CN207749428U - A kind of bridge hanging basket with feeding device - Google Patents

A kind of bridge hanging basket with feeding device Download PDF

Info

Publication number
CN207749428U
CN207749428U CN201820010253.0U CN201820010253U CN207749428U CN 207749428 U CN207749428 U CN 207749428U CN 201820010253 U CN201820010253 U CN 201820010253U CN 207749428 U CN207749428 U CN 207749428U
Authority
CN
China
Prior art keywords
hanging basket
feeding device
beam body
lifting
boom
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820010253.0U
Other languages
Chinese (zh)
Inventor
张鸿
徐成
周建圣
缪丁伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Road Xiang Traffic Engineering Co Ltd
Original Assignee
Jiangsu Road Xiang Traffic Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Road Xiang Traffic Engineering Co Ltd filed Critical Jiangsu Road Xiang Traffic Engineering Co Ltd
Priority to CN201820010253.0U priority Critical patent/CN207749428U/en
Application granted granted Critical
Publication of CN207749428U publication Critical patent/CN207749428U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model is related to bridge construction fields, particularly disclose a kind of bridge hanging basket with feeding device, it solves bridge hanging basket needs in the prior art in advance to transport raw material to beam body top, raw material is transported to Hanging Basket by loop wheel machine and trolley again, problem inconvenient for use, its key points of the technical solution are that, feeding device is arranged in beam body, feeding device includes moveable support base, the crane arm being arranged on support base, anchor beam, crane arm is slidably connected by a support plate and anchoring beam, support wheel and crab capstan are provided on crane arm, coiling has steel wire rope on crab capstan, the end set of steel wire rope has grabhook, when in use, feeding device can first transport raw material to the other positions of beam body, it transports to Hanging Basket to be constructed place along beam body again;Also it can directly transport to Hanging Basket to be constructed place, to save intermediate trafficking step, improve the efficiency of cradle construction.

Description

一种带有上料装置的桥梁挂篮A bridge hanging basket with a feeding device

技术领域technical field

本实用新型涉及桥梁建设领域,特别涉及一种带上料装置的桥梁挂篮。The utility model relates to the field of bridge construction, in particular to a bridge hanging basket with a feeding device.

背景技术Background technique

桥梁的挂篮施工是预应力混凝土连续梁、T形钢结构和悬臂梁分段施工的一项主要设备,它能够沿轨道整体向前。具有自重轻、结构简单、坚固稳定、前移和拆卸方便的特点,挂篮施工适用于浇筑较大跨径的悬臂梁桥,采用挂篮施工,就地分段悬臂作业,无需架设支架和大型吊机,现有技术中的挂篮在进行浇筑时,需要额外使用吊机或其他提升设备将不断将各种原料提升到梁体的上部,再通过人工搬运的方式运输到吊篮处进行混凝土浇筑。The hanging basket construction of the bridge is a main equipment for the segmental construction of prestressed concrete continuous beams, T-shaped steel structures and cantilever beams, and it can move forward along the track as a whole. It has the characteristics of light weight, simple structure, firmness and stability, and is easy to move forward and disassemble. The hanging basket construction is suitable for pouring cantilever beam bridges with large spans. The hanging basket construction is used for the cantilever operation in sections on the spot, without the need for erecting brackets and large-scale bridges. Crane, when the hanging basket in the prior art is pouring, it is necessary to use additional cranes or other lifting equipment to continuously lift various raw materials to the upper part of the beam body, and then transport them to the hanging basket by manual handling for concrete pouring.

为了原料的方便运输,在授权公告号为CN206319262U的实用新型专利中,公开了一种自带运输和吊装系统的菱形挂篮,该专利在现有的挂篮上增加的可行走的吊机和可行走的小车,从而方便将原料由梁体运输到挂篮处,节省了人力。In order to facilitate the transportation of raw materials, in the utility model patent with the authorized announcement number CN206319262U, a diamond-shaped hanging basket with its own transportation and hoisting system is disclosed. The patent adds a walkable crane and The trolley can walk, so that it is convenient to transport the raw materials from the beam body to the hanging basket, saving manpower.

而该专利中,仍然需要预先将原料运输至梁体上部,再通过吊机和小车将原料运输至挂篮处,使用不便。However, in this patent, it is still necessary to transport the raw materials to the upper part of the beam body in advance, and then transport the raw materials to the hanging basket by a crane and a trolley, which is inconvenient to use.

实用新型内容Utility model content

本实用新型的目的是提供一种带有上料装置的桥梁挂篮,其优势在于,可直接将地面的原料提升至梁体端部直接进行施工,节省了中间的运输步骤,提高了挂篮施工的效率。The purpose of this utility model is to provide a bridge hanging basket with a feeding device. Its advantage is that the raw materials on the ground can be directly lifted to the end of the beam body for construction, which saves the intermediate transportation steps and improves the construction efficiency of the hanging basket. efficiency.

