CN207887912U - A kind of porous bit synchronization Full-automatic drilling line - Google Patents
A kind of porous bit synchronization Full-automatic drilling line Download PDFInfo
- Publication number
- CN207887912U CN207887912U CN201721745853.3U CN201721745853U CN207887912U CN 207887912 U CN207887912 U CN 207887912U CN 201721745853 U CN201721745853 U CN 201721745853U CN 207887912 U CN207887912 U CN 207887912U
- Authority
- CN
- China
- Prior art keywords
- tubing
- pedestal
- fixture block
- borehole drill
- bit synchronization
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of porous bit synchronization Full-automatic drilling lines, including pedestal, the base-plates surface is provided with several borehole drill constructions, several borehole drill constructions are arranged in order setting along tubing conveying direction, mobile fixed part is additionally provided between the pedestal and borehole drill construction, the mobile fixed part is arranged along tubing conveying direction, transmission detent mechanism is additionally provided on the pedestal, the transmission detent mechanism is for colliery carries tubing and the drilling of match-drill mechanism, the borehole drill construction includes multiple tubing rollgangs being arranged along tubing conveying direction and tubing hold-down mechanism.The utility model has the effect of that easily adjusting, steady production, and production efficiency are high, and labor intensity is low, saves processing cost.
Description
Technical field
The utility model is related to tubing preparation fields, and in particular to a kind of porous bit synchronization Full-automatic drilling line.
Background technology
It is porous for being bored on the larger big pipe fitting of batch, and hole is not of uniform size, with live all be using laser cutting or
Prepared by the mode of punching, cost is larger, and typically single hole operation, and speed is slower, is unable to reach and stablizes quickly
Speed of production, and hole on the same axis also can not exact position, drilling quality substantially reduces.
Invention content
The technical problem to be solved by the present invention is to overcome problem above of the existing technology, provide a kind of porous
Bit synchronization Full-automatic drilling line has the effect of that easily adjusting, steady production, and production efficiency are high, and labor intensity is low, saves and adds
Work cost.
In order to solve the above technical problems, reaching above-mentioned technique effect, the utility model is achieved through the following technical solutions:
A kind of porous bit synchronization Full-automatic drilling line, including pedestal, the base-plates surface are provided with several borehole drill constructions, if
It does the borehole drill construction and is arranged in order setting along tubing conveying direction, be additionally provided between the pedestal and borehole drill construction mobile solid
Determine portion, the mobile fixed part is arranged along tubing conveying direction, and transmission detent mechanism, the transmission are additionally provided on the pedestal
For detent mechanism for colliery carries tubing and the drilling of match-drill mechanism, the borehole drill construction includes multiple along the setting of tubing conveying direction
Tubing rollgang and tubing hold-down mechanism.
Further, the mobile fixed part includes the convex conduit being arranged in base-plates surface, the convex conduit
Inside it is provided with the bolt assembly for the borehole drill construction that locks.
Further, each borehole drill construction all has one or more drill bit.
Further, further include end blocking mechanism, the conveying in transmission detent mechanism is arranged in the end blocking mechanism
Discharge end, the end blocking mechanism includes barrier plate, and lifting cylinder is provided in the blocking version.
Further, the tubing hold-down mechanism includes lower fixture block and upper fixture block, is all provided in the lower fixture block and upper fixture block
It is equipped with imitation-shaped groove, the lower fixture block is fixed on fixture block pedestal, and the upper fixture block is also connect with lifting moving component.
Further, the tubing rollgang is arranged on lifting frame, and the lifting frame bottom is provided with evacuation
Cylinder, the evacuation cylinder are arranged on roller-way pedestal, and guidance set is additionally provided between the roller-way pedestal and lifting frame,
The tubing rollgang is also connect with feeder motor, and the feeder motor is fixed on lifting frame.
Further, the borehole drill construction includes drill rack, and ball linear track, institute are provided on the drill rack
It states ball linear track to connect with drilling machine and screw rod transmission component, the screw rod transmission component is connect with lead screw power motor.
