CN207778821U - A kind of dual-purpose wall-hung boiler of heating and supplying water - Google Patents

A kind of dual-purpose wall-hung boiler of heating and supplying water Download PDF

Info

Publication number
CN207778821U
CN207778821U CN201721629725.2U CN201721629725U CN207778821U CN 207778821 U CN207778821 U CN 207778821U CN 201721629725 U CN201721629725 U CN 201721629725U CN 207778821 U CN207778821 U CN 207778821U
Authority
CN
China
Prior art keywords
water
heating
pipe
wall
furnace body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721629725.2U
Other languages
Chinese (zh)
Inventor
刘尹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Di Thermal Energy Technology Co Ltd
Original Assignee
Hebei Di Thermal Energy Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Di Thermal Energy Technology Co Ltd filed Critical Hebei Di Thermal Energy Technology Co Ltd
Priority to CN201721629725.2U priority Critical patent/CN207778821U/en
Application granted granted Critical
Publication of CN207778821U publication Critical patent/CN207778821U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of dual-purpose wall-hung boilers of heating and supplying water, including wall hanging furnace body, the top of wall hanging furnace body is equipped with first electrode, the side of first electrode is equipped with second electrode, top one end of wall hanging furnace body is equipped with power port, the center bottom of wall hanging furnace body is equipped with tap water water supply pipe, tap water water supply pipe is equipped with the first solenoid valve, the side of tap water water supply pipe is equipped with heating water inlet pipe, the side of heating water inlet pipe is equipped with sewage draining exit, the side of sewage draining exit is equipped with exhaust outlet, the other side of tap water water supply pipe is equipped with heating return pipe, the side of heating return pipe is equipped with pressure relief opening, one end of heating return pipe is equipped with water flow sensing unit, the bottom end of water flow sensing unit is equipped with accurate filter.The dual-purpose wall-hung boiler of the heating and supplying water can directly control wall-hung boiler and provide hot water to people, directly its closing is controlled by nozzle after being finished by the water proof switch on nozzle, without going wall-hung boiler to open numerous hand valves, bring conveniently.

Description

A kind of dual-purpose wall-hung boiler of heating and supplying water
Technical field
The utility model is related to a kind of wall-hung boilers, and in particular to a kind of dual-purpose wall-hung boiler of heating and supplying water.
Background technology
Wall-hung boiler is a kind of using natural gas as the water heater of the energy, and there is anti-frost protection, anti-dry protection, accident extinguishing to protect A variety of safety precautions such as the excessively high protection of shield, temperature, the anti-jamming protection of water pump.Burnt gas wall hanging furnace has powerful Domestic central Heating function, each room can arbitrarily set comfort temperature according to demand, and be capable of providing big flow constant temperature health hot water, It is used for Household shower bath, kitchen place.Burnt gas wall hanging furnace is the fuel warp using natural gas, artificial coal gas or liquefied gas as fuel Burner exports, and after burning in the combustion chamber, by heat exchanger by heat absorption, the recirculated water in heating system is handed over by way of heat When parallel operation, by heating in reciprocating mode, to constantly export heat to building, heat source is provided for building.General dual-purpose combustion Gas wall-hung boiler is in addition to heating function, having both hot water function(I.e. other than heating, it is also equipped with the function of gas heater).Wall It may be either that cooling fin offer heat source is alternatively ground heating system offer heat source to hang stove.Common wall-hung boiler is divided into heating domestic hot-water two With stove and single two kinds of ground heating furnace.When wall-hung boiler ignition switch enters working condition, wind turbine, which first starts, makes shape in combustion chamber At Negative Pressure Difference, instruction is issued water pump by blast switch, and after starting mode of pump, instruction is issued high-voltage discharger its startup by water flow switch Gas ratio valve is issued in instruction afterwards, and gas ratio valve starts to start.The application of wall-hung boiler is very extensive, and update is also very rapid, Many wall-hung boilers have been generated for the warm dual-purpose wall-hung boiler that supplies water, but it is existing it is double for wall-hung boiler one-sided in use, Need to close many hand valves, operation is cumbersome, and many old men will not operate, and brings inconvenience, and hand valve it is more more more The case where being easy to happen leak.
Utility model content
The purpose of this utility model is that solve the above-mentioned problems and provides a kind of dual-purpose wall-hung boiler of heating and supplying water, from And it solves the above problems.
In order to solve the above-mentioned technical problem, the utility model provides the following technical solution:
The utility model provides a kind of dual-purpose wall-hung boiler of heating and supplying water, including wall hanging furnace body, the wall hanging furnace body Top be equipped with first electrode, the side of the first electrode is equipped with second electrode, and top one end of the wall hanging furnace body is set There is a power port, the center bottom of the wall hanging furnace body is equipped with tap water water supply pipe, and the tap water water supply pipe is equipped with the The side of one solenoid valve, the tap water water supply pipe is equipped with heating water inlet pipe, and the side of the heating water inlet pipe is equipped with sewage draining exit, The side of the sewage draining exit is equipped with exhaust outlet, and the other side of the tap water water supply pipe is equipped with heating return pipe, and the heating is returned The side of water pipe is equipped with pressure relief opening, and one end of the heating return pipe is equipped with water flow sensing unit, the bottom end of the water flow sensing unit Equipped with accurate filter, the bottom end of the accurate filter is equipped with the second triangle vavle, and one end of the heating water inlet pipe, which is equipped with, to be dissipated The top of heat pipe, the heat-dissipating pipe is equipped with automatic exhaust steam valve, and the other end of the heating water inlet pipe is equipped with the first triangle vavle, described First triangle vavle is equipped with bellows and water service pipe, and one end of the water service pipe is equipped with shower nozzle, the shower Nozzle is equipped with waterproof power knob.
As a kind of optimal technical scheme of the utility model, the wall hanging furnace body is adopted by the bellows with described Warm water inlet pipe is connected, and the wall hanging furnace body passes through the heating water inlet pipe and the heating return pipe and the heat-dissipating pipe phase Even, the water service pipe is by first triangle vavle and the heating water inlet pipe, and the water service pipe passes through described the Two triangle vavles are connected with the heating return pipe.
As a kind of optimal technical scheme of the utility model, the top of first triangle vavle and second triangle vavle It is equipped with the third solenoid valve, the bottom end of first triangle vavle and second triangle vavle is equipped with second electromagnetism Valve.
As a kind of optimal technical scheme of the utility model, the first electrode and the second electrode are and controller It is electrically connected, the controller and first solenoid valve are electrically connected, and the waterproof power knob is respectively with the described 1st Angle valve and the second solenoid valve on second triangle vavle and third solenoid valve electric connection.
As a kind of optimal technical scheme of the utility model, the tap water water supply pipe is made of PVC material, described Heating return pipe and the heating water inlet pipe are all made of stainless steel material and are made.
The advantageous effect that the utility model is reached is:The device is a kind of dual-purpose wall-hung boiler of heating and supplying water, which supplies The dual-purpose wall-hung boiler of water can directly control wall-hung boiler and provide hot water to people, after being finished directly by the water proof switch on nozzle Its closing is controlled by nozzle, without going wall-hung boiler to open numerous hand valves, is brought conveniently.
Description of the drawings
Attached drawing is used to provide a further understanding of the present invention, and a part for constitution instruction, with this practicality Novel embodiment for explaining the utility model, does not constitute limitations of the present invention together.In the accompanying drawings:
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the partial structural diagram of the utility model;
In figure:1, wall hanging furnace body;2, power port;3, tap water water supply pipe;4, pressure relief opening;5, heating return pipe;6、 Heating water inlet pipe;7, water service pipe;8, third solenoid valve;9, second solenoid valve;10, accurate filter;11, flow senses Device;12, exhaust outlet;13, sewage draining exit;14, bellows;15, heat-dissipating pipe;16, automatic exhaust steam valve;17, shower nozzle;18, first Electrode;19, second electrode;20, the first solenoid valve;21, the first triangle vavle;22, the second triangle vavle;23, waterproof power knob.
Specific implementation mode
The preferred embodiment of the utility model is illustrated below in conjunction with attached drawing, it should be understood that described herein excellent It selects embodiment to be only used for describing and explaining the present invention, is not used to limit the utility model.
Embodiment 1
As shown in Figs. 1-2, the utility model provides a kind of dual-purpose wall-hung boiler of heating and supplying water, including wall hanging furnace body 1, wall hanging The top of furnace body 1 is equipped with first electrode 18, and the side of first electrode 18 is equipped with second electrode 19, the top of wall hanging furnace body 1 One end is equipped with power port 2, and the center bottom of wall hanging furnace body 1 is equipped with tap water water supply pipe 3, and tap water water supply pipe 3 is equipped with The side of first solenoid valve 20, tap water water supply pipe 3 is equipped with heating water inlet pipe 6, and the side of heating water inlet pipe 6 is equipped with sewage draining exit 13, the side of sewage draining exit 13 is equipped with exhaust outlet 12, and the other side of tap water water supply pipe 3 is equipped with heating return pipe 5, heating return pipe 5 side is equipped with pressure relief opening 4, and one end of heating return pipe 5 is equipped with water flow sensing unit 11, and the bottom end of water flow sensing unit 11 is equipped with essence The bottom end of close filter 10, accurate filter 10 is equipped with the second triangle vavle 22, and one end of heating water inlet pipe 6 is equipped with heat-dissipating pipe 15, The top of heat-dissipating pipe 15 is equipped with automatic exhaust steam valve 16, and the other end of heating water inlet pipe 6 is equipped with the first triangle vavle 21, the first triangle vavle 21 are equipped with bellows 14 and water service pipe 7, and one end of water service pipe 7 is equipped with shower nozzle 17, is set on shower nozzle 17 There is waterproof power knob 23.
Wall hanging furnace body 1 is connected by bellows 14 with heating water inlet pipe 6, and wall hanging furnace body 1 passes through 6 He of heating water inlet pipe Heating return pipe 5 is connected with heat-dissipating pipe 15, and water service pipe 7 passes through the first triangle vavle 21 and heating water inlet pipe 6, water service pipe 7 are connected by the second triangle vavle 22 with heating return pipe 5.
The top of first triangle vavle 21 and the second triangle vavle 22 is equipped with third solenoid valve 8, the first triangle vavle 21 and second The bottom end of triangle vavle 22 is equipped with second solenoid valve 9.
First electrode 18 and second electrode 19 are electrically connected with controller, and controller electrically connects with the first solenoid valve 20 Connect, waterproof power knob 23 respectively with the second solenoid valve 9 and third solenoid valve 8 on the first triangle vavle 21 and the second triangle vavle 22 It is electrically connected.
Tap water water supply pipe 3 is made of PVC material, and heating return pipe 5 and heating water inlet pipe 6 are all made of stainless steel material It is made.
The device is a kind of dual-purpose wall-hung boiler of heating and supplying water, including wall hanging furnace body 1, if when using domestic water, it can To open domestic water switch by waterproof power knob 23, then controller can control the first triangle vavle 21 and heating water inlet pipe Solenoid valve on 6 is closed, and is opened the first triangle vavle 21 and the solenoid valve on water service pipe 7, is at the same time closed the second triangle Third solenoid valve 8 on valve 22 and second solenoid valve 9, the hot water on wall hanging furnace body 1 can pass through bellows 14 and domestic water Pipe 7 is transported on shower nozzle 17, after the completion of use, by waterproof power knob 23, closes domestic water switch, controller The first triangle vavle 21 and the solenoid valve on water service pipe 7 are closed in control, to open the first triangle vavle 21 and heating water inlet pipe 6 On solenoid valve and third solenoid valve 8, close second solenoid valve 9, to allow heat-dissipating pipe 15 work normally, when to wall hanging furnace body When the water level decreasing of the water tank in 1, first electrode 18 and second electrode 19 will disconnect, and be allowed originally to open the first solenoid valve 20 Water feed-tank supplies water, to allow water tank continually to have water.
The advantageous effect that the utility model is reached is:The device is a kind of dual-purpose wall-hung boiler of heating and supplying water, which supplies The dual-purpose wall-hung boiler of water can directly control wall-hung boiler and provide hot water to people, after being finished directly by the water proof switch on nozzle Its closing is controlled by nozzle, without going wall-hung boiler to open numerous hand valves, is brought conveniently.
Finally it should be noted that:The above descriptions are merely preferred embodiments of the present invention, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it still can be with technical scheme described in the above embodiments is modified, or to which part technical characteristic Carry out equivalent replacement.Within the spirit and principle of the utility model, any modification, equivalent replacement, improvement and so on, It should be included within the scope of protection of this utility model.

Claims (5)

1. a kind of dual-purpose wall-hung boiler of heating and supplying water, including wall hanging furnace body (1), which is characterized in that the wall hanging furnace body (1) Top is equipped with first electrode (18), and the side of the first electrode (18) is equipped with second electrode (19), the wall hanging furnace body (1) Top one end be equipped with power port (2), the center bottom of the wall hanging furnace body (1) is equipped with tap water water supply pipe (3), described Tap water water supply pipe (3) is equipped with the first solenoid valve (20), and the side of the tap water water supply pipe (3) is equipped with heating water inlet pipe (6), the side of the heating water inlet pipe (6) is equipped with sewage draining exit (13), and the side of the sewage draining exit (13) is equipped with exhaust outlet (12), The other side of the tap water water supply pipe (3) is equipped with heating return pipe (5), and the side of the heating return pipe (5) is equipped with pressure release One end of mouth (4), the heating return pipe (5) is equipped with water flow sensing unit (11), and the bottom end of the water flow sensing unit (11) is equipped with The bottom end of accurate filter (10), the accurate filter (10) is equipped with the second triangle vavle (22), the heating water inlet pipe (6) One end is equipped with heat-dissipating pipe (15), and the top of the heat-dissipating pipe (15) is equipped with automatic exhaust steam valve (16), the heating water inlet pipe (6) The other end is equipped with the first triangle vavle (21), and first triangle vavle (21) is equipped with bellows (14) and water service pipe (7), institute The one end for stating water service pipe (7) is equipped with shower nozzle (17), and the shower nozzle (17) is equipped with waterproof power knob (23).
2. the dual-purpose wall-hung boiler of a kind of heating and supplying water according to claim 1, which is characterized in that the wall hanging furnace body (1) It is connected with the heating water inlet pipe (6) by the bellows (14), the wall hanging furnace body (1) passes through the heating water inlet pipe (6) it is connected with the heat-dissipating pipe (15) with the heating return pipe (5), the water service pipe (7) passes through first triangle Valve (21) and the heating water inlet pipe (6), the water service pipe (7) are returned by second triangle vavle (22) and the heating Water pipe (5) is connected.
3. the dual-purpose wall-hung boiler of a kind of heating and supplying water according to claim 1, which is characterized in that first triangle vavle (21) It is equipped with third solenoid valve (8), first triangle vavle (21) and the described 2nd 3 with the top of second triangle vavle (22) The bottom end of angle valve (22) is equipped with the second solenoid valve (9).
4. the dual-purpose wall-hung boiler of a kind of heating and supplying water according to claim 3, which is characterized in that the first electrode (18) and The second electrode (19) is electrically connected with controller, and the controller is electrically connected with first solenoid valve (20), institute It is electric with described second on first triangle vavle (21) and second triangle vavle (22) respectively to state waterproof power knob (23) Magnet valve (9) and the third solenoid valve (8) are electrically connected.
5. the dual-purpose wall-hung boiler of a kind of heating and supplying water according to claim 1, which is characterized in that the tap water water supply pipe (3) it is made of PVC material, the heating return pipe (5) and the heating water inlet pipe (6) are all made of stainless steel material and are made.
CN201721629725.2U 2017-11-29 2017-11-29 A kind of dual-purpose wall-hung boiler of heating and supplying water Expired - Fee Related CN207778821U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721629725.2U CN207778821U (en) 2017-11-29 2017-11-29 A kind of dual-purpose wall-hung boiler of heating and supplying water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721629725.2U CN207778821U (en) 2017-11-29 2017-11-29 A kind of dual-purpose wall-hung boiler of heating and supplying water

Publications (1)

Publication Number Publication Date
CN207778821U true CN207778821U (en) 2018-08-28

Family

ID=63234226

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721629725.2U Expired - Fee Related CN207778821U (en) 2017-11-29 2017-11-29 A kind of dual-purpose wall-hung boiler of heating and supplying water

Country Status (1)

Country Link
CN (1) CN207778821U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513766A (en) * 2018-12-11 2019-11-29 单既国 The pre- heat supply method of the smart home equipment layer of heating system, household and steps of exhausting
CN111089325A (en) * 2019-12-16 2020-05-01 南京紫航软件科技有限公司 Boiler heat supply system and heat supply method thereof
CN112682963A (en) * 2020-12-29 2021-04-20 丽水市左尚设计装饰工程有限公司 Floor heating device based on intelligent home decoration

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110513766A (en) * 2018-12-11 2019-11-29 单既国 The pre- heat supply method of the smart home equipment layer of heating system, household and steps of exhausting
CN110513766B (en) * 2018-12-11 2021-04-20 单既国 Intelligent household equipment layer and household preheating method of heating system and exhaust step
CN111089325A (en) * 2019-12-16 2020-05-01 南京紫航软件科技有限公司 Boiler heat supply system and heat supply method thereof
CN112682963A (en) * 2020-12-29 2021-04-20 丽水市左尚设计装饰工程有限公司 Floor heating device based on intelligent home decoration
CN112682963B (en) * 2020-12-29 2022-07-29 丽水市左尚设计装饰工程有限公司 Floor heating device based on intelligent home decoration

Similar Documents

Publication Publication Date Title
CN207778821U (en) A kind of dual-purpose wall-hung boiler of heating and supplying water
CN205825411U (en) A kind of gas heater of band heating function
CN201983454U (en) Gas water heater with steady flow compensator
CN207688189U (en) A kind of waste heat segmentation conversion is integrated to fry stove
CN205717193U (en) A kind of energy-saving gas cooker of integrated heat energy recycle device
CN102116501A (en) Hybrid power wall-hung boiler
CN201615538U (en) Double-source wall-mounted boiler
CN101614442B (en) Device for obtaining higher thermal efficiency by mix-burning high-temperature water pyrolysis gas and fuel
CN207527858U (en) A kind of wall-hung boiler of anti-dry
CN202709481U (en) Automatic temperature control water heater
CN205156316U (en) Environmental protection formula gas heater
CN207438868U (en) A kind of boiler of temperature-control energy-saving
CN209623110U (en) A kind of burnt gas wall hanging furnace
CN207610364U (en) A kind of gas heater of bathtub shower double mode
CN207262707U (en) A kind of multifunctional stove
CN207599960U (en) A kind of wall-hung boiler by wireless signal intellectual monitoring internal information
CN206160468U (en) Safe energy -concerving and environment -protective hot water heating device
CN207599983U (en) A kind of wall-hung boiler of intelligent power saving water-saving
CN215638062U (en) Double-combustion-chamber wall-mounted gas stove
CN109442369A (en) A kind of energy conservation and environmental protection steam boiler for dual purpose
CN207778809U (en) One kind removing deimpurity wall-hung boiler
CN205878561U (en) Hanging stove intelligence temperature control device
CN216522355U (en) Wall-mounted furnace with anti-freezing device
CN208671385U (en) A kind of gas heater and electric heater compensation device
CN211476314U (en) Sectional type burning wall hanging stove

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180828

Termination date: 20211129

CF01 Termination of patent right due to non-payment of annual fee