 23 to place the drill pipe idler 19 of drill pipe 4, fixed board frame 17 is also fixed with a stuck drill The sticking drill device frame 9 of device 10, the drill pipe dismounting device.
第二实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达24的履带,固定在履带架1上的泵站平台22,泵站平台22上设置供电总开关14、液压油箱13、电机驱动的油泵15、控制平台11、座椅12,特点在于:还包括固定在履带架1上的升降油缸16,升降油缸16固定钻机架26,钻机架26固定有支撑油缸2、固定贴板架17、电机3驱动的减速器18、推移油缸23放置钻杆4的钻杆托辊19,固定贴板架17还固定带卡钻装置10的卡钻装置架9、钻杆拆装装置。The second embodiment, referring to Fig. 1 and Fig. 2, a crawler tunnel drilling rig for coal mines with detachable drill rods, mainly includes a crawler with a crawler hydraulic motor 24, a pumping station platform 22 fixed on the crawler frame 1, The power supply main switch 14, hydraulic oil tank 13, motor-driven oil pump 15, control platform 11, and seat 12 are arranged on the pumping station platform 22. Frame 26, the drilling rig frame 26 is fixed with support oil cylinder 2, fixed board frame 17, reducer 18 driven by motor 3, push cylinder 23 to place the drill pipe idler 19 of drill pipe 4, fixed board frame 17 is also fixed with a stuck drill The sticking drill device frame 9 of device 10, the drill pipe dismounting device.
其中:钻杆拆装装置包括固定在卡钻装置架9上部支撑套架8,支撑套架8套装固定有吊装导轨7的吊装伸缩架21,吊装导轨7上设置带吊装液压马达6的连有吊钩20的吊装滑轮座5。Among them: the drill pipe dismounting device includes a support sleeve frame 8 fixed on the upper part of the clamping device frame 9, and the support sleeve frame 8 is set with a hoisting telescopic frame 21 fixed with a hoisting guide rail 7, and a hoisting hydraulic motor 6 is provided on the hoisting guide rail 7. The hoisting pulley block 5 of suspension hook 20.
第三实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达24的履带,固定在履带架1上的泵站平台22,泵站平台22上设置供电总开关14、液压油箱13、电机驱动的油泵15、控制平台11、座椅12,特点在于:还包括固定在履带架1上的升降油缸16,升降油缸16固定钻机架26,钻机架26固定有支撑油缸2、固定贴板架17、电机3驱动的减速器18、推移油缸23放置钻杆4的钻杆托辊19,固定贴板架17还固定带卡钻装置10的卡钻装置架9、钻杆拆装装置。The third embodiment, referring to Fig. 1 and Fig. 2, a crawler tunnel drilling rig for coal mines with detachable drill rods, mainly includes a crawler with a crawler hydraulic motor 24, a pumping station platform 22 fixed on the crawler frame 1, The power supply main switch 14, hydraulic oil tank 13, motor-driven oil pump 15, control platform 11, and seat 12 are arranged on the pumping station platform 22. Frame 26, the drilling rig frame 26 is fixed with support oil cylinder 2, fixed board frame 17, reducer 18 driven by motor 3, push cylinder 23 to place the drill pipe idler 19 of drill pipe 4, fixed board frame 17 is also fixed with a stuck drill The sticking drill device frame 9 of device 10, the drill pipe dismounting device.
其中:钻杆拆装装置包括固定在卡钻装置架9上部支撑套架8,支撑套架8套装固定有吊装导轨7的吊装伸缩架21,吊装导轨7上设置带吊装液压马达6的连有吊钩20的吊装滑轮座5。Among them: the drill pipe dismounting device includes a support sleeve frame 8 fixed on the upper part of the clamping device frame 9, and the support sleeve frame 8 is set with a hoisting telescopic frame 21 fixed with a hoisting guide rail 7, and a hoisting hydraulic motor 6 is provided on the hoisting guide rail 7. The hoisting pulley block 5 of suspension hook 20.
