CN207878688U - A kind of construction site board house sets up typhoon protection measure ruggedized construction - Google Patents

A kind of construction site board house sets up typhoon protection measure ruggedized construction Download PDF

Info

Publication number
CN207878688U
CN207878688U CN201820018505.4U CN201820018505U CN207878688U CN 207878688 U CN207878688 U CN 207878688U CN 201820018505 U CN201820018505 U CN 201820018505U CN 207878688 U CN207878688 U CN 207878688U
Authority
CN
China
Prior art keywords
eaves
steel pipe
board house
construction site
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820018505.4U
Other languages
Chinese (zh)
Inventor
刘热强
谢海鹏
方建华
罗炽乐
刘芳
徐书杰
江国明
翁坚生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Original Assignee
Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd filed Critical Guangdong Provincial Architectural Engineering Machinery Construction Co Ltd
Priority to CN201820018505.4U priority Critical patent/CN207878688U/en
Application granted granted Critical
Publication of CN207878688U publication Critical patent/CN207878688U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

The utility model is related to construction site board house typhoon protection measures more particularly to a kind of construction site board house to set up typhoon protection measure ruggedized construction.Including pre-buried anchoring ironware, pull rod, steel tube fastener and steel pipe;The steel pipe includes that longitudinal steel pipe, lateral steel pipe and eaves bear down on one short steel pipes;The longitudinal direction steel pipe is erected at lateral steel pipe on house panel, it is fixedly connected by steel tube fastener, choose and be provided with eaves between the eaves of roofing position and longitudinal steel pipe on eaves face and bear down on one short steel pipes, the eaves short steel pipes that bear down on one are fixedly connected with longitudinal steel pipe by steel tube fastener;The pre-buried anchoring ironware is embedded in ground, is connect by pull rod with longitudinal steel pipe.The utility model is beared down on one by installing short steel pipes additional on the eaves for choosing roofing position, and corresponding supporting rod is installed below eaves, thus to eaves fix up and down, is strengthened resistance of the eaves to wind-force.

