CN207714784U - A kind of equipment installation protection canopy - Google Patents

A kind of equipment installation protection canopy Download PDF

Info

Publication number
CN207714784U
CN207714784U CN201721270977.0U CN201721270977U CN207714784U CN 207714784 U CN207714784 U CN 207714784U CN 201721270977 U CN201721270977 U CN 201721270977U CN 207714784 U CN207714784 U CN 207714784U
Authority
CN
China
Prior art keywords
protection canopy
sheer pole
upright bar
cross tube
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721270977.0U
Other languages
Chinese (zh)
Inventor
王东会
范成刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal Construction Industry Group Co Ltd
Original Assignee
China Coal Construction Industry Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal Construction Industry Group Co Ltd filed Critical China Coal Construction Industry Group Co Ltd
Priority to CN201721270977.0U priority Critical patent/CN207714784U/en
Application granted granted Critical
Publication of CN207714784U publication Critical patent/CN207714784U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model is related to construction site technical field of safety protection more particularly to a kind of equipment to install protection canopy.The utility model provides a kind of equipment installation protection canopy, including more upright bars and supports fixed double-layer horizontals to protect ceiling by more upright bars;Double-layer horizontal protection ceiling includes the cross tube and sheer pole with upright bar detachable connection respectively, by vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and is laid with the wooden springboard in the upper surface of ceiling frame body.Equipment provided by the present application installs protection canopy, and simple in structure, reasonable design, by connecting each component in a manner of detachable, assembly and disassembly are easy, reusable to reduce use cost and more more aesthetically pleasing than protection canopy made of common steel tube;It is highly practical to ensure the safety of construction personnel conducive to improving and ensureing the structural stability of entire protection canopy meanwhile by being equipped with double-layer horizontal protection canopy, conducive to production and popularization is standardized.

