CN207800948U - Seal assembly and insulator arrangement wire clamp comprising it - Google Patents
Seal assembly and insulator arrangement wire clamp comprising it Download PDFInfo
- Publication number
- CN207800948U CN207800948U CN201820236713.1U CN201820236713U CN207800948U CN 207800948 U CN207800948 U CN 207800948U CN 201820236713 U CN201820236713 U CN 201820236713U CN 207800948 U CN207800948 U CN 207800948U
- Authority
- CN
- China
- Prior art keywords
- sealing
- hole
- clamp
- accommodating
- sealing cover
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Installation Of Indoor Wiring (AREA)
Abstract
Description
技术领域technical field
本实用新型涉及一种设备线夹,特别涉及一种密封组件及包含其的绝缘设备线夹。The utility model relates to an equipment wire clip, in particular to a sealing component and an insulating equipment wire clip containing it.
背景技术Background technique
变压器是配电系统中的主要设备,设备线夹用于变压器和线缆之间的连接,对输配电系统的安全运行起关键作用。The transformer is the main equipment in the power distribution system, and the equipment clamp is used for the connection between the transformer and the cable, which plays a key role in the safe operation of the power transmission and distribution system.
在现有技术中,设备线夹与线缆、变压器的抱杆连接后,通常仅仅是用护套罩住连接处,密封性能较差,不能杜绝潮气与设备线夹接触,长时间使用后,设备线夹的表面容易氧化。另外,当连接不同导体材质时容易发生电化学腐蚀,设备线夹使用寿命较短。In the prior art, after the equipment clamp is connected to the cable and the pole of the transformer, the joint is usually only covered with a sheath, which has poor sealing performance and cannot prevent moisture from contacting the equipment clamp. After long-term use, The surface of the equipment clamp is easily oxidized. In addition, when different conductor materials are connected, electrochemical corrosion is prone to occur, and the service life of the equipment clamp is short.
综上,现有技术中的设备线夹具有密封性能较差、设备线夹使用寿命较短的缺陷。To sum up, the equipment line clamps in the prior art have the defects of poor sealing performance and short service life of the equipment line clamps.
实用新型内容Utility model content
本实用新型要解决的技术问题是为了克服现有技术中的设备线夹具有密封性能较差、设备线夹使用寿命较短的缺陷,提供一种密封组件及包含其的绝缘设备线夹。The technical problem to be solved by the utility model is to provide a sealing assembly and an insulated equipment clamp containing it to overcome the defects of poor sealing performance and short service life of the equipment clamp in the prior art.
本实用新型是通过下述技术方案来解决上述技术问题:The utility model solves the problems of the technologies described above through the following technical solutions:
一种密封组件,用于密封设备线夹,所述设备线夹上穿设有抱杆,所述抱杆沿高度方向具有螺纹端和瓷瓶端,其特点在于,所述密封组件包括:A sealing assembly is used for sealing equipment clamps, the equipment clamp is pierced with a holding rod, and the holding rod has a threaded end and a porcelain bottle end along the height direction, and the feature is that the sealing assembly includes:
密封壳体,所述密封壳体内具有容置腔,所述容置腔用于容置所述设备线夹,所述密封壳体的底部具有密封套容置孔,所述密封壳体的一端具有前密封口,所述前密封口、所述密封套容置孔均与所述容置腔相连通;The sealed housing has an accommodating cavity inside, and the accommodating cavity is used to accommodate the equipment clamp. The bottom of the sealed housing has a sealing sleeve accommodating hole. One end of the sealed housing It has a front sealing port, and the front sealing port and the sealing sleeve accommodating hole are all in communication with the accommodating cavity;
密封套,所述密封套上设有抱杆容置孔,所述抱杆容置孔用于容置所述抱杆的螺纹端,所述密封套密封连接于所述密封套容置孔;A sealing sleeve, the sealing sleeve is provided with a holding hole for holding the rod, and the holding hole is used to accommodate the threaded end of the holding rod, and the sealing sleeve is sealed and connected to the sealing sleeve holding hole;
前密封盖,所述前密封盖密封连接于所述前密封口,所述前密封盖上设有密封入口,所述密封入口用于使线缆进入所述容置腔。The front sealing cover is sealed and connected to the front sealing port, and the front sealing cover is provided with a sealing inlet, and the sealing inlet is used for cables to enter the accommodating cavity.
在本方案中,设备线夹整体位于密封壳体内,抱杆的螺纹端穿设于密封套,线缆通过前密封盖进入容置腔,从而,能够对设备线夹和抱杆进行较好的密封和保护。密封组件提高了设备线夹的密封性能,也使得设备线夹的表面不易氧化,也不易发生电化学腐蚀,提高了设备线夹的使用寿命。In this solution, the equipment clamp is located in the sealed housing as a whole, the threaded end of the holding rod is pierced through the sealing sleeve, and the cable enters the accommodating cavity through the front sealing cover, so that the equipment clamp and the holding rod can be better Sealed and protected. The sealing component improves the sealing performance of the equipment clamp, and also makes the surface of the equipment clamp difficult to be oxidized and electrochemically corroded, thereby improving the service life of the equipment clamp.
较佳地,所述密封套包括:Preferably, the sealing sleeve includes:
连接部;connecting part;
密封部,所述密封部位于所述连接部的内部,所述密封部由弹性材质制成,所述密封部上设有所述抱杆容置孔,所述抱杆容置孔沿所述连接部的高度方向贯穿于所述密封部,所述连接部密封连接于所述密封套容置孔;A sealing part, the sealing part is located inside the connecting part, the sealing part is made of elastic material, the sealing part is provided with the holding rod accommodation hole, and the holding rod accommodation hole is along the The height direction of the connecting part runs through the sealing part, and the connecting part is sealed and connected to the sealing sleeve accommodating hole;
护罩部,所述护罩部连接于所述密封部的底部,所述护套部的内部与所述抱杆容置孔相连通,所述护套部的内部用于容置所述抱杆的瓷瓶端;A shroud part, the shroud part is connected to the bottom of the sealing part, the inside of the sheath part communicates with the pole accommodating hole, and the inside of the sheath part is used for accommodating the holding rod the vase end of the rod;
其中,所述密封部的外壁面与所述连接部的内壁面之间形成有容置空间,所述容置空间内填充有绝缘材质。Wherein, an accommodating space is formed between the outer wall surface of the sealing part and the inner wall surface of the connecting part, and the accommodating space is filled with an insulating material.
在本方案中,抱杆容置孔内插入抱杆后,密封部能够发生弹性变形而抱紧抱杆。由于抱杆的螺纹端上的螺纹的存在,很可能会使得密封部与抱杆之间不能可靠地密封,容置空间内绝缘材质的存在能够避免螺纹对密封性能的影响。从而,当密封套用于抱杆部分的密封时,密封性能较好。另外,护罩部的形状与抱杆的瓷瓶端的形状相适配,护罩部能够对瓷瓶端起到保护作用,有利于提高抱杆的使用寿命。In this solution, after the pole is inserted into the pole holding hole, the sealing part can be elastically deformed to hold the pole tightly. Due to the existence of the thread on the threaded end of the holding rod, it is likely that the seal between the sealing part and the holding rod cannot be reliably sealed, and the existence of insulating material in the accommodation space can avoid the influence of the thread on the sealing performance. Therefore, when the sealing sleeve is used for sealing the pole holding part, the sealing performance is better. In addition, the shape of the shield part is adapted to the shape of the porcelain bottle end of the holding rod, and the shield part can protect the porcelain bottle end, which is beneficial to improve the service life of the holding rod.