其中:控制平台11分别油管连接吊装液压马达6、支撑油缸2、推移油缸23、升降油缸16、履带液压马达24、卡钻装置10,供电总开关14电连接供电电源、控制平台11,控制平台11分别电连接电机3、电机驱动的油泵15,液压油箱13油管连接电机驱动的油泵15。Among them: the control platform 11 is connected to the hoisting hydraulic motor 6, the support cylinder 2, the push cylinder 23, the lifting cylinder 16, the crawler hydraulic motor 24, the drilling device 10, and the main power switch 14 is electrically connected to the power supply, the control platform 11, and the control platform. 11 are respectively electrically connected to the motor 3 and the motor-driven oil pump 15, and the oil pipe of the hydraulic oil tank 13 is connected to the motor-driven oil pump 15.
第四实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机,主要包括带有履带液压马达24的履带,固定在履带架1上的泵站平台22,泵站平台22上设置供电总开关14、液压油箱13、电机驱动的油泵15、控制平台11、座椅12,特点在于:还包括固定在履带架1上的升降油缸16,升降油缸16固定钻机架26,钻机架26固定有支撑油缸2、固定贴板架17、电机3驱动的减速器18、推移油缸23放置钻杆4的钻杆托辊19,固定贴板架17还固定带卡钻装置10的卡钻装置架9、钻杆拆装装置。The fourth embodiment, referring to Fig. 1 and Fig. 2, is a crawler-type tunnel drilling rig for coal mines with detachable drill rods, mainly including a crawler with a crawler hydraulic motor 24, a pumping station platform 22 fixed on the crawler frame 1, The power supply main switch 14, hydraulic oil tank 13, motor-driven oil pump 15, control platform 11, and seat 12 are arranged on the pumping station platform 22. Frame 26, the drilling rig frame 26 is fixed with support oil cylinder 2, fixed board frame 17, reducer 18 driven by motor 3, push cylinder 23 to place the drill pipe idler 19 of drill pipe 4, fixed board frame 17 is also fixed with a stuck drill The sticking drill device frame 9 of device 10, the drill pipe dismounting device.
其中:钻杆拆装装置包括固定在卡钻装置架9上部支撑套架8,支撑套架8套装固定有吊装导轨7的吊装伸缩架21,吊装导轨7上设置带吊装液压马达6的连有吊钩20的吊装滑轮座5。Among them: the drill pipe dismounting device includes a support sleeve frame 8 fixed on the upper part of the clamping device frame 9, and the support sleeve frame 8 is set with a hoisting telescopic frame 21 fixed with a hoisting guide rail 7, and a hoisting hydraulic motor 6 is provided on the hoisting guide rail 7. The hoisting pulley block 5 of suspension hook 20.
其中:控制平台11分别油管连接吊装液压马达6、支撑油缸2、推移油缸23、升降油缸16、履带液压马达24、卡钻装置10,供电总开关14电连接供电电源、控制平台11,控制平台11分别电连接电机3、电机驱动的油泵15,液压油箱13油管连接电机驱动的油泵15。Among them: the control platform 11 is connected to the hoisting hydraulic motor 6, the support cylinder 2, the push cylinder 23, the lifting cylinder 16, the crawler hydraulic motor 24, the drilling device 10, and the main power switch 14 is electrically connected to the power supply, the control platform 11, and the control platform. 11 are respectively electrically connected to the motor 3 and the motor-driven oil pump 15, and the oil pipe of the hydraulic oil tank 13 is connected to the motor-driven oil pump 15.
其中:控制平台11电连接设于吊轨上的电铃25。Wherein: the control platform 11 is electrically connected to the electric bell 25 located on the suspension rail.