Description

A kind of equipment installation protection canopy
Technical field
The utility model is related to construction site technical field of safety protection more particularly to a kind of equipment to install protection canopy.
Background technology
Construction site is the production activity of a high risk.Danger source in construction site is more, object Strike of falling belongs to the extremely incident work safety accident in one of site operation major hazard source and construction site, this is dangerous Source is existing for the moment, often fatal to the injury of site operation and administrative staff, serious often to cause project Loss.
Currently, equipment protection canopy in the prior art generally uses steel tube fastener to protect.Common steel tube fastener protection is adopted It is formed with steel pipe and all kinds of fastener associations, time-consuming, labour-consuming and traditional handicraft technique is coarse, stability is poor, it is difficult to which satisfaction increasingly increases Strong security protection requirement;It is often of high cost and safety coefficient is not high in addition used steel pipe, fastener amount are big.
Utility model content
(1) technical problems to be solved
The purpose of this utility model is:It is good and reusable to provide one kind simple in structure, assembly and disassembly simplicity, security and stability Equipment protection canopy is installed, with solve to use in the prior art time-consuming, labour-consuming existing for the protection canopy that is composed of steel tube fastener, Stability difference and problem of high cost.
(2) technical solution
In order to solve the above-mentioned technical problem, the utility model provides a kind of equipment installation protection canopy, including more upright bars And fixed double-layer horizontal is supported to protect ceiling by the more upright bars;Double-layer horizontal protection ceiling include respectively with it is described The cross tube and sheer pole of upright bar detachable connection pass through the detachable company of vertical keel between the cross tube and sheer pole It connects, to constitute ceiling frame body, and the wooden springboard is laid in the upper surface of the ceiling frame body.
Preferably, the quantity of the upright bar is the six roots of sensation, and upright bar described in the six roots of sensation, which is enclosed, is set as a rectangular frame;The ceiling frame One end of body is extended outward along the short side direction of the rectangular frame, and positioned at the short side direction of the rectangular frame The top for the vertical keel being arranged is connect by diagonal brace with the bottom end for the sheer pole being correspondingly arranged.
Preferably, equipment provided by the present application installation protection canopy further includes bracing piece, one end of the bracing piece with it is described Upright bar connects, and the other end of the bracing piece is connect with the sheer pole being correspondingly arranged.
Preferably, the bottom end of the upright bar is welded with junction steel plate, and the junction steel plate and ground are passed through by foundation bolt The upright bar is fixed on the ground by face.
Preferably, equipment installation protection canopy provided by the present application further includes the waterproof cloth for being set to the wooden springboard bottom.
Preferably, the cross tube and the sheer pole and the connection type of the upright bar are to be bolted;It is described perpendicular Connection type to keel and the cross tube and the sheer pole is to be bolted;The diagonal brace and the vertical keel and The connection type of the sheer pole is to be bolted;The bracing piece and the connection type of the upright bar and the sheer pole are equal To be bolted.
Preferably, the surface of the upright bar, cross tube, sheer pole, vertical keel, diagonal brace and bracing piece is coated with epoxy Anti-corrosion enamelled coating.
Preferably, the vertical keel, diagonal brace and bracing piece are all made of steel plate and are made.
Preferably, the spacing between the cross tube and sheer pole is 700mm.
Preferably, the upright bar, cross tube and sheer pole are all made of square steel and are made.
(3) advantageous effect
The above-mentioned technical proposal of the utility model has the following advantages that:
The utility model provides a kind of equipment installation protection canopy, including more upright bars and is supported by more upright bars fixed Double-layer horizontal protects ceiling;Double-layer horizontal protection ceiling includes the cross tube and sheer pole with upright bar detachable connection respectively, By vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and in the upper table of ceiling frame body Face is laid with the wooden springboard.Equipment provided by the present application installs protection canopy, simple in structure, reasonable design, by by each component with can The mode of detachable connects, and assembly and disassembly are easy, reusable to reduce use cost, and more than protection canopy made of common steel tube For beauty;Meanwhile by being equipped with double-layer horizontal protection canopy, conducive to improving and ensureing the structural stability of entire protection canopy, with true The safety of construction personnel is protected, it is highly practical, conducive to production and popularization is standardized.
Description of the drawings
Fig. 1 is a kind of upright figure of the protection canopy of equipment installation protection canopy preferred embodiment of the utility model;
Fig. 2 is a kind of edge-on figure of the protection canopy of equipment installation protection canopy preferred embodiment of the utility model.
In figure:1:Upright bar;2:Sheer pole;3:Cross tube;4:Vertical keel;5:Diagonal brace;6:Bracing piece;7:Junction steel plate.
Specific implementation mode
It is new below in conjunction with this practicality to keep the purpose, technical scheme and advantage of the utility model embodiment clearer Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described, it is clear that is retouched The embodiment stated is a part of the embodiment of the utility model, instead of all the embodiments.Based on the reality in the utility model Apply example, the every other embodiment that those of ordinary skill in the art are obtained without making creative work, all Belong to the range of the utility model protection.