较佳地,所述密封部沿所述连接部的高度方向具有顶端和底端,所述密封部的底端贴合于所述连接部的底部;Preferably, the sealing portion has a top end and a bottom end along the height direction of the connecting portion, and the bottom end of the sealing portion is attached to the bottom of the connecting portion;
自所述密封部的顶端至所述密封部的底端,所述密封部呈上小下大的喇叭口状;From the top end of the sealing part to the bottom end of the sealing part, the sealing part is in the shape of a bell mouth with a small top and a big bottom;
在沿所述连接部的高度方向上,所述连接部的高度不小于所述密封部的高度。In the direction along the height of the connecting portion, the height of the connecting portion is not smaller than that of the sealing portion.
在本方案中,密封部的底端的横截面的面积大于密封部的顶端的横截面的面积,一方面,能够容置较多量的绝缘材质,有利于实现对抱杆的螺纹端的可靠密封;另一方面,若密封部的底端的横截面的面积小于密封部的顶端的横截面的面积,则很有可能会使得密封部的顶端与抱杆之间存在间隙,影响对抱杆部分的密封效果。In this solution, the cross-sectional area of the bottom end of the sealing part is larger than the cross-sectional area of the top end of the sealing part. On the one hand, it can accommodate a large amount of insulating material, which is beneficial to realize reliable sealing of the threaded end of the holding rod; on the other hand On the one hand, if the cross-sectional area of the bottom end of the sealing portion is smaller than the cross-sectional area of the top end of the sealing portion, there may be a gap between the top end of the sealing portion and the pole, which will affect the sealing effect on the pole portion. .
较佳地,所述线缆包括主线和两根测温线,所述密封口包括第一密封口和两个第二密封口,所述第一密封口用于使所述主线进入所述容置腔,所述第二密封口用于使所述测温线进入所述容置腔;Preferably, the cable includes a main line and two temperature measuring lines, the sealing port includes a first sealing port and two second sealing ports, and the first sealing port is used to allow the main line to enter the container. a housing chamber, the second sealing port is used to allow the temperature measuring line to enter the housing chamber;
所述前密封盖上还设有:The front sealing cover is also provided with:
第一密封延伸部,所述第一密封延伸部自所述前密封盖靠近所述密封壳体的一端朝向所述容置腔延伸,所述第一密封延伸部位于所述第一密封口的延伸方向上;A first sealing extension part, the first sealing extension part extends from an end of the front sealing cover close to the sealing housing toward the accommodating chamber, the first sealing extension part is located at the first sealing port in the direction of extension;
两个第二密封延伸部,所述第二密封延伸部自所述前密封盖靠近所述密封壳体的一端朝向所述容置腔延伸,所述第二密封延伸部位于所述第二密封口的延伸方向上。Two second sealing extensions, the second sealing extensions extend from the end of the front sealing cover close to the sealing housing toward the accommodating cavity, the second sealing extensions are located at the second sealing in the direction of mouth extension.
在本方案中,第一密封延伸部和第二密封延伸部增大了前密封盖与线缆的接触面积,有利于提高线缆的稳定性,另外,由于第一密封延伸部和第二密封延伸部为其他结构提供了设置空间,有利于实现不同规格的线缆穿过。In this solution, the first sealing extension and the second sealing extension increase the contact area between the front sealing cover and the cable, which is conducive to improving the stability of the cable. In addition, because the first sealing extension and the second sealing The extension part provides a setting space for other structures, which is beneficial to realize the passage of cables of different specifications.
较佳地,所述第一密封延伸部采用分级结构,用于使不同规格的所述主线穿过。Preferably, the first sealing extension part adopts a hierarchical structure for allowing the main wires of different specifications to pass through.
在本方案中,分级结构能够提高设备线夹的通用性,有利于节省成本,也便于管理。In this solution, the hierarchical structure can improve the versatility of the equipment clamps, which is beneficial to save costs and facilitate management.
较佳地,所述密封组件还包括上密封盖,且所述上密封盖包括第一密封盖、第二密封盖和第三密封盖;Preferably, the sealing assembly further includes an upper sealing cover, and the upper sealing cover includes a first sealing cover, a second sealing cover and a third sealing cover;
所述密封壳体上设有第一密封口、第二密封口和第三密封口;The sealed housing is provided with a first sealing port, a second sealing port and a third sealing port;
其中,所述第一密封盖、所述第二密封盖和所述第三密封盖一一对应密封连接于所述第一密封口、所述第二密封口和所述第三密封口。Wherein, the first sealing cover, the second sealing cover and the third sealing cover are sealed and connected to the first sealing port, the second sealing port and the third sealing port in one-to-one correspondence.
较佳地,所述第一密封盖通过第一连接带连接于所述第二密封盖,所述第一密封盖通过第二连接带连接于所述第三密封盖。Preferably, the first sealing cover is connected to the second sealing cover through a first connecting band, and the first sealing cover is connected to the third sealing cover through a second connecting band.
在本方案中,第一密封盖、第二密封盖和第三密封盖通过第一连接带和第二连接带连接为一整体,更加便于管理。In this solution, the first sealing cover, the second sealing cover and the third sealing cover are connected as a whole through the first connecting band and the second connecting band, which is more convenient for management.
较佳地,所述第一密封盖的一侧壁连接有连接扣,所述连接扣具有连接槽,所述前密封盖的侧壁上对应设有凸起,所述凸起卡设于所述连接槽。Preferably, a connecting buckle is connected to the side wall of the first sealing cover, and the connecting buckle has a connecting groove, and a protrusion is correspondingly provided on the side wall of the front sealing cover, and the protrusion is clamped on the the connection slot described above.
在本方案中,第一密封盖通过连接扣、凸起扣合到前密封盖上,既便于管理,也有利于提高设备线夹的密封可靠性。In this solution, the first sealing cover is fastened to the front sealing cover through the connecting buckle and the protrusion, which is not only convenient for management, but also conducive to improving the sealing reliability of the equipment cable clamp.
本实用新型还提供一种绝缘设备线夹,其特点在于,其包括如上所述的设备线夹和密封组件。The utility model also provides an insulating equipment clamp, which is characterized in that it comprises the above-mentioned equipment clamp and a sealing assembly.
本实用新型还提供一种绝缘设备线夹,其特征在于,其包括如上所述的设备线夹和密封组件;其中,所述设备线夹包括:The utility model also provides an insulating equipment clamp, which is characterized in that it includes the above-mentioned equipment clamp and a sealing assembly; wherein, the equipment clamp includes:
线夹本体,所述线夹本体上设有线缆入口,所述线缆入口与所述密封入口相连通,所述线夹本体上还设有第一容置孔,所述第一容置孔与所述线缆入口相连通;A cable clamp body, the cable clamp body is provided with a cable inlet, the cable inlet communicates with the sealed inlet, and the cable clamp body is also provided with a first accommodating hole, the first accommodating The hole communicates with the cable inlet;
剪切螺栓,所述剪切螺栓穿设于所述第一容置孔,所述剪切螺栓的螺杆中远离所述剪切螺栓的头部的一端用于抵接于所述线缆;A shearing bolt, the shearing bolt is passed through the first accommodation hole, and the end of the screw rod of the shearing bolt away from the head of the shearing bolt is used to abut against the cable;
其中,所述剪切螺栓的螺杆的外壁面设有至少两个剪切槽,至少两个所述剪切槽沿所述剪切螺栓的轴线方向间隔分布,且每一所述剪切槽沿所述剪切螺栓的螺杆的周向方向延伸;Wherein, the outer wall surface of the screw rod of the shear bolt is provided with at least two shear grooves, at least two of the shear grooves are distributed along the axial direction of the shear bolt at intervals, and each of the shear grooves is along the axis of the shear bolt. the circumferential direction of the screw of the shear bolt extends;
所述剪切螺栓的头部设有安装孔,所述安装孔延伸穿过至少两个所述剪切槽中远离所述剪切螺栓的头部的一个所述剪切槽;The head of the shear bolt is provided with a mounting hole, and the mounting hole extends through one of the at least two shear slots that is remote from the head of the shear bolt;
其中,所述第一密封口与所述剪切螺栓的位置相对应。Wherein, the position of the first sealing port corresponds to the position of the shear bolt.
在本方案中,线夹本体与线缆通过剪切螺栓压紧连接,操作简单、性能稳定。剪切螺栓抵接于线缆后,剪切螺栓从对应的剪切槽处扭断。剪切螺栓上设有至少两个剪切槽,对于较大规格的线缆,剪切螺栓会从靠近线缆的一个剪切槽处被扭断;对于较小规格的线缆,剪切螺栓会从远离线缆的一个剪切槽处被扭断。从而,使得设备线缆能够适应不同规格的线缆,通用性较好。另外,由于安装孔延伸穿过剪切槽,剪切螺栓被扭断后,也能够通过安装孔较为方便地将剪切螺栓从线夹本体上卸下,也便于后期维护。其中,将剪切螺栓安装到线夹本体的过程中,第一密封盖与密封壳体分离,当剪切螺栓压紧线缆到位后,将第一密封盖与密封壳体的第一密封口密封连接。In this solution, the clamp body and the cable are tightly connected by shear bolts, which is easy to operate and stable in performance. After the shear bolt abuts against the cable, the shear bolt is twisted off from the corresponding shear groove. There are at least two shearing grooves on the shearing bolt. For cables with larger specifications, the shearing bolts will be twisted off from one of the shearing grooves close to the cables; for cables with smaller specifications, the shearing bolts will be twisted off at a cut away from the cable. Therefore, the equipment cable can be adapted to cables of different specifications, and the versatility is good. In addition, since the mounting hole extends through the shearing groove, after the shearing bolt is twisted off, the shearing bolt can be easily removed from the clamp body through the mounting hole, which is also convenient for later maintenance. Wherein, in the process of installing the shearing bolt to the clamp body, the first sealing cover is separated from the sealing housing, and when the shearing bolt compresses the cable in place, the first sealing cover and the first sealing port of the sealing housing are separated. Sealed connection.
较佳地,所述线夹本体上还设有第二容置孔,所述设备线夹还包括:Preferably, the cable clip body is also provided with a second accommodation hole, and the device cable clip also includes:
夹套,所述夹套穿设于所述第二容置孔,所述夹套上设有:A jacket, the jacket is passed through the second accommodating hole, and the jacket is provided with:
抱杆容置孔,所述抱杆容置孔用于容置所述抱杆,所述抱杆容置孔位于所述线夹本体中远离所述线缆入口的一端,所述抱杆容置孔沿所述夹套的高度方向延伸;A pole accommodating hole, the pole accommodating hole is used to accommodate the pole, the pole accommodating hole is located at the end of the clamp body away from the cable entrance, the pole accommodating The placement hole extends along the height direction of the jacket;
第一卸应力槽,所述第一卸应力槽位于所述夹套的侧壁上,所述第一卸应力槽延伸至所述抱杆容置孔;A first stress relief groove, the first stress relief groove is located on the side wall of the jacket, and the first stress relief groove extends to the pole accommodating hole;
其中,所述线夹本体中远离所述线缆入口的一端具有开口,所述开口延伸至所述抱杆容置孔;Wherein, one end of the clamp body away from the cable inlet has an opening, and the opening extends to the pole accommodating hole;
所述线夹本体中与所述开口相对应的两侧壁上均设有调节孔,所述线夹本体的两侧壁上的调节孔与所述开口相连通,一紧固件依次穿设于所述线夹本体的其中一侧壁、所述开口和所述线夹本体的另一侧壁;Adjustment holes are provided on the two side walls of the clamp body corresponding to the opening, the adjustment holes on the two side walls of the clamp body communicate with the opening, and a fastener is sequentially passed through One side wall of the clamp body, the opening and the other side wall of the clamp body;
其中,所述第二密封口与所述夹套的位置相对应,所述第三密封口与所述调节孔的位置相对应。Wherein, the second sealing port corresponds to the position of the jacket, and the third sealing port corresponds to the position of the adjustment hole.
在本方案中,通过紧固件能够收紧线夹本体,使得夹套发生弹性变形,进而使得夹套能够与抱杆抱紧,最终实现线缆与变压器的抱杆的连接。其中,在抱杆与夹套抱紧之前,第二密封盖与密封壳体分离、第三密封盖与密封壳体分离,当抱杆与夹套抱紧后,将第二密封盖与密封壳体的第二密封口密封连接、第三密封盖与密封壳体的第三密封口密封连接。In this solution, the clamp body can be tightened by the fastener, so that the jacket is elastically deformed, so that the jacket can be tightly hugged to the pole, and finally the connection between the cable and the pole of the transformer is realized. Among them, before the holding rod and the jacket are tightly hugged, the second sealing cover is separated from the sealing casing, and the third sealing cover is separated from the sealing casing. After the holding rod and the jacket are tightly hugged, the second sealing cover is separated from the sealing casing The second sealing port of the body is sealingly connected, and the third sealing cover is sealingly connected with the third sealing port of the sealing housing.
在符合本领域常识的基础上,上述各优选条件,可任意组合,即得本实用新型各较佳实例。On the basis of conforming to common knowledge in the field, the above-mentioned preferred conditions can be combined arbitrarily to obtain the preferred examples of the present utility model.
本实用新型的积极进步效果在于:The positive progressive effect of the present utility model is:
设备线夹整体位于密封壳体内,抱杆的螺纹端穿设于密封套,线缆通过前密封盖进入容置腔,从而,能够对设备线夹和抱杆进行较好的密封和保护。密封组件提高了设备线夹的密封性能,也使得设备线夹的表面不易氧化,也不易发生电化学腐蚀,提高了设备线夹的使用寿命。The equipment clamp is located in the sealed shell as a whole, the threaded end of the holding rod is pierced through the sealing sleeve, and the cable enters the accommodating cavity through the front sealing cover, so that the equipment clamp and the holding rod can be better sealed and protected. The sealing component improves the sealing performance of the equipment clamp, and also makes the surface of the equipment clamp difficult to be oxidized and electrochemically corroded, thereby improving the service life of the equipment clamp.
附图说明Description of drawings
图1为本实用新型一较佳实施例的密封组件的结构示意图。FIG. 1 is a schematic structural view of a sealing assembly of a preferred embodiment of the present invention.
图2为本实用新型一较佳实施例的密封组件中密封套的结构示意图。Fig. 2 is a schematic structural diagram of a sealing sleeve in a sealing assembly according to a preferred embodiment of the present invention.
图3为本实用新型一较佳实施例的密封组件中密封套的另一位置状态的结构示意图。Fig. 3 is a structural schematic diagram of another position state of the sealing sleeve in the sealing assembly of a preferred embodiment of the present invention.
图4为本实用新型一较佳实施例的密封组件中密封壳体的结构示意图。Fig. 4 is a schematic structural diagram of a sealing housing in a sealing assembly according to a preferred embodiment of the present invention.
图5为本实用新型一较佳实施例的密封组件中上密封盖的结构示意图。Fig. 5 is a schematic structural view of the upper sealing cover in the sealing assembly of a preferred embodiment of the present invention.
图6为本实用新型一较佳实施例的密封组件中前密封盖的结构示意图。Fig. 6 is a schematic structural view of the front sealing cover in the sealing assembly of a preferred embodiment of the present invention.
图7为本实用新型一较佳实施例的密封组件中前密封盖的另一位置状态的结构示意图。Fig. 7 is a structural schematic diagram of another position state of the front sealing cover in the sealing assembly of a preferred embodiment of the present invention.
图8为本实用新型一较佳实施例的绝缘设备线夹中设备线夹的结构示意图。Fig. 8 is a schematic structural view of the equipment clamp in the insulating equipment clamp according to a preferred embodiment of the present invention.
图9为本实用新型一较佳实施例的设备线夹的另一位置状态的结构示意图。Fig. 9 is a structural schematic diagram of another position state of the equipment wire clip according to a preferred embodiment of the present invention.
图10为本实用新型一较佳实施例的设备线夹中线夹本体的结构示意图。Fig. 10 is a schematic structural view of the main body of the wire clip in the equipment wire clip according to a preferred embodiment of the present invention.
图11为本实用新型一较佳实施例的设备线夹中剪切螺栓的结构示意图。Fig. 11 is a schematic structural view of the shear bolt in the equipment clamp according to a preferred embodiment of the present invention.
图12为本实用新型一较佳实施例的设备线夹中夹套的结构示意图。Fig. 12 is a structural schematic diagram of a jacket in a device wire clip according to a preferred embodiment of the present invention.
附图标记说明:Explanation of reference signs:
10 夹套10 jacket
101 抱杆容置孔101 Pole accommodation hole
102 第一卸应力槽102 The first stress relief groove
103 第二卸应力槽103 Second stress relief groove
104 顶端定位部104 Top positioning part
105 卡槽105 card slot
20 底端定位件20 Bottom locator
30 线夹本体30 clamp body
301 线缆入口301 cable entry
302 第一容置孔302 The first receiving hole
303 第二容置孔303 Second storage hole
304 开口304 opening
305 调节孔305 adjustment hole
306 测温线入口306 Temperature measuring line inlet
307 第三容置孔307 The third receiving hole
40 剪切螺栓40 shear bolts
401 剪切槽401 shear slot
402 安装孔402 mounting holes
50 紧固件50 fasteners
60 紧定螺丝60 set screw
70 密封套70 Sealing sleeve
701 连接部701 connection part
7011 凸出部7011 Protrusion
702 密封部702 sealing part
7021 抱杆容置孔7021 Pole holding hole
703 容置空间703 storage space
704 护罩部704 Shield
80 密封壳体80 sealed case
801 第一密封口801 First sealing port
802 第二密封口802 Second sealing port
803 第三密封口803 The third sealing port
804 前密封口804 front seal
90 上密封盖90 Upper sealing cap
901 第一密封盖901 First sealing cap
902 第二密封盖902 Second sealing cap
903 第三密封盖903 third sealing cover
904 第一连接带904 first connecting belt
905 第二连接带905 Second connection belt
906 连接扣906 Connection Buckle
9061 连接槽9061 connection slot
100 前密封盖100 Front sealing cap
1001 凸起1001 raised
1002 第一密封入口1002 First sealed entrance
1003 第一密封延伸部1003 First seal extension
1004 第二密封入口1004 Second Seal Inlet
1005 第二密封延伸部1005 Second seal extension
具体实施方式Detailed ways
下面举个较佳实施例,并结合附图来更清楚完整地说明本实用新型。A preferred embodiment is given below, and the utility model is described more clearly and completely in conjunction with the accompanying drawings.
本实施例揭示一种密封组件,该密封组件用于密封设备线夹,设备线夹上穿设有抱杆,抱杆沿高度方向具有螺纹端和瓷瓶端。参照图1-7予以理解,密封组件包括密封壳体80、密封套70和前密封盖100。其中,密封壳体80内具有容置腔,容置腔用于容置设备线夹,密封壳体80的底部具有密封套70容置孔,密封壳体80的一端具有前密封口804,前密封口804、密封套70容置孔均与容置腔相连通。密封套70上设有抱杆容置孔7021,抱杆容置孔7021用于容置抱杆的螺纹端,密封套70密封连接于密封套70容置孔。前密封盖100密封连接于前密封口804,前密封盖100上设有密封入口,密封入口用于使线缆进入容置腔。This embodiment discloses a sealing assembly, which is used to seal the equipment wire clip. The equipment wire clip is pierced with a holding rod, and the holding rod has a threaded end and a porcelain bottle end along the height direction. As understood with reference to FIGS. 1-7 , the seal assembly includes a seal housing 80 , a seal sleeve 70 and a front seal cover 100 . Wherein, the sealed housing 80 has an accommodating cavity, which is used to accommodate equipment wire clamps, the bottom of the sealed housing 80 has a sealing sleeve 70 accommodating hole, and one end of the sealed housing 80 has a front sealing port 804, the front The sealing port 804 and the accommodating hole of the sealing sleeve 70 are all in communication with the accommodating cavity. The sealing sleeve 70 is provided with a holding hole 7021 for the holding rod, and the holding hole 7021 is used for accommodating the threaded end of the holding rod, and the sealing sleeve 70 is sealingly connected to the holding hole of the sealing sleeve 70 . The front sealing cover 100 is sealingly connected to the front sealing opening 804 , and the front sealing cover 100 is provided with a sealing inlet, which is used for cables to enter the accommodating cavity.
在本实施方式中,设备线夹整体位于密封壳体80内,抱杆的螺纹端穿设于密封套70,线缆通过前密封盖100进入容置腔,从而,能够对设备线夹和抱杆进行较好的密封和保护。密封组件提高了设备线夹的密封性能,也使得设备线夹的表面不易氧化,也不易发生电化学腐蚀,提高了设备线夹的使用寿命。In this embodiment, the equipment cable clamp is located in the sealed housing 80 as a whole, the threaded end of the holding rod is pierced through the sealing sleeve 70, and the cable enters the accommodating cavity through the front sealing cover 100, so that the equipment cable clamp and the holding The rod is better sealed and protected. The sealing component improves the sealing performance of the equipment clamp, and also makes the surface of the equipment clamp difficult to be oxidized and electrochemically corroded, thereby improving the service life of the equipment clamp.
参照图2和图3予以理解,密封套70包括连接部701、密封部702和护罩部704。密封部702位于连接部701的内部,密封部702由弹性材质制成,密封部702上设有抱杆容置孔7021,抱杆容置孔7021沿连接部701的高度方向贯穿于密封部702,连接部701密封连接于密封套70容置孔。护罩部704连接于密封部702的底部,护套部的内部与抱杆容置孔7021相连通,护套部的内部用于容置抱杆的瓷瓶端。其中,密封部702的外壁面与连接部701的内壁面之间形成有容置空间703,容置空间703内填充有绝缘材质。As can be understood with reference to FIGS. 2 and 3 , the sealing sleeve 70 includes a connecting portion 701 , a sealing portion 702 and a shield portion 704 . The sealing part 702 is located inside the connecting part 701. The sealing part 702 is made of elastic material. The sealing part 702 is provided with a holding hole 7021 for the pole, and the holding hole 7021 penetrates the sealing part 702 along the height direction of the connecting part 701. , the connecting portion 701 is sealed and connected to the accommodating hole of the sealing sleeve 70 . The shield part 704 is connected to the bottom of the sealing part 702, the inside of the sheath part communicates with the pole holding hole 7021, and the inside of the sheath part is used to accommodate the porcelain bottle end of the pole. Wherein, an accommodating space 703 is formed between the outer wall surface of the sealing portion 702 and the inner wall surface of the connecting portion 701 , and the accommodating space 703 is filled with an insulating material.
在本实施方式中,抱杆容置孔7021内插入抱杆后,密封部702能够发生弹性变形而抱紧抱杆。由于抱杆的螺纹端上的螺纹的存在,很可能会使得密封部702与抱杆之间不能可靠地密封,容置空间703内绝缘材质的存在能够避免螺纹对密封性能的影响。从而,当密封套70用于抱杆部分的密封时,密封性能较好。另外,护罩部704的形状与抱杆的瓷瓶端的形状相适配,护罩部704能够对瓷瓶端起到保护作用,有利于提高抱杆的使用寿命。In this embodiment, after the pole is inserted into the pole accommodating hole 7021 , the sealing portion 702 can be elastically deformed to hold the pole tightly. Due to the existence of the thread on the threaded end of the holding rod, it is likely that the seal between the sealing part 702 and the holding rod cannot be reliably sealed. The existence of the insulating material in the accommodating space 703 can avoid the influence of the thread on the sealing performance. Therefore, when the sealing sleeve 70 is used for sealing the pole holding part, the sealing performance is better. In addition, the shape of the shield part 704 is adapted to the shape of the porcelain bottle end of the holding rod, and the shield part 704 can protect the porcelain bottle end, which is beneficial to improve the service life of the holding rod.
继续参照图2和图3予以理解,密封部702沿连接部701的高度方向具有顶端和底端,密封部702的底端贴合于连接部701的底部。自密封部702的顶端至密封部702的底端,密封部702呈上小下大的喇叭口状;在沿连接部701的高度方向上,连接部701的高度不小于密封部702的高度。Continue to refer to FIG. 2 and FIG. 3 to understand that the sealing portion 702 has a top end and a bottom end along the height direction of the connecting portion 701 , and the bottom end of the sealing portion 702 is attached to the bottom of the connecting portion 701 . From the top of the sealing part 702 to the bottom of the sealing part 702, the sealing part 702 is in the shape of a bell mouth with a small top and a big bottom;
其中,密封部702的底端的横截面的面积大于密封部702的顶端的横截面的面积,一方面,能够容置较多量的绝缘材质,有利于实现对抱杆的螺纹端的可靠密封;另一方面,若密封部702的底端的横截面的面积小于密封部702的顶端的横截面的面积,则很有可能会使得密封部702的顶端与抱杆之间存在间隙,影响对抱杆部分的密封效果。Wherein, the cross-sectional area of the bottom end of the sealing part 702 is greater than the cross-sectional area of the top end of the sealing part 702, on the one hand, it can accommodate a large amount of insulating material, which is beneficial to realize the reliable sealing of the threaded end of the holding rod; on the other hand On the one hand, if the cross-sectional area of the bottom end of the sealing portion 702 is smaller than the cross-sectional area of the top end of the sealing portion 702, there may be a gap between the top end of the sealing portion 702 and the pole, which affects the protection of the pole portion. Sealing effect.
另外,在本实施方式中,密封部702的材质为橡胶。但是,在其他可替代的实施方式中,密封部702可以采用其他弹性材质,如硅胶等。In addition, in this embodiment, the material of the sealing part 702 is rubber. However, in other alternative implementation manners, the sealing part 702 may be made of other elastic materials, such as silica gel.
参照图2予以理解,连接部701的外壁面上设有凸出部7011,凸出部7011沿连接部701的周向方向延伸,凸出部7011用于贴合于密封壳体80的底部。其中,凸出部7011能够实现连接部701与密封壳体80之间的初步定位,便于实现连接部701与密封壳体80之间的安装,有利于提高连接部701与密封壳体80之间的密封连接。Referring to FIG. 2 , a protruding portion 7011 is provided on the outer wall of the connecting portion 701 , and the protruding portion 7011 extends along the circumferential direction of the connecting portion 701 . Among them, the protruding part 7011 can realize the preliminary positioning between the connecting part 701 and the sealing shell 80, facilitates the installation between the connecting part 701 and the sealing shell 80, and is beneficial to improve the connection between the connecting part 701 and the sealing shell 80. sealed connection.
通常情况下,线缆包括主线和两根测温线,在本实施方式中,参照图6和图7予以理解,密封口包括第一密封口801和两个第二密封口802,第一密封口801用于使主线进入容置腔,第二密封口802用于使测温线进入容置腔。前密封盖100上还设有第一密封延伸部1003和两个第二密封延伸部1005。第一密封延伸部1003自前密封盖100靠近密封壳体80的一端朝向容置腔延伸,第一密封延伸部1003位于第一密封口801的延伸方向上。第二密封延伸部1005自前密封盖100靠近密封壳体80的一端朝向容置腔延伸,第二密封延伸部1005位于第二密封口802的延伸方向上。Usually, the cable includes a main wire and two temperature measuring wires. In this embodiment, it can be understood with reference to FIG. 6 and FIG. The port 801 is used to allow the main line to enter the accommodating cavity, and the second sealing port 802 is used to allow the temperature measurement line to enter the accommodating cavity. A first sealing extension 1003 and two second sealing extensions 1005 are also provided on the front sealing cover 100 . The first sealing extension 1003 extends from an end of the front sealing cover 100 close to the sealing housing 80 toward the accommodating cavity, and the first sealing extension 1003 is located in the extending direction of the first sealing opening 801 . The second sealing extension 1005 extends from an end of the front sealing cover 100 close to the sealing housing 80 toward the accommodating chamber, and the second sealing extension 1005 is located in the extending direction of the second sealing port 802 .
其中,第一密封延伸部1003和第二密封延伸部1005增大了前密封盖100与线缆的接触面积,有利于提高线缆的稳定性,另外,由于第一密封延伸部1003和第二密封延伸部1005为其他结构提供了设置空间,有利于实现不同规格的线缆穿过。Wherein, the first sealing extension 1003 and the second sealing extension 1005 increase the contact area between the front sealing cover 100 and the cable, which is conducive to improving the stability of the cable. In addition, because the first sealing extension 1003 and the second sealing The sealing extension 1005 provides a setting space for other structures, which is conducive to the passage of cables of different specifications.
另外,在本实施方式中,第一密封延伸部1003采用分级结构,用于使不同规格的主线穿过。分级结构能够提高设备线夹的通用性,有利于节省成本,也便于管理。In addition, in this embodiment, the first sealing extension part 1003 adopts a hierarchical structure for allowing main wires of different specifications to pass through. The hierarchical structure can improve the versatility of the equipment clamps, which is beneficial to save costs and facilitate management.
参照图1、图4-6予以理解,密封组件还包括上密封盖90,且上密封盖90包括第一密封盖901、第二密封盖902和第三密封盖903。密封壳体80上设有第一密封口801、第二密封口802和第三密封口803。第一密封盖901、第二密封盖902和第三密封盖903一一对应密封连接于第一密封口801、第二密封口802和第三密封口803。第一密封盖901通过第一连接带904连接于第二密封盖902,第一密封盖901通过第二连接带905连接于第三密封盖903。第一密封盖901的一侧壁连接有连接扣906,连接扣906具有连接槽9061,前密封盖100的侧壁上对应设有凸起1001,凸起1001卡设于连接槽9061。With reference to FIG. 1 and FIGS. 4-6 , the sealing assembly further includes an upper sealing cover 90 , and the upper sealing cover 90 includes a first sealing cover 901 , a second sealing cover 902 and a third sealing cover 903 . The sealing housing 80 is provided with a first sealing port 801 , a second sealing port 802 and a third sealing port 803 . The first sealing cover 901 , the second sealing cover 902 and the third sealing cover 903 are connected to the first sealing port 801 , the second sealing port 802 and the third sealing port 803 in a one-to-one correspondence. The first sealing cover 901 is connected to the second sealing cover 902 through the first connecting band 904 , and the first sealing cover 901 is connected to the third sealing cover 903 through the second connecting band 905 . A side wall of the first sealing cover 901 is connected with a connecting buckle 906 , and the connecting buckle 906 has a connecting groove 9061 . The side wall of the front sealing cover 100 is correspondingly provided with a protrusion 1001 , and the protrusion 1001 is clamped in the connecting groove 9061 .
其中,第一密封盖901、第二密封盖902和第三密封盖903通过第一连接带904和第二连接带905连接为一整体,更加便于管理。Wherein, the first sealing cover 901 , the second sealing cover 902 and the third sealing cover 903 are connected as a whole through the first connecting band 904 and the second connecting band 905 , which is more convenient for management.
在本方案中,第一密封盖901通过连接扣906、凸起1001扣合到前密封盖100上,既便于管理,也有利于提高设备线夹的密封可靠性。In this solution, the first sealing cover 901 is fastened to the front sealing cover 100 through the connecting buckle 906 and the protrusion 1001, which is not only convenient for management, but also conducive to improving the sealing reliability of the equipment cable clamp.
本实施例还揭示一种绝缘设备线夹,其包括设备线夹和上述密封组件,该设备线夹用于实现线缆与变压器抱杆之间的连接。其中,参考图8-12予以理解,设备线夹包括线夹本体30和剪切螺栓40。其中,线夹本体30上设有线缆入口301,线缆入口301用于使线缆伸入线夹本体30。线夹本体30上还设有第一容置孔302(主要在图10中示出),第一容置孔302与线缆入口301相连通。剪切螺栓40穿设于第一容置孔302,剪切螺栓40的螺杆中远离剪切螺栓40的头部的一端用于抵接于线缆。剪切螺栓40的螺杆的外壁面设有至少两个剪切槽401,至少两个剪切槽401沿剪切螺栓40的轴线方向间隔分布,且每一剪切槽401沿剪切螺栓40的螺杆的周向方向延伸。剪切螺栓40的头部设有安装孔402,安装孔402延伸穿过至少两个剪切槽401中远离剪切螺栓40的头部的一个剪切槽401。This embodiment also discloses an insulating equipment clamp, which includes the equipment clamp and the above-mentioned sealing assembly, and the equipment clamp is used to realize the connection between the cable and the transformer pole. Wherein, as understood with reference to FIGS. 8-12 , the equipment clamp includes a clamp body 30 and a shear bolt 40 . Wherein, the cable clamp body 30 is provided with a cable inlet 301 , and the cable inlet 301 is used for extending cables into the cable clamp body 30 . The clamp body 30 is also provided with a first accommodating hole 302 (mainly shown in FIG. 10 ), and the first accommodating hole 302 communicates with the cable inlet 301 . The shear bolt 40 is passed through the first receiving hole 302 , and the end of the screw rod of the shear bolt 40 away from the head of the shear bolt 40 is used to abut against the cable. The outer wall surface of the screw of the shear bolt 40 is provided with at least two shear grooves 401, at least two shear grooves 401 are distributed along the axial direction of the shear bolt 40 at intervals, and each shear groove 401 is along the direction of the shear bolt 40. The circumferential direction of the screw extends. The head of the shear bolt 40 is provided with an installation hole 402 , and the installation hole 402 extends through one of the at least two shear slots 401 that is away from the head of the shear bolt 40 .
在本实施方式中,线夹本体30与线缆通过剪切螺栓40压紧连接,操作简单、性能稳定。剪切螺栓40抵接于线缆后,剪切螺栓40从对应的剪切槽401处扭断。剪切螺栓40上设有至少两个剪切槽401,对于较大规格的线缆,剪切螺栓40会从靠近线缆的一个剪切槽401处被扭断;对于较小规格的线缆,剪切螺栓40会从远离线缆的一个剪切槽401处被扭断。从而,使得设备线缆能够适应不同规格的线缆,通用性较好。另外,由于安装孔402延伸穿过剪切槽401,剪切螺栓40被扭断后,也能够通过安装孔402较为方便地将剪切螺栓40从线夹本体30上卸下,也便于后期维护。其中,安装孔402的壁面上设有内螺纹。In this embodiment, the clamp body 30 and the cable are tightly connected by the shear bolt 40 , which is easy to operate and stable in performance. After the shear bolt 40 abuts against the cable, the shear bolt 40 is twisted off from the corresponding shear groove 401 . The shearing bolt 40 is provided with at least two shearing slots 401, and for a cable of a larger specification, the shearing bolt 40 will be twisted off from one of the shearing slots 401 close to the cable; for a cable of a smaller specification , the shear bolt 40 will be twisted off from a shear slot 401 away from the cable. Therefore, the equipment cable can be adapted to cables of different specifications, and the versatility is good. In addition, since the installation hole 402 extends through the shear groove 401, after the shear bolt 40 is twisted off, the shear bolt 40 can be easily removed from the clamp body 30 through the installation hole 402, which is also convenient for later maintenance. Wherein, the wall surface of the installation hole 402 is provided with an internal thread.
需要说明的是,线夹本体30与线缆的连接表面上加工有螺纹,将线缆连接到线夹本体30中时,螺纹牙能够刺破线缆表面的氧化膜,增大了接触面积,有利于提升导电性能。另外,在本实施方式中,线夹本体30的材质为铝合金,线缆入口301的壁面上涂覆有电力复合脂。铝合金无磁损,具有较好的抗腐蚀性,且质量较轻,能够较低成本,也有利于节能环保。现有技术中的设备线夹多采用紫铜板冲压成形工艺或采用紫铜铸造工艺制作,生产成本较高。也就是说,与现有技术相比,本方案能够降低成本。另外,在线夹本体30与线缆的连接表面上涂覆电力复合脂,由于电力复合脂能够抗氧化,且导电能力较强,从而,有利于提高绝缘线夹的使用寿命。It should be noted that threads are processed on the connection surface between the cable clamp body 30 and the cable. When the cable is connected to the cable clamp body 30, the thread teeth can pierce the oxide film on the surface of the cable, increasing the contact area. Helps improve electrical conductivity. In addition, in this embodiment, the material of the clamp body 30 is aluminum alloy, and the wall surface of the cable inlet 301 is coated with electric composite grease. Aluminum alloy has no magnetic loss, has better corrosion resistance, and is lighter in weight, which can lower the cost and is also conducive to energy saving and environmental protection. The equipment wire clips in the prior art are mostly made by the copper plate stamping process or the copper casting process, and the production cost is relatively high. That is to say, compared with the prior art, this solution can reduce the cost. In addition, the electrical composite grease is coated on the connecting surface of the cable clamp body 30 and the cable, because the electrical composite grease can resist oxidation and has a strong electrical conductivity, thus, it is beneficial to improve the service life of the insulating clamp.
继续参照图8予以理解,在本实施方式中,安装孔402为内六角安装孔402。在其他可替代的实施方式中,安装孔402也可以设置为圆孔或方孔。Continue to refer to FIG. 8 to understand that in this embodiment, the mounting hole 402 is a hexagonal mounting hole 402 . In other alternative implementation manners, the installation hole 402 may also be set as a round hole or a square hole.
参照图8-10予以理解,线夹本体30上还设有第二容置孔303,设备线夹还包括夹套。夹套穿设于第二容置孔303,夹套上设有抱杆容置孔7021和第一卸应力槽102。抱杆容置孔7021用于容置抱杆,抱杆容置孔7021位于线夹本体30中远离线缆入口301的一端,抱杆容置孔7021沿夹套的高度方向延伸。第一卸应力槽102位于夹套的侧壁上,第一卸应力槽102延伸至抱杆容置孔7021。其中,线夹本体30中远离线缆入口301的一端具有开口304,开口304延伸至抱杆容置孔7021。线夹本体30中与开口304相对应的两侧壁上均设有调节孔305,线夹本体30的两侧壁上的调节孔305与开口304相连通,紧固件50依次穿设于线夹本体30的其中一侧壁、开口304和线夹本体30的另一侧壁。As can be understood with reference to FIGS. 8-10 , the cable clip body 30 is further provided with a second accommodating hole 303 , and the equipment cable clip also includes a jacket. The jacket is passed through the second accommodating hole 303 , and the jacket is provided with a pole accommodating hole 7021 and a first stress relief groove 102 . The pole accommodating hole 7021 is used to accommodate the pole. The pole accommodating hole 7021 is located at the end of the clamp body 30 away from the cable inlet 301 . The pole accommodating hole 7021 extends along the height direction of the jacket. The first stress relief groove 102 is located on the side wall of the jacket, and the first stress relief groove 102 extends to the pole accommodating hole 7021 . Wherein, an end of the clamp body 30 away from the cable inlet 301 has an opening 304 , and the opening 304 extends to the holding hole 7021 of the pole. Adjustment holes 305 are provided on the two side walls corresponding to the opening 304 in the wire clamp body 30, the adjustment holes 305 on the two side walls of the wire clamp body 30 communicate with the opening 304, and the fasteners 50 are passed through the wires in turn. One side wall of the clip body 30 , the opening 304 and the other side wall of the clip body 30 .
在本实施方式中,通过紧固件50能够收紧线夹本体30,使得夹套发生弹性变形,进而使得夹套能够与抱杆抱紧,最终实现线缆与变压器的抱杆的连接。In this embodiment, the clamp body 30 can be tightened by the fastener 50, so that the jacket is elastically deformed, and then the jacket can be tightly hugged to the pole, and finally the connection between the cable and the pole of the transformer is realized.
参照图8和图12予以理解,夹套上还设有第二卸应力槽103。第二卸应力槽103位于抱杆容置孔7021的壁面上,且第二卸应力槽103沿夹套的高度方向延伸。第二卸应力槽103使得夹套更加容易发生弹性变形,进而能够较为可靠地抱紧抱杆,使得夹套与抱杆之间不易松动,有利于提高线缆与设备线夹、抱杆之间连接的可靠性。需要说明的是,抱杆容置孔7021的壁面上设有内螺纹,抱杆上设有外螺纹,夹套通过内螺纹、外螺纹之间的配合与抱杆接触,接触面积较大。8 and 12 to understand, the jacket is also provided with a second stress relief groove 103 . The second stress relief groove 103 is located on the wall of the pole holding hole 7021 , and the second stress relief groove 103 extends along the height direction of the jacket. The second stress relief groove 103 makes the jacket more likely to be elastically deformed, and can hold the pole more reliably, so that the gap between the jacket and the pole is not easy to loosen, which is beneficial to improve the distance between the cable and the equipment clamp and the pole. connection reliability. It should be noted that the wall of the pole holding hole 7021 is provided with an internal thread, and the pole is provided with an external thread, and the jacket contacts the pole through the cooperation between the internal thread and the external thread, and the contact area is relatively large.
在本实施方式中,抱杆容置孔7021的壁面上设有三个第二卸应力槽103,且三个第二卸应力槽103沿夹套的周向方向间隔设置。三个第二卸应力槽103能够进一步利于夹套发生弹性变形,进一步有利于提高夹套与抱杆之间连接的可靠性。在其他可替代的实施方式中,在保证夹套自身强度和弹性变形的基础上,第二卸应力槽103也可设置为一个、二个、四个或四个以上。In this embodiment, three second stress relief grooves 103 are provided on the wall surface of the pole holding hole 7021 , and the three second stress relief grooves 103 are arranged at intervals along the circumferential direction of the jacket. The three second stress relief grooves 103 can further facilitate the elastic deformation of the jacket, and further help improve the reliability of the connection between the jacket and the pole. In other alternative embodiments, on the basis of ensuring the strength and elastic deformation of the jacket itself, one, two, four or more second stress relief grooves 103 may also be provided.
参照图8、图9和图12予以理解,夹套沿高度方向具有顶端和底端,夹套的顶端设有顶端定位部104,顶端定位部104自夹套的外壁面沿夹套的周向方向向外延伸。夹套的顶端通过顶端定位部104能够可靠地延伸出线夹本体30,有利于增大夹套与抱杆的接触面积,进而有利于进一步提高夹套与抱杆、线夹本体3030之间连接的可靠性。其中,顶端定位部104为六角螺母,且六角螺母与夹套为一整体结构。Referring to Fig. 8, Fig. 9 and Fig. 12, it can be understood that the jacket has a top end and a bottom end along the height direction, and the top end of the jacket is provided with a top positioning part 104, and the top positioning part 104 is along the circumferential direction of the jacket from the outer wall surface of the jacket. The direction extends outward. The top of the jacket can reliably extend out of the clamp body 30 through the top positioning portion 104, which is conducive to increasing the contact area between the jacket and the pole, and further improves the connection between the jacket, the pole and the clamp body 3030. reliability. Wherein, the top positioning part 104 is a hexagonal nut, and the hexagonal nut and the jacket are an integral structure.
在本实施方式中,省去了顶端定位部104与夹套之间的连接结构,结构简单,使用方便,也有利于提高夹套自身的强度。In this embodiment, the connection structure between the top positioning part 104 and the jacket is omitted, the structure is simple, the use is convenient, and it is also beneficial to improve the strength of the jacket itself.
继续参照图9和图12予以理解,设备线夹还包括底端定位件20,底端定位件20套设于夹套的底端。线夹本体30沿夹套的高度方向具有顶端和底端,夹套的顶端和底端一一对应延伸出线夹本体30的顶端和底端,顶端定位部104压设于夹套的顶端,底端定位件20用于贴合于夹套的底端。夹套的底端伸出线夹本体30,底端定位件20能够防止夹套从外部元件中掉落,有利于进一步提高夹套与抱杆、线夹本体30之间连接的可靠性。另外,在本实施方式中,底端定位件20为卡簧,夹套的外壁面上沿周向方向设有卡槽105,卡簧卡设于卡槽105。Continue to refer to FIG. 9 and FIG. 12 to understand that the equipment clamp further includes a bottom positioning member 20, which is sheathed on the bottom end of the jacket. The clamp body 30 has a top end and a bottom end along the height direction of the jacket. The top and bottom ends of the jacket extend out of the top and bottom ends of the clamp body 30 one by one. The top positioning part 104 is pressed on the top and bottom of the jacket. The end retainer 20 is adapted to fit over the bottom end of the jacket. The bottom end of the jacket protrudes from the clamp body 30 , and the bottom positioning member 20 can prevent the jacket from falling from the external elements, which is beneficial to further improve the reliability of the connection between the jacket, the pole and the clamp body 30 . In addition, in this embodiment, the bottom positioning member 20 is a snap spring, and the outer wall surface of the jacket is provided with a catch groove 105 along the circumferential direction, and the snap ring is clipped in the catch groove 105 .
继续参照图8和图10予以理解,在本实施方式中,线夹本体30上还设有两个测温线入口306和第三容置孔307。其中,第三容置孔307的中心线平行于第一容置孔302的中心线,测温线入口306的中心线平行于线缆入口301的中心线,第三容置孔307内连接有紧定螺丝60,且紧定螺丝60内设有内六角安装孔402。线缆通常包括主线和两根测温线,当将线缆连接到线夹本体30的内部时,主线通过线缆入口301进入线夹本体30的内部,剪切螺栓40抵接于主线;两根测温线分别通过两个测温线入口306进入线夹本体30的内部,紧定螺丝60抵接于测温线。Continue to refer to FIG. 8 and FIG. 10 to understand that in this embodiment, two temperature measuring wire inlets 306 and a third accommodating hole 307 are further provided on the clamp body 30 . Wherein, the centerline of the third accommodation hole 307 is parallel to the centerline of the first accommodation hole 302, the centerline of the temperature measuring line inlet 306 is parallel to the centerline of the cable inlet 301, and the third accommodation hole 307 is connected with The set screw 60 is provided with a hexagonal mounting hole 402 inside the set screw 60 . The cable usually includes a main wire and two temperature measuring wires. When the cable is connected to the inside of the clamp body 30, the main wire enters the inside of the clamp body 30 through the cable inlet 301, and the shear bolt 40 abuts against the main wire; The two temperature measuring wires respectively enter the inside of the clamp body 30 through the two temperature measuring wire inlets 306 , and the set screw 60 abuts against the temperature measuring wires.
另外,需要说明的是,参照图10予以理解,在本实施方式中,线缆入口301的中心线与第二容置孔303的中心线之间的夹角为90°。In addition, it should be noted that referring to FIG. 10 , in this embodiment, the included angle between the centerline of the cable inlet 301 and the centerline of the second accommodating hole 303 is 90°.
对于该设备线夹,剪切螺栓40使得设备线缆能够适应不同规格的线缆,通用性较好。另外,由于安装孔402延伸穿过剪切槽401,剪切螺栓40被扭断后,也能够通过安装孔402较为方便地将剪切螺栓40从线夹本体30上卸下,也便于后期维护。For the device cable clip, the shear bolt 40 enables the device cable to adapt to cables of different specifications, and has good versatility. In addition, since the installation hole 402 extends through the shear groove 401, after the shear bolt 40 is twisted off, the shear bolt 40 can be easily removed from the clamp body 30 through the installation hole 402, which is also convenient for later maintenance.
在该绝缘设备线夹中,密封入口与线缆入口301相连通。另外,第一密封口801与剪切螺栓40的位置相对应,第二密封口802与夹套的位置相对应,第三密封口803与调节孔305的位置相对应。其中,将剪切螺栓40安装到线夹本体30的过程中,第一密封盖901与密封壳体80分离,当剪切螺栓40压紧线缆到位后,将第一密封盖901与密封壳体80的第一密封口801密封连接。在抱杆与夹套抱紧之前,第二密封盖902与密封壳体80分离、第三密封盖903与密封壳体80分离,当抱杆与夹套抱紧后,将第二密封盖902与密封壳体80的第二密封口802密封连接、第三密封盖903与密封壳体80的第三密封口803密封连接。In the insulating device clamp, the sealing inlet communicates with the cable inlet 301 . In addition, the first sealing port 801 corresponds to the position of the shear bolt 40 , the second sealing port 802 corresponds to the position of the jacket, and the third sealing port 803 corresponds to the position of the adjustment hole 305 . Wherein, during the process of installing the shear bolt 40 to the clamp body 30, the first sealing cover 901 is separated from the sealing housing 80, and when the shearing bolt 40 compresses the cable in place, the first sealing cover 901 is separated from the sealing housing 80. The first sealing port 801 of the body 80 is sealed and connected. Before the holding rod and the jacket are tightly hugged, the second sealing cover 902 is separated from the sealing housing 80, and the third sealing cover 903 is separated from the sealing housing 80. After the holding rod and the jacket are tightly hugged, the second sealing cover 902 It is sealingly connected with the second sealing port 802 of the sealing case 80 , and the third sealing cover 903 is sealingly connecting with the third sealing port 803 of the sealing case 80 .
在该绝缘设备线夹中,设备线夹整体位于密封组件的密封壳体80内,抱杆的螺纹端穿设于密封套70,线缆通过前密封盖100进入容置腔,从而,能够对设备线夹和抱杆进行较好的密封和保护。密封组件提高了设备线夹的密封性能,也使得设备线夹的表面不易氧化,也不易发生电化学腐蚀,提高了设备线夹的使用寿命。In the insulated equipment clamp, the equipment clamp is entirely located in the sealing housing 80 of the sealing assembly, the threaded end of the holding rod is passed through the sealing sleeve 70, and the cable enters the accommodating cavity through the front sealing cover 100, so that the Equipment clamps and poles are better sealed and protected. The sealing component improves the sealing performance of the equipment clamp, and also makes the surface of the equipment clamp difficult to be oxidized and electrochemically corroded, thereby improving the service life of the equipment clamp.
虽然以上描述了本实用新型的具体实施方式,但是本领域的技术人员应当理解,这仅是举例说明,本实用新型的保护范围是由所附权利要求书限定的。本领域的技术人员在不背离本实用新型的原理和实质的前提下,可以对这些实施方式做出多种变更或修改,但这些变更和修改均落入本实用新型的保护范围。Although the specific implementation of the utility model has been described above, those skilled in the art should understand that this is only an example, and the protection scope of the utility model is defined by the appended claims. Those skilled in the art can make various changes or modifications to these embodiments without departing from the principle and essence of the present utility model, but these changes and modifications all fall within the protection scope of the present utility model.
Claims (11)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820236713.1U CN207800948U (en) | 2018-02-09 | 2018-02-09 | Seal assembly and insulator arrangement wire clamp comprising it |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820236713.1U CN207800948U (en) | 2018-02-09 | 2018-02-09 | Seal assembly and insulator arrangement wire clamp comprising it |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207800948U true CN207800948U (en) | 2018-08-31 |
Family
ID=63276234
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820236713.1U Active CN207800948U (en) | 2018-02-09 | 2018-02-09 | Seal assembly and insulator arrangement wire clamp comprising it |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207800948U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110137714A (en) * | 2018-02-09 | 2019-08-16 | 江苏嘉盟电力设备有限公司 | Seal assembly and insulator arrangement wire clamp comprising it |
-
2018
- 2018-02-09 CN CN201820236713.1U patent/CN207800948U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN110137714A (en) * | 2018-02-09 | 2019-08-16 | 江苏嘉盟电力设备有限公司 | Seal assembly and insulator arrangement wire clamp comprising it |
| CN110137714B (en) * | 2018-02-09 | 2024-01-19 | 江苏嘉盟电力设备有限公司 | Sealing assembly and insulating equipment wire clamp comprising same |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US6764354B2 (en) | Submersible electrical set-screw connector | |
| CN110323592B (en) | Electric connector, electric unit and vehicle | |
| CN210723583U (en) | Electric connector socket device and protective cover device thereof | |
| CN208368739U (en) | A kind of electric wire head connector of Fast Installation | |
| CN110137714B (en) | Sealing assembly and insulating equipment wire clamp comprising same | |
| CN210781613U (en) | Waterproof structure of controller wiring terminal | |
| CN209169419U (en) | A new type of sealing assembly and insulation span equipment wire clip including the same | |
| CN111541061A (en) | A line repair device | |
| EP2320523B1 (en) | Watertight junction box | |
| CN207781925U (en) | Device clamp | |
| CN211126267U (en) | an aviation connector | |
| CN210468171U (en) | Cable connector crimping structure and cable connector | |
| CN216529477U (en) | Equipment wire clamp | |
| CN111668613B (en) | A cable connector | |
| CN210517139U (en) | Wire connector | |
| CN211320436U (en) | Radio frequency connector | |
| CN219779278U (en) | Permeation-preventing device for steam turbine temperature sensor | |
| CN218005311U (en) | Connector with a locking member | |
| CN206148638U (en) | Insulated, Sealed Cable Connectors | |
| CN223348344U (en) | Insulating rod cable fixing device | |
| CN224248905U (en) | Binding post for rust-proof truck storage battery | |
| CN221447564U (en) | Core floating socket | |
| CN215451134U (en) | Reactor terminal fixing structure | |
| CN213093407U (en) | Electrode assembly and lead joint | |
| CN110492264A (en) | A kind of cable connector |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| EE01 | Entry into force of recordation of patent licensing contract |
Assignee: Shanghai Jiameng International Trade Co.,Ltd. Assignor: JIANGSU JIAMENG ELECTRICAL EQUIPMENT Co.,Ltd. Contract record no.: X2025980032723 Denomination of utility model: Sealing component and insulating device clamp containing it Sealing component Insulating device clamp Granted publication date: 20180831 License type: Common License Record date: 20251107 |
|
| EE01 | Entry into force of recordation of patent licensing contract |