CN207686279U CN201820009643.6U CN201820009643U CN207686279U CN 207686279 U CN207686279 U CN 207686279U CN 201820009643 U CN201820009643 U CN 201820009643U CN 207686279 U CN207686279 U CN 207686279U
Authority
CN
China
Prior art keywords
slide
slide bar
mould bases
fluid pressure
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820009643.6U
Other languages
Chinese (zh)
Inventor
张文骞
张淏喆
王太明
张洪权
宋俊峰
朱小娥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Hai Ruiqi Hydraulic Technology Co., Ltd
Original Assignee
Zhengzhou Zhongtian Building Energy Saving Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhengzhou Zhongtian Building Energy Saving Co Ltd filed Critical Zhengzhou Zhongtian Building Energy Saving Co Ltd
Priority to CN201820009643.6U priority Critical patent/CN207686279U/en
Application granted granted Critical
Publication of CN207686279U publication Critical patent/CN207686279U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to building fields, more particularly to a kind of fluid pressure type creeping formwork, including be fixed on wall slide bar, can be along the slide and mould bases that slide bar moves, it is provided with track on the slide bar, slide is moved by track along slide bar, location hole is evenly arranged on slide bar, slide is installed on by bolt at location hole;Vertical pivot is provided on mould bases, vertical pivot is set in the through-hole of slide, steel card is equipped on the slide bar, steel card one end is fixedly installed on slide bar, the other end is set in by clamping screw on vertical pivot, hydraulic cylinder is provided on the mould bases, the piston rod of hydraulic cylinder is connect with slide;The mould bases upper end is provided with electric hoist, lower end is equipped with fixed pulley, and the hoisting rope connection wound on the drag-line and fixed pulley of electric hoist, the hoisting rope other end is fixed on slide, which can continuously construct, and highly shortened the construction time, safe.

