CN207812441U - The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile - Google Patents

The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile Download PDF

Info

Publication number
CN207812441U
CN207812441U CN201721693449.6U CN201721693449U CN207812441U CN 207812441 U CN207812441 U CN 207812441U CN 201721693449 U CN201721693449 U CN 201721693449U CN 207812441 U CN207812441 U CN 207812441U
Authority
CN
China
Prior art keywords
reinforcement cage
steel reinforcement
hard
cast
building enclosure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721693449.6U
Other languages
Chinese (zh)
Inventor
郑四二
陈亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hongye Polytron Technologies Inc Foundation Soil
Original Assignee
Shenzhen Hongye Polytron Technologies Inc Foundation Soil
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongye Polytron Technologies Inc Foundation Soil filed Critical Shenzhen Hongye Polytron Technologies Inc Foundation Soil
Priority to CN201721693449.6U priority Critical patent/CN207812441U/en
Application granted granted Critical
Publication of CN207812441U publication Critical patent/CN207812441U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The technical field of the utility model steel reinforcement cage,It discloses for the lateral hard building enclosure of the steel reinforcement cage of cast-in-situ bored pile,Solution cavity region and steel reinforcement cage including being formed in stake holes medium position,Steel reinforcement cage is placed in stake holes,Section is gone along with sb. to guard him with opposite with solution cavity region in the middle part of steel reinforcement cage,The periphery for going along with sb. to guard him section is enclosed with hard sleeve,Section is gone along with sb. to guard him in hard sleeve closing,And in the periphery arrangement of prominent steel reinforcement cage,Hard sleeve is welded with steel reinforcement cage,The lateral hard building enclosure of steel reinforcement cage provided by the utility model for cast-in-situ bored pile,The periphery closing for going along with sb. to guard him section of steel reinforcement cage is enclosed with hard sleeve,After steel reinforcement cage is placed in stake holes,Hard sleeve has separated the connection with solution cavity region inside steel reinforcement cage,During the inside fill concrete toward steel reinforcement cage,Concrete does not diffuse into solution cavity,The quality of concrete-pile is high,Pile is at low cost.

Description

The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile
Technical field
The utility model is related to the technical field of steel reinforcement cage, the lateral hard of steel reinforcement cage of more particularly, to cast-in-situ bored pile Building enclosure.
Background technology
Bridges and culverts or Pile Foundation of Highrise Building construction in encounter solution cavity when, the prior art frequently with into hole throwing slabstone, The different construction technology such as slip casing by pressure and use steel pile casting follow-up.In the prior art, it when solution cavity is bigger, backfills to material Material demand is big, of high cost, and technical difficulty is high, quality problems easily occurs.
Utility model content
The purpose of this utility model is to provide the lateral hard building enclosures of steel reinforcement cage for cast-in-situ bored pile, it is intended to solve Certainly in the prior art, the problem of pile is of high cost, concrete easily leaks outside, easy mass accident.
The utility model is realized in this way the lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile, including shape At in the solution cavity region of the periphery of stake holes medium position and steel reinforcement cage, the steel reinforcement cage is placed in the stake holes, the reinforcing bar The middle part of cage has the go along with sb. to guard him section opposite with the solution cavity region, and the periphery for going along with sb. to guard him section is enclosed with hard sleeve, described hard Section is gone along with sb. to guard him described in matter sleeve closure, and in the periphery arrangement of the prominent steel reinforcement cage, the hard sleeve is welded with the steel reinforcement cage It connects.
Further, the steel reinforcement cage includes multiple around the longitudinal rib being arranged in juxtaposition and around multiple longitudinal ribs Stirrup, the hard sleeve welds with the lengthways of rod and stirrup respectively.
Further, the length that the upper end of the hard sleeve enters the solution cavity area top soil body is 2 meters.
Further, the length that the lower end of the hard sleeve enters the solution cavity region lower part soil body is 2 meters.
Further, the hard sleeve is made of Steel material.
Further, the hard sleeve is welding fabrication.
Further, the hard sleeve is enclosed by multiple arcs steel plate.
Further, the periphery for going along with sb. to guard him section is enclosed with soft cloth set, and the soft cloth set extends respectively to hard set The top and lower part of pipe.
Compared with prior art, the lateral hard of the steel reinforcement cage provided by the utility model for cast-in-situ bored pile goes along with sb. to guard him knot The periphery closing for going along with sb. to guard him section of structure, steel reinforcement cage is enclosed with hard sleeve, after steel reinforcement cage is placed in stake holes, hard sleeve partition With the connection in solution cavity region inside steel reinforcement cage, when toward the inside casting concrete of steel reinforcement cage, concrete will not expand to solution cavity It dissipates, the cost of karst cave treatment will be saved, improve pile quality, avoid the occurrence of quality accident.
Description of the drawings
Fig. 1 is the schematic front view that hard sleeve is arranged on the steel reinforcement cage of the utility model embodiment offer;
Fig. 2 is cut-away illustration of the setting hard sleeve in utilization on the steel reinforcement cage of the utility model embodiment offer.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only used to explain The utility model is not used to limit the utility model.
The realization of the utility model is described in detail below in conjunction with specific embodiment.
It is preferred embodiment provided by the utility model referring to Fig.1 shown in -2.
The lateral hard building enclosure of steel reinforcement cage provided in this embodiment for cast-in-situ bored pile, is used in bore forming In, be formed with solution cavity region 100, including steel reinforcement cage 12 on the outside of the medium position of stake holes, the middle part of steel reinforcement cage 12 have with it is molten What hole region 100 was aligned goes along with sb. to guard him section, is enclosed with hard sleeve 13 in the periphery for going along with sb. to guard him section of steel reinforcement cage 12,13 ring of hard sleeve It is arranged around the periphery for going along with sb. to guard him section of steel reinforcement cage 12, steel reinforcement cage 12 is gone along with sb. to guard him into section closing package, is welded with steel reinforcement cage 12, and hard Casing 13 is in the periphery arrangement of prominent steel reinforcement cage 12.
The lateral hard building enclosure of the steel reinforcement cage for cast-in-situ bored pile of above-mentioned offer, in practice of construction, steel reinforcement cage The 12 periphery closing for going along with sb. to guard him section is enclosed with hard sleeve 13, and after steel reinforcement cage 12 is placed in stake holes, hard sleeve 13 separates The connection of steel reinforcement cage 12 inside and solution cavity region 100, when toward the inside casting concrete of steel reinforcement cage 12, concrete will not be to Solution cavity is spread, and will save the cost of karst cave treatment, is improved pile quality, is avoided the occurrence of quality accident.
Specifically, steel reinforcement cage 12 includes multiple around the longitudinal rib 121 being arranged in juxtaposition and around multiple longitudinal ribs 121 Stirrup 122, above-mentioned hard sleeve 13 is welded with longitudinal reinforcement and stirrup 122 respectively, in this manner it is ensured that hard sleeve 13 exists Soundness on steel reinforcement cage 12.
In addition, the length that the upper end of hard sleeve 13 enters the solution cavity top soil body is 2 meters.
Furthermore the length that the lower end of hard sleeve 13 enters the solution cavity lower part soil body is 2 meters.
In the present embodiment, hard sleeve 13 is made of Steel material, is enclosed by multiple arcs steel plate, also, hard Casing 13 is welding fabrication.
The periphery for going along with sb. to guard him section is enclosed with soft cloth set 108, soft cloth set 108 extend respectively to the top of hard sleeve 13 with And lower part.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this All any modification, equivalent and improvement etc., should be included in the utility model made by within the spirit and principle of utility model Protection domain within.

Claims (8)

1. the lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile, which is characterized in that including being formed in position in stake holes The solution cavity region for the periphery set and steel reinforcement cage, the steel reinforcement cage are placed in the stake holes, the middle part of the steel reinforcement cage have with The solution cavity region it is opposite go along with sb. to guard him section, the periphery for going along with sb. to guard him section is enclosed with hard sleeve, described in the hard sleeve closing Section is gone along with sb. to guard him, and in the periphery arrangement of the prominent steel reinforcement cage, the hard sleeve is welded with the steel reinforcement cage.
2. being used for the lateral hard building enclosure of steel reinforcement cage of cast-in-situ bored pile as described in claim 1, which is characterized in that described Steel reinforcement cage includes multiple around the longitudinal rib being arranged in juxtaposition and around the stirrup of multiple longitudinal ribs, the hard sleeve point It is not welded with the longitudinal rib and stirrup.
3. being used for the lateral hard building enclosure of steel reinforcement cage of cast-in-situ bored pile as claimed in claim 2, which is characterized in that described The length that the upper end of hard sleeve enters the solution cavity area top soil body is 2 meters.
4. being used for the lateral hard building enclosure of steel reinforcement cage of cast-in-situ bored pile as claimed in claim 3, which is characterized in that described The length that the lower end of hard sleeve enters the solution cavity region lower part soil body is 2 meters.
5. the lateral hard building enclosure of the steel reinforcement cage according to any one of claims 1-4 for cast-in-situ bored pile, feature It is, the hard sleeve is made of Steel material.
6. the lateral hard building enclosure of the steel reinforcement cage according to any one of claims 1-4 for cast-in-situ bored pile, feature It is, the hard sleeve is welding fabrication.
7. the lateral hard building enclosure of the steel reinforcement cage according to any one of claims 1-4 for cast-in-situ bored pile, feature It is, the hard sleeve is enclosed by multiple arcs steel plate.
8. the lateral hard building enclosure of the steel reinforcement cage according to any one of claims 1-4 for cast-in-situ bored pile, feature Be, the periphery for going along with sb. to guard him section is enclosed with soft cloth set, the soft cloth set extend respectively to hard sleeve top and Lower part.
CN201721693449.6U 2017-12-07 2017-12-07 The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile Active CN207812441U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721693449.6U CN207812441U (en) 2017-12-07 2017-12-07 The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721693449.6U CN207812441U (en) 2017-12-07 2017-12-07 The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile

Publications (1)

Publication Number Publication Date
CN207812441U true CN207812441U (en) 2018-09-04

Family

ID=63335390

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721693449.6U Active CN207812441U (en) 2017-12-07 2017-12-07 The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile

Country Status (1)

Country Link
CN (1) CN207812441U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868810A (en) * 2019-02-27 2019-06-11 中建一局集团第一建筑有限公司 One kind passing through buried major diameter discarded pipe and does operation pile making method
CN110318412A (en) * 2019-06-05 2019-10-11 广东建邦兴业集团有限公司 A kind of solution cavity pile base construction method
CN111501737A (en) * 2020-04-16 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Reinforced cast-in-situ bored pile and construction method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109868810A (en) * 2019-02-27 2019-06-11 中建一局集团第一建筑有限公司 One kind passing through buried major diameter discarded pipe and does operation pile making method
CN110318412A (en) * 2019-06-05 2019-10-11 广东建邦兴业集团有限公司 A kind of solution cavity pile base construction method
CN111501737A (en) * 2020-04-16 2020-08-07 中国电建集团华东勘测设计研究院有限公司 Reinforced cast-in-situ bored pile and construction method thereof

Similar Documents

Publication Publication Date Title
CN207812441U (en) The lateral hard building enclosure of steel reinforcement cage for cast-in-situ bored pile
CN104179364B (en) Punch after a kind of shear wall ruggedized construction and construction method thereof
JP6539566B2 (en) Construction method of cast-in-place concrete pile
KR101625976B1 (en) Support wire implanting anchor
JP2005264556A (en) Concrete filled steel segment and primary lining body for tunnel
CN106284204B (en) A kind of quick device and technique of fill heap of fighting flood and relieve victims, protect
CN208329021U (en) Miniature steel pipe pile for foundation stabilization
CN204139643U (en) Punch after a kind of shear wall ruggedized construction
CN205276243U (en) Stretch -proofing geogrid
CN207672563U (en) The lateral soft building enclosure of steel reinforcement cage for cast-in-situ bored pile
CN106245664B (en) Rigid wall retaining design and its construction method with rectangle steel reinforcement cage
CN206816956U (en) A kind of reinforcement type jacking pipe structure
CN206581221U (en) A kind of reservoir dam surface concrete protective layer
CN106906952A (en) A kind of band oblique pull rib rectangular steel pipe reinforced column and its construction method
CN103556612A (en) Water seepage and drainage pipe and construction method thereof
CN103437376A (en) Sidewall retaining structure of basement
CN104153361B (en) Prestressed concrete pipe pile underground pile connection construction method
CN208235541U (en) A kind of foundation pit breast beam structure
CN209585019U (en) A kind of cast-in-situ bored pile pile crown reinforcing bar protective device
RU153411U1 (en) Piling shell
CN204139165U (en) A kind of waterproof sleeve for bored pile
CN205676897U (en) One is positioned at original ground following pier stud constructing device
CN206418793U (en) Beam expands cross section structure
KR20090055731A (en) The connectors for steel pile head embedded inconcrete footing with double cap and thereof structure