CN207714784U - A kind of equipment installation protection canopy - Google Patents
A kind of equipment installation protection canopy Download PDFInfo
- Publication number
- CN207714784U CN207714784U CN201721270977.0U CN201721270977U CN207714784U CN 207714784 U CN207714784 U CN 207714784U CN 201721270977 U CN201721270977 U CN 201721270977U CN 207714784 U CN207714784 U CN 207714784U
- Authority
- CN
- China
- Prior art keywords
- protection canopy
- sheer pole
- upright bar
- cross tube
- ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 title abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 34
- 239000010959 steel Substances 0.000 claims abstract description 34
- 230000035807 sensation Effects 0.000 claims description 10
- 239000004593 Epoxy Substances 0.000 claims description 5
- 239000011248 coating agent Substances 0.000 claims description 5
- 238000000576 coating method Methods 0.000 claims description 5
- 239000004744 fabric Substances 0.000 claims description 4
- 230000001681 protective effect Effects 0.000 claims description 2
- 230000002787 reinforcement Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 16
- 238000004519 manufacturing process Methods 0.000 abstract description 7
- 230000000694 effects Effects 0.000 description 8
- 239000000463 material Substances 0.000 description 3
- 230000003796 beauty Effects 0.000 description 2
- 238000005260 corrosion Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 238000005299 abrasion Methods 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 239000003513 alkali Substances 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical group [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 239000004035 construction material Substances 0.000 description 1
- 230000007797 corrosion Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000004922 lacquer Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000126 substance Substances 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model is related to construction site technical field of safety protection more particularly to a kind of equipment to install protection canopy.The utility model provides a kind of equipment installation protection canopy, including more upright bars and supports fixed double-layer horizontals to protect ceiling by more upright bars;Double-layer horizontal protection ceiling includes the cross tube and sheer pole with upright bar detachable connection respectively, by vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and is laid with the wooden springboard in the upper surface of ceiling frame body.Equipment provided by the present application installs protection canopy, and simple in structure, reasonable design, by connecting each component in a manner of detachable, assembly and disassembly are easy, reusable to reduce use cost and more more aesthetically pleasing than protection canopy made of common steel tube;It is highly practical to ensure the safety of construction personnel conducive to improving and ensureing the structural stability of entire protection canopy meanwhile by being equipped with double-layer horizontal protection canopy, conducive to production and popularization is standardized.
Description
Technical field
The utility model is related to construction site technical field of safety protection more particularly to a kind of equipment to install protection canopy.
Background technology
Construction site is the production activity of a high risk.Danger source in construction site is more, object
Strike of falling belongs to the extremely incident work safety accident in one of site operation major hazard source and construction site, this is dangerous
Source is existing for the moment, often fatal to the injury of site operation and administrative staff, serious often to cause project
Loss.
Currently, equipment protection canopy in the prior art generally uses steel tube fastener to protect.Common steel tube fastener protection is adopted
It is formed with steel pipe and all kinds of fastener associations, time-consuming, labour-consuming and traditional handicraft technique is coarse, stability is poor, it is difficult to which satisfaction increasingly increases
Strong security protection requirement;It is often of high cost and safety coefficient is not high in addition used steel pipe, fastener amount are big.
Utility model content
(1) technical problems to be solved
The purpose of this utility model is:It is good and reusable to provide one kind simple in structure, assembly and disassembly simplicity, security and stability
Equipment protection canopy is installed, with solve to use in the prior art time-consuming, labour-consuming existing for the protection canopy that is composed of steel tube fastener,
Stability difference and problem of high cost.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides a kind of equipment installation protection canopy, including more upright bars
And fixed double-layer horizontal is supported to protect ceiling by the more upright bars;Double-layer horizontal protection ceiling include respectively with it is described
The cross tube and sheer pole of upright bar detachable connection pass through the detachable company of vertical keel between the cross tube and sheer pole
It connects, to constitute ceiling frame body, and the wooden springboard is laid in the upper surface of the ceiling frame body.
Preferably, the quantity of the upright bar is the six roots of sensation, and upright bar described in the six roots of sensation, which is enclosed, is set as a rectangular frame;The ceiling frame
One end of body is extended outward along the short side direction of the rectangular frame, and positioned at the short side direction of the rectangular frame
The top for the vertical keel being arranged is connect by diagonal brace with the bottom end for the sheer pole being correspondingly arranged.
Preferably, equipment provided by the present application installation protection canopy further includes bracing piece, one end of the bracing piece with it is described
Upright bar connects, and the other end of the bracing piece is connect with the sheer pole being correspondingly arranged.