As shown in Figure 1 to Figure 2, the utility model embodiment provides a kind of equipment installation protection canopy, including more upright bars 1 And support fixed double-layer horizontal that ceiling, upright bar 1 is protected to be used as support element by more upright bars 1;Specifically, double-layer horizontal protection canopy Top include respectively with the cross tube 3 and sheer pole 2 of 1 detachable connection of upright bar, wherein cross tube 3 and 2 equal level of sheer pole are set It sets;By 4 detachable connection of vertical keel between cross tube 3 and sheer pole 2, to constitute ceiling frame body, and in ceiling frame body Upper surface be laid with the wooden springboard, improve and anti-pound effect.Wherein, the wooden springboard is that one kind walks convenient for worker, transports material above it A kind of construction material being used in turn temporarily of material and construction operation.
Protection canopy, simple in structure, reasonable design, by by cross tube 3, sheer pole are installed using equipment provided by the present application 2, it being connected in a manner of detachable between upright bar 1 and vertical keel 4, assembly and disassembly are easy, reusable to reduce use cost, And it is more more aesthetically pleasing than protection canopy made of common steel tube;It is whole conducive to improving and ensureing meanwhile by being equipped with double-layer horizontal protection canopy The structural stability of a protection canopy, it is highly practical to ensure the safety of construction personnel, conducive to being standardized production and pushing away Extensively.
It should be noted that:The quantity of upright bar 1 can be four or the six roots of sensation or ten or other quantity, can enclose be set as it is rectangular or Round or tee type or L-type or U-shaped, can specifically select quantity and the arrangement side of rational upright bar 1 according to actual implementation condition Formula.
Preferably, the quantity of upright bar 1 is the six roots of sensation, and six roots of sensation upright bar 1, which is enclosed, is set as a rectangular frame;One end edge of ceiling frame body The short side direction for rectangular frame extends outward, and positioned at the vertical keel 4 of the short side direction of rectangular frame setting Top is connect by diagonal brace 5 with the bottom end for the sheer pole 2 being correspondingly arranged.Specifically, three upright bars 1 are a row, and six roots of sensation upright bar 1 is enclosed It is set as rectangular frame structure, it is easy for description, rectangular short side direction is set as front, correspondingly, rectangular length Edge direction is set as side.Wherein, rectangular frame is stretched out into one end of ceiling frame body, constitutes cantilevered structure to increase protection canopy Lower space, wherein the length of stretching can be reasonably arranged according to actual implementation condition.To ensure the steady of cantilevered structure It is qualitative, it is additionally provided with the diagonal brace 5 for connecting vertical keel 4 and sheer pole 2, effectively to strengthen the structure of entire protection canopy Intensity improves the safety in utilization of entire protection canopy.
It is further preferred that equipment provided by the present application installation protection canopy further includes bracing piece 6, one end of bracing piece 6 with Upright bar 1 connects, and the other end of bracing piece 6 is connect with the sheer pole 2 being correspondingly arranged.In this way, bracing piece 6 and upright bar 1 and sheer pole 2 The support construction of a triangle is collectively formed, stability is good, and then effectively strengthens the integral strength of equipment installation protection canopy, To improve working security.Wherein, the quantity of bracing piece 6 can be reasonably arranged according to actual implementation condition.
Preferably, the bottom end of upright bar 1 is welded with junction steel plate 7, and junction steel plate 7 and ground are passed through by foundation bolt, with Upright bar 1 is fixed on the ground.Specifically, junction steel plate 7 is equipped with screw hole, and foundation bolt passes through the screw hole on junction steel plate 7 Afterwards, it is inserted into ground, so that protection canopy is firmly fixed on the ground by upright bar 1, it is simple in structure, easy to operate and solid It is good to determine effect.
Particularly, in order to improve the connection effect of upright bar 1 and ground, the bottom end of upright bar 1 is solderable to be connected to polylith junction steel plate 7.In the present embodiment, the quantity of junction steel plate 7 is two pieces, and two pieces of junction steel plates 7 are symmetrical arranged centered on the center of upright bar 1 In the bottom end of upright bar 1, aesthetics is good, and good fixing effect.
It is further preferred that equipment installation protection canopy provided by the present application further includes the waterproof cloth for being set to wooden springboard bottom, To prevent sleety weather from causing construction inconvenient.Wherein, waterproof cloth can pass through rivet or bonding or other connection types and the wooden springboard Bottom connection, rational connection type can be specifically selected according to actual implementation condition.
Preferably, cross tube 3 and sheer pole 2 and the connection type of upright bar 1 are to be bolted;Vertical keel 4 and upper cross The connection type of bar 3 and sheer pole 2 is to be bolted;Diagonal brace 5 and the connection type of vertical keel 4 and sheer pole 2 are spiral shell It tethers and connects;Bracing piece 6 and the connection type of upright bar 1 and sheer pole 2 are to be bolted.In the present embodiment, each component it Between connection type be all bolted, the mode being connected by screw bolts is repeated and is utilized, and assembles and disassembles easy, is effectively increased Whole equipment installs the disassembly efficiency of protection canopy.In addition to this, the mode being connected by screw bolts, simple in structure, production cost is low, Good economy performance.
