CN207844938U - The telescopic boom device that climbs - Google Patents

The telescopic boom device that climbs Download PDF

Info

Publication number
CN207844938U
CN207844938U CN201721871508.4U CN201721871508U CN207844938U CN 207844938 U CN207844938 U CN 207844938U CN 201721871508 U CN201721871508 U CN 201721871508U CN 207844938 U CN207844938 U CN 207844938U
Authority
CN
China
Prior art keywords
climbing
telescopic
arc
arc groove
pair
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721871508.4U
Other languages
Chinese (zh)
Inventor
汪小林
黄轶
谢燕青
孔德志
翁亮
徐鹏程
楼楠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Construction No 4 Group Co Ltd
Original Assignee
Shanghai Construction No 4 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Construction No 4 Group Co Ltd filed Critical Shanghai Construction No 4 Group Co Ltd
Priority to CN201721871508.4U priority Critical patent/CN207844938U/en
Application granted granted Critical
Publication of CN207844938U publication Critical patent/CN207844938U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

本实用新型的伸缩式爬升梁装置,涉及超高层建筑施工技术领域。针对现有塔机爬升梁需进行焊接加长以应对核心筒内部墙体收分,导致剪力墙承受偏心弯矩变大的问题。它包括一对平行且间隔设置的爬升主梁,分别套设于爬升主梁两端的四根伸缩梁,及多个沿塔机爬升方向设置并固接于两侧剪力墙的弧槽牛腿;伸缩梁的一端与爬升主梁螺栓连接,其另一端连接有销轴,伸缩梁与弧槽牛腿可拆卸式连接。

The telescopic climbing beam device of the utility model relates to the technical field of super high-rise building construction. Aiming at the problem that the climbing beam of the existing tower crane needs to be welded and lengthened to deal with the shrinkage of the inner wall of the core tube, resulting in a larger eccentric bending moment of the shear wall. It includes a pair of parallel and spaced climbing girders, four telescopic beams respectively sleeved at both ends of the climbing girder, and multiple arc groove corbels set along the climbing direction of the tower crane and fixed to the shear walls on both sides. ; One end of the telescopic beam is bolted to the climbing main beam, and the other end is connected to a pin shaft, and the telescopic beam is detachably connected to the arc groove corbel.

Description

伸缩式爬升梁装置Telescopic climbing beam device

技术领域technical field

本实用新型涉及超高层建筑施工技术领域,特别涉及一种用于超高层建筑的内爬式动臂塔机的伸缩式爬升梁装置。The utility model relates to the technical field of super high-rise building construction, in particular to a telescopic climbing beam device used for an inner-climbing boom tower crane of a super high-rise building.

背景技术Background technique

随着超高层建筑的飞速兴起,大型动臂塔机作为超高层建筑施工时的主要垂直运输设备得到广泛的应用。With the rapid rise of super high-rise buildings, large-scale luffing jib tower cranes have been widely used as the main vertical transportation equipment during the construction of super high-rise buildings.

目前,大型动臂塔机主要采用外挂及内支撑两类支撑方式。其中,采用内支撑方式的动臂塔机支撑结构如下:预先在核心筒剪力墙中设置预埋件,然后将牛腿焊接在预埋件上,再将爬升梁搁置于牛腿之上并进行三面围焊,该施工工艺复杂,操作困难;而且,上述支撑结构在应对墙体收分时,需对爬升梁进行焊接加长,由于需要三面围焊,需要在爬升梁端头留有150mm左右的操作空间,这势必会导致牛腿及周边剪力墙承受的偏心弯矩变大,因此,常规爬升梁越来越不适用于超高层建筑的施工。At present, large-scale luffing jib tower cranes mainly adopt two types of support methods: external suspension and internal support. Among them, the support structure of the luffing jib tower crane adopting the internal support method is as follows: pre-set embedded parts in the core tube shear wall, then weld the corbels to the embedded parts, then place the climbing beam on the corbels and Welding on three sides is complicated and difficult to operate; moreover, when the above-mentioned support structure is dealing with wall shrinkage, it is necessary to weld and lengthen the climbing beam. Since three-sided welding is required, about 150 mm of space should be left at the end of the climbing beam Therefore, the conventional climbing beam is increasingly unsuitable for the construction of super high-rise buildings.

发明内容Contents of the invention

针对现有内支撑结构的爬升梁应对核心筒内部墙体收分时,需对爬升梁进行焊接加长,不但施工工艺复杂、高空操作时间长且施工风险高,而且导致牛腿及周边剪力墙承受的偏心弯矩变大的问题。本实用新型的目的是提供一种伸缩式爬升梁装置,采用爬升主梁和伸缩梁螺栓连接的两段式结构,以适应超高层建筑墙体收分的施工要求,施工方便且高效,伸缩梁与弧槽牛腿采用销轴连接的方式,将偏心距缩小到最小,减小了剪力墙的墙体负荷。When the climbing beam of the existing internal support structure is to shrink the inner wall of the core tube, the climbing beam needs to be welded and lengthened. Not only the construction process is complicated, the high-altitude operation time is long and the construction risk is high, but also the corbel and surrounding shear walls are damaged. The problem of increased eccentric bending moment. The purpose of this utility model is to provide a telescopic climbing beam device, which adopts a two-stage structure connected by climbing main beams and telescopic beams with bolts, so as to meet the construction requirements of super high-rise building walls, and the construction is convenient and efficient. The pin shaft connection with the arc groove corbel minimizes the eccentricity and reduces the wall load of the shear wall.