第五实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机的使用方法,包括打开供电总开关14,从控制平台11操作履带液压马达24,将钻机移至打钻位置,特点在于:从控制平台11做以下操作,升降油缸16调整钻孔角度,支撑油缸2支撑固定在巷道两侧,①手动吊装滑轮座5使吊钩20到达钻杆4位置,操作吊装液压马达6,用吊钩吊起钻杆4后,手动吊装滑轮座5将钻杆4吊到钻杆托辊19位置,操作吊装液压马达6将钻杆4放在钻杆托辊19上,操作卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4连接于钻机上,打开卡钻装置10,启动钻机钻进到一根钻杆深度后,停止钻进,启动卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4从钻机上卸下,重复①操作,完成打钻到要求钻孔深度。The fifth embodiment, referring to Fig. 1 and Fig. 2, a method of using a crawler tunnel drilling rig for coal mines with detachable drill rods, including turning on the main power switch 14, operating the crawler hydraulic motor 24 from the control platform 11, and moving the drilling rig To the drilling position, the features are as follows: do the following operations from the control platform 11, the lifting cylinder 16 adjusts the drilling angle, the support cylinder 2 supports and fixes on both sides of the roadway, ① Manually hoist the pulley seat 5 to make the hook 20 reach the position of the drill pipe 4, Operate the hoisting hydraulic motor 6, lift the drill pipe 4 with a hook, manually hoist the pulley seat 5 to hoist the drill pipe 4 to the position of the drill pipe idler 19, and operate the hoisting hydraulic motor 6 to place the drill pipe 4 on the drill pipe idler 19 First, operate the drill clamping device 10 to clamp the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to connect the drill rod 4 to the drilling machine, open the drill clamping device 10, and start the drilling machine to drill to the depth of a drill pipe Finally, stop drilling, start the drill sticking device 10 to block the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to unload the drill pipe 4 from the drilling rig, repeat the operation ①, and complete drilling to the required hole depth.
第六实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机的使用方法,包括打开供电总开关14,从控制平台11操作履带液压马达24,将钻机移至打钻位置,特点在于:从控制平台11做以下操作,升降油缸16调整钻孔角度,支撑油缸2支撑固定在巷道两侧,①手动吊装滑轮座5使吊钩20到达钻杆4位置,操作吊装液压马达6,用吊钩吊起钻杆4后,手动吊装滑轮座5将钻杆4吊到钻杆托辊19位置,操作吊装液压马达6将钻杆4放在钻杆托辊19上,操作卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4连接于钻机上,打开卡钻装置10,启动钻机钻进到一根钻杆深度后,停止钻进,启动卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4从钻机上卸下,重复①操作,完成打钻到要求钻孔深度。The sixth embodiment, referring to Fig. 1 and Fig. 2, a method of using a crawler-type tunnel drilling rig for coal mines with detachable drill rods, including turning on the main power switch 14, operating the crawler hydraulic motor 24 from the control platform 11, and moving the drilling rig To the drilling position, the features are as follows: do the following operations from the control platform 11, the lifting cylinder 16 adjusts the drilling angle, the support cylinder 2 supports and fixes on both sides of the roadway, ① Manually hoist the pulley seat 5 to make the hook 20 reach the position of the drill pipe 4, Operate the hoisting hydraulic motor 6, lift the drill pipe 4 with a hook, manually hoist the pulley seat 5 to hoist the drill pipe 4 to the position of the drill pipe idler 19, and operate the hoisting hydraulic motor 6 to place the drill pipe 4 on the drill pipe idler 19 First, operate the drill clamping device 10 to clamp the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to connect the drill rod 4 to the drilling machine, open the drill clamping device 10, and start the drilling machine to drill to the depth of a drill pipe Finally, stop drilling, start the drill sticking device 10 to block the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to unload the drill pipe 4 from the drilling rig, repeat the operation ①, and complete drilling to the required hole depth.
其中:当打钻到要求钻孔深度后,②启动电机3驱动减速器18,启动推移油缸23将钻杆4从钻孔中拉出一根钻杆深度后停止,启动卡钻装置10将下一根钻杆4卡住,卸下一根钻杆4,手动推移吊装滑轮座5至卸下一根钻杆4的位置,启动吊装液压马达6将此钻杆吊起后,手动推移吊装滑轮座5至钻杆堆场,放下钻杆4,重复②操作,完成所有钻杆拆卸后,从控制平台11做以下操作,升降油缸16复位,支撑油缸2收起,完成一个钻孔施工。Wherein: after drilling to the required drilling depth, 2. start the motor 3 to drive the reducer 18, start the push cylinder 23 to pull the drill pipe 4 out of the borehole and stop after a depth of the drill pipe, and start the sticking device 10 to move down. A drill pipe 4 is stuck, unload a drill pipe 4, manually push the hoisting pulley seat 5 to the position where a drill pipe 4 is unloaded, start the hoisting hydraulic motor 6 to hoist the drill pipe, and then manually push the hoisting pulley Block 5 to the drill pipe storage yard, put down the drill pipe 4, repeat the operation ②, after completing the disassembly of all drill pipes, do the following operations from the control platform 11, the lifting cylinder 16 resets, the support cylinder 2 is packed, and a drilling construction is completed.