Preferably, the bottom end of the upright bar is welded with junction steel plate, and the junction steel plate and ground are passed through by foundation bolt
The upright bar is fixed on the ground by face.
Preferably, equipment installation protection canopy provided by the present application further includes the waterproof cloth for being set to the wooden springboard bottom.
Preferably, the cross tube and the sheer pole and the connection type of the upright bar are to be bolted;It is described perpendicular
Connection type to keel and the cross tube and the sheer pole is to be bolted;The diagonal brace and the vertical keel and
The connection type of the sheer pole is to be bolted;The bracing piece and the connection type of the upright bar and the sheer pole are equal
To be bolted.
Preferably, the surface of the upright bar, cross tube, sheer pole, vertical keel, diagonal brace and bracing piece is coated with epoxy
Anti-corrosion enamelled coating.
Preferably, the vertical keel, diagonal brace and bracing piece are all made of steel plate and are made.
Preferably, the spacing between the cross tube and sheer pole is 700mm.
Preferably, the upright bar, cross tube and sheer pole are all made of square steel and are made.
(3) advantageous effect
The above-mentioned technical proposal of the utility model has the following advantages that:
The utility model provides a kind of equipment installation protection canopy, including more upright bars and is supported by more upright bars fixed
Double-layer horizontal protects ceiling;Double-layer horizontal protection ceiling includes the cross tube and sheer pole with upright bar detachable connection respectively,
By vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and in the upper table of ceiling frame body
Face is laid with the wooden springboard.Equipment provided by the present application installs protection canopy, simple in structure, reasonable design, by by each component with can
The mode of detachable connects, and assembly and disassembly are easy, reusable to reduce use cost, and more than protection canopy made of common steel tube
For beauty;Meanwhile by being equipped with double-layer horizontal protection canopy, conducive to improving and ensureing the structural stability of entire protection canopy, with true
The safety of construction personnel is protected, it is highly practical, conducive to production and popularization is standardized.
Description of the drawings
Fig. 1 is a kind of upright figure of the protection canopy of equipment installation protection canopy preferred embodiment of the utility model;
Fig. 2 is a kind of edge-on figure of the protection canopy of equipment installation protection canopy preferred embodiment of the utility model.
In figure:1:Upright bar;2:Sheer pole;3:Cross tube;4:Vertical keel;5:Diagonal brace;6:Bracing piece;7:Junction steel plate.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer
Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched
The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model
Apply example, the every other embodiment that those of ordinary skill in the art are obtained without making creative work, all
Belong to the range of the utility model protection.
As shown in Figure 1 to Figure 2, the utility model embodiment provides a kind of equipment installation protection canopy, including more upright bars 1
And support fixed double-layer horizontal that ceiling, upright bar 1 is protected to be used as support element by more upright bars 1;Specifically, double-layer horizontal protection canopy
Top include respectively with the cross tube 3 and sheer pole 2 of 1 detachable connection of upright bar, wherein cross tube 3 and 2 equal level of sheer pole are set
It sets;By 4 detachable connection of vertical keel between cross tube 3 and sheer pole 2, to constitute ceiling frame body, and in ceiling frame body
Upper surface be laid with the wooden springboard, improve and anti-pound effect.Wherein, the wooden springboard is that one kind walks convenient for worker, transports material above it
A kind of construction material being used in turn temporarily of material and construction operation.
Protection canopy, simple in structure, reasonable design, by by cross tube 3, sheer pole are installed using equipment provided by the present application
2, it being connected in a manner of detachable between upright bar 1 and vertical keel 4, assembly and disassembly are easy, reusable to reduce use cost,
And it is more more aesthetically pleasing than protection canopy made of common steel tube;It is whole conducive to improving and ensureing meanwhile by being equipped with double-layer horizontal protection canopy
The structural stability of a protection canopy, it is highly practical to ensure the safety of construction personnel, conducive to being standardized production and pushing away
Extensively.
It should be noted that:The quantity of upright bar 1 can be four or the six roots of sensation or ten or other quantity, can enclose be set as it is rectangular or
Round or tee type or L-type or U-shaped, can specifically select quantity and the arrangement side of rational upright bar 1 according to actual implementation condition
Formula.