本实用新型的上述技术目的是通过以下技术方案得以实现的:The above-mentioned technical purpose of the utility model is achieved through the following technical solutions:

一种带有上料装置的桥梁挂篮,包括安装在梁体上的主衍架和安装在梁体下部的底模板,还包括设置于梁体上部外侧的上料装置,所述上料装置包括安装在梁体上部的支撑座、设置于所述支撑座朝向所述主衍架一侧的锚固梁和安装在所述支撑座上部的起重臂,所述起重臂通过一支撑板与所述锚固梁滑动连接,所述支撑座可在梁体上沿平行于所述锚固梁的方向进行移动,所述起重臂可悬伸到梁体外。A bridge hanging basket with a feeding device, including a main truss installed on the beam body and a bottom formwork installed on the lower part of the beam body, and a feeding device arranged outside the upper part of the beam body, the feeding device It includes a support seat installed on the upper part of the beam body, an anchor beam arranged on the side of the support seat facing the main truss, and a lifting arm installed on the upper part of the support seat. The anchor beam is slidably connected, the support seat can move on the beam body along a direction parallel to the anchor beam, and the lifting arm can hang out of the beam body.

通过采用上述技术方案,在使用时,上料装置可将原料先运输至梁体的其他位置,对原料进行初步的处理,如:混凝土的搅拌、钢筋的切割等,再将经过初步处理后的原料沿梁体运输至挂篮所要施工处;也可直接将无需进行初步处理或在地面已初步处理完毕后的原料运输至挂篮所要施工处,从而节省了中间的运输步骤,提高了挂篮施工的效率。By adopting the above technical scheme, when in use, the feeding device can transport the raw materials to other positions of the beam body first, and perform preliminary processing on the raw materials, such as: mixing of concrete, cutting of steel bars, etc., and then the raw materials after preliminary processing The raw materials are transported along the beam to the place where the hanging basket is to be constructed; the raw materials that do not need preliminary treatment or have been preliminarily treated on the ground can also be directly transported to the construction place where the hanging basket is to be constructed, thus saving intermediate transportation steps and improving the hanging basket. construction efficiency.

作为优选,所述锚固梁包括与梁体表面固定连接的锚固部和设置于所述锚固部顶部的抵接部,所述锚固部的内部设置有第一钢筋支架,所述第一钢筋支架穿设于梁体内。Preferably, the anchor beam includes an anchor portion fixedly connected to the surface of the beam body and an abutment portion disposed on the top of the anchor portion, a first steel bar bracket is arranged inside the anchor portion, and the first steel bar bracket passes through located in the beam body.

通过采用上述技术方案,通过第一钢筋支架的设置,由于梁体主要由混凝土浇筑而成,依靠第一钢筋支架与混凝土之间的粘结锚固作用,使得锚固部与梁体稳定连接,从而使锚固部在受力时,第一钢筋支架、梁体的混凝土和锚固部共同受力,从而提高了锚固梁与梁体连接的稳定性。By adopting the above technical scheme, through the setting of the first steel bar support, since the beam body is mainly made of concrete pouring, relying on the bonding and anchoring effect between the first steel bar support and the concrete, the anchoring part is stably connected to the beam body, so that When the anchoring part is stressed, the first steel bar support, the concrete of the beam body and the anchoring part are jointly stressed, thereby improving the stability of the connection between the anchoring beam and the beam body.

作为优选,所述抵接部内设置有第二钢筋支架,所述第二钢筋支架穿设于所述锚固部内。Preferably, a second steel bar bracket is provided in the abutting portion, and the second steel bar bracket is penetrated in the anchoring portion.

通过采用上述技术方案,依靠第二钢筋支架与混凝土之间的粘结锚固作用,使得抵接部在受力时,第二钢筋支架、抵接部的混凝土和锚固部的混凝土共同受力,从而提高了抵接部与锚固部连接的稳定性。By adopting the above technical scheme, relying on the bonding and anchoring effect between the second steel bar bracket and the concrete, when the abutment part is stressed, the second steel bar bracket, the concrete of the abutment part and the concrete of the anchorage part are jointly stressed, thus The stability of the connection between the abutment part and the anchor part is improved.

作为优选,所述支撑板的一端与所述起重臂固定连接,所述支撑板的另一端的上表面设置有支撑轮,所述抵接部的下表面开设有供所述支撑轮滑动的支撑槽。Preferably, one end of the support plate is fixedly connected to the boom, a support wheel is provided on the upper surface of the other end of the support plate, and a support wheel is provided on the lower surface of the abutting portion for the sliding of the support wheel. Support slot.

通过采用上述技术方案,当支撑座沿平行于锚固梁的方向进行移动时,支撑轮抵接在支撑槽内,且沿支撑槽进行滑动。通过支撑板的设置,使得使锚固梁对起重臂加以支撑,提高了起重臂在提升重物使的稳定性。By adopting the above technical solution, when the support seat moves in a direction parallel to the anchor beam, the support wheel abuts in the support groove and slides along the support groove. The setting of the support plate enables the anchor beam to support the boom, thereby improving the stability of the boom when lifting heavy objects.

作为优选,梁体上设置有滑动导轨,所述支撑座设置于所述滑动导轨上,所述支撑座的底部设置有可沿所述滑动导轨滑动的滑轮。Preferably, a sliding guide rail is provided on the beam body, the support seat is provided on the sliding guide rail, and a pulley is provided at the bottom of the support seat to slide along the sliding guide rail.