The utility model has the beneficial effects that:
Tubing can be carried out to mobile transport by tubing rollgang and tubing hold-down mechanism and gripped, clamping is solid
It can be drilled, and position is fixed after clamping, therefore multiple borehole drill constructions can work at the same time, be improved by borehole drill construction after fixed
Production efficiency.And it is adjustable to move the fixed position that fixed part enables to borehole drill construction on pedestal, to adapt to different batches pipe
Adjustment under material bore position different situations is adjusted and is taken less, convenient and efficient.
The above description is merely an outline of the technical solution of the present invention, in order to better understand the skill of the utility model
Art means, and can be implemented in accordance with the contents of the specification, below on the preferred embodiment of the present invention and the accompanying drawings in detail
It describes in detail bright as after.Specific embodiment of the present utility model is shown in detail by following embodiment and its attached drawing.
Description of the drawings
Attached drawing described herein is used to provide a further understanding of the present invention, and is constituted part of this application,
The exemplary embodiment of the utility model and the description thereof are used to explain the utility model, does not constitute to the improper of the utility model
It limits.In the accompanying drawings:
Fig. 1 is the overall structure diagram of one embodiment of the utility model;
Fig. 2 is the utility model convex channel portion structural schematic diagram;
Fig. 3 is the utility model end blocking mechanism structural schematic diagram;
Fig. 4 is the utility model tubing hold-down mechanism structural schematic diagram;
Fig. 5 is the utility model tubing rollgang part-structure schematic diagram;
Fig. 6 is the utility model borehole drill construction structural schematic diagram.
Figure label explanation:1, pedestal, 2, borehole drill construction, 3, mobile fixed part, 4, transmission detent mechanism, 5, tubing conveying
Roller-way, 6, tubing hold-down mechanism, 7, convex conduit, 8, bolt assembly, 9, end blocking mechanism, 10, barrier plate, 11, lifting
Cylinder, 12, lower fixture block, 13, upper fixture block, 14, imitation-shaped groove, 15, fixture block pedestal, 16, lifting moving component, 17, lifting frame,
18, cylinder is avoided, 19, roller-way pedestal, 20, guidance set, 21, feeder motor, 22, drill rack, 23, ball linear track,
24, lead screw power motor, 25, drilling machine.
Specific implementation mode
Below with reference to the accompanying drawings and in conjunction with the embodiments, the utility model is described in detail.
Shown in referring to Figures 1 and 2, an embodiment of the porous bit synchronization Full-automatic drilling line of the utility model, including base
Seat 1, base-plates surface are provided with several borehole drill constructions 2, and several borehole drill constructions are arranged in order setting along tubing conveying direction, pedestal and
Mobile fixed part 3 is additionally provided between borehole drill construction, mobile fixed part is arranged along tubing conveying direction, and mobile fixed part is mainly used
It, can also be quick in borehole drill construction is fixed on base-plates surface, and when borehole drill construction position is matched with bore position portion
Mobile adjustment;Transmission detent mechanism 4 is additionally provided on pedestal, tubing can be carried out conveying movement and closed by transmission detent mechanism
Right position, which is set, fixes tubing, is drilled with match-drill mechanism;Wherein, borehole drill construction includes multiple being arranged along tubing conveying direction
Tubing rollgang 5 and tubing hold-down mechanism 6, tubing rollgang support set pipeline and rotate, and realize the movement of tubing, tubing pressure
The outside of tubing can be then clamped in tight mechanism, with fixed position.
Above-mentioned mobile fixed part includes the convex conduit 7 being arranged in base-plates surface, is provided with and is used in convex conduit
The bolt assembly 8 of locking borehole drill construction, is that bolt assembly is unscrewed to the movement that borehole drill construction can be realized when needing movement, is moved
It is dynamic that bolt assembly is tightened afterwards in place.
With reference to shown in Fig. 3, in order to find the clip position of tubing accurately, end blocking mechanism 9 can also be set, end stops machine
The conveying discharge end in transmission detent mechanism is arranged in structure, and end blocking mechanism includes barrier plate 10, stops and is provided with lifting in version
Cylinder 11, when tubing is when conveying mobile, lifting cylinder, which stretches out, extend out to barrier plate in the mobile space of tubing conveying, tubing
End can be kept out on barrier plate, realize tubing positioning, and gripping for tubing can ensure bore position after positioning, when
After tubing drills, lifting cylinder action declines barrier plate, therefore tubing can smoothly discharge.