第七实施例,参见图1、图2,一种可拆装钻杆的煤矿用履带式坑道钻机的使用方法,包括打开供电总开关14,从控制平台11操作履带液压马达24,将钻机移至打钻位置,特点在于:从控制平台11做以下操作,升降油缸16调整钻孔角度,支撑油缸2支撑固定在巷道两侧,①手动吊装滑轮座5使吊钩20到达钻杆4位置,操作吊装液压马达6,用吊钩吊起钻杆4后,手动吊装滑轮座5将钻杆4吊到钻杆托辊19位置,操作吊装液压马达6将钻杆4放在钻杆托辊19上,操作卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4连接于钻机上,打开卡钻装置10,启动钻机钻进到一根钻杆深度后,停止钻进,启动卡钻装置10卡住钻杆4,启动电机3驱动减速器18,启动推移油缸23将钻杆4从钻机上卸下,重复①操作,完成打钻到要求钻孔深度。The seventh embodiment, referring to Fig. 1 and Fig. 2, a method of using a crawler-type tunnel drilling rig for coal mines with detachable drill pipes, including turning on the main power switch 14, operating the crawler hydraulic motor 24 from the control platform 11, and moving the drilling rig To the drilling position, the features are as follows: do the following operations from the control platform 11, the lifting cylinder 16 adjusts the drilling angle, the support cylinder 2 supports and fixes on both sides of the roadway, ① Manually hoist the pulley seat 5 to make the hook 20 reach the position of the drill pipe 4, Operate the hoisting hydraulic motor 6, lift the drill pipe 4 with a hook, manually hoist the pulley seat 5 to hoist the drill pipe 4 to the position of the drill pipe idler 19, and operate the hoisting hydraulic motor 6 to place the drill pipe 4 on the drill pipe idler 19 First, operate the drill clamping device 10 to clamp the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to connect the drill rod 4 to the drilling machine, open the drill clamping device 10, and start the drilling machine to drill to the depth of a drill pipe Finally, stop drilling, start the drill sticking device 10 to block the drill pipe 4, start the motor 3 to drive the reducer 18, start the push cylinder 23 to unload the drill pipe 4 from the drilling rig, repeat the operation ①, and complete drilling to the required hole depth.
其中:当打钻到要求钻孔深度后,②启动电机3驱动减速器18,启动推移油缸23将钻杆4从钻孔中拉出一根钻杆深度后停止,启动卡钻装置10将下一根钻杆4卡住,卸下一根钻杆4,手动推移吊装滑轮座5至卸下一根钻杆4的位置,启动吊装液压马达6将此钻杆吊起后,手动推移吊装滑轮座5至钻杆堆场,放下钻杆4,重复②操作,完成所有钻杆拆卸后,从控制平台11做以下操作,升降油缸16复位,支撑油缸2收起,完成一个钻孔施工。Wherein: after drilling to the required drilling depth, 2. start the motor 3 to drive the reducer 18, start the push cylinder 23 to pull the drill pipe 4 out of the borehole and stop after a depth of the drill pipe, and start the sticking device 10 to move down. A drill pipe 4 is stuck, unload a drill pipe 4, manually push the hoisting pulley seat 5 to the position where a drill pipe 4 is unloaded, start the hoisting hydraulic motor 6 to hoist the drill pipe, and then manually push the hoisting pulley Block 5 to the drill pipe storage yard, put down the drill pipe 4, repeat the operation ②, after completing the disassembly of all drill pipes, do the following operations from the control platform 11, the lifting cylinder 16 resets, the support cylinder 2 is packed, and a drilling construction is completed.