Preferably, the quantity of upright bar 1 is the six roots of sensation, and six roots of sensation upright bar 1, which is enclosed, is set as a rectangular frame;One end edge of ceiling frame body
The short side direction for rectangular frame extends outward, and positioned at the vertical keel 4 of the short side direction of rectangular frame setting
Top is connect by diagonal brace 5 with the bottom end for the sheer pole 2 being correspondingly arranged.Specifically, three upright bars 1 are a row, and six roots of sensation upright bar 1 is enclosed
It is set as rectangular frame structure, it is easy for description, rectangular short side direction is set as front, correspondingly, rectangular length
Edge direction is set as side.Wherein, rectangular frame is stretched out into one end of ceiling frame body, constitutes cantilevered structure to increase protection canopy
Lower space, wherein the length of stretching can be reasonably arranged according to actual implementation condition.To ensure the steady of cantilevered structure
It is qualitative, it is additionally provided with the diagonal brace 5 for connecting vertical keel 4 and sheer pole 2, effectively to strengthen the structure of entire protection canopy
Intensity improves the safety in utilization of entire protection canopy.
It is further preferred that equipment provided by the present application installation protection canopy further includes bracing piece 6, one end of bracing piece 6 with
Upright bar 1 connects, and the other end of bracing piece 6 is connect with the sheer pole 2 being correspondingly arranged.In this way, bracing piece 6 and upright bar 1 and sheer pole 2
The support construction of a triangle is collectively formed, stability is good, and then effectively strengthens the integral strength of equipment installation protection canopy,
To improve working security.Wherein, the quantity of bracing piece 6 can be reasonably arranged according to actual implementation condition.
Preferably, the bottom end of upright bar 1 is welded with junction steel plate 7, and junction steel plate 7 and ground are passed through by foundation bolt, with
Upright bar 1 is fixed on the ground.Specifically, junction steel plate 7 is equipped with screw hole, and foundation bolt passes through the screw hole on junction steel plate 7
Afterwards, it is inserted into ground, so that protection canopy is firmly fixed on the ground by upright bar 1, it is simple in structure, easy to operate and solid
It is good to determine effect.
Particularly, in order to improve the connection effect of upright bar 1 and ground, the bottom end of upright bar 1 is solderable to be connected to polylith junction steel plate
7.In the present embodiment, the quantity of junction steel plate 7 is two pieces, and two pieces of junction steel plates 7 are symmetrical arranged centered on the center of upright bar 1
In the bottom end of upright bar 1, aesthetics is good, and good fixing effect.
It is further preferred that equipment installation protection canopy provided by the present application further includes the waterproof cloth for being set to wooden springboard bottom,
To prevent sleety weather from causing construction inconvenient.Wherein, waterproof cloth can pass through rivet or bonding or other connection types and the wooden springboard
Bottom connection, rational connection type can be specifically selected according to actual implementation condition.
Preferably, cross tube 3 and sheer pole 2 and the connection type of upright bar 1 are to be bolted;Vertical keel 4 and upper cross
The connection type of bar 3 and sheer pole 2 is to be bolted;Diagonal brace 5 and the connection type of vertical keel 4 and sheer pole 2 are spiral shell
It tethers and connects;Bracing piece 6 and the connection type of upright bar 1 and sheer pole 2 are to be bolted.In the present embodiment, each component it
Between connection type be all bolted, the mode being connected by screw bolts is repeated and is utilized, and assembles and disassembles easy, is effectively increased
Whole equipment installs the disassembly efficiency of protection canopy.In addition to this, the mode being connected by screw bolts, simple in structure, production cost is low,
Good economy performance.
It is further preferred that upright bar 1, cross tube 3, sheer pole 2, vertical keel 4, diagonal brace 5 and bracing piece 6 surface apply
It is covered with epoxy anticorrosion enamelled coating.Particularly, in the present embodiment, the surface of junction steel plate 7 is also coated with epoxy anticorrosion enamelled coating, ring
There is oxygen anti-decaying paint fabulous adhesive force resistance to chemical corrosion, preferable alkali resistance and coating is hard to realize anti-invade with effective
Effect is lost, is conducive to improve the service life of equipment installation protection canopy, while being also conducive to beauty.
Preferably, the spacing between cross tube 3 and sheer pole 2 is 700mm.In guarantee protection canopy overall construction intensity and really
Under the premise of protecting protection canopy lower part working space, to improve aesthetics, in the present embodiment, double-layer horizontal protects the height of ceiling
For 700mm.In addition to this, cross tube 3 and the spacing of lower whippletree can be also reasonably arranged according to actual implementation condition.