Description

A kind of fluid pressure type creeping formwork
Technical field
The utility model is related to building field more particularly to a kind of fluid pressure type creeping formworks.
Background technology
Creeping formwork is a kind of self climbing, is not required to the tool-typed formwork of crane for hoisting, and template is not required to dismount when construction, can be whole Body self climbing;Since it is huge tool formula template, can one floor of one-time-concreting walls concrete, metope one can be left The secondary story height that climbs, creeping formwork are suitable for the cast-in-place mixed of on the outside of external wall of high-rise building and elevator shaft inside non-floor barrier Solidifying soil vertical structure construction, especially some external wall elevation complex shapes, using art concrete or not floated finish concrete, Vertical missing controls tighter skyscraper.
But traditional creeping formwork has disadvantages that, the structure type of removing itself is complicated outer, it is most important that was constructing Cheng Zhong results in each creeping formwork and is required for be promoted again when climbing since the hoisting rope other end is fixed on wall The end of rope is re-installed in higher fixed seat, limits speed of application, and due to frequently locking hoisting rope end, deposit In security risk.
Utility model content
The purpose of the utility model is to overcome current creeping formworks during secondary climb, and the end of hoisting rope is again It is installed in higher fixed seat, the slow problem of speed of application, and a kind of fluid pressure type creeping formwork is provided, which optimizes Existing creeping formwork structure, makes template during climbing, and need not leave metope, can continuously construct, highly shortened and apply It is safe between working hour.
The utility model is realized in this way:A kind of fluid pressure type creeping formwork, including be fixed on wall slide bar, can be along cunning The slide and mould bases of bar movement, are provided with track on the slide bar, slide is moved along slide bar by track, is uniformly arranged on slide bar There are location hole, slide to be installed at location hole by bolt;Vertical pivot is provided on mould bases, vertical pivot is set in the through-hole of slide, Steel card is installed on the slide bar, steel card one end is fixedly installed on slide bar, the other end be set in by clamping screw it is perpendicular On axis, hydraulic cylinder is provided on the mould bases, the piston rod of hydraulic cylinder is connect with slide;The mould bases upper end is provided with electric calabash Reed, lower end are equipped with fixed pulley, and the hoisting rope connection wound on the drag-line and fixed pulley of electric hoist, the hoisting rope other end is fixed on On slide.
Preferably, the steel card include two be oppositely arranged, whole arc ring one and arc ring two annular in shape, two arcs Ring one end is connected in the form of revolute, and the clamping screw is articulated with one end of arc ring, and two end of arc ring is provided with out Mouth slot, tight fixed bolt are fixed on by nut in open slot.
Preferably, the open slot is evenly arranged with anti-skid bulge close to the side of bolt.
Preferably, the hydraulic cylinder is installed on the downside of mould bases, and the end of hydraulic cylinder piston rod and the lower end of slide connect.
Preferably, the hoisting rope is steel wire rope.
The utility model has the following advantages that:A kind of fluid pressure type creeping formwork of the utility model, optimizes existing creeping formwork The end of hoisting rope is mounted on slide by structure, drives hoisting rope to shrink by moving sliding base, and then fixed pulley is carried It rises, makes template during climbing, metope need not be left, can greatly save the time of the first floor layer that climbs of creeping formwork, Can continuity construction, highly shortened the construction time, it is safe.
Description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the structural schematic diagram of steel card;
In figure:1- walls, 2- slide bars, 3- slides, 4- mould bases, 5- tracks, 6- vertical pivots, 7- steel cards, 701- arcs ring one, 702- arcs ring two, 703- clamping screws, 704- open slots, 8- hydraulic cylinders, 9- electric hoists, 10- fixed pulleys, 11- hoisting ropes, 12- location holes.
Specific implementation mode
With reference to specific embodiment, the utility model will be further described.
Embodiment 1:A kind of fluid pressure type creeping formwork, as shown in Figs. 1-2, including be fixed on wall slide bar 2, can be along slide bar Mobile slide 3 and mould bases 4, slide bar are mounted on by fixed seat on wall 1, and fixed seat is embedded on wall.The cunning It is provided with track 5 on bar 2, pulley is provided on slide, slide 3 can be moved by pulley, track 5 along slide bar 2, on slide bar Even to be provided with location hole 12, when slide rises to precalculated position along track, slide is installed on by bolt at location hole 12;Mould Vertical pivot 6 is installed, vertical pivot 6 is set in the through-hole of slide 3, can be moved up and down along through-hole wall, is pacified on the slide bar 2 on frame Equipped with steel card 7, steel card one end is fixedly installed on slide bar 2, the other end is set in by clamping screw 703 on vertical pivot 6, when When vertical pivot 6 rises to precalculated position along through-hole, steel card 7 being capable of clamping vertical pivot 6.Steel card is oppositely arranged including two, is whole in ring The arc ring 1 and arc ring 2 702 of shape, arc ring one are connected with arc ring two in the form of revolute, the locking screw Bolt 703 is articulated with the free end of one 701 end of arc ring, and 2 702 free end of arc ring is provided with open slot 704, clamp screw Bolt rotation sticks into open slot, and the end of tight fixed bolt 703 is crossed open slot 704 and fixed by nut, open slot 704 are evenly arranged with anti-skid bulge close to the side of tight fixed bolt end, can increase the friction between nut and open slot 704 Power prevents nut loosening.Hydraulic cylinder 8 is provided on the mould bases 4, hydraulic cylinder is installed on the downside of mould bases, hydraulic cylinder piston rod End is connect with the lower end of slide 3, for driving slide 3 to move up and down;4 upper end of the mould bases is provided with electric hoist 9, lower end peace Equipped with fixed pulley 10, the hoisting rope 11 wound on the drag-line and fixed pulley of electric hoist connects, and 11 other end of hoisting rope is fixed on cunning On seat 3, hoisting rope is steel wire rope, for driving mould bases 4 to move up and down.
Operation principle:
When creeping formwork climbs, first by the bolt looseness at 2 location hole of slide bar, starting hydraulic cylinder 8, slide 3 rises along slide bar 2, When rising to corresponding position, stops hydraulic cylinder 8, the bolt at 2 location hole of slide bar is screwed again, slide 3 is fixed;Then The clamping screw 703 of steel card is opened, electric hoist 9 is started, hoisting rope pulls up, and hoisting rope 11 drives fixed pulley to rise, in turn Through-hole wall of the mould bases 4 on slide moves up, and when moving to precalculated position on mould bases, the clamping screw 703 of steel card is locked again Tightly, mould bases is fixed, completion is once climbed.

Claims (5)

1. a kind of fluid pressure type creeping formwork, it is characterised in that:Including be fixed on wall slide bar, can along the slide that slide bar moves and Mould bases is provided with track on the slide bar, and slide is moved by track along slide bar, and location hole, slide are evenly arranged on slide bar It is installed at location hole by bolt;Vertical pivot is provided on mould bases, vertical pivot is set in the through-hole of slide, is installed on the slide bar There is steel card, steel card one end is fixedly installed on slide bar, the other end is set in by clamping screw on vertical pivot, on the mould bases It is provided with hydraulic cylinder, the piston rod of hydraulic cylinder is connect with slide;The mould bases upper end is provided with electric hoist, lower end is equipped with and determines cunning It takes turns, the hoisting rope connection wound on the drag-line and fixed pulley of electric hoist, the hoisting rope other end is fixed on slide.
2. a kind of fluid pressure type creeping formwork according to claim 1, it is characterised in that:The steel card is oppositely arranged including two, Whole arc ring one and arc ring two annular in shape, two arc ring one end are connected in the form of revolute, the clamping screw hinge It is connected to one end of arc ring, two end of arc ring is provided with open slot, and tight fixed bolt is fixed on by nut in open slot.
3. a kind of fluid pressure type creeping formwork according to claim 2, it is characterised in that:The open slot is equal close to the side of bolt It is even to be provided with anti-skid bulge.
4. a kind of fluid pressure type creeping formwork according to claim 1, it is characterised in that:The hydraulic cylinder is installed on the downside of mould bases, The end of hydraulic cylinder piston rod and the lower end of slide connect.
5. a kind of fluid pressure type creeping formwork according to claim 1, it is characterised in that:The hoisting rope is steel wire rope.
CN201820009643.6U 2018-01-04 2018-01-04 A kind of fluid pressure type creeping formwork Expired - Fee Related CN207686279U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820009643.6U CN207686279U (en) 2018-01-04 2018-01-04 A kind of fluid pressure type creeping formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820009643.6U CN207686279U (en) 2018-01-04 2018-01-04 A kind of fluid pressure type creeping formwork

Publications (1)

Publication Number Publication Date
CN207686279U true CN207686279U (en) 2018-08-03

Family

ID=62990801

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820009643.6U Expired - Fee Related CN207686279U (en) 2018-01-04 2018-01-04 A kind of fluid pressure type creeping formwork

Country Status (1)

Country Link
CN (1) CN207686279U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236630A (en) * 2020-01-12 2020-06-05 武汉瑞锦丰路桥设备股份有限公司 Automatic hydraulic climbing formwork

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111236630A (en) * 2020-01-12 2020-06-05 武汉瑞锦丰路桥设备股份有限公司 Automatic hydraulic climbing formwork

Similar Documents

Publication Publication Date Title
CN103806645A (en) Light intelligent hydraulic formwork climbing device with good wind and fire resistant performance
CN206767425U (en) A kind of integral hoisting device for rapid for ground-connecting-wall steel reinforcement cage
CN109551617A (en) A kind of internal model demoulding structure for precast hollow pier
CN214785829U (en) A safe lifting and fast climbing frame for high-rise building construction
CN206255777U (en) Self-propelled multipurpose is adjustable double lifting point truss straddle truck
CN207686279U (en) A kind of fluid pressure type creeping formwork
CN107815971A (en) High mound is from climbing hydraulic pressure mould system that turns over
CN202926333U (en) Hanging system of whole-circle integral upside down hanging formwork
CN212249184U (en) Electric creeping formwork device for building construction
CN109968501B (en) Prefabricated stand convenient to installation and preparation mould thereof
CN113882281A (en) Hanging basket walking system for bridge cantilever construction and operation method
CN110821151B (en) Self-elevating Climbing Formwork for Transportable Personnel
CN207647168U (en) A kind of construction hydraulic formwork climbing device
CN218434629U (en) Lifting frame for tower type pier construction
CN218492299U (en) Tower type pier construction device
CN217838166U (en) Template overhead hoist is used in hydraulic engineering construction
CN207844841U (en) A kind of great diameter and long pile cages decentralization suspender
CN215516375U (en) Manhole hoisting device for foundation reinforcement cage
CN2703832Y (en) Elevator well creeping formwork hoisting frame
CN214935398U (en) A hoisting device that saves the hoisting bars of a steel cage
CN2256418Y (en) Creeping formwork lifting frame for lift shaft
CN210457252U (en) High heat preservation section bar processing hoist device of flexibility
CN116591460A (en) Formwork integrated sliding system
CN213569151U (en) A fixed device for lifting a tower crane
CN115849267A (en) Tunnel construction operation vehicle set

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20200506

Address after: 110020 1710, No. 58-5, Xinghua South Street, Tiexi District, Shenyang, Liaoning Province

Patentee after: Shenyang Hai Ruiqi Hydraulic Technology Co., Ltd

Address before: 450000, room 2, unit 3, building 1510, China World Trade Center New Territories, Jinshui District, Henan, Zhengzhou

Patentee before: ZHENGZHOU ZHONGTIAN BUILDING ENERGY SAVING Co.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

Termination date: 20210104