CN207726630U - A kind of masonry operation supplies overhead hoist - Google Patents
A kind of masonry operation supplies overhead hoist Download PDFInfo
- Publication number
- CN207726630U CN207726630U CN201721641779.0U CN201721641779U CN207726630U CN 207726630 U CN207726630 U CN 207726630U CN 201721641779 U CN201721641779 U CN 201721641779U CN 207726630 U CN207726630 U CN 207726630U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- steel pipes
- scaffold
- hoist
- overhead hoist
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 41
- 239000010959 steel Substances 0.000 claims abstract description 41
- 239000000463 material Substances 0.000 claims abstract description 30
- 238000007665 sagging Methods 0.000 claims abstract 2
- 238000010276 construction Methods 0.000 claims description 13
- 238000000034 method Methods 0.000 description 4
- 238000009435 building construction Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Landscapes
- Movable Scaffolding (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
技术领域technical field
本实用新型属于建筑施工技术装置,具体为一种砌体作业物料吊运装置。The utility model belongs to a building construction technical device, in particular to a masonry operation material hoisting device.
背景技术Background technique
在建筑施工过程中,砌体作业是施工过程中最为基础的工作之一,层高的提升,使得砌体作业中物料提升成本越加高昂,传统施工中,工人利用灰盆采用人工向上搬运,导致费时费力;搬运加砌块时效率更低。这样就导致在高层的砌体作业时,需要有一种装置可以简易快捷的吊运材料。In the process of building construction, masonry work is one of the most basic tasks in the construction process. The increase in storey height makes the cost of material lifting in masonry work more expensive. In traditional construction, workers use ash basins to carry upwards manually. It is time-consuming and labor-intensive; the efficiency is lower when moving and adding blocks. Like this just causes when high-rise masonry work, needs to have a kind of device that can lift material easily and quickly.
实用新型内容Utility model content
针对现有技术存在的问题,本实用新型为解决现有技术中存在的问题采用的技术方案如下:For the problems existing in the prior art, the technical scheme adopted by the utility model for solving the problems existing in the prior art is as follows:
一种砌体作业物料吊运装置,包括移动脚手架和物料提升架,其特征在于:所述移动脚手架顶部铺设操作平台,所述物料提升架包括与移动脚手架连接的两根竖直钢管,竖直钢管上端中间设置水平短钢管,水平短钢管中部架设有小型卷扬机,卷扬机吊运锁链下垂,锁链底部设置挂钩,用于提拉物料。A material hoisting device for masonry work, including a mobile scaffold and a material lifting frame, characterized in that: an operating platform is laid on the top of the mobile scaffold, and the material lifting frame includes two vertical steel pipes connected with the mobile scaffold, vertical A horizontal short steel pipe is arranged in the middle of the upper end of the steel pipe, and a small hoist is erected in the middle of the short horizontal steel pipe.
所述移动脚手架根据现场施工需求选取一副或多副,脚手架高度按需求选择搭设。One or more pairs of mobile scaffolds are selected according to the construction requirements on site, and the height of the scaffolds is selected and erected according to the requirements.
所述竖直钢管与移动脚手架之间,以及竖直钢管与水平短钢管之间通过十字扣连接固定。Between the vertical steel pipe and the mobile scaffold, and between the vertical steel pipe and the horizontal short steel pipe, the cross buckle is connected and fixed.
所述卷扬机电缆沿钢管铺设,通过线卡与钢管连接,卷扬机控制按钮设置在一侧竖直钢管上,便于施工人员操控。The hoist cable is laid along the steel pipe, and is connected to the steel pipe through a wire clip. The hoist control button is arranged on one side of the vertical steel pipe, which is convenient for construction personnel to control.
本实用新型具有如下优点:The utility model has the following advantages:
本装置在使用时,操作人员可利用按钮在操作平台上面控制物料提升,大大提升工效,简易方便。When the device is in use, the operator can use the buttons to control the lifting of materials on the operating platform, which greatly improves the work efficiency and is simple and convenient.
(1)灵活运用施工现场常见的机械、材料组成,利用钢管及活动脚手架用扣件将其连接组合成骨架,在其顶部安装小型卷扬机组成物料吊运装置,施工人员可在操作平台利用按钮控制物料提升,利用机械代替人工,从而大大提高施工效率,操作方便、简单、实用。(1) Make flexible use of common machinery and materials on the construction site, use steel pipes and movable scaffolding fasteners to connect them into a skeleton, install a small winch on the top to form a material lifting device, and construction personnel can use buttons on the operating platform to control The material is lifted, and the machine is used to replace the labor, thereby greatly improving the construction efficiency, and the operation is convenient, simple and practical.
(2)该装置所采用材料均为施工现场较为常见的材料,就地取材,而且安装拆卸方便,可循环使用,成本较低。(2) The materials used in the device are relatively common materials in the construction site, and the materials are obtained locally, and the installation and disassembly are convenient, recyclable, and the cost is low.
附图说明Description of drawings
图1为吊运装置主视图;Fig. 1 is the front view of lifting device;
图2为吊运装置侧视图;Fig. 2 is a side view of the lifting device;
其中:1-钢管,2-操作平台,3-移动脚手架,4-卷扬机,5-控制按钮,6-电缆。Among them: 1-steel pipe, 2-operating platform, 3-mobile scaffold, 4-winch, 5-control button, 6-cable.
具体实施方式Detailed ways
下面通过实施例,并结合附图,对本实用新型的技术方案作进一步具体的说明,如图1-2所示,一种砌体作业物料吊运装置,包括移动脚手架3和物料提升架,其特征在于:所述移动脚手架3顶部铺设操作平台2,用于工人站立和放置材料,所述物料提升架包括与移动脚手架3连接的两根竖直钢管1,竖直钢管上端中间设置水平短钢管,水平短钢管中部架设有小型卷扬机4,卷扬机吊运锁链下垂,锁链底部设置挂钩,用于提拉物料,The technical solution of the present utility model will be further specifically described through the embodiments below in conjunction with the accompanying drawings. As shown in Figure 1-2, a material hoisting device for masonry work includes a mobile scaffold 3 and a material lifting frame. It is characterized in that an operating platform 2 is laid on the top of the mobile scaffold 3 for workers to stand and place materials, the material lifting frame includes two vertical steel pipes 1 connected to the mobile scaffold 3, and a horizontal short steel pipe is arranged in the middle of the upper end of the vertical steel pipes , the middle part of the horizontal short steel pipe is equipped with a small hoist 4, the hoist hoisting chain is drooping, and the bottom of the chain is provided with a hook for lifting materials.
所述移动脚手架3根据现场施工需求选取一副或多副,脚手架高度按需求选择搭设。One or more sets of mobile scaffolds 3 are selected according to on-site construction requirements, and the height of the scaffolds is selected and erected according to requirements.
所述竖直钢管1与移动脚手架之间,以及竖直钢管与水平短钢管之间通过十字扣连接固定。Between the vertical steel pipe 1 and the mobile scaffold, and between the vertical steel pipe and the horizontal short steel pipe, the connection is fixed by a cross buckle.
所述卷扬机电缆沿钢管铺设,通过线卡与钢管连接,卷扬机控制按钮5设置在一侧竖直钢管上,便于施工人员操控。The cable of the hoist is laid along the steel pipe, and is connected with the steel pipe through a wire clip. The hoist control button 5 is arranged on one side of the vertical steel pipe, which is convenient for construction personnel to control.
具体操作流程如下:The specific operation process is as follows:
1、搭设移动脚手架3,下部场地保证水平坚实,脚手架顶部搭设操作平台 2放置材料,确保架体牢固;1. Set up mobile scaffolding 3, ensure that the lower part of the site is level and firm, and set up an operating platform on the top of the scaffolding 2. Place materials to ensure that the frame is firm;
2、利用十字扣件将两根长钢管1与移动脚手架3连接,顶部用短钢管将两长钢管利用十字扣件连接,确保整体稳定;2. Use the cross fastener to connect the two long steel pipes 1 with the mobile scaffold 3, and use the short steel pipe on the top to connect the two long steel pipes with the cross fastener to ensure the overall stability;
3、将小型物料提升机(卷扬机)固定在顶部短钢管中间,吊运锁链垂直放下,卷扬机电缆利用线卡与钢管固定牢固,保证施工安全,并将按钮固定于一侧钢管上,便于施工人员操控;3. Fix the small material hoist (winch) in the middle of the short steel pipe at the top, and put down the hoisting chain vertically. The cable of the hoist is fixed firmly with the steel pipe by using a wire clip to ensure construction safety, and the button is fixed on one side of the steel pipe, which is convenient for construction personnel. manipulation;
4、物料提升时,将所需提升物料与吊钩连接好后,操作平台上的人员利用按钮控制物料提升。4. When the material is lifted, after the required lifting material is connected with the hook, the personnel on the operating platform use the button to control the material lifting.
本实用新型的保护范围并不限于上述的实施例,显然,本领域的技术人员可以对本实用新型进行各种改动和变形而不脱离本实用新型的范围和精神。倘若这些改动和变形属于本实用新型权利要求及其等同技术的范围内,则本实用新型的意图也包含这些改动和变形在内。The scope of protection of the utility model is not limited to the above-mentioned embodiments. Obviously, those skilled in the art can make various changes and deformations to the utility model without departing from the scope and spirit of the utility model. If these changes and deformations fall within the scope of the claims of the utility model and their equivalent technologies, the intent of the utility model is to include these changes and deformations.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721641779.0U CN207726630U (en) | 2017-11-30 | 2017-11-30 | A kind of masonry operation supplies overhead hoist |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721641779.0U CN207726630U (en) | 2017-11-30 | 2017-11-30 | A kind of masonry operation supplies overhead hoist |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207726630U true CN207726630U (en) | 2018-08-14 |
Family
ID=63089214
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721641779.0U Expired - Fee Related CN207726630U (en) | 2017-11-30 | 2017-11-30 | A kind of masonry operation supplies overhead hoist |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207726630U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114735584A (en) * | 2022-04-12 | 2022-07-12 | 中国二十冶集团有限公司 | Vertical transportation device for cylindrical structure construction |
-
2017
- 2017-11-30 CN CN201721641779.0U patent/CN207726630U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN114735584A (en) * | 2022-04-12 | 2022-07-12 | 中国二十冶集团有限公司 | Vertical transportation device for cylindrical structure construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103603504B (en) | The dynamo-electric heavy caliber standpipe of super highrise building is with the method for main body progress lifting construction | |
| CN205296803U (en) | Elevator automatic lifting operation panel | |
| CN206753012U (en) | A kind of attachment type raise scaffold just hangs hanging apparatus | |
| CN202370234U (en) | Tool type elevator hoistway construction platform | |
| CN203794533U (en) | Light portable mobile lifting equipment | |
| CN204456690U (en) | Multi-functional installation colored steel mobile roof support | |
| CN209583455U (en) | A kind of outdoor handling machine for building | |
| CN204401999U (en) | Climbing scaffold with unloading platform | |
| CN202441045U (en) | Rail-type electric attached lifting scaffold | |
| CN206203763U (en) | Self-driving floor hanging apparatus | |
| CN102677907A (en) | Method for manually installing steel beam at top of silo | |
| CN204983692U (en) | Concrete panel's hoist device | |
| CN206769351U (en) | A kind of regularization hoistway operation platform hoisting frame | |
| CN212406038U (en) | Lower hanging construction platform module of high-altitude large-cantilever steel roof truss | |
| CN209568688U (en) | A kind of elevating construction platform | |
| CN203461720U (en) | Simple cantilever hoisting machine | |
| CN209760761U (en) | A construction platform in the core tube and the construction structure of the elevator core tube | |
| CN207312995U (en) | One kind self-control bridge-collision-avoidance wall form hanging device | |
| CN202000647U (en) | Base device for lifting scaffold in elevator shaft | |
| CN206554485U (en) | Hoisting type operating platform in a kind of vertical shaft | |
| CN215291319U (en) | Multi-point elevator shaft construction lifting platform | |
| CN201896016U (en) | Lifting basket device for storage tank maintenance | |
| CN205153559U (en) | Cast -in -place roof beam prestressing force tensioning equipment | |
| CN209293394U (en) | A kind of simple assembling formula hoistable platform | |
| CN204384733U (en) | Bus plug-in strip Lift-on/Lift-off System |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180814 |