CN207841713U - A kind of production of concrete wire pole pours mold - Google Patents
A kind of production of concrete wire pole pours mold Download PDFInfo
- Publication number
- CN207841713U CN207841713U CN201820065017.9U CN201820065017U CN207841713U CN 207841713 U CN207841713 U CN 207841713U CN 201820065017 U CN201820065017 U CN 201820065017U CN 207841713 U CN207841713 U CN 207841713U
- Authority
- CN
- China
- Prior art keywords
- mold
- right half
- half mold
- cylinder
- left half
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Manufacturing Of Tubular Articles Or Embedded Moulded Articles (AREA)
Abstract
The utility model discloses a kind of productions of concrete wire pole to pour mold, including left half mold and right half mold, the left half mold and right half mold are fixed in supporting table, it is provided with fixing groove on the right end top surface of the supporting table, the right half mold is arranged in fixing groove, the both ends of the right half mold are both provided with right half end mold, the right half end mold is bolted to connection with right half mold, the left half mold, the cylinder both sides of right half mold and right half end mold are both provided with journal stirrup, it is provided with mounting hole on the journal stirrup, it is fixedly installed support plate on the end cylinder of the left half mold, the bottom of the support plate is provided with slot.The utility model solves the problem of tradition pours mold die sinking and mold closing is more difficult, is difficult to take out out of mold after concrete wire pole molding by the way that right half end mold, support plate, slot, leading screw and cylinder is arranged.
Description
Technical field
The utility model is related to concrete wire pole production equipment technology, specially a kind of concrete wire pole production pours
Mold.
Background technology
Electric pole is the bridge of electricity, and electricity is allowed to transport each place, newly-built with Electric Power Network Planning and the quick progress of construction
Transmission line of electricity is more and more, we have wooden electric pole by common electric pole, there is cement electric pole, their height differs, and stands flat
Former intermountain, spreads over around people, and cement electric pole, which needs to use in process of production, pours mold, but traditional pours mold
Opening and closing is inconvenient, and molding concrete wire pole is difficult to take out out of mold, therefore the utility model designs a kind of concrete wire pole
Production pours mold to solve the above problems.
Through retrieval, Chinese patent grant number CN205835646U, Granted publication 2016.12.28 disclose a kind of cement electricity
Line bar manufactures the automatic tipping arrangement of mold, including traverse displacement unit, longitudinal-moving device, turnover device and lifting gear, described traversing
Device includes traversing motor, the first transmission mechanism, walking dolly, cross moving track and supporting rack, the traversing motor driving walking
Trolley is walked on cross moving track;The longitudinal-moving device includes vertical shift motor, the second transmission mechanism, end carriage vehicle and vertical shift track,
The vertical shift motor drive terminal beam vehicle is walked on the vertical shift track;The turnover device includes motor seat board, upset motor
And turning wheel, the turning wheel are connected with upset motor;The lifting gear is connect with traverse displacement unit, and drives turnover device liter
Drop movement.
Concrete wire pole manufacture mold in the patent has the following disadvantages:
1. the concrete wire pole manufactures, mold movement is difficult, and die sinking and mold closing are more difficult;
2. the concrete wire pole manufactures mold and is difficult to take out out of mold after concrete wire pole molding, low production efficiency.
Utility model content
In view of the deficiencies of the prior art, the utility model provides a kind of production of concrete wire pole and pours mold, solves
Tradition pours mold die sinking and mold closing is more difficult, the problem of being difficult to take out out of mold after concrete wire pole molding.
To achieve the above object, the utility model provides the following technical solutions:A kind of production of concrete wire pole pours mold,
Including left half mold and right half mold, the left half mold and right half mold are fixed in supporting table, the supporting table
Right end top surface on be provided with fixing groove, the right half mold is arranged in fixing groove, and the both ends of the right half mold are respectively provided with
There are right half end mold, the right half end mold to be bolted to connection with right half mold, the left half mold, right half module
The cylinder both sides of tool and right half end mold are both provided with journal stirrup, and mounting hole is provided on the journal stirrup, the left half mold
Support plate is fixedly installed on the cylinder of end, the bottom of the support plate is provided with slot, is provided with immediately below the slot
Cylinder, clearance fit between the piston rod and slot in the cylinder, the bottom of the cylinder are fixed on nut seat, institute
It states nut seat to be set on leading screw, one end of the leading screw is fixedly connected by shaft coupling with the output shaft of decelerating motor, described
The other end of leading screw is rotatablely connected with bearing block, and the decelerating motor and bearing block are fixedly installed on the ground, the nut
It is slidably connected between the guide rail of the two bottom sides and fixed setting of seat on the ground.
Preferably, RF transmitter, right half end are both provided at the both ends end center of the left half mold
The end of mold is provided with infrared receiver with the RF transmitter relative position.
Preferably, the end of the left half mold and right half end mold, which is bolted, is provided with baffle.
Preferably, there are two the cylinder settings, two cylinders are symmetricly set on the two bottom sides of left half mold.
The utility model provides a kind of production of concrete wire pole and pours mold, has following advantageous effect:
(1)During mold closing, the piston rod controlled in cylinder injects in slot the utility model, by left half mold from branch
It is held up on support platform, controls decelerating motor rotation at this time, and then drive nut seat movement, nut seat drives cylinder movement, when left half
Mold stops movement when being moved to the surface of right half mold, then controls cylinder decline so that left half mold and right half mold connect
It touches, is fixed to each other by journal stirrup, then sealed both ends by baffle, during die sinking, by above-mentioned inverse operation by left half mold
After removing, then right half end mold disassembled from the both ends of right half mold, the both ends of molding concrete wire pole are naked at this time
It exposes outside, therefore concrete wire pole is easy to take out out of mold.
(2)The utility model is by being arranged RF transmitter and infrared receiver so that left half mold is moved to the right side
The position of the top of half mold is more accurate, avoids position inaccurate, causes the decline of product quality.
(3)The utility model is fixed in supporting table convenient for mold by the way that fixing groove is arranged, avoids mold rolling, pound
Hinder worker.
Description of the drawings
Fig. 1 is the utility model overall structure vertical view;
Fig. 2 is sectional view at A-A in the utility model Fig. 1;
Fig. 3 is sectional view at B-B in the utility model Fig. 1.
In figure:1 left half mold, 2 right half molds, 3 supporting tables, 4 fixing grooves, 5 right half end molds, 6 journal stirrups, 7 mounting holes,
8 support plates, 9 slots, 10 baffles, 11 RF transmitters, 12 infrared receivers, 13 decelerating motors, 14 leading screws, 15 bearings
Seat, 16 nut seats, 17 cylinders, 18 guide rails.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The every other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in Figs. 1-3, the utility model provides a kind of technical solution:A kind of production of concrete wire pole pours mold, wraps
Left half mold 1 and right half mold 2 are included, left half mold 1 and right half mold 2 are fixed in supporting table 3, the right side of supporting table 3
Fixing groove 4 is provided on the top surface of end, right half mold 2 is arranged in fixing groove 4, by the way that fixing groove 4 is arranged, is fixed on convenient for mold
In supporting table 3, mold rolling is avoided, injures worker by a crashing object, the both ends of right half mold 2 are both provided with right half end mold 5, right half end
Head mould tool 5 is bolted to connection with right half mold 2, the cylinder two of half end mold 5 of left half mold 1, right half mold 2 and the right side
Side is both provided with journal stirrup 6, and mounting hole 7 is provided on journal stirrup 6, support plate 8 is fixedly installed on the end cylinder of left half mold 1,
The bottom of support plate 8 is provided with slot 9, and the underface of slot 9 is provided with cylinder 17, and there are two the settings of cylinder 17, two cylinders
17 are symmetricly set on the two bottom sides of left half mold 1, clearance fit between the piston rod in cylinder 17 and slot 9, cylinder 17
Bottom is fixed on nut seat 16, and nut seat 16 is set on leading screw 14, and one end of leading screw 14 passes through shaft coupling and deceleration
The output shaft of motor 13 is fixedly connected, and the other end and the bearing block 15 of leading screw 14 are rotatablely connected, decelerating motor 13 and bearing block 15
It is fixedly installed on the ground, is slidably connected between the guide rail 18 of the two bottom sides of nut seat 16 and fixed setting on the ground,
There are two the settings of leading screw 14, and two leading screws 14 are symmetricly set on the upper and lower ends of left half mold 1, the both ends end of left half mold 1
RF transmitter 11 is both provided at center, the end of right half end mold 5 is set with 11 relative position of RF transmitter
It is equipped with infrared receiver 12, by the way that RF transmitter 11 and infrared receiver 12 is arranged so that left half mold 1 is moved to
The position of the top of right half mold 2 is more accurate, and the end of left half mold 1 and right half end mold 5, which is bolted, to be set
It is equipped with baffle 10.
In use, during mold closing, the piston rod controlled in cylinder 17 injects in slot 9, by left half mold 1 from supporting table
It being held up on 3, controls decelerating motor 13 at this time and rotate, and then nut seat 16 is driven to move, nut seat 16 drives cylinder 17 to move, when
Left half mold 1 stops movement when being moved to the surface of right half mold 2, then controls the decline of cylinder 17 so that left half mold 1 and the right side
Half mold 2 contacts, and is fixed to each other by journal stirrup 6, then sealed both ends by baffle 10, during die sinking, by above-mentioned opposite behaviour
Make after removing left half mold 1, then right half end mold 5 is disassembled from the both ends of right half mold 2, at this time molding cement
The both ends of electric pole are exposed outside, therefore concrete wire pole is easy to take out out of mold.
It can to sum up obtain, the utility model is by being arranged right half end mold 5, support plate 8, slot 9, leading screw 14 and cylinder
17, solve the problem of tradition pours mold die sinking and mold closing is more difficult, is difficult to take out out of mold after concrete wire pole molding.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any actual relationship or order or sequence.Moreover, the terms "include", "comprise" or its any other variant are intended to
Non-exclusive inclusion, so that the process, method, article or equipment including a series of elements is not only wanted including those
Element, but also include other elements that are not explicitly listed, or further include for this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art,
It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (4)
1. a kind of concrete wire pole production pours mold, including left half mold(1)With right half mold(2), it is characterised in that:It is described
Left half mold(1)With right half mold(2)It is fixed at supporting table(3)On, the supporting table(3)Right end top surface on be arranged
There is fixing groove(4), the right half mold(2)It is arranged in fixing groove(4)It is interior, the right half mold(2)Both ends be both provided with the right side
Half end mold(5), the right half end mold(5)With right half mold(2)It is bolted to connection, the left half mold
(1), right half mold(2)With right half end mold(5)Cylinder both sides be both provided with journal stirrup(6), the journal stirrup(6)On be provided with
Mounting hole(7), the left half mold(1)End cylinder on be fixedly installed support plate(8), the support plate(8)Bottom
It is provided with slot(9), the slot(9)Underface be provided with cylinder(17), the cylinder(17)Interior piston rod and slot
(9)Between clearance fit, the cylinder(17)Bottom be fixed at nut seat(16)On, the nut seat(16)It is set in
Leading screw(14)On, the leading screw(14)One end pass through shaft coupling and decelerating motor(13)Output shaft be fixedly connected, the silk
Thick stick(14)The other end and bearing block(15)Rotation connection, the decelerating motor(13)And bearing block(15)It is fixed at ground
On face, the nut seat(16)Two bottom sides and fixed setting guide rail on the ground(18)Between be slidably connected.
2. a kind of concrete wire pole production according to claim 1 pours mold, it is characterised in that:The left half mold
(1)Both ends end center at be both provided with RF transmitter(11), the right half end mold(5)End with it is described red
Outside line transmitter(11)Relative position is provided with infrared receiver(12).
3. a kind of concrete wire pole production according to claim 1 pours mold, it is characterised in that:The left half mold
(1)With right half end mold(5)End be bolted and be provided with baffle(10).
4. a kind of concrete wire pole production according to claim 1 pours mold, it is characterised in that:The cylinder(17)If
There are two setting, two cylinders(17)It is symmetricly set on left half mold(1)Two bottom sides.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820065017.9U CN207841713U (en) | 2018-01-13 | 2018-01-13 | A kind of production of concrete wire pole pours mold |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820065017.9U CN207841713U (en) | 2018-01-13 | 2018-01-13 | A kind of production of concrete wire pole pours mold |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207841713U true CN207841713U (en) | 2018-09-11 |
Family
ID=63414793
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820065017.9U Expired - Fee Related CN207841713U (en) | 2018-01-13 | 2018-01-13 | A kind of production of concrete wire pole pours mold |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207841713U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110421686A (en) * | 2019-07-30 | 2019-11-08 | 济宁医学院 | A kind of armored concrete steel plate casting machine |
CN112454648A (en) * | 2020-11-18 | 2021-03-09 | 张明轩 | Pouring system is used in cement wire pole production |
-
2018
- 2018-01-13 CN CN201820065017.9U patent/CN207841713U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110421686A (en) * | 2019-07-30 | 2019-11-08 | 济宁医学院 | A kind of armored concrete steel plate casting machine |
CN112454648A (en) * | 2020-11-18 | 2021-03-09 | 张明轩 | Pouring system is used in cement wire pole production |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207841713U (en) | A kind of production of concrete wire pole pours mold | |
CN109014536B (en) | Automatic assembly device and method for welded steel bar truss floor support plate | |
CN110778120B (en) | Pouring trolley for shear wall | |
CN212044899U (en) | Cutting device of rubber block | |
CN111644589A (en) | Cast iron pipe double-station centrifugal casting machine | |
CN111360971B (en) | PC prefabricated part production line and fixed die platform thereof | |
CN201669783U (en) | Bedplate basin type sanitary ceramics stripping equipment | |
CN108273856A (en) | A kind of hydraulic stepping square billet feeding device with automatic steel splitting function | |
CN219806269U (en) | Device is pour in assembled building shaping | |
CN212883650U (en) | Tin-making metal stamping raw material flattening machine | |
CN203582015U (en) | Small brick stacking machine | |
CN208179882U (en) | A kind of template system of straddle type monorail rail tracks | |
CN216235716U (en) | Aluminum alloy track sliding device | |
CN109967547A (en) | A kind of crane end carriage automation pressurizing unit | |
CN212503800U (en) | Prefabricated stair board production mount table for mould | |
CN214026668U (en) | Support is adjusted with mould to production of polymer heat insulating strip | |
CN206567409U (en) | The feed device of drawer guideway transverse direction progressive die | |
CN203305358U (en) | Die-demolding wear-free wall slab molding machine | |
CN221074278U (en) | Lining trolley capping device | |
CN219507574U (en) | Hydraulic jack | |
CN217021003U (en) | Vertical and horizontal double-saw-head transverse moving device | |
CN219821922U (en) | Wood tray centering device for overturning platform | |
CN219489469U (en) | Slab lifting machine | |
CN212495286U (en) | Cast iron pipe double-station centrifugal casting machine | |
CN220270338U (en) | Nano coating surface flatness detection device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180911 Termination date: 20220113 |