本实用新型解决其技术问题所采用的技术方案是:伸缩式爬升梁装置包括一对平行且间隔设置的爬升主梁,一对所述爬升主梁位于相对设置的两面剪力墙之间,用于固定动臂塔机塔身;四根伸缩梁,所述伸缩梁分别套设于所述爬升主梁的两端,以及多个弧槽牛腿,所述弧槽牛腿沿所述动臂塔机爬升方向设置并固接于两侧剪力墙,用于搁置所述爬升主梁和所述伸缩梁;所述伸缩梁的一端与所述爬升主梁螺栓连接,所述伸缩梁的另一端连接有销轴,所述爬升主梁两侧的伸缩梁分别与固接于剪力墙的所述弧槽牛腿可拆卸式连接。The technical scheme adopted by the utility model to solve the technical problem is: the telescopic climbing beam device includes a pair of parallel and spaced climbing main beams, and the pair of climbing main beams are located between two opposite shear walls. fixed to the tower body of the boom tower crane; four telescopic beams, the telescopic beams are respectively sleeved on the two ends of the climbing main beam, and a plurality of arc groove corbels, the arc groove corbels extend along the boom The climbing direction of the tower crane is set and fixed to the shear walls on both sides for shelving the climbing main beam and the telescopic beam; one end of the telescopic beam is connected with the climbing main beam by bolts, and the other end of the telescopic beam One end is connected with a pin shaft, and the telescopic beams on both sides of the climbing main beam are respectively detachably connected with the arc groove corbels fixed to the shear wall.

优选的,所述伸缩梁的一端套设于所述爬升主梁内,其另一端固接有固定件及销轴,所述固定件由平行且间隔设置的一对耳板,以及垂直固接于一对所述耳板之间的端板组成,所述端板固接于所述伸缩梁的端部,所述销轴的两端分别与两侧的耳板焊接固定;所述弧槽牛腿包括平行且间隔设置的一对侧板,及固接于一对所述侧板之间的加固块,一对所述侧板的顶部均设有形状一致的弧形凹槽,所述伸缩梁的销轴卡扣于所述弧槽牛腿的弧形凹槽内。Preferably, one end of the telescopic beam is sleeved in the climbing main beam, and the other end is fixedly connected with a fixing piece and a pin shaft. It is composed of an end plate between a pair of ear plates, the end plate is fixedly connected to the end of the telescopic beam, and the two ends of the pin shaft are respectively welded and fixed to the ear plates on both sides; the arc groove The corbel includes a pair of side plates arranged in parallel and at intervals, and a reinforcing block fixed between the pair of side plates. The tops of the pair of side plates are provided with arc-shaped grooves of the same shape. The pin shaft of the telescopic beam is buckled in the arc groove of the arc groove corbel.

优选的,与所述销轴连接一侧的所述耳板的外轮廓呈弧形。Preferably, the outer contour of the ear plate on the side connected to the pin shaft is arc-shaped.

优选的,所述弧槽牛腿的弧形凹槽的两端还分别设有延伸端,一侧的所述延伸端设有螺栓孔一,相对一侧的所述延伸端铰接有卡扣,所述卡扣的末端设有与所述螺栓孔一相对应的螺栓孔二,所述卡扣闭合后与另一所述延伸端通过固定螺栓连接。Preferably, the two ends of the arc-shaped groove of the arc-groove corbel are respectively provided with extension ends, the extension ends on one side are provided with bolt holes 1, and the extension ends on the opposite side are hinged with buckles. The end of the buckle is provided with a second bolt hole corresponding to the first bolt hole, and after the buckle is closed, it is connected to the other extension end through a fixing bolt.

优选的,所述弧槽牛腿与所述剪力墙内的预埋件固接,所述预埋件包括与所述剪力墙墙体平行设置的埋板,及连接于所述埋板一侧的多个锚筋,多对所述预埋件沿动臂塔机爬升方向设置,相对设置的两对所述预埋件的中心连线所在平面与水平面平行。Preferably, the arc groove corbel is fixedly connected to the embedded part in the shear wall, and the embedded part includes a buried plate arranged parallel to the wall of the shear wall, and is connected to the buried plate A plurality of anchor bars on one side, and multiple pairs of embedded parts are arranged along the climbing direction of the luffing jib tower crane, and the plane where the connecting lines between the centers of the two pairs of embedded parts arranged oppositely is parallel to the horizontal plane.

优选的,所述爬升主梁和所述伸缩梁的盖板和/或侧板上沿其长度方向设有相对应的多个等间距的限位螺栓孔,所述爬升主梁与所述伸缩梁通过限位螺栓连接。Preferably, the cover plate and/or side plate of the climbing main beam and the telescopic beam are provided with a plurality of corresponding spacing bolt holes along the length direction thereof, and the climbing main beam and the telescopic beam The beams are connected by limit bolts.

优选的,每块所述盖板或腹板上设置的所述限位螺栓孔至少为两排,且至少两排所述限位螺栓孔沿所述盖板或腹板的中心线对称设置。Preferably, there are at least two rows of limit bolt holes on each cover or web, and at least two rows of limit bolt holes are arranged symmetrically along the centerline of the cover or web.

优选的,相邻两个所述限位螺栓孔的间距为50mm。Preferably, the distance between two adjacent limiting bolt holes is 50 mm.