其中:当打开供电总开关14时,电铃响数秒钟时间,提醒钻孔钻进施工开始,当拆装钻杆时有角度影响时,手动推拉或撞击吊装导轨7,使吊装伸缩架21在支撑套架8中滑动实现调整。Wherein: when the power supply main switch 14 is turned on, the electric bell rings for a few seconds to remind the drilling and drilling construction to start. Sliding realizes adjustment in cover frame 8.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721290170.3U CN207892527U (en) | 2017-10-09 | 2017-10-09 | The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721290170.3U CN207892527U (en) | 2017-10-09 | 2017-10-09 | The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207892527U true CN207892527U (en) | 2018-09-21 |
Family
ID=63546886
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721290170.3U Expired - Fee Related CN207892527U (en) | 2017-10-09 | 2017-10-09 | The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207892527U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107676036A (en) * | 2017-10-09 | 2018-02-09 | 煤科集团沈阳研究院有限公司 | The colliery crawler-type tunnel drilling rig and application method of dismantled and assembled drilling rod |
| CN115961989A (en) * | 2022-12-12 | 2023-04-14 | 江苏浩吉矿用装备有限公司 | Automatic anchor rod drilling machine for coal mine |
-
2017
- 2017-10-09 CN CN201721290170.3U patent/CN207892527U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107676036A (en) * | 2017-10-09 | 2018-02-09 | 煤科集团沈阳研究院有限公司 | The colliery crawler-type tunnel drilling rig and application method of dismantled and assembled drilling rod |
| CN115961989A (en) * | 2022-12-12 | 2023-04-14 | 江苏浩吉矿用装备有限公司 | Automatic anchor rod drilling machine for coal mine |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107676036A (en) | The colliery crawler-type tunnel drilling rig and application method of dismantled and assembled drilling rod | |
| CN103670420B (en) | Tunneling boring shaft drilling machine | |
| US9995086B2 (en) | Center-pillared full-face shaft drilling machine | |
| CN103485717B (en) | The all-hydraulic anchor shaft anchor cable drill carriage of a kind of four arm | |
| CN201747390U (en) | Suspension type multifunctional tunnel operation machine | |
| CN105840100B (en) | A kind of automatic moving type water jet drilling machine | |
| CN104989272B (en) | Upward Raise Drilling Technology | |
| CN104695984A (en) | Multifunctional tunnel construction trolley | |
| CN203891763U (en) | Full-hydraulic anchor rod and anchor rope drill wagon | |
| CN103821464B (en) | Tubing string vertical vehicular full-automatic smart hydraulic workover rig | |
| CN106948826A (en) | A kind of multifunctional tunnel repair machine | |
| CN103899320B (en) | Direct pipelayer | |
| CN204627622U (en) | The multi-functional construction trolley in a kind of tunnel | |
| CN207892527U (en) | The coal mine crawler-type tunnel drilling rig of dismantled and assembled drilling rod | |
| CN201232566Y (en) | Novel blasting top coal hydraulic support | |
| CN201354588Y (en) | Pneumatic tracked hydraulic jumbo | |
| CN204024469U (en) | The all-hydraulic anchor shaft anchor cable drill carriage of six arms that a kind of supporting continuous miner uses | |
| CN210134839U (en) | A search and salvage device for a drill bit falling into a vertical blast hole | |
| CN203603910U (en) | Full-face vertical shaft drill | |
| CN206554793U (en) | Use from the platform-type anti-well rig of shifting in a kind of colliery | |
| CN108533300A (en) | A kind of Telescopic movable supporting arch | |
| CN205225102U (en) | Automatic workover machine of skid -mounted formula | |
| CN204040898U (en) | The all-hydraulic anchor shaft anchor cable drill carriage of eight arms that a kind of supporting continuous miner uses | |
| CN216342231U (en) | Simple platform for installing tunnel lining structure | |
| CN204326963U (en) | The anti-well boring device of a kind of vertical shaft |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 |