CN207794298U - A kind of standard cell mode building site bar that can be recycled - Google Patents

A kind of standard cell mode building site bar that can be recycled Download PDF

Info

Publication number
CN207794298U
CN207794298U CN201721813857.0U CN201721813857U CN207794298U CN 207794298 U CN207794298 U CN 207794298U CN 201721813857 U CN201721813857 U CN 201721813857U CN 207794298 U CN207794298 U CN 207794298U
Authority
CN
China
Prior art keywords
gatehouse
standard
column
construction site
recyclable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721813857.0U
Other languages
Chinese (zh)
Inventor
陆通
胡宗友
赵能洪
朱成伟
熊文辉
张斌凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Construction Engineering Co Ltd
Original Assignee
Wuhan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Construction Engineering Co Ltd filed Critical Wuhan Construction Engineering Co Ltd
Priority to CN201721813857.0U priority Critical patent/CN207794298U/en
Application granted granted Critical
Publication of CN207794298U publication Critical patent/CN207794298U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

本实用新型公开了一种可循环使用的标准单元式工地门楼,包括独立砼基础、柱靴、门楼立柱、门头梁、装饰材料和大门,所述的柱靴分别与独立砼基础和门楼立柱相连;所述的门头梁分别与两根门楼立柱的顶部相连;所述的装饰材料分别安装在门楼立柱和门头梁外;所述的大门分别与两根门楼立柱的内侧相连。它利用钢结构的标准单元,根据需求组装,可以模数化的增高或降低,伸长或缩短,且便于安装、拆卸,可以循环使用;所用材料为混凝土和钢材,耐久性好,周转次数多,使用时间长,具有绿色环保、节约社会资源的特点。

The utility model discloses a recyclable standard unit type construction site gatehouse, which comprises an independent concrete foundation, column boots, gatehouse columns, gate head beams, decorative materials and a gate, and the column boots are respectively connected with the independent concrete foundation and the gatehouse column connected; the gate beams are respectively connected to the tops of the two gateposts; the decorative materials are respectively installed outside the gateposts and the gate beams; the gates are respectively connected to the inner sides of the two gateposts. It uses the standard unit of steel structure and assembles according to the needs. It can be increased or lowered modularly, elongated or shortened, and it is easy to install and disassemble, and can be recycled. The materials used are concrete and steel, which have good durability and many turnover times. , use for a long time, with the characteristics of green environmental protection and saving social resources.

Description

一种可循环使用的标准单元式工地门楼A recyclable standard unit construction site gatehouse

技术领域technical field

本实用新型属于建筑工程的施工临时设施技术领域,具体涉及一种可循环使用的标准单元式工地门楼。The utility model belongs to the technical field of construction temporary facilities of construction engineering, and in particular relates to a recyclable standard unit construction site gatehouse.

背景技术Background technique

如今建筑工程行业已进入绿色施工阶段,倡导施工的临时设施尽量可以实现重复周转使用,降低施工成本,节约社会资源。然而现在的工地门楼有砌体结构的、混凝土结构的,或者用钢结构简易焊接而成的,均为一次性使用,无法周转和再次循环使用,工程竣工移交后,这些门楼只能变成建筑垃圾或废铁。因此业内急需一种全新的工地门楼来弥补现有临时设施和技术上的不足。Now that the construction engineering industry has entered the stage of green construction, it is advocated that temporary facilities for construction can be reused as much as possible to reduce construction costs and save social resources. However, the gatehouses on the construction site now have masonry structures, concrete structures, or simple welded steel structures, all of which are for one-time use and cannot be turned over and recycled. Trash or scrap iron. Therefore, the industry is in urgent need of a brand-new site gatehouse to make up for the existing temporary facilities and technical deficiencies.

实用新型内容Utility model content

本实用新型的目的是在于提供一种可循环使用的标准单元式工地门楼,它利用钢结构的标准单元,根据需求组装,可以模数化的增高或降低,伸长或缩短,且便于安装、拆卸,可以循环使用,达到绿色施工的目的。The purpose of this utility model is to provide a recyclable standard unit construction site gatehouse, which utilizes standard units of steel structure and is assembled according to requirements. It can be disassembled and recycled to achieve the purpose of green construction.

为了实现上述目的,本实用新型采取以下技术方案:In order to achieve the above object, the utility model takes the following technical solutions:

一种可循环使用的标准单元式工地门楼,它包括独立砼基础、柱靴、门楼立柱、门头梁、装饰材料和大门,其特征在于,所述的柱靴分别与独立砼基础和门楼立柱相连;所述的门头梁分别与两根门楼立柱的顶部相连;所述的装饰材料分别安装在门楼立柱和门头梁外;所述的大门分别与两根门楼立柱的内侧相连。A recyclable standard unit construction site gatehouse, which includes an independent concrete foundation, column boots, gatehouse columns, door head beams, decorative materials and gates, is characterized in that the column boots are respectively connected with the independent concrete foundation and gatehouse column connected; the gate beams are respectively connected to the tops of the two gateposts; the decorative materials are respectively installed outside the gateposts and gate beams; the gates are respectively connected to the inner sides of the two gateposts.

所述的独立砼基础可以在工地或工厂预制,其根据现行的《建筑地基基础设计规范》 (GB50007)进行设计,长、宽、高均不小于1m,砼强度等级不小于C20,钢筋不小于HPB300;砼浇筑前预埋好锚栓和吊耳;所述的柱靴由角钢和钢板焊接而成;所述的门楼立柱与独立砼基础的锚栓通过所述的柱靴相连。The independent concrete foundation can be prefabricated at the construction site or in the factory, and it is designed according to the current "Code for Design of Building Foundations" (GB50007). HPB300; anchor bolts and lifting lugs are pre-embedded before concrete pouring; the column shoe is welded by angle steel and steel plate; the gatehouse column is connected with the anchor bolt of the independent concrete foundation through the column shoe.

所述的门楼立柱由柱标准节用螺栓对接而成,柱标准节由柱主标准片与次标准片用螺栓组装而成。The gatehouse column is formed by butt joints of column standard sections with bolts, and the column standard section is assembled from the main standard piece and the secondary standard piece of the column with bolts.

所述的门头梁与门楼立柱由梁标准节用螺栓对接而成,梁标准节由梁主标准片与次标准片用螺栓组装而成。The door head beam and the gate tower column are formed by butt jointing of the beam standard section with bolts, and the beam standard section is assembled with the beam main standard piece and the secondary standard piece with bolts.

所述的柱主标准片是由角钢焊接而成的钢结构平面桁架,其规格根据柱标准节的要求而定,在角钢上钻好螺栓孔。The main standard piece of the column is a plane truss of steel structure welded by angle steel.

所述的梁主标准片是由角钢焊接而成的钢结构平面桁架,其规格根据梁标准节的要求而定,在角钢上钻好螺栓孔。The beam main standard piece is a steel structure plane truss welded by angle steel, and its specification is determined according to the requirements of the beam standard section, and bolt holes are drilled on the angle steel.

所述的次标准片是由角钢焊接而成的钢结构平面桁架,在角钢上钻好螺栓孔。均可用于与柱主标准片、梁主标准片组装而分别形成门楼立柱和门头梁。The sub-standard piece is a plane truss of steel structure welded by angle steel, and bolt holes are drilled on the angle steel. All can be used to assemble with the main standard sheet of the column and the main standard sheet of the beam to form the column of the gatehouse and the beam of the door head respectively.

所述的柱主标准片和梁主标准片的模数可以为1m、1.5m、2m、3m等。The modulus of the main standard sheet of the column and the main standard sheet of the beam can be 1m, 1.5m, 2m, 3m, etc.

所述的次标准片的尺寸一般为0.97m宽×0.97m高。The size of the sub-standard sheet is generally 0.97m wide by 0.97m high.

所述的装饰材料为干挂石材、铝合金板或铝塑复合板等可以重复使用的装饰材料。The decoration material is a reusable decoration material such as dry-hanging stone, aluminum alloy board or aluminum-plastic composite board.

所述的大门为工厂预制的钢门。The gate is a factory prefabricated steel gate.

上述的技术措施中最关键的是柱主标准片、梁主标准片和次标准片,通过所述的柱主标准片、梁主标准片分别和次标准片进行标准节式地组合、螺栓连接,一方面可以使工地门楼有很好的灵活性和适用性,另一方面,螺栓连接可以使所述工地门楼安装、拆除、运输方便,有利于下一个工地的重复循环使用。而现有技术的混凝土砌体工地门楼或全焊接钢结构工地门楼均只能一次使用,不可重复循环使用,浪费很大。相对于现有技术,本实用新型能够降低工程的临时设施成本,节约社会资源,绿色环保。The most critical of the above-mentioned technical measures are the main standard sheet of the column, the main standard sheet of the beam and the secondary standard sheet, through which the main standard sheet of the column, the main standard sheet of the beam and the secondary standard sheet are respectively combined and bolted in standard sections On the one hand, the gatehouse on the construction site can have good flexibility and applicability; on the other hand, the bolt connection can make the gatehouse on the construction site easy to install, dismantle, and transport, which is beneficial to the repeated use of the next construction site. And the concrete masonry construction site gatehouse of prior art or all welded steel structure construction site gatehouse all can only be used once, can not recycle, and waste is very big. Compared with the prior art, the utility model can reduce the cost of temporary facilities of the project, save social resources, and be environmentally friendly.

本实用新型的安装的总体顺序是:首先将预制的砼独立基础吊装到做好垫层的基坑中,调整于设计位置后,基坑回填;接下来,在地面上,将柱主标准片与次标准片螺栓组装成柱标准节,再由柱标准节螺栓对接成格构式门楼立柱;梁主标准片与次标准片组装成梁标准节,再由梁标准节螺栓对接成格构式门头梁。The overall sequence of the installation of the utility model is as follows: first, hoist the prefabricated concrete independent foundation into the foundation pit of the cushion layer, adjust it to the design position, and then backfill the foundation pit; Assemble with the sub-standard plate bolts to form a column standard section, and then connect the column standard section bolts to form a lattice gate column; assemble the beam main standard section and the secondary standard section to form a beam standard section, and then use the beam standard section bolts to form a lattice structure door beam.

再接下来,用汽车吊将门楼主柱吊装对准砼独立基础的预埋锚栓就位,放置垫片和螺母固定;再用汽车吊将格构式门头梁吊装就位于门楼立柱柱顶;最后安装装饰材料与大门。Next, use a car crane to hoist the main pillar of the main gate to the pre-embedded anchor bolt of the concrete independent foundation, and place gaskets and nuts to fix it; Finally, the decoration materials and the gate are installed.

本实用新型的拆卸的顺序与安装的相反。The sequence of dismounting of the utility model is opposite to that of installation.

与现有技术相比,本实用新型的优点和有益效果是:Compared with the prior art, the advantages and beneficial effects of the utility model are:

(1)可周转和重复循环使用,各部分之间均为螺栓连接,安装、拆除、运输方便。(1) It can be used repeatedly and repeatedly, and all parts are connected by bolts, which is convenient for installation, removal and transportation.

(2)所用材料为混凝土和钢材,耐久性好,周转次数多,使用时间长,具有绿色环保、节约社会资源的优点。(2) The materials used are concrete and steel, which have good durability, many turnover times and long service life, and have the advantages of being green and environmentally friendly and saving social resources.

附图说明Description of drawings

图1为一种可循环使用的标准单元式工地门楼主体结构的主视图。Fig. 1 is a front view of the main structure of a recyclable standard unit type construction site gatehouse.

图2为一种可循环使用的标准单元式工地门楼独立砼基础的立体图。Fig. 2 is a perspective view of a recyclable standard unit gatehouse independent concrete foundation.

图3为一种可循环使用的标准单元式工地门楼柱主标准片的主视图。Fig. 3 is a front view of a main standard sheet of a recyclable standard unit type construction site gate tower.

图4为一种可循环使用的标准单元式工地门楼次标准片的主视图。Fig. 4 is a front view of a reusable standard unit gate building sub-standard sheet.

图5为一种可循环使用的标准单元式工地门楼梁主标准片的主视图。Fig. 5 is a front view of a main standard sheet of a recyclable standard unit type construction site gate beam.

图6为一种可循环使用的标准单元式工地门楼的门楼立柱每段柱标准节及节点详图。Fig. 6 is a detailed diagram of the standard joints and joints of each section of the gatehouse column of a recyclable standard unit gatehouse on the construction site.

图7为一种可循环使用的标准单元式工地门楼的门楼立柱每段柱标准节的组装图。Fig. 7 is an assembly diagram of each column standard section of a recyclable standard unit gatehouse gatehouse column.

图8为一种可循环使用的标准单元式工地门楼的门头每段梁标准节及节点详图。Fig. 8 is a detailed diagram of the standard joints and joints of each section of the beam at the gate head of a recyclable standard unit gatehouse.

图9为一种可循环使用的标准单元式工地门楼的门头每段梁标准节的组装图。Fig. 9 is an assembly diagram of each section beam standard section of the door head of a recyclable standard unit gatehouse on construction site.

图10为一种可循环使用的标准单元式工地门楼的立体图。Fig. 10 is a perspective view of a recyclable standard unit construction site gatehouse.

图中,1-独立砼基础,2-柱靴,3-门楼立柱,4-门头梁,5-柱标准节,6-吊耳,7-锚栓, 8-柱主标准片,9-次标准片,10-梁主标准片,11-装饰材料(干挂石材或铝合金板或铝塑复合板),12-大门,13-路面,14-梁标准节,15-螺栓孔,16-螺栓。In the figure, 1-independent concrete foundation, 2-column shoe, 3-gate column, 4-door head beam, 5-column standard section, 6-hanging lug, 7-anchor bolt, 8-column main standard piece, 9- Secondary standard sheet, 10-beam main standard sheet, 11-decorative material (dry-hanging stone or aluminum alloy plate or aluminum-plastic composite board), 12-gate, 13-pavement, 14-beam standard section, 15-bolt hole, 16 -bolt.

具体实施方式Detailed ways

实施例1:Example 1:

下面结合附图对本实用新型进一步说明。Below in conjunction with accompanying drawing, the utility model is further described.

如图1~图7所示,一种可循环使用的标准单元式工地门楼,它包括独立砼基础1、柱靴2、门楼立柱3、门头梁4、装饰材料11和大门12,其特征在于:所述的柱靴2分别与独立砼基础1和门楼立柱3相连;门头梁4分别与门楼立柱3和门楼立柱3的顶部相连;装饰材料11分别安装在门楼立柱3和门头梁4外;大门12分别与门楼立柱3和门楼立柱3的内侧相连。As shown in Figures 1 to 7, a recyclable standard unit construction site gatehouse includes an independent concrete foundation 1, column boots 2, gatehouse columns 3, gate beams 4, decorative materials 11 and gates 12, and its characteristics In that: the column boots 2 are respectively connected with the independent concrete foundation 1 and the gatehouse column 3; the gate beam 4 is respectively connected with the gatehouse column 3 and the top of the gatehouse column 3; the decoration material 11 is respectively installed on the gatehouse column 3 and the gatehouse beam 4 outside; the gate 12 links to each other with the inboard of gatehouse column 3 and gatehouse column 3 respectively.

所述的独立砼基础1是根据现行的《建筑地基基础设计规范》(GB50007)进行设计,长、宽、高均不小于1m,砼强度等级不小于C20,钢筋不小于HPB300,钢筋保护层严格按照规范执行。The independent concrete foundation 1 is designed according to the current "Code for Design of Building Foundations" (GB50007). Follow the specification.

混凝土浇前,将吊耳6、锚栓7锚固于于独立砼基础1中,锚栓7须定位准确,保证后期门楼立柱3的就位。Before pouring the concrete, the lugs 6 and the anchor bolts 7 are anchored in the independent concrete foundation 1, and the anchor bolts 7 must be positioned accurately to ensure that the gatehouse columns 3 are in place later.

所述的柱靴2由角钢和钢板焊接而成,用于门楼立柱3与独立砼基础1的锚栓7之间的连接。The column shoe 2 is welded by angle steel and steel plate, and is used for the connection between the gatehouse column 3 and the anchor bolt 7 of the independent concrete foundation 1 .

所述的门楼立柱3由柱标准节5用螺栓对接而成,柱标准节5由柱主标准片8与次标准片9用螺栓16组装而成,如图7所示。The gatehouse column 3 is formed by butt jointing of the column standard section 5 with bolts, and the column standard section 5 is assembled by the column main standard sheet 8 and the secondary standard sheet 9 with bolts 16, as shown in Figure 7 .

所述的门头梁4与门楼立柱3的组成原理一样,由梁标准节14用螺栓对接而成,梁标准节14由梁主标准片10与次标准片9用螺栓组装而成。The composition principle of described gate head beam 4 is the same as gatehouse column 3, is formed by butt jointing of beam standard section 14 with bolts, and beam standard section 14 is assembled by beam main standard sheet 10 and secondary standard sheet 9 with bolts.

所述的柱主标准片8是由角钢焊接而成的钢结构平面桁架,其规格根据柱标准节5的要求而定,一般为1m宽×3m高,在角钢上钻好螺栓孔15。The main standard piece 8 of the column is a plane truss of steel structure welded by angle steel. Its specifications are determined according to the requirements of the standard section 5 of the column. It is generally 1m wide by 3m high. Bolt holes 15 are drilled on the angle steel.

所述的次标准片9是由角钢焊接而成的钢结构平面桁架,一般为0.97m宽×0.97m高,在角钢上钻好螺栓孔15。The sub-standard sheet 9 is a plane truss of steel structure welded by angle steel, generally 0.97m wide by 0.97m high, and the bolt holes 15 are drilled on the angle steel.

所述的梁主标准片10是由角钢焊接而成的钢结构平面桁架,其规格根据梁标准节14 的要求而定,一般为1.5m宽×3m长,在角钢上钻好螺栓孔15。The beam main standard piece 10 is a steel structure planar truss welded by angle steel. Its specifications are determined according to the requirements of the beam standard section 14, generally 1.5m wide by 3m long. Bolt holes 15 are drilled on the angle steel.

如图10所示,此工地门楼的组成如下:As shown in Figure 10, the composition of the site gatehouse is as follows:

2个独立砼基础1的规格一样,均为1.2m(长)×1.2m(宽)×1m(高)。锚栓7的规格为M24×750,吊耳为钢材牌号均为HRB400。The specifications of the two independent concrete foundations 1 are the same, 1.2m (length) × 1.2m (width) × 1m (height). The specification of the anchor bolt 7 is M24×750, and the lifting lug is Steel grades are HRB400.

2根门楼立柱3的规格一样,均为1m(长)×1m(宽)×6m(高),均由两段柱标准节 5螺栓对接而成。每段柱标准节5由2个柱主标准片8和5个次标准片9通过螺栓组装而成。柱主标准片8由角钢L70×8和L50×5焊接而成,规格为1m(宽)×3m(长);次标准片9 由角钢L40×4焊接而成,规格为0.97m(宽)×0.97m(长)。The specifications of 2 gatehouse columns 3 are the same, all are 1m (long) * 1m (wide) * 6m (high), all are butted by two section post standard sections 5 bolts. Each column standard section 5 is assembled by bolts from 2 main column standard pieces 8 and 5 secondary standard pieces 9 . The main standard piece 8 of the column is welded by angle steel L70×8 and L50×5, and the specification is 1m (width)×3m (length); the secondary standard piece 9 is welded by angle steel L40×4, and the specification is 0.97m (width) ×0.97m (length).

1根门头梁4的规格为9m(长)×1m(宽)×1.5m(高),由3段梁标准节14通过螺栓对接而成。每段柱标准节14由2个梁主标准片10和4个次标准片9通过螺栓组装而成。梁主标准片10由角钢L70×8和L50×5焊接而成,规格为1.5m(高)×3m(长);次标准片9 与门楼立柱3所用的规格一样。The specification of a gate beam 4 is 9m (length) × 1m (width) × 1.5m (height), which is formed by butt jointing of three beam standard sections 14 by bolts. Each column standard section 14 is assembled by bolts from 2 main beam standard pieces 10 and 4 secondary standard pieces 9 . The beam main standard piece 10 is welded by angle steel L70×8 and L50×5, and its specification is 1.5m (height)×3m (length);

此工地门楼安装的总体顺序是:首先将预制的砼独立基础1吊装到做好垫层的基坑中,调整于设计位置后,基坑回填。接下来,在地面上,将柱主标准片8与次标准片9组装成柱标准节5,再由两段柱标准节5螺栓对接成门楼立柱3;再将梁主标准片10与次标准片9 组装成柱标准节14,再由3段梁标准节14螺栓对接成门头梁4。The overall sequence for the installation of the gatehouse on this construction site is: first, the prefabricated concrete independent foundation 1 is hoisted into the foundation pit with a well-prepared cushion, and after being adjusted to the designed position, the foundation pit is backfilled. Next, on the ground, the column main standard piece 8 and the secondary standard piece 9 are assembled into the column standard section 5, and then the two sections of the column standard section 5 are bolted to form the gatehouse column 3; then the beam main standard piece 10 and the secondary standard section The sheet 9 is assembled into a column standard section 14, and then the beam standard section 14 bolts of three sections are butted to form the door beam 4.

再接下来,用QY16汽车吊将门楼主柱3吊装对准砼独立基础1的预埋锚栓7就位,放置垫片和螺母固定;再用汽车吊将门头梁4吊装就位于门楼立柱3柱顶;最后安装装饰材料11与大门12。Next, use the QY16 truck crane to hoist the door main column 3 to the pre-embedded anchor bolt 7 of the concrete independent foundation 1 and place it in place, place gaskets and nuts to fix it; top; finally install the decorative material 11 and the gate 12.

本实用新型的拆卸顺序与安装相反。The sequence of disassembly of the utility model is opposite to that of installation.

通过本实用新型提供的一种可循环使用的标准单元式工地门楼,其安装方法简单且快捷,使得安装工期大为缩短,减少了施工成本,因此,本实用新型具有高度的产业利用价值。The utility model provides a recyclable standard unit construction site gatehouse, the installation method of which is simple and quick, greatly shortening the installation period and reducing the construction cost. Therefore, the utility model has high industrial utilization value.

Claims (10)

1.一种可循环使用的标准单元式工地门楼,包括独立砼基础(1)、柱靴(2)、门楼立柱(3)、门头梁(4)、装饰材料(11)和大门(12),其特征在于,所述的柱靴(2)分别与独立砼基础(1)和门楼立柱(3)相连;所述的门头梁(4)分别与两根门楼立柱(3)的顶部相连;所述的装饰材料(11)分别安装在门楼立柱(3)和门头梁(4)外;所述的大门(12)分别与两根门楼立柱(3)的内侧相连。1. A recyclable standard unit construction site gatehouse, including an independent concrete foundation (1), column boots (2), gatehouse columns (3), gate beams (4), decorative materials (11) and gates (12 ), characterized in that the column boots (2) are respectively connected with the independent concrete foundation (1) and the gatehouse columns (3); connected; the decorative materials (11) are respectively installed outside the gatehouse pillars (3) and the door beams (4); the gates (12) are respectively connected to the inner sides of the two gatehouse pillars (3). 2.根据权利要求1所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的独立砼基础(1)长、宽、高均不小于1m,砼强度等级不小于C20,钢筋不小于HPB300;所述的独立砼基础(1)的主筋上有吊耳(6)和锚栓(7);所述的柱靴(2)由角钢和钢板焊接;所述的门楼立柱(3)与独立砼基础(1)的锚栓(7)通过所述的柱靴(2)相连。2. A recyclable standard unit construction site gatehouse according to claim 1, characterized in that: the length, width and height of the independent concrete foundation (1) are not less than 1m, and the concrete strength grade is not less than C20 , the steel bar is not less than HPB300; the main reinforcement of the independent concrete foundation (1) has lifting lugs (6) and anchor bolts (7); the column shoe (2) is welded by angle steel and steel plate; the gatehouse column (3) It is connected with the anchor bolt (7) of the independent concrete foundation (1) through the column shoe (2). 3.根据权利要求1所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的门楼立柱(3)由柱标准节(5)用螺栓对接,柱标准节(5)由柱主标准片(8)与次标准片(9)用螺栓(16)组装。3. A recyclable standard unit construction site gatehouse according to claim 1, characterized in that: said gatehouse upright column (3) is butt-jointed by column standard joints (5) with bolts, and column standard joints (5) It is assembled with bolts (16) by the main standard sheet (8) and the secondary standard sheet (9) of the column. 4.根据权利要求1所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的门头梁(4)由梁标准节(14)用螺栓对接,梁标准节(14)由梁主标准片(10)与次标准片(9)用螺栓组装。4. A recyclable standard unit construction site gatehouse according to claim 1, characterized in that: the gate head beam (4) is butt-jointed by beam standard joints (14) with bolts, and the beam standard joints (14 ) is assembled with bolts from the main standard piece (10) and the secondary standard piece (9) of the beam. 5.根据权利要求3所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的柱主标准片(8)由角钢焊接的钢结构平面桁架,在角钢上钻螺栓孔(15)。5. A recyclable standard unit construction site gatehouse according to claim 3, characterized in that: the main standard piece (8) of the column is a steel structure plane truss welded by angle steel, and bolt holes are drilled on the angle steel (15). 6.根据权利要求4所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的梁主标准片(10)由角钢焊接的钢结构平面桁架,在角钢上钻螺栓孔(15)。6. A recyclable standard unit construction site gatehouse according to claim 4, characterized in that: said beam main standard piece (10) is a steel structure plane truss welded by angle steel, and bolt holes are drilled on the angle steel (15). 7.根据权利要求3所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的次标准片(9)是由角钢焊接而成的钢结构平面桁架,在角钢上钻好螺栓孔(15)。7. A recyclable standard unit construction site gatehouse according to claim 3, characterized in that: said sub-standard sheet (9) is a steel structure plane truss welded by angle steel, and drilled on the angle steel Good bolt holes (15). 8.根据权利要求5所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的柱主标准片(8)的模数为1m-3m 。8. A recyclable standard unit construction site gatehouse according to claim 5, characterized in that: the modulus of the column main standard piece (8) is 1m-3m. 9.根据权利要求6所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的梁主标准片(10)的模数为1m-3m 。9. A recyclable standard unit construction site gatehouse according to claim 6, characterized in that: the modulus of the beam main standard piece (10) is 1m-3m. 10.根据权利要求1所述的一种可循环使用的标准单元式工地门楼,其特征在于:所述的装饰材料(11)为干挂石材、铝合金板或铝塑复合板。10. A recyclable standard unit construction site gatehouse according to claim 1, characterized in that: said decorative material (11) is dry-hanging stone, aluminum alloy plate or aluminum-plastic composite plate.
CN201721813857.0U 2017-12-22 2017-12-22 A kind of standard cell mode building site bar that can be recycled Expired - Fee Related CN207794298U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721813857.0U CN207794298U (en) 2017-12-22 2017-12-22 A kind of standard cell mode building site bar that can be recycled

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721813857.0U CN207794298U (en) 2017-12-22 2017-12-22 A kind of standard cell mode building site bar that can be recycled

Publications (1)

Publication Number Publication Date
CN207794298U true CN207794298U (en) 2018-08-31

Family

ID=63282376

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721813857.0U Expired - Fee Related CN207794298U (en) 2017-12-22 2017-12-22 A kind of standard cell mode building site bar that can be recycled

Country Status (1)

Country Link
CN (1) CN207794298U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method
CN115075164A (en) * 2022-06-24 2022-09-20 凌云建设集团有限公司 Construction method of quickly-assembled and quickly-disassembled fabricated gate

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108035436A (en) * 2017-12-22 2018-05-15 武汉建工集团股份有限公司 A kind of standard knot formula building site bar that can be recycled
CN110344743A (en) * 2019-06-19 2019-10-18 五冶集团上海有限公司 A kind of construction site can be used in turn standardization gate posts and its installation method
CN115075164A (en) * 2022-06-24 2022-09-20 凌云建设集团有限公司 Construction method of quickly-assembled and quickly-disassembled fabricated gate
CN115075164B (en) * 2022-06-24 2023-12-26 凌云建设集团有限公司 Assembled gate construction method capable of being assembled and disassembled quickly

Similar Documents

Publication Publication Date Title
CN105089178B (en) A kind of pre-splicing Standard formula building of prefabricated steel reinforced concrete shear walls
CN204826308U (en) Structure assembly type structure is pieced together in advance to prefabricated shaped steel concrete shear force wall
CN108518003A (en) Detachable prefabricated assembled steel-concrete composite beam plate
CN106759879A (en) Precast prestressed concrete frame is from rehabilitation energy dissipation node and its construction method
CN105952044B (en) Fully-prefabricated prestressed concrete floor structure and prestressed assembly method
CN201296979Y (en) Embedded part for large-sized reinforcing steel bar concrete column top beam node
CN107354863A (en) A kind of assembled gate-type round steel pipe bridge pier that power consumption binder is set
CN103397727A (en) Connection structure of building steel beam and composite floor slab
CN206768570U (en) A kind of foundation ditch assembled steel trestle
CN207934054U (en) A kind of prefabricated assembled raft foundation
CN106869404A (en) A kind of prefabricated assembled bolt connection steel reinforced concrete combination beam
CN108756196A (en) A kind of assembled architecture main body protective device and its construction method
CN110080418A (en) A kind of detachable assembling type shear wall structure of bolt splicing
CN206736696U (en) A kind of prefabricated assembled anchor bolts steel reinforced concrete combination beam
CN205153145U (en) Adopt precast concrete coincide floor of bolt and connection structure of H shaped steel roof beam
CN108035436A (en) A kind of standard knot formula building site bar that can be recycled
CN206397121U (en) Build the outer crossbeam of aluminum alloy mould plate and floor combining structure
CN206298957U (en) Bilateral formula precast prestressed concrete frame is from rehabilitation energy dissipation node
CN209099519U (en) An assembled prestressed reinforced concrete frame structure
CN209443654U (en) Assembled large span T plate building prefabricated components
CN207794690U (en) The assembled steel reinforced machining shed that can be had enough to meet the need
CN217517474U (en) Novel detachable assembled continuous beam for high-pile wharf
CN207121922U (en) A kind of foundation structure in digging-free assembled stereoscopic garage
CN207017528U (en) A kind of prefabricated U-shaped composite beam
CN206495497U (en) Build aluminum alloy mould plate crossbeam and floor combining structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180831

CF01 Termination of patent right due to non-payment of annual fee