本实用新型的效果在于:本实用新型的伸缩式爬升梁装置具有如下有益效果:采用爬升主梁和伸缩梁螺栓连接的两段式结构,便于伸缩式爬升梁装置缩短或伸长,以适应超高层建筑墙体收分的施工要求,避免传统爬升梁焊接加长工艺带来的高空安拆风险,施工工艺复杂等问题,具有施工方便且高效的特点;伸缩梁与弧槽牛腿采用销轴连接的方式,将偏心距缩小到最小(减小偏心距50%左右),极大地减小了弧槽牛腿传递给墙体的弯矩,减小了剪力墙的墙体负荷。The effect of the utility model is that the telescopic climbing beam device of the utility model has the following beneficial effects: the two-stage structure connected by the climbing main beam and the telescopic beam bolt is used to facilitate the shortening or elongation of the telescopic climbing beam device to adapt to the super The construction requirements of high-rise building wall closing, avoiding the high-altitude installation and dismantling risks brought by the traditional climbing beam welding and lengthening process, and the complicated construction process, etc., have the characteristics of convenient and efficient construction; the telescopic beam and the arc groove corbel are connected by pin shafts The way of reducing the eccentricity to the minimum (reducing the eccentricity by about 50%) greatly reduces the bending moment transmitted by the arc groove corbel to the wall, and reduces the wall load of the shear wall.

附图说明Description of drawings

图1为本实用新型一实施例的伸缩式爬升梁装置的结构示意图;Fig. 1 is a schematic structural view of a telescopic climbing beam device according to an embodiment of the present invention;

图2为本实用新型一实施例的伸缩式爬升梁装置的爆炸图;Fig. 2 is an exploded view of a telescopic climbing beam device according to an embodiment of the present invention;

图3至图6为本实用新型一实施例的伸缩式爬升梁装置的使用方法示意图。3 to 6 are schematic diagrams of the usage method of the telescopic climbing beam device according to an embodiment of the present invention.

图中标号如下:The numbers in the figure are as follows:

剪力墙1;预埋件2;埋板2a;锚筋2b;Shear wall 1; embedded part 2; buried plate 2a; anchor bar 2b;

爬升主梁10;限位螺栓孔11;限位螺栓12;Climbing main beam 10; limit bolt hole 11; limit bolt 12;

伸缩梁20;固定件24;耳板241;端板242;销轴25;Telescopic beam 20; Fixing piece 24; Ear plate 241; End plate 242; Pin shaft 25;

弧槽牛腿30;侧板31;弧形凹槽32;加固块33;延伸端34;螺栓孔一35;卡扣36;螺栓孔二37。arc groove corbel 30; side plate 31; arc groove 32; reinforcement block 33; extension end 34; bolt hole one 35; buckle 36; bolt hole two 37.

具体实施方式Detailed ways

以下结合附图和具体实施例对本实用新型提出的伸缩式爬升梁装置作进一步详细说明。根据下面的说明和权利要求书,本实用新型的优点和特征将更清楚。需说明的是,附图均采用非常简化的形式且均使用非精准的比例,仅用以方便、明晰地辅助说明本实用新型实施例的目的。为叙述方便,下文中所述的“上”、“下”与附图的上、下的方向一致,但这不能成为本实用新型技术方案的限制。The telescopic climbing beam device proposed by the utility model will be described in further detail below in conjunction with the accompanying drawings and specific embodiments. According to the following description and claims, the advantages and features of the utility model will be more clear. It should be noted that all the drawings are in very simplified form and use inaccurate scales, which are only used to facilitate and clearly illustrate the purpose of the embodiment of the present utility model. For the convenience of description, the "up" and "down" described below are consistent with the directions of up and down in the drawings, but this cannot be a limitation of the technical solution of the present utility model.

结合图1至图6,并重点参考图1和图2说明本实用新型的伸缩式爬升梁装置,它包括一对平行且间隔设置的爬升主梁10,四根伸缩梁20,以及多个弧槽牛腿30;爬升主梁10位于相对设置的两面剪力墙1之间,用于固定动臂塔机(图中未示出)塔身,其主体结构及材质与现有爬升梁一致,只是在爬升主梁10端部与剪力墙1之间留有一定间隙,使得伸缩梁20能够在爬升主梁10端部沿其长度方向进行伸缩;弧槽牛腿30沿动臂塔机爬升方向设置并固接于两侧剪力墙1,弧槽牛腿30用于搁置爬升主梁10和伸缩梁20,承担伸缩式爬升梁装置的荷载;四根伸缩梁20分别套设于一对爬升主梁10的两端,伸缩梁20的一端与爬升主梁10螺栓连接,它可沿着爬升主梁10的长度方向进行伸缩,以达到跟随剪力墙1收分而调整伸缩式爬升梁装置长度的目的,伸缩梁20的另一端连接有销轴25,四根伸缩梁20分别与固接于两侧剪力墙1的弧槽牛腿30可拆卸式连接。Combining Figures 1 to 6, and emphatically referring to Figures 1 and 2, the telescopic climbing beam device of the present invention is illustrated, which includes a pair of parallel and spaced climbing main beams 10, four telescopic beams 20, and a plurality of arcs Groove corbel 30; climbing main girder 10 is located between the two opposite shear walls 1, used to fix the tower body of the boom tower crane (not shown in the figure), its main structure and material are consistent with the existing climbing girder, Only a certain gap is left between the end of the climbing girder 10 and the shear wall 1, so that the telescopic beam 20 can expand and contract along its length at the end of the climbing girder 10; the arc groove corbel 30 climbs along the boom tower crane The direction is set and fixed to the shear walls 1 on both sides. The arc groove corbel 30 is used to place the climbing main beam 10 and the telescopic beam 20, and bear the load of the telescopic climbing beam device; the four telescopic beams 20 are respectively sleeved on a pair of The two ends of the climbing girder 10 and one end of the telescopic beam 20 are bolted to the climbing girder 10, which can expand and contract along the length direction of the climbing girder 10, so as to adjust the telescopic climbing girder following the shrinkage of the shear wall 1 For the purpose of device length, the other end of the telescopic beam 20 is connected with a pin 25, and the four telescopic beams 20 are respectively detachably connected to the arc groove corbels 30 fixed to the shear walls 1 on both sides.