通过采用上述技术方案,支撑座滑动时,由于滑轮周面上的凹槽与滑动导轨相匹配,支撑座可沿滑动导轨滑动,提高了支撑座在梁体上移动的稳定性。By adopting the above technical solution, when the support base slides, since the grooves on the peripheral surface of the pulley match the slide guide rail, the support base can slide along the slide guide rail, which improves the stability of the support base moving on the beam body.

作为优选,所述起重臂上设置有起重绞盘,所述起重臂远离所述锚固梁的一端的上部设置有起重轮,所述起重绞盘上绕卷有一起重绳,并经过起重轮悬挂于梁体外。As a preference, a hoisting winch is arranged on the boom, and a crane wheel is arranged on the upper part of the boom far away from the anchor beam, and a heavy rope is wound on the hoisting winch, and passes through The lifting wheels are suspended outside the beam.

通过采用上述技术方案,通过起重绞盘对起重绳的收卷或伸出,经过起重轮的转向作用,钢丝的端部就实现了上升或下降,同时起重轮可起到支撑的作用,防止起重绳与起重臂发生摩擦,影响上料装置的正常使用。By adopting the above technical scheme, the end of the steel wire can be raised or lowered through the winding or stretching of the hoisting rope by the hoisting winch and the turning action of the hoisting wheel, and the hoisting wheel can play a supporting role , to prevent friction between the hoisting rope and the boom, affecting the normal use of the feeding device.

作为优选,所述起重轮的周面开设有限位槽。Preferably, a limiting groove is provided on the peripheral surface of the lifting wheel.

通过采用上述技术方案,通过限位槽的设置,对起重绳的移动进行限位,防止起重绳从起重轮表面脱落,从而提高了起重绳沿支撑轮滑动的稳定性。By adopting the above technical solution, the movement of the hoisting rope is limited by the setting of the limiting groove, preventing the hoisting rope from falling off the surface of the hoisting wheel, thereby improving the stability of the hoisting rope sliding along the supporting wheel.

作为优选,所述限位槽的底部设置有防滑纹路。Preferably, the bottom of the limiting groove is provided with anti-slip lines.

通过采用上述技术方案,通过防滑纹路的设置,增大了限位槽内壁的粗糙程度,当起重绳沿支撑轮滑动时,可防止起重绳与支撑轮发生打滑现象,减少了原料提升时的抖动,从而提高了原料提升过程中的稳定性。By adopting the above technical scheme, the roughness of the inner wall of the limiting groove is increased through the setting of anti-skid lines. When the hoisting rope slides along the supporting wheel, it can prevent the hoisting rope and the supporting wheel from slipping, reducing the time when the raw material is lifted. The jitter, thus improving the stability of the raw material lifting process.

作为优选,所述起重绳的端部设置有起重钩,所述起重钩的上部开设有悬挂环,所述起重绳通过所述悬挂环与所述起重钩连接。Preferably, a hoisting hook is provided at the end of the hoisting rope, and a suspension ring is provided on the upper part of the hoisting hook, and the hoisting rope is connected to the hoisting hook through the suspension ring.

通过采用上述技术方案,起重绳通过穿设在悬挂环内,从而与起重钩固定,起重钩可悬挂吊篮,吊篮内可放置粉料等原材料,从而将粉料等原材料运输至梁体或底模板处进行施工;也可将钢筋等原料通过钢丝绳捆扎,再通过起重钩悬挂钢丝绳将钢筋等原料运输至梁体或底模板处进行施工。By adopting the above technical scheme, the hoisting rope is fixed to the hoisting hook by passing through the suspension ring, the hoisting hook can hang the hanging basket, and raw materials such as powder can be placed in the hanging basket, so that the raw materials such as powder can be transported to The construction is carried out at the beam body or the bottom formwork; the steel bars and other raw materials can also be bundled with steel wire ropes, and then the steel bars and other raw materials can be transported to the beam body or the bottom formwork by hanging the steel wire ropes through the lifting hook for construction.

作为优选,所述起重臂的上部设置有限位结构,所述限位结构包括限位支架和设置于限位支架内上的两个限位轮,所述起重绳穿设于两个所述限位轮之间。As a preference, a limit structure is provided on the upper part of the boom, the limit structure includes a limit bracket and two limit wheels arranged inside the limit bracket, and the lifting rope is passed through the two between the limit wheels.

通过采用上述技术方案,通过两个限位轮的设置,对起重绳加以限位,防止起重绳受自身重力影响,发生下垂后与起重臂发生干涉,导致起重绳磨损严重和原料提升时发生抖动,从而提高了重物提升时的稳定性和上料装置的可靠性。By adopting the above-mentioned technical scheme, the hoisting rope is limited by the setting of two limiting wheels, so as to prevent the hoisting rope from being affected by its own gravity and interfere with the boom after drooping, resulting in serious wear and tear of the hoisting rope and the loss of raw materials. Vibration occurs during lifting, which improves the stability of lifting heavy objects and the reliability of the feeding device.