It is further preferred that upright bar 1, cross tube 3, sheer pole 2, vertical keel 4, diagonal brace 5 and bracing piece 6 surface apply It is covered with epoxy anticorrosion enamelled coating.Particularly, in the present embodiment, the surface of junction steel plate 7 is also coated with epoxy anticorrosion enamelled coating, ring There is oxygen anti-decaying paint fabulous adhesive force resistance to chemical corrosion, preferable alkali resistance and coating is hard to realize anti-invade with effective Effect is lost, is conducive to improve the service life of equipment installation protection canopy, while being also conducive to beauty.
Preferably, the spacing between cross tube 3 and sheer pole 2 is 700mm.In guarantee protection canopy overall construction intensity and really Under the premise of protecting protection canopy lower part working space, to improve aesthetics, in the present embodiment, double-layer horizontal protects the height of ceiling For 700mm.In addition to this, cross tube 3 and the spacing of lower whippletree can be also reasonably arranged according to actual implementation condition.
Preferably, vertical keel 4, diagonal brace 5 and bracing piece 6 are all made of steel plate and are made, intensity height, high temperature resistance, high pressure, low Temperature, abrasion are conducive to improve the overall construction intensity of equipment installation protection canopy;Upright bar 1, cross tube 3 and sheer pole 2 are all made of square steel It is made.In the present embodiment, upright bar 1, cross tube 3 and sheer pole 2 are all made of square steel and are made, and square steel has intensity height, manufacture letter Just, short construction period and the good advantage of assembling, are conducive to improve the overall construction intensity of equipment installation protection canopy, so with into Improve to one step the safety of protection.
Preferred embodiment:
Equipment provided in this embodiment installs protection canopy, including more upright bars 1 and supports fixed bilayer by more upright bars 1 Horizontal protective ceiling, in material selection, upright bar 1 preferably uses specification for the square steel of 120mm × 120mm × 3mm;Double-layer horizontal Protection ceiling includes the cross tube 3 and sheer pole 2 with 1 detachable connection of upright bar respectively, wherein cross tube 3 and sheer pole 2 are equal It is horizontally disposed;By 4 detachable connection of vertical keel between cross tube 3 and sheer pole 2, to constitute ceiling frame body, and in canopy The upper surface of upper frame body is laid with the wooden springboard.Wherein, cross tube 3 preferably uses specification for 50mm × 50mm × 3mm's with sheer pole 2 Square steel, vertical keel 4 preferably use specification for the steel plate of 300mm × 300mm × 5mm.
It is further preferred that six roots of sensation upright bar 1 is arranged in equipment installation protection canopy provided in this embodiment altogether, six roots of sensation upright bar 1 divides For two rows, a row three encloses and is set as rectangle structure.Wherein, the height of the protection canopy after assembling is 4m, length 8m, width For 6.5m;It is all made of and is bolted between each component.Two be arranged along the long side direction (long side) of rectangle structure stand The spacing of bar 1 is 4m, and the spacing for two upright bars 1 being arranged along the short side direction (width) of rectangle structure is 5m.Every vertical The bottom of bar 1 is welded with junction steel plate 7, and the expansion bolt of a diameter of 18mm is used in combination to be fixed on ground.Sheer pole 2 is apart from ground The height of 3.3m is arranged, and height setting of the cross tube 3 apart from ground 4.0m, cross tube 3 and sheer pole 2 connect with 1 bolt of upright bar It connects.
Particularly, between twice cross bar it is the double-deck hard protection support, top, which is completely spread, prevents pounding the wooden springboard, cross tube 3 and sheer pole 2 Between be arranged vertical keel 4, along rectangle structure long side direction be arranged vertical keel spacing be 2m;Along rectangle The spacing of the vertical keel 4 of the width direction setting of structure is 2.5m;Further, to improve aesthetics and LP blades effect, Blue epoxy-based lacquers are brushed on each component.
In conclusion the utility model provides a kind of equipment installation protection canopy, including more upright bars and by more upright bars Support fixed double-layer horizontal protection ceiling;Double-layer horizontal protection ceiling includes the cross tube with upright bar detachable connection respectively And sheer pole, by vertical keel detachable connection between cross tube and sheer pole, to constitute ceiling frame body, and in ceiling frame The upper surface of body is laid with the wooden springboard.Equipment provided by the present application installs protection canopy, simple in structure, reasonable design, by will be each Component is connected in a manner of detachable, and assembly and disassembly are easy, reusable to reduce use cost, and than made of common steel tube Protection canopy is more aesthetically pleasing;Meanwhile by being equipped with double-layer horizontal protection canopy, conducive to improving and ensureing the stable structure of entire protection canopy Property, it is highly practical to ensure the safety of construction personnel, conducive to production and popularization is standardized.
Finally it should be noted that:Above example is only to illustrate the technical solution of the utility model, rather than its limitations; Although the utility model is described in detail with reference to the foregoing embodiments, it will be understood by those of ordinary skill in the art that: It still can be with technical scheme described in the above embodiments is modified, or is carried out to which part technical characteristic etc. With replacement;And these modifications or replacements, various embodiments of the utility model technology that it does not separate the essence of the corresponding technical solution The spirit and scope of scheme.

Claims (9)

1. a kind of equipment installs protection canopy, it is characterised in that:Including more upright bars and by more fixed pair of the upright bar supports Layer horizontal protective ceiling;Double-layer horizontal protection ceiling include respectively with the cross tube of the upright bar detachable connection and under Cross bar, by vertical keel detachable connection between the cross tube and sheer pole, to constitute ceiling frame body, and in the canopy The upper surface of upper frame body is laid with the wooden springboard;The bottom end of the upright bar is welded with junction steel plate, and the company is passed through by foundation bolt Steel plate and ground are connect, the upright bar is fixed on the ground.
2. equipment according to claim 1 installs protection canopy, it is characterised in that:The quantity of the upright bar is the six roots of sensation, the six roots of sensation The upright bar, which is enclosed, is set as a rectangular frame;One end of the ceiling frame body is outside along the short side direction of the rectangular frame Extend, and the top of the vertical keel positioned at the setting of the short side direction of the rectangular frame is set by diagonal brace with corresponding The bottom end for the sheer pole set connects.
3. equipment according to claim 2 installs protection canopy, it is characterised in that:Further include bracing piece, the bracing piece One end is connect with the upright bar, and the other end of the bracing piece is connect with the sheer pole being correspondingly arranged.
4. equipment according to claim 1 installs protection canopy, it is characterised in that:Further include being set to the wooden springboard bottom Waterproof cloth.
5. equipment according to claim 3 installs protection canopy, it is characterised in that:The cross tube and the sheer pole and institute The connection type for stating upright bar is to be bolted;The connection type of the vertical keel and the cross tube and the sheer pole is equal To be bolted;The connection type of the diagonal brace and the vertical keel and the sheer pole is to be bolted;The reinforcement Bar and the connection type of the upright bar and the sheer pole are to be bolted.
6. equipment according to claim 5 installs protection canopy, it is characterised in that:The upright bar, sheer pole, is erected cross tube It is coated with epoxy anticorrosion enamelled coating to the surface of keel, diagonal brace and bracing piece.
7. equipment according to claim 6 installs protection canopy, it is characterised in that:The vertical keel, diagonal brace and bracing piece Steel plate is all made of to be made.
8. equipment according to claim 1 installs protection canopy, it is characterised in that:Between between the cross tube and sheer pole Away from for 700mm.
9. installing protection canopy according to claim 1-8 any one of them equipment, it is characterised in that:The upright bar, cross tube and Sheer pole is all made of square steel and is made.
CN201721270977.0U 2017-09-29 2017-09-29 A kind of equipment installation protection canopy Expired - Fee Related CN207714784U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721270977.0U CN207714784U (en) 2017-09-29 2017-09-29 A kind of equipment installation protection canopy

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721270977.0U CN207714784U (en) 2017-09-29 2017-09-29 A kind of equipment installation protection canopy

Publications (1)

Publication Number Publication Date
CN207714784U true CN207714784U (en) 2018-08-10

Family

ID=63064318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721270977.0U Expired - Fee Related CN207714784U (en) 2017-09-29 2017-09-29 A kind of equipment installation protection canopy

Country Status (1)

Country Link
CN (1) CN207714784U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115949272A (en) * 2022-12-13 2023-04-11 国网浙江省电力有限公司舟山供电公司 GIS guards based on device enclosure routes

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115949272A (en) * 2022-12-13 2023-04-11 国网浙江省电力有限公司舟山供电公司 GIS guards based on device enclosure routes

Similar Documents

Publication Publication Date Title
CN202370253U (en) Assembly type single-row vertical rod machining shed for building construction site
CN106499202B (en) The portable edge protection column of box-type for safety management in construction site
CN103437283B (en) A kind of hanging basket truss of energy rapid-assembling
CN207714784U (en) A kind of equipment installation protection canopy
CN204059595U (en) Detachable building
CN207612014U (en) A 10kV cable terminal production platform
CN213390122U (en) Stay cable type tower connecting assembly, tower ground anchor, tower and wind generating set
CN202831591U (en) Special-shaped truss operation platform capable of hoisting to super high space
CN214740093U (en) Aluminum alloy fastener group for scaffold
CN214995851U (en) Climb a high strength triangular supports
CN209874424U (en) Building assembled safety scaffold
CN222632791U (en) Corrosion prevention tool for boundary area of helicopter deck
CN212054451U (en) Ladder is climbed to communication electricity tower
CN208272104U (en) Novel three tower
CN214696998U (en) Regularization safety protection structure capable of being lifted in additional section mode
CN214942222U (en) Climbing frame equipment convenient to install
CN205777849U (en) A kind of portable shade net support
CN203451999U (en) Hanging basket stringer with quick assembly function
CN221837912U (en) A safe lifting platform for building construction
CN219060823U (en) Operation platform
CN215717687U (en) Lattice formula light pole
CN221589902U (en) Steel structure building with stronger wind resistance
CN218334716U (en) Direct lightning protection device for wind generating set
CN110821135A (en) Attached lifting scaffold
CN221879601U (en) Mounting structure of wind power sleeve

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180810