本实用新型的伸缩式爬升梁装置具有如下有益效果:采用爬升主梁10和伸缩梁20螺栓连接的两段式结构,便于伸缩式爬升梁装置缩短或伸长,以适应超高层建筑墙体收分的施工要求,避免传统爬升梁焊接加长工艺带来的高空安拆风险,施工工艺复杂等问题,具有施工方便且高效的特点;伸缩梁20与弧槽牛腿30采用销轴25连接的方式,将偏心距缩小到最小(减小偏心距50%左右),极大地减小了弧槽牛腿30传递给墙体的弯矩,减小了剪力墙1的墙体负荷。The telescopic climbing beam device of the present utility model has the following beneficial effects: the two-stage structure connected by the bolts of the climbing main beam 10 and the telescopic beam 20 is used to facilitate the shortening or elongation of the telescopic climbing beam device to adapt to the super high-rise building wall. To meet the specific construction requirements, avoid the high-altitude installation and dismantling risks brought about by the traditional climbing beam welding and lengthening process, and the construction process is complicated. It has the characteristics of convenient and efficient construction; , reducing the eccentricity to the minimum (reducing the eccentricity by about 50%), greatly reducing the bending moment transmitted to the wall by the arc groove corbel 30, and reducing the wall load of the shear wall 1.

如图2所示,伸缩梁20的一端套设于爬升主梁10内,其另一端固接有固定件24及销轴25,固定件24由平行且间隔设置的一对耳板241,以及垂直固接于一对耳板241之间的端板242组成,端板242与伸缩梁20横截面尺寸一致,且端板242焊接固定于伸缩梁20的端部,水平设置的销轴25的两端分别与两侧的耳板241焊接固定;弧槽牛腿30包括平行且间隔设置的一对侧板31,及固接于一对侧板31之间的加固块33,一对侧板31的顶部均设有形状一致的弧形凹槽32,弧形凹槽32的弧度略大于伸缩梁20销轴25的外径,使得伸缩梁20的销轴25能够卡扣36于弧槽牛腿30的弧形凹槽32内,销轴25与弧槽牛腿30通过搁置的方式进行力的传递,销轴25的形式不仅能将竖向力均匀地传递给各个弧槽牛腿30,还能使得传力点最大限度靠近墙体,避免偏心距过大的情况出现,且搁置的施工方式在爬升梁拆卸安装过程中都无需引入点焊作业,施工更为方便。As shown in Figure 2, one end of the telescopic beam 20 is sleeved in the climbing main beam 10, and the other end is fixedly connected with a fixing part 24 and a pin shaft 25. The end plate 242 is vertically fixed between a pair of ear plates 241. The cross-sectional size of the end plate 242 is consistent with that of the telescopic beam 20, and the end plate 242 is welded and fixed to the end of the telescopic beam 20. The pin shaft 25 arranged horizontally The two ends are respectively welded and fixed to the ear plates 241 on both sides; the arc groove corbel 30 includes a pair of side plates 31 arranged in parallel and at intervals, and a reinforcing block 33 fixed between the pair of side plates 31, and the pair of side plates The tops of 31 are all provided with the arc groove 32 of uniform shape, and the radian of arc groove 32 is slightly larger than the outer diameter of telescopic beam 20 pin shaft 25, makes the pin shaft 25 of telescopic beam 20 can buckle 36 in the arc groove. In the arc-shaped groove 32 of the leg 30, the pin shaft 25 and the arc-groove corbel 30 transmit force by laying aside. The form of the pin shaft 25 can not only transmit the vertical force evenly to each arc-groove corbel 30, It can also make the force transmission point close to the wall as much as possible to avoid the situation of excessive eccentricity, and the shelving construction method does not need to introduce spot welding during the disassembly and installation of the climbing beam, which makes the construction more convenient.

较佳的,与销轴25连接一侧的耳板241的外轮廓呈弧形,便于伸缩梁20的拆卸及安装,避免耳板241与弧槽牛腿30发生碰撞而损坏,本实施例耳板241的外轮廓优选半圆形,加工更加方便。Preferably, the outer contour of the ear plate 241 on the side connected to the pin shaft 25 is arc-shaped, which facilitates the disassembly and installation of the telescopic beam 20, and prevents the ear plate 241 from colliding with the arc groove corbel 30 and being damaged. The outer contour of the plate 241 is preferably semicircular, which is more convenient to process.

请继续参考图2,弧槽牛腿30的弧形凹槽32的两端还分别设有延伸端34,一侧的延伸端34设有螺栓孔一35,相对一侧的延伸端34铰接有卡扣36,卡扣36的末端设有与螺栓孔一35相对应的螺栓孔二37,伸缩梁20的销轴25卡扣36于弧槽牛腿30的弧形凹槽32内之后,闭合卡扣36使其与另一延伸端34通过固定螺栓连接,起到对销轴25的上下限位作用;延伸端34的设置便于卡扣36的安装及固定,卡扣36优选弧形杆件,避免闭合后的卡扣36与销轴25发生碰撞。Please continue to refer to Fig. 2, the two ends of the arc groove 32 of the arc groove corbel 30 are respectively provided with extension ends 34, and the extension end 34 on one side is provided with a bolt hole 1 35, and the extension end 34 on the opposite side is hinged with Buckle 36, the end of buckle 36 is provided with bolt hole 2 37 corresponding to bolt hole 1 35, after pin 25 buckle 36 of telescopic beam 20 is in the arc groove 32 of arc groove corbel 30, close The buckle 36 makes it connect with the other extension end 34 through a fixing bolt, which acts as an upper and lower limit on the pin shaft 25; the setting of the extension end 34 facilitates the installation and fixing of the buckle 36, and the buckle 36 is preferably an arc rod , to prevent the closed buckle 36 from colliding with the pin shaft 25 .