Preferably, vertical keel 4, diagonal brace 5 and bracing piece 6 are all made of steel plate and are made, intensity height, high temperature resistance, high pressure, low
Temperature, abrasion are conducive to improve the overall construction intensity of equipment installation protection canopy;Upright bar 1, cross tube 3 and sheer pole 2 are all made of square steel
It is made.In the present embodiment, upright bar 1, cross tube 3 and sheer pole 2 are all made of square steel and are made, and square steel has intensity height, manufacture letter
Just, short construction period and the good advantage of assembling, are conducive to improve the overall construction intensity of equipment installation protection canopy, so with into
Improve to one step the safety of protection.
Preferred embodiment:
Equipment provided in this embodiment installs protection canopy, including more upright bars 1 and supports fixed bilayer by more upright bars 1
Horizontal protective ceiling, in material selection, upright bar 1 preferably uses specification for the square steel of 120mm × 120mm × 3mm;Double-layer horizontal
Protection ceiling includes the cross tube 3 and sheer pole 2 with 1 detachable connection of upright bar respectively, wherein cross tube 3 and sheer pole 2 are equal
It is horizontally disposed;By 4 detachable connection of vertical keel between cross tube 3 and sheer pole 2, to constitute ceiling frame body, and in canopy
The upper surface of upper frame body is laid with the wooden springboard.Wherein, cross tube 3 preferably uses specification for 50mm × 50mm × 3mm's with sheer pole 2
Square steel, vertical keel 4 preferably use specification for the steel plate of 300mm × 300mm × 5mm.
It is further preferred that six roots of sensation upright bar 1 is arranged in equipment installation protection canopy provided in this embodiment altogether, six roots of sensation upright bar 1 divides
For two rows, a row three encloses and is set as rectangle structure.Wherein, the height of the protection canopy after assembling is 4m, length 8m, width
For 6.5m;It is all made of and is bolted between each component.Two be arranged along the long side direction (long side) of rectangle structure stand
The spacing of bar 1 is 4m, and the spacing for two upright bars 1 being arranged along the short side direction (width) of rectangle structure is 5m.Every vertical
The bottom of bar 1 is welded with junction steel plate 7, and the expansion bolt of a diameter of 18mm is used in combination to be fixed on ground.Sheer pole 2 is apart from ground
The height of 3.3m is arranged, and height setting of the cross tube 3 apart from ground 4.0m, cross tube 3 and sheer pole 2 connect with 1 bolt of upright bar
It connects.
Particularly, between twice cross bar it is the double-deck hard protection support, top, which is completely spread, prevents pounding the wooden springboard, cross tube 3 and sheer pole 2
Between be arranged vertical keel 4, along rectangle structure long side direction be arranged vertical keel spacing be 2m;Along rectangle
The spacing of the vertical keel 4 of the width direction setting of structure is 2.5m;Further, to improve aesthetics and LP blades effect,
Blue epoxy-based lacquers are brushed on each component.
In conclusion the utility model provides a kind of equipment installation protection canopy, including more upright bars and by more upright bars
Support fixed double-layer horizontal protection ceiling;Double-layer horizontal protection ceiling includes the cross tube with upright bar detachable connection respectively
And sheer pole, by vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and in ceiling frame
The upper surface of body is laid with the wooden springboard.Equipment provided by the present application installs protection canopy, simple in structure, reasonable design, by will be each
Component is connected in a manner of detachable, and assembly and disassembly are easy, reusable to reduce use cost, and than made of common steel tube
Protection canopy is more aesthetically pleasing;Meanwhile by being equipped with double-layer horizontal protection canopy, conducive to improving and ensureing the stable structure of entire protection canopy
Property, it is highly practical to ensure the safety of construction personnel, conducive to production and popularization is standardized.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations;
Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that:
It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc.
With replacement;And these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution
The spirit and scope of scheme.
Claims (9)
1. a kind of equipment installs protection canopy, it is characterised in that:Including more upright bars and by more fixed pair of the upright bar supports
Layer horizontal protective ceiling;Double-layer horizontal protection ceiling include respectively with the cross tube of the upright bar detachable connection and under
Cross bar, by vertical keel detachable connection between the cross tube and sheer pole, to constitute ceiling frame body, and in the canopy
The upper surface of upper frame body is laid with the wooden springboard;The bottom end of the upright bar is welded with junction steel plate, and the company is passed through by foundation bolt
Steel plate and ground are connect, the upright bar is fixed on the ground.
2. equipment according to claim 1 installs protection canopy, it is characterised in that:The quantity of the upright bar is the six roots of sensation, the six roots of sensation
The upright bar, which is enclosed, is set as a rectangular frame;One end of the ceiling frame body is outside along the short side direction of the rectangular frame
Extend, and the top of the vertical keel positioned at the setting of the short side direction of the rectangular frame is set by diagonal brace with corresponding
The bottom end for the sheer pole set connects.
3. equipment according to claim 2 installs protection canopy, it is characterised in that:Further include bracing piece, the bracing piece
One end is connect with the upright bar, and the other end of the bracing piece is connect with the sheer pole being correspondingly arranged.
4. equipment according to claim 1 installs protection canopy, it is characterised in that:Further include being set to the wooden springboard bottom
Waterproof cloth.
5. equipment according to claim 3 installs protection canopy, it is characterised in that:The cross tube and the sheer pole and institute
The connection type for stating upright bar is to be bolted;The connection type of the vertical keel and the cross tube and the sheer pole is equal
To be bolted;The connection type of the diagonal brace and the vertical keel and the sheer pole is to be bolted;The reinforcement
Bar and the connection type of the upright bar and the sheer pole are to be bolted.
6. equipment according to claim 5 installs protection canopy, it is characterised in that:The upright bar, sheer pole, is erected cross tube
It is coated with epoxy anticorrosion enamelled coating to the surface of keel, diagonal brace and bracing piece.
7. equipment according to claim 6 installs protection canopy, it is characterised in that:The vertical keel, diagonal brace and bracing piece
Steel plate is all made of to be made.
8. equipment according to claim 1 installs protection canopy, it is characterised in that:Between between the cross tube and sheer pole
Away from for 700mm.
9. installing protection canopy according to claim 1-8 any one of them equipment, it is characterised in that:The upright bar, cross tube and
Sheer pole is all made of square steel and is made.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721270977.0U CN207714784U (en) | 2017-09-29 | 2017-09-29 | A kind of equipment installation protection canopy |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721270977.0U CN207714784U (en) | 2017-09-29 | 2017-09-29 | A kind of equipment installation protection canopy |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207714784U true CN207714784U (en) | 2018-08-10 |
Family
ID=63064318
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721270977.0U Expired - Fee Related CN207714784U (en) | 2017-09-29 | 2017-09-29 | A kind of equipment installation protection canopy |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207714784U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115949272A (en) * | 2022-12-13 | 2023-04-11 | 国网浙江省电力有限公司舟山供电公司 | GIS guards based on device enclosure routes |
-
2017
- 2017-09-29 CN CN201721270977.0U patent/CN207714784U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115949272A (en) * | 2022-12-13 | 2023-04-11 | 国网浙江省电力有限公司舟山供电公司 | GIS guards based on device enclosure routes |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202370253U (en) | Assembly type single-row vertical rod machining shed for building construction site | |
| CN106499202B (en) | The portable edge protection column of box-type for safety management in construction site | |
| CN103437283B (en) | A kind of hanging basket truss of energy rapid-assembling | |
| CN207714784U (en) | A kind of equipment installation protection canopy | |
| CN204059595U (en) | Detachable building | |
| CN207612014U (en) | A 10kV cable terminal production platform | |
| CN213390122U (en) | Stay cable type tower connecting assembly, tower ground anchor, tower and wind generating set | |
| CN202831591U (en) | Special-shaped truss operation platform capable of hoisting to super high space | |
| CN214740093U (en) | Aluminum alloy fastener group for scaffold | |
| CN214995851U (en) | Climb a high strength triangular supports | |
| CN209874424U (en) | Building assembled safety scaffold | |
| CN222632791U (en) | Corrosion prevention tool for boundary area of helicopter deck | |
| CN212054451U (en) | Ladder is climbed to communication electricity tower | |
| CN208272104U (en) | Novel three tower | |
| CN214696998U (en) | Regularization safety protection structure capable of being lifted in additional section mode | |
| CN214942222U (en) | Climbing frame equipment convenient to install | |
| CN205777849U (en) | A kind of portable shade net support | |
| CN203451999U (en) | Hanging basket stringer with quick assembly function | |
| CN221837912U (en) | A safe lifting platform for building construction | |
| CN219060823U (en) | Operation platform | |
| CN215717687U (en) | Lattice formula light pole | |
| CN221589902U (en) | Steel structure building with stronger wind resistance | |
| CN218334716U (en) | Direct lightning protection device for wind generating set | |
| CN110821135A (en) | Attached lifting scaffold | |
| CN221879601U (en) | Mounting structure of wind power sleeve |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180810 Termination date: 20190929 |