综上所述,本实用新型具有以下有益效果:In summary, the utility model has the following beneficial effects:

1、通过起重钩、起重绳、起重绞盘、起重轮的设置,实现了将原料从地面提升到梁体上或挂篮施工处;通过支撑座、滑轮和滑动导轨的设置,实现了将原料从梁体其他位置运输至挂篮施工处;1. Through the setting of the lifting hook, lifting rope, lifting winch and lifting wheel, the raw materials can be lifted from the ground to the beam body or the construction place of the hanging basket; through the setting of the support seat, pulley and sliding guide rail, the In order to transport raw materials from other positions of the beam body to the construction site of the hanging basket;

2、通过限位结构、支撑板、锚固梁的设置,提高了上料装置的可靠性和稳定性。2. The reliability and stability of the feeding device is improved through the setting of the limit structure, support plate and anchor beam.

附图说明Description of drawings

图1为带有上料装置的桥梁挂篮的结构示意图;Fig. 1 is the structural representation of the bridge hanging basket with feeding device;

图2为上料装置的结构示意图;Fig. 2 is the structural representation of feeding device;

图3为锚固梁的剖面视图;Fig. 3 is the sectional view of anchor beam;

图4为图2中A处的放大图;Fig. 4 is the enlarged view of place A in Fig. 2;

图5为图2中B处的放大图;Fig. 5 is the enlarged view of place B in Fig. 2;

图6为起重轮、限位结构的安装示意图。Fig. 6 is a schematic diagram of the installation of the lifting wheel and the limit structure.

图中:1、主衍架;2、底模板;3、上料装置;31、支撑座;311、滑动导轨;312、滑轮;32、锚固梁;321、锚固部;322、抵接部;3221、支撑槽;323、第一钢筋支架;324、第二钢筋支架;33、起重臂;331、起重绞盘;332、起重轮;3321、限位槽;3322、防滑纹路;333、起重绳;334、起重钩;3341、悬挂环;335、限位结构;3351、限位支架;3352、限位轮;34、支撑板;341、支撑轮;35、驱动结构;351、驱动电机;352、丝杆;4、梁体。In the figure: 1. Main truss frame; 2. Bottom template; 3. Feeding device; 31. Support seat; 311. Slide guide rail; 312. Pulley; 32. Anchoring beam; 321. Anchoring part; 322. Abutting part; 3221, support groove; 323, the first steel bar support; 324, the second steel bar support; 33, the lifting arm; 331, the lifting winch; 332, the lifting wheel; 3321, the limit groove; Lifting rope; 334, lifting hook; 3341, suspension ring; 335, limit structure; 3351, limit bracket; 3352, limit wheel; 34, support plate; 341, support wheel; 35, driving structure; 351, Drive motor; 352, screw mandrel; 4, beam body.

具体实施方式Detailed ways

以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.

参考附图1,一种带有上料装置的桥梁挂篮,包括安装在梁体4上的主衍架1、安装在梁体4下部的底模板2和设置于梁体4上部外侧的上料装置3。Referring to accompanying drawing 1, a bridge hanging basket with a feeding device includes a main truss 1 installed on the beam body 4, a bottom formwork 2 installed on the lower part of the beam body 4, and an upper plate arranged on the outer side of the upper part of the beam body 4. Material device 3.

参考附图2,上料装置3包括安装在梁体4上部的支撑座31、设置于支撑座31朝向主衍架1一侧的锚固梁32和安装在支撑座31上部的起重臂33。起重臂33通过一支撑板34与锚固梁32滑动连接,支撑座31可在梁体4上沿平行于锚固梁32的方向进行移动。Referring to accompanying drawing 2, feeding device 3 comprises support base 31 installed on the upper part of beam body 4, anchor beam 32 arranged on the side of support base 31 facing main truss 1 and jib 33 installed on support base 31 upper part. The boom 33 is slidingly connected to the anchor beam 32 through a support plate 34 , and the support base 31 can move on the beam body 4 along a direction parallel to the anchor beam 32 .

参考附图3,锚固梁32的整体呈L形,锚固梁32由混凝土浇筑而成,锚固梁32包括与梁体4表面固定连接的锚固部321和设置于锚固部321顶部的抵接部322,锚固部321的内部设置有第一钢筋支架323,第一钢筋支架323穿设于梁体4内。Referring to accompanying drawing 3, the whole of anchoring beam 32 is L-shaped, and anchoring beam 32 is formed by pouring concrete, and anchoring beam 32 comprises the anchoring part 321 that is fixedly connected with the surface of beam body 4 and the abutment part 322 that is arranged on the top of anchoring part 321 , the inside of the anchor portion 321 is provided with a first steel bar bracket 323 , and the first steel bar bracket 323 is penetrated in the beam body 4 .

通过第一钢筋支架323的设置,由于梁体4主要由混凝土浇筑而成,依靠第一钢筋支架323与混凝土之间的粘结锚固作用,使得锚固部321与梁体4稳定连接,从而使锚固部321在受力时,第一钢筋支架323、梁体4的混凝土和锚固部321共同受力,从而提高了锚固梁32与梁体4连接的稳定性。Through the setting of the first steel bar bracket 323, since the beam body 4 is mainly formed by pouring concrete, relying on the bonding and anchoring effect between the first steel bar bracket 323 and the concrete, the anchor portion 321 is stably connected to the beam body 4, thereby making the anchorage When the part 321 is stressed, the first steel bar support 323 , the concrete of the beam body 4 and the anchoring part 321 are jointly stressed, thereby improving the stability of the connection between the anchor beam 32 and the beam body 4 .

抵接部322的内部设置有第二钢筋支架324,第二钢筋支架324穿设于锚固部321内。A second steel bar bracket 324 is disposed inside the abutting portion 322 , and the second steel bar bracket 324 penetrates inside the anchoring portion 321 .

同理,通过第二钢筋支架324的设置,使得抵接部322在受力时,第二钢筋支架324、抵接部322的混凝土和锚固部321的混凝土共同受力,从而提高了抵接部322与锚固部321连接的稳定性。Similarly, through the setting of the second reinforcement bracket 324, when the abutting portion 322 is stressed, the second reinforcement bracket 324, the concrete of the abutting portion 322 and the concrete of the anchoring portion 321 are jointly stressed, thereby improving the strength of the abutting portion. 322 and the stability of the connection of the anchor portion 321.

参考附图2与附图4,支撑板34的一端与支撑座31通过螺栓固定连接,支撑板34的另一端上表面设置有支撑轮341,抵接部322的下表面开设有供支撑轮341滑动的支撑槽3221。With reference to accompanying drawing 2 and accompanying drawing 4, one end of support plate 34 and support base 31 are fixedly connected by bolt, the upper surface of the other end of support plate 34 is provided with support wheel 341, and the lower surface of abutting portion 322 is provided with support wheel 341. Sliding support groove 3221.

当支撑座31沿平行于锚固梁32的方向进行移动时,支撑轮341抵接在支撑槽3221内,且沿支撑槽3221进行滑动。通过支撑板34的设置,使得使锚固梁32对起重臂33加以支撑,提高了起重臂33在提升重物使的稳定性。When the supporting seat 31 moves along a direction parallel to the anchor beam 32 , the supporting wheel 341 abuts against the supporting groove 3221 and slides along the supporting groove 3221 . The setting of the support plate 34 enables the anchor beam 32 to support the jib 33 , which improves the stability of the jib 33 when lifting heavy objects.

参考附图2与附图5,梁体4的上表面设置有滑动导轨311,滑动导轨311与锚固梁32平行设置。支撑座31设置在滑动导轨311上,支撑座31的底部设置有可沿滑动到会滑动的滑轮312。支撑座31滑动时,由于滑轮312周面上的凹槽与滑动导轨311相匹配,支撑座31可沿滑动导轨311滑动,提高了支撑座31在梁体4上移动的稳定性。Referring to accompanying drawings 2 and 5 , a sliding guide rail 311 is provided on the upper surface of the beam body 4 , and the sliding guide rail 311 is arranged parallel to the anchor beam 32 . The support base 31 is arranged on the sliding guide rail 311 , and the bottom of the support base 31 is provided with a pulley 312 that can slide along the slide rail. When the support base 31 slides, because the groove on the peripheral surface of the pulley 312 matches the sliding guide rail 311, the support base 31 can slide along the sliding guide rail 311, which improves the stability of the support base 31 moving on the beam body 4.

梁体4上还设置有驱动结构35,驱动结构35包括驱动电机351和由驱动电机351带动的丝杆352,丝杆352与支撑座31通过螺纹连接。因而随着驱动电机351的启动,丝杆352可带动支撑座31移动。The beam body 4 is also provided with a drive structure 35 , the drive structure 35 includes a drive motor 351 and a screw 352 driven by the drive motor 351 , the screw 352 is screwed to the support base 31 . Therefore, with the activation of the driving motor 351 , the screw rod 352 can drive the support base 31 to move.

起重臂33的顶部为一平面,起重臂33的靠近锚固梁32的一端设置有起重绞盘331,起重臂33远离锚固梁32的一端的上部设置有起重轮332,起重绞盘331上绕卷有一起重绳333,并经过起重轮332悬挂于梁体4外。The top of the boom 33 is a plane, and the end of the boom 33 near the anchor beam 32 is provided with a hoisting winch 331, and the top of the boom 33 away from the end of the anchor beam 32 is provided with a hoisting wheel 332, and the hoisting winch A heavy rope 333 is wound on the 331, and is suspended outside the beam body 4 through the lifting wheel 332.

通过起重绞盘331对起重绳333的收卷或伸出,经过起重轮332的转向作用,钢丝的端部就实现了上升或下降,同时起重轮332可起到支撑的作用,防止起重绳333与起重臂33发生摩擦,影响上料装置3的正常使用。By winding up or stretching out the hoisting rope 333 by the hoisting winch 331, and through the turning action of the hoisting wheel 332, the end of the steel wire can rise or fall, and the hoisting wheel 332 can play a supporting role simultaneously to prevent The hoisting rope 333 rubs against the boom 33 , affecting the normal use of the feeding device 3 .

参考附图6,起重轮332的周面上开设有限位槽3321,限位槽3321的截面为弧形,限位槽3321的内设置有防滑纹路3322。Referring to FIG. 6 , a limiting groove 3321 is provided on the peripheral surface of the lifting wheel 332 , the cross section of the limiting groove 3321 is arc-shaped, and an anti-slip texture 3322 is arranged inside the limiting groove 3321 .

通过限位槽3321的设置,对起重绳333的移动进行限位,防止起重绳333从起重轮332表面脱落,从而提高了起重绳333沿起重轮332滑动的稳定性。通过防滑纹路3322的设置,增大了限位槽3321内壁的粗糙程度,当起重绳333沿起重轮332滑动时,可防止起重绳333与起重轮332发生打滑现象,减少了原料提升时的抖动,从而提高了原料提升过程中的稳定性。The movement of the hoisting rope 333 is limited by the setting of the limiting slot 3321 , preventing the hoisting rope 333 from falling off from the surface of the hoisting wheel 332 , thereby improving the stability of the hoisting rope 333 sliding along the hoisting wheel 332 . Through the setting of the anti-slip lines 3322, the roughness of the inner wall of the limiting groove 3321 is increased, and when the hoisting rope 333 slides along the hoisting wheel 332, it can prevent the hoisting rope 333 and the hoisting wheel 332 from slipping, reducing the amount of raw materials. Vibration during lifting, thus improving the stability of the raw material lifting process.

参考附图1与附图2,起重绳333的端部设置有起重钩334,起重钩334的上部开设有悬挂环3341,起重绳333穿过悬挂环3341从而实现对起重钩334的固定。起重钩334可悬挂吊篮,吊篮内可放置粉料等原材料,从而将粉料等原材料运输至梁体4或底模板2处进行施工;也可将钢筋等原料通过钢丝绳捆扎,再通过起重钩334悬挂钢丝绳将钢筋等原料运输至梁体4或底模板2处进行施工。With reference to accompanying drawing 1 and accompanying drawing 2, the end of hoisting rope 333 is provided with hoisting hook 334, and the top of hoisting hook 334 is provided with suspension ring 3341, and hoisting rope 333 passes suspension ring 3341 so as to realize lifting hook. 334 fixed. The hoisting hook 334 can hang the hanging basket, and powder and other raw materials can be placed in the hanging basket, so that the powder and other raw materials can be transported to the beam body 4 or the bottom formwork 2 for construction; the steel bars and other raw materials can also be bundled with wire ropes, and then passed through The lifting hook 334 hangs the steel wire rope and transports the raw materials such as steel bars to the beam body 4 or the bottom template 2 for construction.

通过悬挂环3341的设置,可实现起重钩334与起重绳333的固定,通过起重钩334的设置,可悬挂吊篮或钢丝绳,从而将粉料或钢筋等原料运输至梁体4或底模板2处进行施工,提高了吊篮施工效率。Through the setting of the suspension ring 3341, the fixing of the lifting hook 334 and the lifting rope 333 can be realized. Through the setting of the lifting hook 334, a hanging basket or a steel wire rope can be hung, so that raw materials such as powder or steel bars can be transported to the beam body 4 or The bottom formwork is constructed at 2 places, which improves the construction efficiency of the hanging basket.

参考附图6,起重臂33上还设置有限位结构335,限位结构335包括限位支架3351和设置于限位支架3351上的两个限位轮3352,两个限位轮3352呈上下位置分布,起重绳333穿设于两个限位轮3352间。With reference to accompanying drawing 6, limit structure 335 is also provided on boom 33, and limit structure 335 comprises limit bracket 3351 and is arranged on two limit wheels 3352 on limit bracket 3351, and two limit wheels 3352 are up and down. Position distribution, the hoisting rope 333 is threaded between the two limiting wheels 3352 .

通过两个限位轮3352的设置,对起重绳333加以限位,防止起重绳333受自身重力影响,发生下垂后与起重臂33发生干涉,导致起重绳333磨损严重和原料提升时发生抖动,从而提高了重物提升时的稳定性和上料装置3的可靠性。Through the setting of the two limit wheels 3352, the hoisting rope 333 is limited to prevent the hoisting rope 333 from being affected by its own gravity and interfere with the boom 33 after drooping, resulting in serious wear of the hoisting rope 333 and the lifting of raw materials Occurs when shaking, thereby improving the stability and the reliability of the feeding device 3 when the heavy object is lifted.

参考附图1,如有实际需要,还可在梁体4另一侧设置同样的上料装置3,从而便于增大上料装置3的上料速度和便于从梁体4的两侧同时上料。With reference to accompanying drawing 1, if there is actual need, the same feeding device 3 can also be set on the other side of the beam body 4, so that it is convenient to increase the feeding speed of the feeding device 3 and to facilitate loading from both sides of the beam body 4 simultaneously. material.

在使用时,上料装置3可将原料先运输至梁体4的其他位置,对原料进行初步的处理,如:混凝土的搅拌、钢筋的切割等,再将经过初步处理后的原料沿梁体4运输至挂篮所要施工处;也可直接将无需进行初步处理或在地面已初步处理完毕后的原料运输至挂篮所要施工处,从而节省了中间的运输步骤,提高了挂篮施工的效率。When in use, the feeding device 3 can transport the raw materials to other positions of the beam body 4 first, and perform preliminary processing on the raw materials, such as: mixing of concrete, cutting of steel bars, etc., and then pass the raw materials after preliminary treatment along the beam body 4 Transport to the construction place where the hanging basket is to be constructed; it is also possible to directly transport the raw materials that do not need preliminary treatment or have been preliminarily treated on the ground to the construction place where the hanging basket is to be constructed, thereby saving the intermediate transportation steps and improving the construction efficiency of the hanging basket .

本具体实施例仅仅是对本实用新型的解释,其并不是对本实用新型的限制,本领域技术人员在阅读完本说明书后可以根据需要对本实施例做出没有创造性贡献的修改,但只要在本实用新型的权利要求范围内都受到专利法的保护。This specific embodiment is only an explanation of the utility model, and it is not a limitation of the utility model. After reading this description, those skilled in the art can make modifications to the embodiment without creative contribution according to needs, but as long as it is within the utility model All new claims are protected by patent law.

Claims (10)

1.一种带有上料装置的桥梁挂篮,包括安装在梁体(4)上的主衍架(1)和安装在梁体(4)下部的底模板(2),其特征在于,还包括设置于梁体(4)上部外侧的上料装置(3),所述上料装置(3)包括安装在梁体(4)上部的支撑座(31)、设置于所述支撑座(31)朝向所述主衍架(1)一侧的锚固梁(32)和安装在所述支撑座(31)上部的起重臂(33),所述起重臂(33)通过一支撑板(34)与所述锚固梁(32)滑动连接,所述支撑座(31)可在梁体(4)上沿平行于所述锚固梁(32)的方向进行移动,所述起重臂(33)可悬伸到梁体(4)外。1. A bridge hanging basket with a feeding device, comprising a main truss (1) installed on the beam body (4) and a bottom formwork (2) installed on the lower part of the beam body (4), characterized in that, It also includes a feeding device (3) arranged on the outer side of the upper part of the beam body (4). 31) The anchor beam (32) facing the side of the main truss (1) and the boom (33) installed on the upper part of the support base (31), the boom (33) passing through a support plate (34) is slidingly connected with the anchor beam (32), the support base (31) can move on the beam body (4) in a direction parallel to the anchor beam (32), and the boom ( 33) can be suspended outside the beam body (4). 2.根据权利要求1所述的一种带有上料装置的桥梁挂篮,其特征在于,所述锚固梁(32)包括与梁体(4)表面固定连接的锚固部(321)和设置于所述锚固部(321)顶部的抵接部(322),所述锚固部(321)的内部设置有第一钢筋支架(323),所述第一钢筋支架(323)穿设于梁体(4)内。2. A bridge hanging basket with a feeding device according to claim 1, characterized in that, the anchor beam (32) includes an anchor portion (321) fixedly connected to the surface of the beam body (4) and a set The abutting portion (322) on the top of the anchoring portion (321), the interior of the anchoring portion (321) is provided with a first steel bar bracket (323), and the first steel bar bracket (323) is pierced through the beam body (4) inside. 3.根据权利要求2所述的一种带有上料装置的桥梁挂篮,其特征在于,所述抵接部(322)内设置有第二钢筋支架(324),所述第二钢筋支架(324)穿设于所述锚固部(321)内。3. A bridge hanging basket with a feeding device according to claim 2, characterized in that, a second steel bar bracket (324) is arranged inside the abutting portion (322), and the second steel bar bracket (324) is penetrated in the anchoring part (321). 4.根据权利要求2所述的一种带有上料装置的桥梁挂篮,其特征在于,所述支撑板(34)的一端与所述起重臂(33)固定连接,所述支撑板(34)的另一端的上表面设置有支撑轮(341),所述抵接部(322)的下表面开设有供所述支撑轮(341)滑动的支撑槽(3221)。4. A bridge hanging basket with a feeding device according to claim 2, characterized in that one end of the support plate (34) is fixedly connected to the boom (33), and the support plate A supporting wheel (341) is provided on the upper surface of the other end of (34), and a supporting groove (3221) for the sliding of the supporting wheel (341) is provided on the lower surface of the abutting portion (322). 5.根据权利要求1所述的一种带有上料装置的桥梁挂篮,其特征在于,梁体(4)上设置有滑动导轨(311),所述支撑座(31)设置于所述滑动导轨(311)上,所述支撑座(31)的底部设置有可沿所述滑动导轨(311)滑动的滑轮(312)。5. A bridge hanging basket with a feeding device according to claim 1, characterized in that a sliding guide rail (311) is set on the beam body (4), and the support seat (31) is set on the On the sliding guide rail (311), the bottom of the support seat (31) is provided with a pulley (312) that can slide along the sliding guide rail (311). 6.根据权利要求1所述的一种带有上料装置的桥梁挂篮,其特征在于,所述起重臂(33)上设置有起重绞盘(331),所述起重臂(33)远离所述锚固梁(32)的一端的上部设置有起重轮(332),所述起重绞盘(331)上绕卷有一起重绳(333),并经过起重轮(332)悬挂于梁体(4)外。6. A bridge hanging basket with a feeding device according to claim 1, characterized in that a lifting winch (331) is arranged on the boom (33), and the boom (33) ) is provided with a lifting wheel (332) on the upper part of the end away from the anchor beam (32), and a heavy rope (333) is wound on the lifting winch (331), and is suspended by the lifting wheel (332) Outside the beam body (4). 7.根据权利要求6所述的一种带有上料装置的桥梁挂篮,其特征在于,所述起重轮(332)的周面开设有限位槽(3321)。7. The bridge hanging basket with a feeding device according to claim 6, characterized in that, a limiting groove (3321) is provided on the peripheral surface of the lifting wheel (332). 8.根据权利要求7所述的一种带有上料装置的桥梁挂篮,其特征在于,所述限位槽(3321)的底部设置有防滑纹路(3322)。8. The bridge hanging basket with a feeding device according to claim 7, characterized in that, the bottom of the limiting groove (3321) is provided with anti-skid lines (3322). 9.根据权利要求6所述的一种带有上料装置的桥梁挂篮,其特征在于,所述起重绳(333)的端部设置有起重钩(334),所述起重钩(334)的上部开设有悬挂环(3341),所述起重绳(333)通过所述悬挂环(3341)与所述起重钩(334)连接。9. A bridge hanging basket with a feeding device according to claim 6, characterized in that a lifting hook (334) is provided at the end of the lifting rope (333), and the lifting hook A suspension ring (3341) is provided on the upper part of (334), and the lifting rope (333) is connected to the lifting hook (334) through the suspension ring (3341). 10.根据权利要求6所述的一种带有上料装置的桥梁挂篮,其特征在于,所述起重臂(33)的上部设置有限位结构(335),所述限位结构(335)包括限位支架(3351)和设置于限位支架(3351)内上的两个限位轮(3352),所述起重绳(333)穿设于两个所述限位轮(3352)之间。10. A bridge hanging basket with a feeding device according to claim 6, characterized in that, the upper part of the boom (33) is provided with a limit structure (335), and the limit structure (335 ) includes a limit bracket (3351) and two limit wheels (3352) arranged inside the limit bracket (3351), and the lifting rope (333) is passed through the two limit wheels (3352) between.
CN201820010253.0U 2018-01-03 2018-01-03 A kind of bridge hanging basket with feeding device Expired - Fee Related CN207749428U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820010253.0U CN207749428U (en) 2018-01-03 2018-01-03 A kind of bridge hanging basket with feeding device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820010253.0U CN207749428U (en) 2018-01-03 2018-01-03 A kind of bridge hanging basket with feeding device

Publications (1)

Publication Number Publication Date
CN207749428U true CN207749428U (en) 2018-08-21

Family

ID=63151474

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820010253.0U Expired - Fee Related CN207749428U (en) 2018-01-03 2018-01-03 A kind of bridge hanging basket with feeding device

Country Status (1)

Country Link
CN (1) CN207749428U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646362A (en) * 2020-06-01 2020-09-11 吕友飞 Be applied to bridge construction's quick hoist mechanism
CN114890069A (en) * 2022-06-24 2022-08-12 安徽康新建设工程有限公司 Transfer device capable of conveniently conveying objects to two ends of bridge and conveying method thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111646362A (en) * 2020-06-01 2020-09-11 吕友飞 Be applied to bridge construction's quick hoist mechanism
CN114890069A (en) * 2022-06-24 2022-08-12 安徽康新建设工程有限公司 Transfer device capable of conveniently conveying objects to two ends of bridge and conveying method thereof

Similar Documents

Publication Publication Date Title
CN201809077U (en) Portable curtain wall material lifting device
CN211286601U (en) Chimney construction device applying hydraulic lifting and rollover technology
CN204454402U (en) Detachable winch hanging apparatus
CN207748760U (en) A kind of bridge crane of hoisting large-size drainpipe
CN107500109A (en) A kind of overhead crane with electric hoists
CN105645275B (en) Cable hoist and its construction method
CN207749428U (en) A kind of bridge hanging basket with feeding device
CN216038342U (en) Novel large-scale crane for box type bridge construction
CN108408667A (en) Broken line type girder truss rod piece Quick overturning device and its method for turning
CN104831623B (en) A kind of across pier suspension bracket self-propelling device
CN201183702Y (en) Novel silo hoisting device using movable pulley
CN210117190U (en) Small material hoister
CN103982046A (en) Lifting and installation method of buckling restrained braces
CN208603617U (en) A kind of handling apparatus of vertical shaft construction of concrete lining material
CN110803174A (en) A dual-ropeway ramp transport device and method of using the same
CN216663844U (en) Bridge floor transverse prestress tensioning auxiliary device
CN205527413U (en) Hang cantilever crane
CN218201751U (en) Multipurpose crane for finished tubular piles
CN211806925U (en) Prefab steel tensioning device
CN212356327U (en) Traction device for dismounting and mounting large tower crane
CN210286537U (en) Four-point crane for hoisting bin cover of transport ship
CN211004232U (en) Hanging beam crane with floor function
CN204310700U (en) A kind of indoor hoisting crane
CN220098359U (en) A mobile sports car device for curtain wall hoisting operations
CN217756625U (en) Existing building roof hoist and mount system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180821