为使弧槽牛腿30牢固连接于两侧剪力墙1,弧槽牛腿30与剪力墙1内的预埋件2固接,预埋件2包括与剪力墙1墙体平行设置的埋板2a,及连接于埋板2a一侧的多个锚筋2b,预埋件2用于焊接固定弧槽牛腿30,起到将力彻底传递至剪力墙1的作用;多对预埋件2沿动臂塔机爬升方向设置,相对设置的两对预埋件2的中心连线所在平面与水平面平行,使得爬升的动臂塔机的固定平面保持水平。In order to firmly connect the arc groove corbel 30 to the shear wall 1 on both sides, the arc groove corbel 30 is fixedly connected to the embedded part 2 in the shear wall 1, and the embedded part 2 includes a wall parallel to the shear wall 1. The buried plate 2a, and a plurality of anchor bars 2b connected to one side of the buried plate 2a, the embedded parts 2 are used to weld and fix the arc groove corbel 30, and play the role of completely transmitting the force to the shear wall 1; multiple pairs The embedded parts 2 are arranged along the climbing direction of the luffing jib tower crane, and the plane where the center line of the two pairs of embedded parts 2 oppositely arranged is parallel to the horizontal plane, so that the fixed plane of the climbing luffing jib tower crane remains horizontal.

本实施例的爬升主梁10和伸缩梁20均为箱型梁,即横截面形式呈箱型,它一般由盖板、腹板、底板以及隔板组成,当然,也可采用其他类似的形式,均可实现本实用新型的技术方案。如图2所示,爬升主梁10和伸缩梁20的盖板上沿其长度方向设有相对应的多个等间距的限位螺栓孔11,爬升主梁10和伸缩梁20之间依据墙体间距调整适当的伸缩长度后,通过限位螺栓12连接固定伸缩式爬升梁装置的长度,通过设置等间距的限位螺栓孔11实现伸缩式爬升梁装置长度的灵活调节,拆装更加方便;当然,也可在爬升主梁10和伸缩梁20两侧的腹板上设置等间距的多个限位螺栓孔11,也可实现本实用新型技术方案;更佳的,在爬升主梁10、伸缩梁20的盖板及腹板上均设有沿其长度方向的多个等间距的限位螺栓孔11,以进一步加强两者连接的稳定性;而且,每块盖板或腹板上设置的限位螺栓孔11至少为两排,且至少两排限位螺栓孔11沿盖板或腹板的中心线对称设置,如此设置使得爬升主梁10及伸缩梁20两者的连接位置更加牢固,而且受力均衡。The climbing girder 10 and the telescopic beam 20 of this embodiment are all box-shaped girders, that is, the cross-sectional form is box-shaped, and it is generally composed of a cover plate, a web, a bottom plate and a partition. Of course, other similar forms can also be used. , all can realize the technical solution of the utility model. As shown in Figure 2, the cover plates of the climbing girder 10 and the telescopic beam 20 are provided with a plurality of correspondingly spaced stop bolt holes 11 along their lengths, and the climbing girder 10 and the telescopic beam 20 are separated by a wall. After adjusting the proper telescopic length of body spacing, the length of the telescopic climbing beam device is connected and fixed through the limit bolt 12, and the flexible adjustment of the length of the telescopic climbing beam device is realized by setting the limit bolt holes 11 at equal intervals, and the disassembly and assembly are more convenient; Of course, a plurality of spacer bolt holes 11 at equal intervals can also be set on the webs on both sides of the climbing girder 10 and the telescopic beam 20, and the technical solution of the utility model can also be realized; more preferably, the climbing girder 10, The cover plate and the web of the telescopic beam 20 are all provided with a plurality of equally spaced limit bolt holes 11 along the length direction to further strengthen the stability of the connection between the two; and each cover plate or web is provided with There are at least two rows of limit bolt holes 11, and at least two rows of limit bolt holes 11 are arranged symmetrically along the center line of the cover plate or web plate, so that the connection position between the climbing main beam 10 and the telescopic beam 20 is more firm , and the force is balanced.

更佳的,由于超高层建筑墙体收分多以50mm一档进行,因此,相邻两个限位螺栓孔11的间距设置为50mm,用于对伸缩式爬升梁装置的长度进行精细限值;More preferably, since the wall of a super high-rise building is mostly retracted in 50mm steps, the distance between two adjacent limit bolt holes 11 is set to 50mm, which is used to finely limit the length of the telescopic climbing beam device. ;

结合图3至图6说明本实用新型伸缩式爬升梁装置的使用方法,具体步骤如下:The usage method of the telescopic climbing beam device of the present invention is illustrated in conjunction with Fig. 3 to Fig. 6, and the specific steps are as follows:

S1:如图3所示,在施工剪力墙1时,在相对设置的剪力墙1内预埋施工多对预埋件2,多对预埋件2沿动臂塔机爬升方向设置,相对设置的两对预埋件2的中心连线所在平面与水平面平行,将弧槽牛腿30与预埋件2进行焊接固定;S1: As shown in Figure 3, when constructing the shear wall 1, multiple pairs of embedded parts 2 are pre-embedded in the opposite shear wall 1, and the multiple pairs of embedded parts 2 are arranged along the climbing direction of the boom tower crane. The plane where the center lines of the two pairs of embedded parts 2 are located is parallel to the horizontal plane, and the arc groove corbel 30 and the embedded part 2 are welded and fixed;

S2:继续参考图3,依照安装高度以及剪力墙1墙体之间的间距,调整伸缩梁20的伸缩长度,使得爬升主梁10和伸缩梁20同一平面上的限位螺栓孔11相对应,将限位螺栓12对应插入爬升主梁10和伸缩梁20上的限位螺栓孔11并拧紧固定,以确定爬升主梁10和伸缩梁20的长度;S2: Continue to refer to Figure 3, adjust the telescopic length of the telescopic beam 20 according to the installation height and the distance between the walls of the shear wall 1, so that the climbing main beam 10 and the limit bolt holes 11 on the same plane of the telescopic beam 20 correspond to each other Insert the limit bolt 12 into the limit bolt hole 11 on the climbing main beam 10 and the telescopic beam 20 and tighten and fix it, so as to determine the length of the climbing main beam 10 and the telescopic beam 20;

S3:如图4所示,安装时,将螺栓连接的爬升主梁10和伸缩梁20起吊至弧槽牛腿30上方并缓慢放入,使得伸缩梁20端部的销轴25卡扣36于弧槽牛腿30的弧形凹槽32内,如图5所示,待伸缩梁20两端搁置平稳,依照其水平度进行适当调整后,将弧槽牛腿30的卡扣36合上并锁紧固定,闭合弧形凹槽32,限制伸缩式爬升梁装置的上、下位移,安装结束。S3: As shown in Figure 4, during installation, hoist the bolt-connected climbing girder 10 and telescopic beam 20 above the arc groove corbel 30 and put them in slowly so that the pin shaft 25 at the end of the telescopic beam 20 snaps 36 into place. In the arc-shaped groove 32 of the arc-groove corbel 30, as shown in FIG. Lock and fix, close the arc groove 32, limit the upward and downward displacement of the telescopic climbing beam device, and the installation is completed.

步骤S3还包括,当需拆卸伸缩式爬升梁装置以循环使用时,只需将安装过程逆向实施即可,先松开弧槽牛腿30上的卡扣36,打开弧形凹槽32,再将伸缩式爬升梁装置吊出。Step S3 also includes that when the telescopic climbing beam device needs to be disassembled for recycling, it only needs to reverse the installation process, first loosen the buckle 36 on the arc groove corbel 30, open the arc groove 32, and then Lift out the telescopic climbing beam unit.

上述使用方法还包括步骤S4,如图6所示,随着动臂塔机的爬升,在伸缩式爬升梁装置的上方的预埋件2上焊接弧槽牛腿30,先松开弧槽牛腿30上的卡扣36,起吊伸缩式爬升梁装置至待安装位置并临时固定后,再次参考图3至图5,依照剪力墙1墙体收分程度,取出连接爬升主梁10和伸缩梁20的限位螺栓12,调整伸缩梁20的伸出长度,再使用限位螺栓12固定爬升主梁10和伸缩梁20的长度,然后,将调整好长度的爬升主梁10和伸缩梁20搁置于弧槽牛腿30上,适当调整爬升主梁10和伸缩梁20的水平度,将弧槽牛腿30上的卡扣36锁紧固定,完成周转流程。The above method of use also includes step S4, as shown in Figure 6, as the boom tower crane climbs, the arc groove bracket 30 is welded on the embedded part 2 above the telescopic climbing beam device, and the arc groove bracket is first released. The clip 36 on the leg 30 lifts the telescopic climbing beam device to the position to be installed and temporarily fixes it. Referring to Figure 3 to Figure 5 again, take out the connecting climbing main beam 10 and the telescopic The limit bolt 12 of the beam 20 adjusts the extension length of the telescopic beam 20, and then uses the limit bolt 12 to fix the length of the climbing main beam 10 and the telescopic beam 20, and then, the adjusted length of the climbing main beam 10 and the telescopic beam 20 Put it on the arc groove corbel 30, properly adjust the levelness of the climbing girder 10 and the telescopic beam 20, lock and fix the buckle 36 on the arc groove corbel 30, and complete the turnover process.

综上,伸缩梁20与弧槽牛腿30采用销轴25连接的方式,螺栓连接为一体的爬升主梁10和伸缩梁20能够直接搁置安装于弧槽牛腿30,无需多余的高空焊接和定位操作,具有安装方便,施工误差适应性强,安全便捷等特点;随着动臂塔机的爬升,当剪力墙1墙体出现收分时,取出连接爬升主梁10和伸缩梁20的限位螺栓12,通过调整伸缩梁20的伸出长度以适应施工要求,操作灵活方便,解决了传统焊接加长爬升梁工艺带来的施工工艺复杂,以及牛腿及周边剪力墙1承受的偏心弯矩变大等施工难题,更加适用于现今超高层建筑施工。In summary, the telescopic beam 20 and the arc groove corbel 30 are connected by the pin shaft 25, and the climbing girder 10 and the telescopic beam 20, which are integrally connected by bolts, can be directly placed and installed on the arc groove corbel 30 without redundant high-altitude welding and Positioning operation has the characteristics of convenient installation, strong adaptability to construction errors, safety and convenience; with the climbing of the luffing jib tower crane, when the wall of the shear wall 1 shrinks, take out the connecting main beam 10 and the telescopic beam 20 The limit bolt 12 is flexible and convenient to operate by adjusting the extension length of the telescopic beam 20 to meet the construction requirements, and solves the complicated construction process caused by the traditional welding and lengthening climbing beam technology, as well as the eccentricity of the corbel and the surrounding shear wall 1 Construction problems such as increased bending moment are more suitable for the construction of super high-rise buildings today.

上述描述仅是对本实用新型较佳实施例的描述,并非对本实用新型范围的任何限定,本实用新型领域的普通技术人员根据上述揭示内容做的任何变更、修饰,均属于权利要求范围。The above description is only a description of the preferred embodiments of the present utility model, not any limitation to the scope of the present utility model. Any changes and modifications made by those skilled in the field of the present utility model according to the above disclosed content all belong to the scope of the claims.

Claims (8)

1.伸缩式爬升梁装置,其特征在于,包括:1. The telescopic climbing beam device is characterized in that, comprising: 一对平行且间隔设置的爬升主梁,一对所述爬升主梁位于相对设置的两面剪力墙之间,用于固定动臂塔机塔身;A pair of parallel and spaced climbing girders, the pair of climbing girders are located between two opposite shear walls, and are used to fix the tower body of the boom tower crane; 四根伸缩梁,所述伸缩梁分别套设于所述爬升主梁的两端,以及,Four telescopic beams, the telescopic beams are respectively sleeved on both ends of the climbing main beam, and, 多个弧槽牛腿,所述弧槽牛腿沿所述动臂塔机爬升方向设置并固接于两侧剪力墙,用于搁置所述爬升主梁和所述伸缩梁;A plurality of arc groove corbels, the arc groove corbels are arranged along the climbing direction of the boom tower crane and fixed to the shear walls on both sides, for shelving the climbing main girder and the telescopic beam; 所述伸缩梁的一端与所述爬升主梁螺栓连接,所述伸缩梁的另一端连接有销轴,所述爬升主梁两侧的伸缩梁分别与固接于剪力墙的所述弧槽牛腿可拆卸式连接。One end of the telescopic beam is bolted to the climbing main beam, and the other end of the telescopic beam is connected to a pin shaft. Corbels are detachable. 2.根据权利要求1所述的伸缩式爬升梁装置,其特征在于:所述伸缩梁的一端套设于所述爬升主梁内,其另一端固接有固定件及销轴,所述固定件由平行且间隔设置的一对耳板,以及垂直固接于一对所述耳板之间的端板组成,所述端板固接于所述伸缩梁的端部,所述销轴的两端分别与两侧的耳板焊接固定;所述弧槽牛腿包括平行且间隔设置的一对侧板,及固接于一对所述侧板之间的加固块,一对所述侧板的顶部均设有形状一致的弧形凹槽,所述伸缩梁的销轴卡扣于所述弧槽牛腿的弧形凹槽内。2. The telescopic climbing beam device according to claim 1, characterized in that: one end of the telescopic beam is sleeved in the climbing main beam, and the other end is fixedly connected with a fixing piece and a pin shaft, and the fixing The part is composed of a pair of lug plates arranged in parallel and at intervals, and an end plate fixed vertically between the pair of lug plates, the end plate is fixed at the end of the telescopic beam, and the pin shaft The two ends are respectively welded and fixed to the ear plates on both sides; the arc groove corbel includes a pair of side plates arranged in parallel and at intervals, and a reinforcing block fixed between the pair of side plates, and a pair of side plates The tops of the boards are all provided with arc-shaped grooves of the same shape, and the pin shafts of the telescopic beams are buckled in the arc-shaped grooves of the arc-groove corbels. 3.根据权利要求2所述的伸缩式爬升梁装置,其特征在于:与所述销轴连接一侧的所述耳板的外轮廓呈弧形。3. The telescopic climbing beam device according to claim 2, characterized in that: the outer contour of the ear plate on the side connected to the pin shaft is arc-shaped. 4.根据权利要求2所述的伸缩式爬升梁装置,其特征在于:所述弧槽牛腿的弧形凹槽的两端还分别设有延伸端,一侧的所述延伸端设有螺栓孔一,相对一侧的所述延伸端铰接有卡扣,所述卡扣的末端设有与所述螺栓孔一相对应的螺栓孔二,所述卡扣闭合后与另一所述延伸端通过固定螺栓连接。4. The telescopic climbing beam device according to claim 2, characterized in that: the two ends of the arc-shaped groove of the arc-groove corbel are respectively provided with extension ends, and the extension ends on one side are provided with bolts Hole 1, the extension end on the opposite side is hinged with a buckle, and the end of the buckle is provided with a bolt hole 2 corresponding to the bolt hole 1. After the buckle is closed, it is connected with the other extension end. Attached by fixing bolts. 5.根据权利要求1所述的伸缩式爬升梁装置,其特征在于:所述弧槽牛腿与所述剪力墙内的预埋件固接,所述预埋件包括与所述剪力墙墙体平行设置的埋板,及连接于所述埋板一侧的多个锚筋,多对所述预埋件沿动臂塔机爬升方向设置,相对设置的两对所述预埋件的中心连线所在平面与水平面平行。5. The telescopic climbing beam device according to claim 1, characterized in that: the arc groove corbel is fixedly connected to the embedded parts in the shear wall, and the embedded parts include the A buried plate arranged parallel to the wall, and a plurality of anchor bars connected to one side of the buried plate, multiple pairs of the embedded parts are arranged along the climbing direction of the boom tower crane, and two pairs of the embedded parts arranged oppositely The plane of the connecting line of the center is parallel to the horizontal plane. 6.根据权利要求1所述的伸缩式爬升梁装置,其特征在于:所述爬升主梁和所述伸缩梁的盖板和/或侧板上沿其长度方向设有相对应的多个等间距的限位螺栓孔,所述爬升主梁与所述伸缩梁通过限位螺栓连接。6. The telescopic climbing beam device according to claim 1, characterized in that: the cover plate and/or side plate of the climbing main beam and the telescopic beam are provided with corresponding multiple etc. The spaced limit bolt holes, the climbing main beam and the telescopic beam are connected by limit bolts. 7.根据权利要求6所述的伸缩式爬升梁装置,其特征在于:每块所述盖板或腹板上设置的所述限位螺栓孔至少为两排,且至少两排所述限位螺栓孔沿所述盖板或腹板的中心线对称设置。7. The telescopic climbing beam device according to claim 6, characterized in that: there are at least two rows of said limit bolt holes provided on each said cover plate or web, and at least two rows of said limit bolt holes Bolt holes are arranged symmetrically along the center line of the cover or web. 8.根据权利要求6或7所述的伸缩式爬升梁装置,其特征在于:相邻两个所述限位螺栓孔的间距为50mm。8. The telescopic climbing beam device according to claim 6 or 7, wherein the distance between two adjacent stop bolt holes is 50mm.
CN201721871508.4U 2017-12-28 2017-12-28 The telescopic boom device that climbs Expired - Fee Related CN207844938U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721871508.4U CN207844938U (en) 2017-12-28 2017-12-28 The telescopic boom device that climbs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721871508.4U CN207844938U (en) 2017-12-28 2017-12-28 The telescopic boom device that climbs

Publications (1)

Publication Number Publication Date
CN207844938U true CN207844938U (en) 2018-09-11

Family

ID=63419357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721871508.4U Expired - Fee Related CN207844938U (en) 2017-12-28 2017-12-28 The telescopic boom device that climbs

Country Status (1)

Country Link
CN (1) CN207844938U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108059096A (en) * 2017-12-28 2018-05-22 上海建工四建集团有限公司 Telescopic boom device and its application method of climbing
CN109057321A (en) * 2018-11-16 2018-12-21 上海建工集团股份有限公司 Integral steel platform mould bases super large bearing capacity attached wall system and construction method
CN111170178A (en) * 2018-11-12 2020-05-19 广东庞源工程机械有限公司 A segmented composite inner climbing steel beam structure
CN113860190A (en) * 2021-10-29 2021-12-31 上海建工四建集团有限公司 Cantilever tower crane girder-turning-free placing bracket and mounting method
CN113860189A (en) * 2021-10-29 2021-12-31 上海建工四建集团有限公司 Pin shaft type climbing beam of non-turnover internal climbing tower crane and use method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108059096A (en) * 2017-12-28 2018-05-22 上海建工四建集团有限公司 Telescopic boom device and its application method of climbing
CN111170178A (en) * 2018-11-12 2020-05-19 广东庞源工程机械有限公司 A segmented composite inner climbing steel beam structure
CN109057321A (en) * 2018-11-16 2018-12-21 上海建工集团股份有限公司 Integral steel platform mould bases super large bearing capacity attached wall system and construction method
CN109057321B (en) * 2018-11-16 2019-02-15 上海建工集团股份有限公司 Integral steel platform mould bases super large bearing capacity attached wall system and construction method
CN113860190A (en) * 2021-10-29 2021-12-31 上海建工四建集团有限公司 Cantilever tower crane girder-turning-free placing bracket and mounting method
CN113860189A (en) * 2021-10-29 2021-12-31 上海建工四建集团有限公司 Pin shaft type climbing beam of non-turnover internal climbing tower crane and use method thereof
CN113860190B (en) * 2021-10-29 2023-10-31 上海建工四建集团有限公司 Cantilever crane turnover-free beam rest bracket and installation method
CN113860189B (en) * 2021-10-29 2024-02-09 上海建工四建集团有限公司 Pin shaft type overturn-free climbing system of internal climbing tower crane

Similar Documents

Publication Publication Date Title
CN103526699B (en) Method for replacing pipe bridge hanging steel ropes
CN105905781B (en) The hanging method of big segment steel truss girder
CN209384393U (en) Joint strengthening type steel-pipe assembly concrete connecting structure
CN101503908A (en) Construction method for spacing suspension cable structural template support platform
CN103496641B (en) A kind of turntable structure and there is the hoisting crane of this turntable structure
CN103526688A (en) Pipe bridge hanging system
CN219157933U (en) Box-type connecting column and superposition Liang Ganghe butt-joint connecting structure
CN202449770U (en) Tower crane lower support assembly and tower crane with same
CN101781886B (en) Box body spliced large-size bearing platform
CN205502246U (en) Outsourcing steel -concrete composite beam - steel -pipe column connected node
CN106276630A (en) A kind of internal-climbing tower crane supporting construction of band shearing frame
CN115852843A (en) Construction method of cable crane main tower cable saddle of long-span railway suspension bridge
CN203112392U (en) Deformation-resistant climbing frame of tower crane
CN105780659A (en) Lifting appliance special for erection of large-tonnage steel box beam segment in non-stayed cable area of cable-stayed bridge
CN104847161A (en) Supporting frame used for fixing holding pole
CN104963410A (en) Sliding connecting joint of steel structure beam column
CN120159119A (en) A truss structure and construction method thereof
CN202788002U (en) Assembled overhanging-type feed-receiving platform
CN210238296U (en) A large-scale tower crane attached wall space steel truss foundation
CN207890943U (en) The combined attachment device of tower crane
CN206942191U (en) A kind of temporary support of telescopic in height regulation reinforces combination steel construction
CN207175285U (en) A tower crane attachment node suitable for construction in earthquake-prone areas
CN113216412B (en) A protruding bidirectional double-cable beam-column connection node for a large-span cable-stayed structure
CN110116966A (en) A kind of movable arm tower crane climbs boom device and its application method
CN214527808U (en) Novel super-long truss type tower crane attachment device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911