CN207847221U - A kind of assembly type communication base station iron tower - Google Patents
A kind of assembly type communication base station iron tower Download PDFInfo
- Publication number
- CN207847221U CN207847221U CN201820052426.5U CN201820052426U CN207847221U CN 207847221 U CN207847221 U CN 207847221U CN 201820052426 U CN201820052426 U CN 201820052426U CN 207847221 U CN207847221 U CN 207847221U
- Authority
- CN
- China
- Prior art keywords
- pylon
- idler wheel
- base station
- communication base
- foundation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 title claims abstract description 40
- 238000004891 communication Methods 0.000 title claims abstract description 23
- 229910052742 iron Inorganic materials 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 31
- 239000010959 steel Substances 0.000 claims abstract description 31
- 238000010276 construction Methods 0.000 claims description 10
- 238000003466 welding Methods 0.000 claims description 3
- 239000007787 solid Substances 0.000 claims 1
- 238000009434 installation Methods 0.000 description 9
- 239000000463 material Substances 0.000 description 6
- 230000000630 rising effect Effects 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 230000032258 transport Effects 0.000 description 3
- 238000004804 winding Methods 0.000 description 3
- 238000011900 installation process Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
- Support Of Aerials (AREA)
Abstract
Description
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820052426.5U CN207847221U (en) | 2018-01-12 | 2018-01-12 | A kind of assembly type communication base station iron tower |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820052426.5U CN207847221U (en) | 2018-01-12 | 2018-01-12 | A kind of assembly type communication base station iron tower |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207847221U true CN207847221U (en) | 2018-09-11 |
Family
ID=63418148
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820052426.5U Active CN207847221U (en) | 2018-01-12 | 2018-01-12 | A kind of assembly type communication base station iron tower |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207847221U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107762230A (en) * | 2017-09-30 | 2018-03-06 | 中国铁塔股份有限公司长春市分公司 | Multistage linking pylon |
| CN109339554A (en) * | 2018-10-15 | 2019-02-15 | 合肥鸿坤通信工程有限公司 | A self-supporting communication rack and communication equipment |
-
2018
- 2018-01-12 CN CN201820052426.5U patent/CN207847221U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107762230A (en) * | 2017-09-30 | 2018-03-06 | 中国铁塔股份有限公司长春市分公司 | Multistage linking pylon |
| CN109339554A (en) * | 2018-10-15 | 2019-02-15 | 合肥鸿坤通信工程有限公司 | A self-supporting communication rack and communication equipment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103243930B (en) | System and method for modularized construction of super high-rise steel structures | |
| CN105421859A (en) | Electricity grid telegraph pole erecting device and construction method | |
| CN103643800B (en) | The erection & lift system of buckling-restrained bracing member and construction method thereof | |
| CN105421860A (en) | Electricity grid telegraph pole erecting device and construction method | |
| CN104627330B (en) | Forward installation construction method for construction platform system of super-huge storage tank | |
| CN206460782U (en) | HTGR Nuclear Power Plant irradiated fuel store storehouse vertical shaft heat shielding cylinder erecting device | |
| CN105804400A (en) | Curved surface net frame lifting construction method | |
| CN207847221U (en) | A kind of assembly type communication base station iron tower | |
| CN109944435B (en) | Template support frame for silo cone shell construction and construction method | |
| CN202139255U (en) | Tooling platform for assembling converter body equipment | |
| CN109826082B (en) | Construction method for installing decorative structure in multi-tower combined space of cable-stayed bridge | |
| CN104818675B (en) | Assembling method for steel bar segments | |
| CN102146492A (en) | Method for installing converter body equipment and tooling platform | |
| CN106567542A (en) | Super high-rise double tower building steel structure corridor assembling method | |
| CN107130521B (en) | Method for constructing large-section beam bailey bracket hoisting mold of pit cliff wall section | |
| CN109898871A (en) | Inclined in two-way steel column mounting and positioning device and localization method | |
| CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
| CN104131706A (en) | Vertical steel bar two-layer connecting structure of concrete framework structure and construction method of vertical steel bar two-layer connecting structure | |
| CN220908670U (en) | Double-deck cylinder steel construction view beacon | |
| CN209538639U (en) | Make track movable Scaffold by oneself | |
| CN203559570U (en) | Operating platform for steel pipe support frame overhung on surrounding columns | |
| CN110748140A (en) | Track beam hanging basket special for stepped curtain wall | |
| CN115405084B (en) | Dome construction platform and dome construction method | |
| CN207177310U (en) | A kind of crane beam on rock wall for underground power house reinforcing bar is from steady structure | |
| CN107381376B (en) | Device and method for hoisting by utilizing curtain wall embedded part |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: An assembled communication base tower Effective date of registration: 20201217 Granted publication date: 20180911 Pledgee: Taiyuan high tech Zone Science and Technology Branch Pledgor: HAINA COMMUNICATION TECHNOLOGY Co.,Ltd. Registration number: Y2020140000008 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20180911 Pledgee: Taiyuan high tech Zone Science and Technology Branch Pledgor: HAINA COMMUNICATION TECHNOLOGY Co.,Ltd. Registration number: Y2020140000008 |
|
| CP03 | Change of name, title or address | ||
| CP03 | Change of name, title or address |
Address after: 030600 North Koucun Section of 8th Road, Phase II, Huitong Industrial Park, Jinzhong Development Zone, Shanxi Comprehensive Reform Demonstration Zone, Jinzhong City, Shanxi Province Patentee after: Haina Industrial Holdings Group Co.,Ltd. Country or region after: China Address before: 030600 North Koucun Section of 8th Road, Phase II, Huitong Industrial Park, Jinzhong Development Zone, Shanxi Comprehensive Reform Demonstration Zone, Jinzhong City, Shanxi Province Patentee before: HAINA COMMUNICATION TECHNOLOGY Co.,Ltd. Country or region before: China |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: A prefabricated communication base station tower Granted publication date: 20180911 Pledgee: Taiyuan high tech Zone Science and Technology Branch Pledgor: Haina Industrial Holdings Group Co.,Ltd. Registration number: Y2024140000001 |