With reference to shown in Fig. 4, tubing hold-down mechanism includes lower fixture block 12 and upper fixture block 13, passes through matching for upper fixture block and lower fixture block
Tubing is fixedly clamped by conjunction, and imitation-shaped groove 14 is both provided in lower fixture block and upper fixture block, to increase contact surface, improves steady after clamping
Qualitative, lower fixture block is fixed on fixture block pedestal 15, and upper fixture block is also connect with lifting moving component 16, lifting moving component energy
Upper fixture block is enough driven to carry out clamping downwards or unclamp upwards, direction can also be what horizontal cross was arranged herein certainly, unclamp
It is convenient for the conveying of tubing to move afterwards.
Referring to Figure 5, tubing rollgang is arranged on lifting frame 17, and lifting frame bottom is provided with evacuation cylinder
18, evacuation cylinder is arranged on roller-way pedestal 19, guidance set 20 is additionally provided between roller-way pedestal and lifting frame, tubing is defeated
Roller-way is sent also to be connect with feeder motor 21, feeder motor is fixed on lifting frame, and lifting frame support tubing conveying roller
Road, the action by avoiding cylinder realize that the effect extended and retracted can be connected on tubing when extended, pass through conveying
Motor rotation provides conveying power, and tubing can be moved, and when withdrawn, tubing rollgang is detached with tubing, does not influence to manage
The clamping and drilling of material.
With reference to shown in Fig. 6, in one embodiment, borehole drill construction includes drill rack 22, and ball is provided on drill rack
Linear track 23, ball linear track are connect with drilling machine 25 and screw rod transmission component, screw rod transmission component and lead screw power motor
24 connections.High precision ball linear track is wherein used, sliding is light, stablizes, is not easy to wear, easy-maintaining.Screw rod transmission component
Coordinate the reciprocating motion power of supply drilling machine with lead screw power motor, realizes drilling effect.
Wherein each borehole drill construction all has one or more drill bit.When needing to bore a hole, it is only necessary to install one
Two drill bits can be arranged when needing drill two holes in a drill bit, and the wherein power resources of drill bit are that the prior art is not done
It is described in detail.When needing in the same radial direction of tubing or the multiple holes of the radially brill that is closer to, can be designed as shown in fig. 6
Structure can carry out tubing multi-faceted how dynamic boring work simultaneously.
The preferred embodiment that these are only the utility model, is not intended to limit the utility model, for this field
Technical staff for, various modifications and changes may be made to the present invention.Within the spirit and principle of the utility model,
Any modification, equivalent replacement, improvement and so on should be included within the scope of protection of this utility model.
Claims (7)
1. a kind of porous bit synchronization Full-automatic drilling line, it is characterised in that:Including pedestal, if the base-plates surface is provided with drilled dry
Holes mechanism, several borehole drill constructions are arranged in order setting along tubing conveying direction, are also set between the pedestal and borehole drill construction
It is equipped with mobile fixed part, the mobile fixed part is arranged along tubing conveying direction, and transmission localization machine is additionally provided on the pedestal
Structure, for the transmission detent mechanism for colliery carries tubing and the drilling of match-drill mechanism, the borehole drill construction includes multiple along tubing
The tubing rollgang and tubing hold-down mechanism of conveying direction setting.
2. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:The mobile fixed part includes
Convex conduit in base-plates surface is set, the bolt assembly for the borehole drill construction that locks is provided in the convex conduit.
3. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:Each borehole drill construction is equal
With one or more drill bit.
4. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:It further include end blocking machine
The conveying discharge end in transmission detent mechanism is arranged in structure, the end blocking mechanism, and the end blocking mechanism includes barrier plate,
It is provided with lifting cylinder on the barrier plate.
5. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:The tubing hold-down mechanism packet
Lower fixture block and upper fixture block are included, imitation-shaped groove is both provided in the lower fixture block and upper fixture block, the lower fixture block is fixed at fixture block
On pedestal, the upper fixture block is also connect with lifting moving component.
6. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:The tubing rollgang is set
It sets on lifting frame, the lifting frame bottom is provided with evacuation cylinder, and the evacuation cylinder is arranged on roller-way pedestal, institute
It states and is additionally provided with guidance set between roller-way pedestal and lifting frame, the tubing rollgang is also connect with feeder motor, institute
Feeder motor is stated to be fixed on lifting frame.
7. porous bit synchronization Full-automatic drilling line according to claim 1, it is characterised in that:The borehole drill construction includes boring
Hole rack is provided with ball linear track, the ball linear track and drilling machine and screw rod transmission component on the drill rack
Connection, the screw rod transmission component are connect with lead screw power motor.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721136057 | 2017-09-06 | ||
CN201721136057X | 2017-09-06 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207887912U true CN207887912U (en) | 2018-09-21 |
Family
ID=63548747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721745853.3U Expired - Fee Related CN207887912U (en) | 2017-09-06 | 2017-12-14 | A kind of porous bit synchronization Full-automatic drilling line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207887912U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109746476A (en) * | 2019-02-27 | 2019-05-14 | 中建五局安装工程有限公司 | A kind of elliptical air manufacturing device |
CN112496759A (en) * | 2020-11-17 | 2021-03-16 | 浙江景宁周氏机械有限公司 | Porous drilling device |
CN113333809A (en) * | 2021-06-10 | 2021-09-03 | 重庆市汇畅钢管制造有限公司 | Multi-pipe synchronous punching device |
-
2017
- 2017-12-14 CN CN201721745853.3U patent/CN207887912U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109746476A (en) * | 2019-02-27 | 2019-05-14 | 中建五局安装工程有限公司 | A kind of elliptical air manufacturing device |
CN112496759A (en) * | 2020-11-17 | 2021-03-16 | 浙江景宁周氏机械有限公司 | Porous drilling device |
CN113333809A (en) * | 2021-06-10 | 2021-09-03 | 重庆市汇畅钢管制造有限公司 | Multi-pipe synchronous punching device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207887912U (en) | A kind of porous bit synchronization Full-automatic drilling line | |
CN107891273B (en) | Multi-station machining forming hole intelligent equipment | |
CN204018781U (en) | A kind of multistation valve flange drilling equipment | |
CN204018780U (en) | A kind of double-ended double-station holes pressure-plate boring device | |
CN208976890U (en) | A kind of crankshaft oil hole facing attachment | |
CN205237550U (en) | Multistation revolving stage and positioner thereof | |
CN201644856U (en) | Special drilling machine for machining 465Q cylinder cover connecting holes | |
CN108515306A (en) | A kind of trigone circular arc drilling rod Intelligent welding equipment | |
KR20120077918A (en) | A drilling machine | |
CN107971511A (en) | A kind of grooved bit component, perforating device and drilling method | |
CN107150241A (en) | A kind of tool for drilling fixture | |
CN207723538U (en) | Dowel hole special fixture is bored on pull-fork assembly | |
CN110576201B (en) | Multi-station feeding type drilling machine | |
CN212144572U (en) | Numerical control machine tool special for machining oblique and straight oil holes of crankshaft | |
CN213288784U (en) | Device for boring deep hole on lathe | |
CN208628848U (en) | A kind of Circular Pipe three-dimensional brill milling workpiece special processing equipment | |
CN104070200A (en) | Drilling machine | |
CN207086958U (en) | A kind of automatic double-head drilling machine | |
CN207521731U (en) | A kind of adjustable bore bit fixture of boring direction | |
CN208584241U (en) | Drilling tool is used in axial support | |
CN208214700U (en) | A kind of trigone circular arc drilling rod Intelligent welding equipment | |
CN105290455A (en) | Drilling device for forming timing hole in balance shaft | |
CN207857914U (en) | A kind of novel drill jig of auto parts and components processing | |
CN201604014U (en) | Large-scale ring piece bolt hole chamfering tooling | |
CN204094526U (en) | A kind of wheel automatic drilling machine automatic positioning equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180921 Termination date: 20191214 |