Description

A kind of construction site board house sets up typhoon protection measure ruggedized construction
Technical field
The utility model is related to construction site board house typhoon protection measures more particularly to a kind of construction site board house to set up anti- Wind measure ruggedized construction.
Background technology
Construction site board house is built as general shanty, has unification handsome in appearance, easy construction, construction speed Degree is fast, is easy to dismounting, repeatable the advantages that utilizing, and is had a wide range of applications in terms of construction and rescue and relief work.And it compares In permanent house, construction site board house wind resistance is poor, especially in coastal area, if do not considered violent typhoon to movable plate The influence in room, it may occur that situations such as board house roof is thrown, building structure is impaired or even is toppled over.
The prior art is by installation steel at the top of roof boarding in the problem of processing construction site board house wind resistance difference Pipe carries out reinforcing of bearing down on one, while reinforcing the connection of roof boarding and ground in the pre-buried anchor in ground.But for eaves position by There is relative relief in roof boarding and eaves, cross bar can only be pressed on roof boarding when steel pipe is beared down on one, and eaves are not appointed What reinforce, be easy to cause choose roofing position eaves part blown by typhoon it is winged.
Utility model content
The utility model is at least one defect overcome described in the above-mentioned prior art(It is insufficient), a kind of construction site is provided Board house sets up typhoon protection measure ruggedized construction.
In order to solve the above technical problems, the technical solution of the utility model is as follows:
A kind of construction site board house sets up typhoon protection measure ruggedized construction, including pre-buried anchor, drawknot device, steel pipe Fastener and steel pipe;The steel pipe includes that longitudinal steel pipe, lateral steel pipe and eaves bear down on one short steel pipes;The longitudinal direction steel pipe and lateral steel Pipe support is located on board house roof boarding, is fixedly connected by steel tube fastener, chooses the eaves of roofing position and on eaves face Longitudinal steel pipe between be provided with eaves and bear down on one short steel pipes, the eaves short steel pipes that bear down on one pass through steel tube fastener with longitudinal steel pipe It is fixedly connected;Drawknot device one end is connect with longitudinal fastener for connection, the other end with pre-buried anchor.
The utility model key is to have installed the eaves short steel pipes that bear down on one additional on eaves face to bear down on one to eaves board, is solved Choose the problem of the eaves wind resistance difference of roofing position.
Further, eaves short steel pipes one end of bearing down on one is adjacent to eaves face.
Further, eaves lower part is installed with supporting rod, and described supporting rod one end is connect with house sidings, other end connection Eaves bottom.
Further, further, the pre-buried anchor can be pre-buried anchoring ironware, when installing pre-buried anchoring iron Part is embedded in ground.
Further, the drawknot device can be pull rod.
Further, the lateral steel pipe is erected at the ridge and eaves on roof, and the longitudinal direction steel pipe is erected at ridge It is fixedly connected with fastener between eaves, and with lateral steel pipe.
Compared with prior art, the construction site board house of the utility model sets up typhoon protection measure ruggedized construction by choosing Go out on the eaves of roofing position to install short steel pipes additional and bear down on one, corresponding supporting rod is installed below eaves, thus eaves are carried out Lower fixation, strengthens resistance of the eaves to wind-force.
Description of the drawings
Fig. 1 is the elevation of the utility model embodiment construction site board house;
Fig. 2 is the detail structure figure of the utility model embodiment construction site board house;
Wherein:1 pre-buried anchor, 2 drawknot devices, 3 eaves bear down on one short steel pipes, 4 steel tube fasteners, 5 longitudinal steel pipes 6 laterally Steel pipe, 7 supporting rods.
Specific implementation mode
In order to facilitate the understanding of those skilled in the art, below in conjunction with attached drawing and embodiment to the utility model into traveling One step is described in detail.
Embodiment one
A kind of construction site board house sets up typhoon protection measure ruggedized construction, including pre-buried anchor 1, drawknot device 2, steel Tube clamps 4 and steel pipe;The steel pipe includes that longitudinal steel pipe 5, lateral steel pipe 6 and eaves bear down on one short steel pipes 3;The longitudinal direction steel pipe 5 Be erected on board house roof boarding with lateral steel pipe 6, be fixedly connected by steel tube fastener 4, choose the eaves of roofing position with it is vertical It is provided with eaves between longitudinal steel pipe 5 on eaves face to bear down on one short steel pipes 3, the eaves bear down on one short steel pipes 3 and longitudinal steel pipe 5 are fixedly connected by steel tube fastener 4;Described 2 one end of drawknot device is connect with longitudinal steel pipe 5, the other end and pre-buried anchor 1 Connection.
Embodiment two
The present embodiment is similar to embodiment one, and further, the eaves 3 one end of short steel pipes of bearing down on one is adjacent to eaves face, room Eaves lower part is installed with supporting rod 7, and 7 one end of the supporting rod is connect with house sidings, and the other end connects eaves bottom.
The pre-buried anchor 1 includes pre-buried anchoring ironware, and when installing, pre-buried anchoring ironware was embedded in ground.The drawknot Device 2 includes pull rod.
The transverse direction steel pipe 6 be erected at the ridge on roof at eaves, the longitudinal direction steel pipe 5 be erected at ridge and eaves it Between, and be fixedly connected with the fastener 4 of lateral steel pipe 6.
In the present embodiment, pre-buried anchor 1 is pre-buried anchoring ironware, and drawknot device 2 is pull rod.
Obviously, above-described embodiment of the utility model is only intended to clearly illustrate the utility model example, and simultaneously Non- is the restriction to the embodiment of the utility model.For those of ordinary skill in the art, in above description On the basis of can also make other variations or changes in different ways.There is no need and unable to give thoroughly all embodiments It lifts.All any modification, equivalent and improvement made within the spirit and principle of the present invention etc. should be included in this Within the protection domain of utility model claims.

Claims (6)

1. a kind of construction site board house sets up typhoon protection measure ruggedized construction, which is characterized in that including pre-buried anchor(1)、 Drawknot device(2), steel tube fastener(4)And steel pipe;The steel pipe includes longitudinal steel pipe(5), lateral steel pipe(6)Bear down on one with eaves short Steel pipe(3);The longitudinal direction steel pipe(5)With lateral steel pipe(6)It is erected on board house roof boarding, passes through steel tube fastener(4)It is fixed to connect It connects, the eaves and longitudinal steel pipe on eaves face for choosing roofing position(5)Between be provided with eaves and bear down on one short steel pipes(3) , the eaves bear down on one short steel pipes(3)With longitudinal steel pipe(5)Pass through steel tube fastener(4)It is fixedly connected;The drawknot device(2)One End and longitudinal steel pipe(5)Connection, the other end and pre-buried anchor(1)Connection.
2. construction site board house according to claim 1 sets up typhoon protection measure ruggedized construction, which is characterized in that the room Eaves bears down on one short steel pipes(3)One end is adjacent to eaves face.
3. construction site board house according to claim 2 sets up typhoon protection measure ruggedized construction, which is characterized in that the room The lower part of eaves is installed with supporting rod(7), the supporting rod(7)One end is connect with house sidings, and the other end connects eaves bottom.
4. construction site board house according to claim 1 sets up typhoon protection measure ruggedized construction, which is characterized in that described pre- Bury anchor(1)Including pre-buried anchoring ironware, when installing, pre-buried anchoring ironware was embedded in ground.
5. construction site board house according to claim 1 sets up typhoon protection measure ruggedized construction, which is characterized in that the drawing Tie device(2)Including pull rod.
6. construction site board house according to claim 1 sets up typhoon protection measure ruggedized construction, which is characterized in that the cross To steel pipe(6)It is erected at the ridge and eaves on roof, the longitudinal direction steel pipe(5)Be erected between ridge and eaves, and with cross To steel pipe(6)Use fastener(4)It is fixedly connected.
CN201820018505.4U 2018-01-05 2018-01-05 A kind of construction site board house sets up typhoon protection measure ruggedized construction Active CN207878688U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820018505.4U CN207878688U (en) 2018-01-05 2018-01-05 A kind of construction site board house sets up typhoon protection measure ruggedized construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820018505.4U CN207878688U (en) 2018-01-05 2018-01-05 A kind of construction site board house sets up typhoon protection measure ruggedized construction

Publications (1)

Publication Number Publication Date
CN207878688U true CN207878688U (en) 2018-09-18

Family

ID=63505821

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820018505.4U Active CN207878688U (en) 2018-01-05 2018-01-05 A kind of construction site board house sets up typhoon protection measure ruggedized construction

Country Status (1)

Country Link
CN (1) CN207878688U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441025A (en) * 2018-12-17 2019-03-08 北京凯盛建材工程有限公司 A kind of fabricated roofing cornice support rod component, support unit and installation method
CN110005087A (en) * 2019-05-14 2019-07-12 中铁建工集团有限公司 Spelling pulling type movable plank house roofing global anti-wind system

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441025A (en) * 2018-12-17 2019-03-08 北京凯盛建材工程有限公司 A kind of fabricated roofing cornice support rod component, support unit and installation method
CN109441025B (en) * 2018-12-17 2024-03-29 北京凯盛建材工程有限公司 Assembled roof cornice supporting rod assembly, supporting unit and installation method
CN110005087A (en) * 2019-05-14 2019-07-12 中铁建工集团有限公司 Spelling pulling type movable plank house roofing global anti-wind system
CN110005087B (en) * 2019-05-14 2023-11-28 中铁建工集团有限公司 Assembled and drawn movable plank house roof wind-resistant system

Similar Documents

Publication Publication Date Title
CN207878688U (en) A kind of construction site board house sets up typhoon protection measure ruggedized construction
CN213449635U (en) High-speed railway station room clear water concrete canopy and high-speed railway station
CN207794693U (en) A kind of novel prolongable draining water proof type container house
CN203213303U (en) Structure of joint between steel beam and concrete pillar under condition of overlong lateral row frame
CN202530816U (en) A hurricane-shielding reinforcing device of a prefabricated house
CN101691785A (en) Bamboo structure house with open internal wall
CN212672593U (en) A roof duct wind resistance device
CN202899319U (en) Waterproof panel point of side wall of existing building and roof of new-built building
CN207453284U (en) A kind of roofing bottom plate and roof board system for improving water resistance
CN205976573U (en) Large -span stand cable protection canopy
CN209556766U (en) A kind of storm door of the substation in coastal cities
CN103015647B (en) A kind of subsides wall glass awning and mounting method thereof
CN212376156U (en) Roof leakage organized drainage device of box-type board house
CN207453290U (en) A kind of laterally attached roofing bottom plate and roof board system
CN201378977Y (en) Drainage steel column
CN217326149U (en) Waterproof node of light steel construction factory building gable parapet
CN105908906A (en) Roof panel capable of improving wind uplift resistance
CN105926866A (en) Roof panel support switch over device
CN206987720U (en) A kind of double shield cage cat ladders
CN206956945U (en) Connector between roof beam and wall top guide beam
CN219080764U (en) Anti-slip wooden house roof
CN201180345Y (en) House chimney reinforcement device
CN205369742U (en) A roofing system of falling into water for steel construction
CN205531042U (en) Upright lock stitches steel tile roofing system
KR101174043B1 (en) Roof structure for building and construction method of new roof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant