A kind of 10kV aerial condutors lifting device Download PDFInfo
- Publication number
- CN207765885U CN207765885U CN201820028601.7U CN201820028601U CN207765885U CN 207765885 U CN207765885 U CN 207765885U CN 201820028601 U CN201820028601 U CN 201820028601U CN 207765885 U CN207765885 U CN 207765885U
- Authority
- CN
- China
- Prior art keywords
- pole
- cross
- arm
- hoop
- fixedly connected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Electric Cable Installation (AREA)
Abstract
本实用新型涉及一种10kV架空导线抬升器,包括横担支杆、导线夹、斜支杆、电动推杆、导向抱箍、支撑抱箍、立杆、固定夹具,横担支杆上滑动连接有若干导线夹,斜支杆设置在横担支杆两侧,立杆与横担支杆固定连接,立杆与导向抱箍滑动连接,立杆底端与电动推杆的输出端固定连接;固定夹具固定连接在横担支杆上,斜支杆顶端与固定夹具铰接,斜支杆底端与立杆铰接,导向抱箍、支撑抱箍固定在电杆上;电动推杆通过支撑抱箍与电杆固定连接。本实用新型适用于10kV带负荷水平架空线路直线杆改耐张杆并加装柱上开关导线,且不论是绝缘线路还是裸导线线路上均可带电应用,能够确保导线与横担的空气间隙。
The utility model relates to a 10kV overhead wire lifter, which comprises a cross-arm pole, a wire clamp, an inclined pole, an electric push rod, a guide hoop, a support hoop, a vertical pole, a fixing fixture, and a sliding connection on the cross-arm pole. There are several wire clamps, the inclined poles are arranged on both sides of the cross-arm pole, the vertical pole is fixedly connected with the cross-arm pole, the vertical pole is slidingly connected with the guide hoop, and the bottom end of the vertical pole is fixedly connected with the output end of the electric push rod; The fixed fixture is fixedly connected to the cross-arm pole, the top of the inclined pole is hinged with the fixed fixture, the bottom of the inclined pole is hinged with the vertical pole, the guide hoop and the support hoop are fixed on the electric pole; the electric push rod passes through the support hoop Fixed connection with pole. The utility model is suitable for 10kV load-carrying horizontal overhead line straight rods to be converted into tension rods and equipped with on-column switch wires, and can be applied live on both insulated wires and bare wires, and can ensure the air gap between the wires and the cross arm.
Description
技术领域technical field
本实用新型涉及一种10kV架空导线抬升器,尤其涉及一种适用于10kV带负荷的电动架空导线抬升器。The utility model relates to a 10kV overhead wire lifter, in particular to an electric overhead wire lifter suitable for 10kV with load.
背景技术Background technique
覆盖面最大的10kV架空配电线路网络承担着输电线路网络与各个用户之间的主要连接作用。由于该电压等级线路的绝缘水平较低,在大气过电压、污秽或其他外界因素的作用下易发生故障,并且由于部分地区配电线路设施陈旧老化,设备存在众多隐患,加之社会经济快速发展,不断增加的企业报装用电,基础设施建设引起的10kV架空配电线路的迁改逐年增多,这都会影响配网持续供电的可靠性。而要减少停电线路和停电时间,提高配网供电的可靠性,主要的手段就是大力、全面、安全地开展配电带电作业。The 10kV overhead distribution line network with the largest coverage is responsible for the main connection between the transmission line network and various users. Due to the low insulation level of the voltage level line, it is prone to failure under the action of atmospheric overvoltage, pollution or other external factors, and because the distribution line facilities in some areas are old and aging, there are many hidden dangers in the equipment, coupled with the rapid development of social economy, The ever-increasing number of companies reporting for installation of electricity, and the relocation of 10kV overhead distribution lines caused by infrastructure construction are increasing year by year, which will affect the reliability of the continuous power supply of the distribution network. To reduce power outage lines and outage time, and improve the reliability of distribution network power supply, the main means is to vigorously, comprehensively and safely carry out live distribution work.
目前配网带电作业,尤其是直线杆改耐张杆操作时,采用绝缘杆作业法、绝缘手套作业法更换直线杆绝缘子、横担时,大都使用抬升装置。传统的抬升装置安装不便、固定后不能二次提升导线与横担间的高度,造成导线对横担的间距小,这就需要操作手法熟练的作业人员来进行,操作难度较大。At present, when the live work of the distribution network is performed, especially when the straight rod is changed to a tension rod, when the insulating rod operation method and the insulating glove operation method are used to replace the linear rod insulator and the cross arm, most of the lifting devices are used. The traditional lifting device is inconvenient to install, and the height between the wire and the cross-arm cannot be raised twice after being fixed, resulting in a small distance between the wire and the cross-arm, which requires skilled operators to carry out, and the operation is difficult.
现有技术中多采用螺杆、棘轮扳手等提升机构,提升高度有限,提升过程采用手动操作,劳动强度大,往往需要至少两个人员轮流作业实现横担的提升。手动操作由于用力不均,会造成提升机构扭转,需要调整提升机构,作业效率不高。同时临时调整时,需要在高空下攀返回提升机构,提升横担,再上攀到横担处作业,十分费时费力。In the prior art, lifting mechanisms such as screw rods and ratchet wrenches are often used, and the lifting height is limited. The lifting process is manually operated, which is labor-intensive, and often requires at least two people to take turns to lift the cross arm. Due to the uneven force of manual operation, the lifting mechanism will be twisted, and the lifting mechanism needs to be adjusted, so the operating efficiency is not high. At the same time, during temporary adjustment, it is necessary to climb back to the lifting mechanism at a high altitude, lift the cross arm, and then climb up to the cross arm for operation, which is very time-consuming and laborious.
发明内容Contents of the invention
为克服现有技术的不足,本实用新型的目的是提供一种10kV架空导线抬升器,提升导线高度,降低更换直线杆横担及绝缘子的作业强度及难度,便于携带,方便作业。In order to overcome the deficiencies of the prior art, the purpose of this utility model is to provide a 10kV overhead wire lifter, which can raise the height of the wire, reduce the work intensity and difficulty of replacing the straight pole cross arm and insulator, and is easy to carry and work.
为实现上述目的,本实用新型通过以下技术方案实现:In order to achieve the above object, the utility model is realized through the following technical solutions:
一种10kV架空导线抬升器,包括横担支杆、导线夹、斜支杆、电动推杆、导向抱箍、支撑抱箍、立杆、固定夹具,横担支杆上滑动连接有若干导线夹,斜支杆设置在横担支杆两侧,立杆与横担支杆固定连接,立杆与导向抱箍滑动连接,立杆底端与电动推杆的输出端固定连接;固定夹具固定连接在横担支杆上,斜支杆顶端与固定夹具铰接,斜支杆底端与立杆铰接,导向抱箍、支撑抱箍固定在电杆上;电动推杆通过支撑抱箍与电杆固定连接。A 10kV overhead wire lifter, including a cross-arm support rod, a wire clamp, an inclined support rod, an electric push rod, a guide hoop, a support hoop, a vertical pole, and a fixing fixture, and several wire clamps are slidably connected to the cross-arm support rod , the inclined struts are set on both sides of the cross-arm strut, the vertical pole is fixedly connected with the cross-arm strut, the vertical pole is slidingly connected with the guide hoop, the bottom end of the vertical pole is fixedly connected with the output end of the electric push rod; the fixed fixture is fixedly connected On the cross-arm pole, the top of the inclined pole is hinged with the fixing fixture, the bottom of the inclined pole is hinged with the vertical pole, the guide hoop and the support hoop are fixed on the pole; the electric push rod is fixed with the pole through the support hoop connect.
所述的导向抱箍为两个,两个导向抱箍之间连接有固定柱。There are two guide hoops, and a fixed column is connected between the two guide hoops.
还包括手动开关、控制盒、锂电池,电动推杆上连接有控制盒,手动开关、锂电池与控制盒电连接。It also includes a manual switch, a control box, and a lithium battery, the electric push rod is connected with the control box, and the manual switch, the lithium battery are electrically connected with the control box.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
本实用新型适用于10kV带负荷水平架空线路直线杆改耐张杆并加装柱上开关导线,且不论是绝缘线路还是裸导线线路上均可带电应用,能够有效的控制导线与横担的空气间隙和安全距离。具体优点是:The utility model is suitable for 10kV load-carrying horizontal overhead line straight rods to be changed into tension rods and equipped with on-column switch wires, and can be applied live whether it is an insulated line or a bare wire line, and can effectively control the air between the wires and the cross arm. Clearance and safety distance. The specific advantages are:
1、现场人员的劳动强度,由原来提升导线需要3—5个操作人员减少到一人操作即可,由原有的手动调整高度,改为电动调整。1. The labor intensity of on-site personnel has been reduced from 3-5 operators to one person to lift the wire, and the original manual height adjustment has been changed to electric adjustment.
2、导向抱箍采用两个,并配合支撑抱箍使用,避免立杆在升降过程中发生扭转,整个操作过程中,无需调整本装置。2. Two guiding hoops are used together with the supporting hoops to avoid twisting of the pole during the lifting process. During the whole operation process, there is no need to adjust the device.
3、由于采用电动推杆,缩短了作业时间,是原有作业时间的一半。3. Due to the use of electric push rods, the working time is shortened, which is half of the original working time.
附图说明Description of drawings
图1是本实用新型的结构示意图。Fig. 1 is the structural representation of the utility model.
图中:1-横担支杆 2-导线夹 3-斜支杆 4-电动推杆 5-导向抱箍 6-支撑抱箍 7-立杆 8-固定夹具 9-固定柱 10-三相导线 11-锂电池 12-控制盒 13-把手 14-电杆。In the figure: 1-horizontal pole 2-wire clamp 3-oblique pole 4-electric push rod 5-guiding hoop 6-supporting hoop 7-pole 8-fixing fixture 9-fixing column 10-three-phase wire 11-lithium battery 12-control box 13-handle 14-pole.
具体实施方式Detailed ways
下面结合说明书附图对本实用新型进行详细地描述,但是应该指出本实用新型的实施不限于以下的实施方式。The utility model is described in detail below in conjunction with the accompanying drawings, but it should be pointed out that the implementation of the utility model is not limited to the following embodiments.
见图1,10kV架空导线抬升器,包括横担支杆1、导线夹2、斜支杆3、电动推杆4、导向抱箍5、支撑抱箍6、立杆7、固定夹具8,横担支杆1上滑动连接有若干导线夹2,斜支杆3设置在横担支杆1两侧,确保横担支杆4及立杆7能够稳定工作,立杆7与横担支杆1可通过夹具固定连接,立杆7与导向抱箍5滑动连接,立杆7底端与电动推杆4的输出端固定连接;固定夹具8固定连接在横担支杆1上,斜支杆3顶端与固定夹具8铰接,斜支杆3底端与立杆7铰接,导向抱箍5、支撑抱箍6固定在电杆14上;电动推杆4通过支撑抱箍6与电杆14固定连接。As shown in Figure 1, the 10kV overhead wire lifter includes cross arm support rod 1, wire clamp 2, inclined support rod 3, electric push rod 4, guide hoop 5, support hoop 6, vertical rod 7, fixing fixture 8, horizontal There are a number of wire clips 2 slidingly connected to the supporting rod 1, and the inclined supporting rods 3 are arranged on both sides of the cross-arm supporting rod 1 to ensure that the cross-arm supporting rod 4 and the vertical rod 7 can work stably. It can be fixedly connected by a clamp, the vertical rod 7 is slidably connected with the guide hoop 5, and the bottom end of the vertical rod 7 is fixedly connected with the output end of the electric push rod 4; The top end is hinged with the fixed fixture 8, the bottom end of the inclined support rod 3 is hinged with the vertical rod 7, the guide hoop 5 and the support hoop 6 are fixed on the pole 14; the electric push rod 4 is fixedly connected with the pole 14 through the support hoop 6 .
其中,导向抱箍5为两个,两个导向抱箍5之间连接有固定柱9,用以限定两个导向抱箍5的间距,实现立柱的多点定位,确保其在作业过程中稳定驱动横担支杆1升降,不发生扭转。导向抱箍5与支撑抱箍6均采用螺栓与电杆14固定连接。横担支杆1、斜支杆3、立杆7均由绝缘杆制作,绝缘杆可采用环氧树脂材料制作,优选轻质绝缘杆,如:美国hastings的绝缘杆。导向抱箍5、支撑抱箍6为铝合金材质,降低整体的重量,方便作业人员携带。Among them, there are two guide hoops 5, and a fixed column 9 is connected between the two guide hoops 5 to limit the distance between the two guide hoops 5, realize multi-point positioning of the column, and ensure its stability during operation. Drive the cross-arm strut 1 to go up and down without twisting. Both the guiding hoop 5 and the supporting hoop 6 are fixedly connected with the pole 14 by bolts. The cross-arm support rod 1, the oblique support rod 3, and the vertical rod 7 are all made of insulating rods, and the insulating rods can be made of epoxy resin materials, preferably lightweight insulating rods, such as the insulating rods of Hastings in the United States. The guide hoop 5 and the support hoop 6 are made of aluminum alloy, which reduces the overall weight and is convenient for operators to carry.
电动提升绝缘横担还包括手动开关、控制盒12、锂电池11,电动推杆4上连接有控制盒12,手动开关、锂电池11与控制盒12电连接,手动开关携带在作业人员身上。为防止损伤电动推杆4等重要部件,在锂电池11上设置把手13,携带时可倒提电动提升绝缘横担。The electric lifting insulating cross-arm also includes manual switch, control box 12, lithium battery 11, is connected with control box 12 on the electric push rod 4, and manual switch, lithium battery 11 are electrically connected with control box 12, and manual switch is carried on the operator's body. For preventing important parts such as damage electric push rod 4, handle 13 is set on lithium battery 11, can carry upside down when carrying electric lifting insulation cross-arm.
10kV带负荷水平架空线路电动提升方法,包括以下步骤:The electric hoisting method of 10kV horizontal overhead line with load includes the following steps:
1)电动推杆4、控制盒12、锂电池11均与支撑抱箍6固定连接,导向抱箍5与立杆7滑动连接,电动推杆4、立杆7、带有导线夹2的横担支杆1、斜支杆3依次安装;作业人员携带电动提升绝缘横担爬上电杆14,将支撑抱箍6、导向抱箍5安装在电杆14上,立杆7与电杆14平行设置,使立杆7在导向抱箍5内顺畅滑动,锁紧支撑抱箍6及导向抱箍5,横担支杆1与电杆14、三相导线10均保持垂直;1) The electric push rod 4, the control box 12, and the lithium battery 11 are all fixedly connected to the support hoop 6, the guide hoop 5 is slidably connected to the vertical rod 7, and the electric push rod 4, the vertical rod 7, and the horizontal rail with the wire clip 2 The supporting pole 1 and the inclined pole 3 are installed in sequence; the operator carries the electric hoisting insulating crossarm and climbs up the pole 14, and installs the supporting hoop 6 and the guiding hoop 5 on the pole 14. The vertical pole 7 and the pole 14 Arranged in parallel, so that the vertical pole 7 slides smoothly in the guide hoop 5, locks the support hoop 6 and the guide hoop 5, and keeps the cross arm pole 1 perpendicular to the electric pole 14 and the three-phase wire 10;
2)调整导线夹2在横担支杆1的位置,使导线夹2对准三相导线10,作业人员通过手动开关控制电动推杆4向上推进横担支杆1,将三相导线10锁入导线夹2中,拆除三相导线10绝缘子上的绑扎线;2) Adjust the position of the wire clamp 2 on the cross-arm pole 1, so that the wire clamp 2 is aligned with the three-phase wire 10, and the operator controls the electric push rod 4 to push the cross-arm pole 1 upward through the manual switch, and locks the three-phase wire 10. Enter the wire clamp 2, remove the binding wire on the three-phase wire 10 insulators;
3)作业人员再次通过手动开关控制电动推杆4向上推进横担支杆1,将三相导线10提升到位,对横担及三相导线10绝缘子进行更换;3) The operator once again controls the electric push rod 4 to push the cross-arm pole 1 upwards through the manual switch, lifts the three-phase wire 10 into place, and replaces the cross-arm and three-phase wire 10 insulators;
4)更换完毕后,作业人员通过手动开关控制电动推杆4输出端向下运动,三相导线10落下至新绝缘子卡槽内,对三相导线10及绝缘子进行绑扎固定;4) After the replacement is completed, the operator controls the output end of the electric push rod 4 to move downward through the manual switch, and the three-phase wire 10 falls into the slot of the new insulator, and the three-phase wire 10 and the insulator are bound and fixed;
5)拆除导向抱箍5及支撑抱箍6,作业人员携带电动提升绝缘横担爬下电杆14,完成作业。5) Remove the guide hoop 5 and the support hoop 6, and the operator climbs down the pole 14 with the electric hoisting insulating cross arm to complete the operation.
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820028601.7U CN207765885U (en) | 2018-01-08 | 2018-01-08 | A kind of 10kV aerial condutors lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201820028601.7U CN207765885U (en) | 2018-01-08 | 2018-01-08 | A kind of 10kV aerial condutors lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207765885U true CN207765885U (en) | 2018-08-24 |
Family
ID=63183092
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201820028601.7U Active CN207765885U (en) | 2018-01-08 | 2018-01-08 | A kind of 10kV aerial condutors lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207765885U (en) |
Cited By (8)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108919293A (en) * | 2018-09-28 | 2018-11-30 | 广东电网有限责任公司 | LiDAR monitoring device and utility pole |
| CN109212279A (en) * | 2018-11-29 | 2019-01-15 | 国网上海市电力公司 | A kind of transformer belt electric detection means |
| CN109904824A (en) * | 2019-03-14 | 2019-06-18 | 国网黑龙江省电力有限公司齐齐哈尔供电公司 | Small wire line lifting cross arm |
| CN111525482A (en) * | 2020-05-28 | 2020-08-11 | 广东电网有限责任公司 | Low-voltage wire lifting device |
| CN111910982A (en) * | 2020-08-05 | 2020-11-10 | 国网黑龙江省电力有限公司伊春供电公司 | Transmission line ground clearance lifting cross arm |
| CN115021148A (en) * | 2022-06-01 | 2022-09-06 | 国网江苏省电力有限公司盐城供电分公司 | Device for laying electric overhead line |
| CN118739151A (en) * | 2024-06-13 | 2024-10-01 | 广东久盛电力科技有限公司 | A cable upper fixing device for bypass operation and a cable upper fixing method |
| CN118943938A (en) * | 2024-08-08 | 2024-11-12 | 江苏齐天电力建设集团有限公司 | An intelligent insulator replacement auxiliary device |
-
2018
- 2018-01-08 CN CN201820028601.7U patent/CN207765885U/en active Active
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108919293A (en) * | 2018-09-28 | 2018-11-30 | 广东电网有限责任公司 | LiDAR monitoring device and utility pole |
| CN109212279A (en) * | 2018-11-29 | 2019-01-15 | 国网上海市电力公司 | A kind of transformer belt electric detection means |
| CN109904824A (en) * | 2019-03-14 | 2019-06-18 | 国网黑龙江省电力有限公司齐齐哈尔供电公司 | Small wire line lifting cross arm |
| CN111525482A (en) * | 2020-05-28 | 2020-08-11 | 广东电网有限责任公司 | Low-voltage wire lifting device |
| CN111525482B (en) * | 2020-05-28 | 2021-07-27 | 广东电网有限责任公司 | A low-voltage wire lifting device |
| CN111910982A (en) * | 2020-08-05 | 2020-11-10 | 国网黑龙江省电力有限公司伊春供电公司 | Transmission line ground clearance lifting cross arm |
| CN115021148A (en) * | 2022-06-01 | 2022-09-06 | 国网江苏省电力有限公司盐城供电分公司 | Device for laying electric overhead line |
| CN115021148B (en) * | 2022-06-01 | 2024-04-05 | 国网江苏省电力有限公司盐城供电分公司 | Device for laying electric overhead line |
| CN118739151A (en) * | 2024-06-13 | 2024-10-01 | 广东久盛电力科技有限公司 | A cable upper fixing device for bypass operation and a cable upper fixing method |
| CN118739151B (en) * | 2024-06-13 | 2025-01-17 | 广东久盛电力科技有限公司 | Cable up-leading fixing device for bypass operation and up-leading method thereof |
| CN118943938A (en) * | 2024-08-08 | 2024-11-12 | 江苏齐天电力建设集团有限公司 | An intelligent insulator replacement auxiliary device |
| CN118943938B (en) * | 2024-08-08 | 2025-02-28 | 江苏齐天电力建设集团有限公司 | An intelligent insulator replacement auxiliary device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN108155601A (en) | A kind of method that on-load straight line pole changes tension-resistant rod | |
| CN107104387A (en) | One kind can second lift wire insulation cross-arm and lifting wire method | |
| CN103175998B (en) | A kind of portable test shaft tower detected for transmission circuit insulator string high-voltage performance | |
| CN106505466A (en) | Lifting insulating cross arm for distribution network operation without power failure and its operation method | |
| CN207067191U (en) | Rotatable Labor-saving isolator detecting support bar | |
| CN103647229B (en) | Earth potential reset suspension insulator side of wire bowl head W sells special tool utensil | |
| CN204439667U (en) | A kind of portable type current transformer testing clamp | |
| CN201449397U (en) | Multi-purpose wiring operating lever based on field high voltage test | |
| CN102623927B (en) | Charged for replacement 220kV circuit multiloop double bundle conductor insulator tool and method | |
| CN202712459U (en) | Angle adjustable ground wire device for electric power system | |
| CN202602171U (en) | A tool for power-on replacing multi-loop double split conductor insulator of 220kV line | |
| CN102916372B (en) | 10kV multi-circuit lines on the same pole mesophase spherule wire lifting instrument | |
| CN207440130U (en) | A kind of halo-free support device pressure-resistant for extra-high voltage transformer shelf depreciation | |
| CN210779825U (en) | Device for replacing the entire string of tensile insulators at the cross arm end and wire end of DC transmission lines | |
| CN102191874B (en) | Insulating cross arm with movable arc grooves | |
| CN206820360U (en) | One kind can second lift wire insulation cross-arm | |
| CN102510029B (en) | Ground potential electrified bar cutter device changing method | |
| CN107069508B (en) | Auxiliary tool for replacing post insulator of isolating switch under 110kV | |
| CN208058283U (en) | A kind of equipment moving device | |
| CN110212324A (en) | A kind of hanging device and method of voltage levels temporary ground wire | |
| CN211701243U (en) | A jumper spacer bar electrified defect elimination device | |
| CN211150812U (en) | Novel grounding wire device | |
| CN212374821U (en) | Insulating platform that overhauls of live working | |
| CN209562011U (en) | It is arranged vertically 10kV overhead transmission line on-load and replaces on-pole switch device | |
| CN201312079Y (en) | Clamping apparatus for live line replacement of suspended insulator in middle of 500KV untypical tangent tower via splicing method |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |