CN207644831U - A kind of construction site bar material management piling bin - Google Patents

A kind of construction site bar material management piling bin Download PDF

Info

Publication number
CN207644831U
CN207644831U CN201721805776.6U CN201721805776U CN207644831U CN 207644831 U CN207644831 U CN 207644831U CN 201721805776 U CN201721805776 U CN 201721805776U CN 207644831 U CN207644831 U CN 207644831U
Authority
CN
China
Prior art keywords
montant
bar
leading exterior
cross bar
montants
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721805776.6U
Other languages
Chinese (zh)
Inventor
田开端
李海朝
李海军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721805776.6U priority Critical patent/CN207644831U/en
Application granted granted Critical
Publication of CN207644831U publication Critical patent/CN207644831U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction site bar material management piling bins, including cross bar and cross frame, the leading exterior surface side of the cross bar is installed with No.1 montant, and the leading exterior surface other side of cross bar is installed with No. two montants, the leading exterior surface of the No.1 montant is installed with fixinig plate, and the outer surface of No.1 montant is installed with connecting screw close to the front end of fixinig plate, the leading exterior surface of the cross bar is installed with upper buckle close to the side of No. two montants, and cross bar is installed with brake hoop close to one end outer surface of No. two montants.A kind of construction site bar material management piling bin described in the utility model, equipped with brake bar, band jack, cloth for keeping out rain and double bolt interfaces, reinforcing bar shelf-stability can be improved, it avoids exposing to the weather, reduce the possibility that corrosion occurs for reinforcing bar, and the dismounting of piling bin can be facilitated to move, it is applicable in different operating situation, brings better prospect of the application.

Description

A kind of construction site bar material management piling bin
Technical field
The utility model is related to piling bin field, more particularly to a kind of construction site bar material management piling bin.
Background technology
Piling bin refers to for construction site and facilitating the placement of bar material and a kind of place tool for designing, is applying Work is widely used in field, has the characteristics that easy to operate, placing area is big, it is simple to make;Existing piling bin is deposited when in use In certain drawbacks, a piling bin generally fixed structure can not be moved arbitrarily, can not adapt to the use in different range, Piling bin is generally open type design, and bar material is subjected to exposing to the weather during placement being susceptible to corrosion shape for a long time Condition influences the using effect of reinforcing bar, in addition, the dismounting of piling bin is more troublesome, certain shadow is brought to the use of piling bin It rings, for this purpose, it is proposed that a kind of construction site bar material management piling bin.
Utility model content
The main purpose of the utility model is to provide a kind of construction site bar material management piling bins, can be effective Solve the problems in background technology.
To achieve the above object, the technical solution that the utility model is taken is:
A kind of construction site bar material management piling bin, including cross bar and cross frame, outside the front end of the cross bar Surface side is installed with No.1 montant, and the leading exterior surface other side of cross bar is installed with No. two montants, and described one The leading exterior surface of number montant is installed with fixinig plate, and the outer surface of No.1 montant is fixedly mounted close to the front end of fixinig plate There is connecting screw, the leading exterior surface of the cross bar is installed with upper buckle close to the side of No. two montants, and cross bar is close One end outer surface of No. two montants is installed with brake hoop, and the cross frame is fixedly connected with the inner surface of No.1 montant, And the leading exterior surface of cross frame is movably installed with shaft, the inner surface of the shaft is installed with brake bar, the cross The lower end outer surface of bar is installed with link close to the side of No. two montants, and the outer surface of cross bar is lived close to the lower end of link Dynamic to be equipped with rope, the leading exterior surface of the cross frame is movably installed with fixed block, the No.1 close to the side of shaft The lower end outer surface of montant is installed with pedestal, and the upper end outer surface of pedestal is installed with band jack, the bottom The lower end outer surface side of seat is movably installed with universal wheel, and the leading exterior surface of pedestal is movably installed with cloth for keeping out rain, and described one The inner surface of number montant is installed with double bolt interfaces, and the front inner surfaces of double bolt interfaces is inserted before being installed with Hole, and the side inner surface of double bolt interfaces is installed with side jack, the outer surface of the cloth for keeping out rain are installed with built-in Spool, and the leading exterior surface of cloth for keeping out rain is installed with lower buckle.
Preferably, a side external surface of the universal wheel is equipped with damper brake, and the upper end outer surface of universal wheel is equipped with protection Lid.
Preferably, the connection type between the No.1 montant and the lower end outer surface and pedestal of No. two montants is weldering It connects, and the upper end outer surface of No.1 montant and No. two montants is installed with protection overcoat.
Preferably, the rotation angle of the shaft is zero to 360 deg, and shaft is through the interior table of cross frame Face.
Preferably, the upper end outer surface of the link is equipped with fixing axle, and fixing axle is fixedly connected with cross bar.
Preferably, the quantity of the brake hoop is two groups, and brake hoop Parallel Symmetric described in two groups is placed.
Compared with prior art, the utility model has the advantages that:The construction site bar material management heap Frame is put, using brake bar, reinforcing bar can be avoided, because mobile phenomenon is occurred by outer force effect, to improve reinforcing bar during placement The stability of placement can avoid reinforcing bar from bearing to expose to the weather using cloth for keeping out rain, reduce the possibility that corrosion occurs for reinforcing bar, prolong Its long service life can facilitate the daily dismounting and movement of piling bin using band jack and double bolt interfaces, improve heap The functionality of frame is put, entire piling bin is simple in structure, easy to operate, and the effect used is more preferable relative to traditional approach.
Description of the drawings
Fig. 1 is a kind of overall structure diagram of construction site bar material management piling bin of the utility model.
Fig. 2 is a kind of partial view of construction site bar material management piling bin of the utility model.
Fig. 3 is the inside enlarged view of A in a kind of construction site bar material management piling bin Fig. 2 of the utility model.
Fig. 4 is the partial enlarged view of B in a kind of construction site bar material management piling bin Fig. 2 of the utility model.
In figure:1, cross bar;2, No.1 montant;3, No. two montants;4, fixinig plate;5, connecting screw;6, upper buckle;7, it brakes Ring;8, cross frame;9, shaft;10, brake bar;11, link;12, rope;13, fixed block;14, pedestal;15, band drag hook connects Bar;16, universal wheel;17, cloth for keeping out rain;18, double bolt interfaces;19, front jack;20, side jack;21, built-in spool;22, lower card Button.
Specific implementation mode
To make the technical means, creative features, achievement of purpose, and effectiveness of the utility model be easy to understand, below In conjunction with specific implementation mode, the utility model is expanded on further.
As shown in Figs 1-4, a kind of construction site bar material management piling bin, including cross bar 1 and cross frame 8, it is horizontal The leading exterior surface side of bar 1 is installed with No.1 montant 2, and the leading exterior surface other side of cross bar 1 is installed with two Number montant 3, the leading exterior surface of No.1 montant 2 is installed with fixinig plate 4, and the outer surface of No.1 montant 2 is close to fixinig plate 4 Front end be installed with connecting screw 5, the leading exterior surface of cross bar 1 is installed with upper card close to the side of No. two montants 3 Button 6, and cross bar 1 is installed with brake hoop 7, cross frame 8 and No.1 montant 2 close to one end outer surface of No. two montants 3 Inner surface is fixedly connected, and the leading exterior surface of cross frame 8 is movably installed with shaft 9, and the inner surface of shaft 9 is installed with The lower end outer surface of brake bar 10, cross bar 1 is installed with link 11, and the outer surface of cross bar 1 close to the side of No. two montants 3 It is movably installed with rope 12 close to the lower end of link 11, the leading exterior surface of cross frame 8 is installed close to the side activity of shaft 9 There is fixed block 13, the lower end outer surface of No.1 montant 2 is installed with pedestal 14, and the upper end outer surface of pedestal 14 is fixedly mounted There is band jack 15, the lower end outer surface side of pedestal 14 is movably installed with universal wheel 16, and the leading exterior surface of pedestal 14 It is movably installed with cloth for keeping out rain 17, the inner surface of No.1 montant 2 is installed with double bolt interfaces 18, the front end of double bolt interfaces 18 Inner surface is installed with front jack 19, and the side inner surface of double bolt interfaces 18 is installed with side jack 20, cloth for keeping out rain 17 outer surface is installed with built-in spool 21, and the leading exterior surface of cloth for keeping out rain 17 is installed with lower buckle 22.
One side external surface of universal wheel 16 is equipped with damper brake, and the upper end outer surface of universal wheel 16 is equipped with protective cover;No.1 Connection type between montant 2 and the lower end outer surface and pedestal 14 of No. two montants 3 is welding, and No.1 montant 2 and No. two The upper end outer surface of montant 3 is installed with protection overcoat;The rotation angle of shaft 9 is zero to 360 deg, and shaft 9 Through the inner surface of cross frame 8;The upper end outer surface of link 11 is equipped with fixing axle, and fixing axle is fixedly connected with cross bar 1;System The quantity of rotating ring 7 is two groups, and 7 Parallel Symmetric of brake hoop described in two groups is placed.
It should be noted that the utility model is a kind of construction site bar material management piling bin, it is when in use, horizontal Bar 1, No.1 montant 2 and No. two montants 3, cross frame 8 and pedestal 14 constitute the basic framework of piling bin, pass through No.1 montant Front jack 19 on double bolt interfaces 18 and rear jack 20 inside 2 can carry out the assembling of piling bin, by connecting screw 5 and solid Being used cooperatively between stator 4 can will be fixed between cross bar 1 and No.1 montant 2 and No. two montants 3, and reinforcing bar is put into stacking After frame, reinforcing bar can be fixed by agreeing between the brake bar 10 in shaft 9 and connecting screw 5, prevents it arbitrarily It is mobile, and the rope 12 above link 11 together with reinforced-bar binding, can will avoid its left and right from moving with being used cooperatively for fixed block 13 It is dynamic, secondary fixed effect is played, built-in spool 21 is provided on pedestal 14, passes through the 22 pairs of screenings of upper buckle 6 and lower buckle The fixation of waterproof cloth 17 can cover piling bin, and avoid exposing to the weather the damage caused by reinforcing bar, when piling bin needs to move When, it can be by piling bin in the auxiliary of universal wheel 16 by 7 being attached with external equipment with jack 15 for lower section of brake hoop It is moved under helping, it is more practical.
The advantages of basic principles and main features and the utility model of the utility model have been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the present utility model is not limited to the above embodiments, described in above embodiments and description Only illustrate the principles of the present invention, on the premise of not departing from the spirit and scope of the utility model, the utility model is also It will have various changes and improvements, these various changes and improvements fall within the scope of the claimed invention.The utility model Claimed range is defined by the appending claims and its equivalent thereof.

Claims (6)

1. a kind of construction site bar material management piling bin, including cross bar(1)With cross frame(8), it is characterised in that:Institute State cross bar(1)Leading exterior surface side be installed with No.1 montant(2), and cross bar(1)The leading exterior surface other side it is solid Dingan County is equipped with No. two montants(3), the No.1 montant(2)Leading exterior surface be installed with fixinig plate(4), and No.1 montant (2)Outer surface close to fixinig plate(4)Front end be installed with connecting screw(5), the cross bar(1)Leading exterior surface lean on Nearly No. two montants(3)Side be installed with buckle(6), and cross bar(1)Close to No. two montants(3)One end outer surface it is solid Dingan County is equipped with brake hoop(7), the cross frame(8)With No.1 montant(2)Inner surface be fixedly connected, and cross frame(8) Leading exterior surface be movably installed with shaft(9), the shaft(9)Inner surface be installed with brake bar(10), the cross Bar(1)Lower end outer surface close to No. two montants(3)Side be installed with link(11), and cross bar(1)Outer surface lean on Nearly link(11)Lower end be movably installed with rope(12), the cross frame(8)Leading exterior surface close to shaft(9)One Side is movably installed with fixed block(13), the No.1 montant(2)Lower end outer surface be installed with pedestal(14), and pedestal (14)Upper end outer surface be installed with band jack(15), the pedestal(14)Lower end outer surface side activity installation There is universal wheel(16), and pedestal(14)Leading exterior surface be movably installed with cloth for keeping out rain(17), the No.1 montant(2)Interior table Face is installed with double bolt interfaces(18), double bolt interfaces(18)Front inner surface be installed with front jack (19), and double bolt interfaces(18)Side inner surface be installed with side jack(20), the cloth for keeping out rain(17)Outer surface It is installed with built-in spool(21), and cloth for keeping out rain(17)Leading exterior surface be installed with lower buckle(22).
2. a kind of construction site bar material management piling bin according to claim 1, it is characterised in that:It is described universal Wheel(16)A side external surface be equipped with damper brake, and universal wheel(16)Upper end outer surface be equipped with protective cover.
3. a kind of construction site bar material management piling bin according to claim 1, it is characterised in that:The No.1 Montant(2)With No. two montants(3)Lower end outer surface and pedestal(14)Between connection type be welding, and No.1 montant (2)With No. two montants(3)Upper end outer surface be installed with protection overcoat.
4. a kind of construction site bar material management piling bin according to claim 1, it is characterised in that:The shaft (9)Rotation angle be zero to 360 deg, and shaft(9)Through cross frame(8)Inner surface.
5. a kind of construction site bar material management piling bin according to claim 1, it is characterised in that:The link (11)Upper end outer surface be equipped with fixing axle, fixing axle and cross bar(1)It is fixedly connected.
6. a kind of construction site bar material management piling bin according to claim 1, it is characterised in that:The braking Ring(7)Quantity be two groups, and brake hoop described in two groups(7)Parallel Symmetric is placed.
CN201721805776.6U 2017-12-21 2017-12-21 A kind of construction site bar material management piling bin Expired - Fee Related CN207644831U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721805776.6U CN207644831U (en) 2017-12-21 2017-12-21 A kind of construction site bar material management piling bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721805776.6U CN207644831U (en) 2017-12-21 2017-12-21 A kind of construction site bar material management piling bin

Publications (1)

Publication Number Publication Date
CN207644831U true CN207644831U (en) 2018-07-24

Family

ID=62877892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721805776.6U Expired - Fee Related CN207644831U (en) 2017-12-21 2017-12-21 A kind of construction site bar material management piling bin

Country Status (1)

Country Link
CN (1) CN207644831U (en)

Similar Documents

Publication Publication Date Title
CN206784874U (en) A kind of scaffold of architectural engineering
CN206158925U (en) A burst formula wind power generation tower section of thick bamboo
CN205429037U (en) Load and unload convenient batteries of electric vehicle box
CN207644831U (en) A kind of construction site bar material management piling bin
CN208761393U (en) A kind of novel automatic-lifting type garbage throw-in port
CN206394709U (en) A kind of low clearance vehicle frame of radar antenna carrier vehicle
CN108083105A (en) A kind of connection structure of crane support and walking crossbeam
CN202829165U (en) Portable steel wire rope winding vehicle
CN209071054U (en) One kind having end Dual-layer sealing device suspension insulator
CN206655227U (en) A kind of simple rocker-arm hand pile-driver
CN206202898U (en) Novel reactor extranal packing box
CN207108234U (en) Vertical shaft hanging basket
CN206858031U (en) A kind of preventing wire rope from falling slot device
CN102900023B (en) A kind of combined type working platform
CN209037099U (en) A kind of Bag Making Machine blowing air cylinder lifting device
CN205929045U (en) Concrete mixing transport vechicle overhead pneumatic storage tank
CN207459151U (en) A kind of antenna being easily installed
CN107747664A (en) A kind of quarry tipper pump valve support
CN207749809U (en) A kind of gate-type coating steel pipe scaffold protection structure
CN207750412U (en) Welded type brakes iron heel
CN206488017U (en) A kind of reinforced dismountable machine rack
CN217964008U (en) Lifting type waste gas suction hood
CN207863582U (en) A kind of multifunction combined three tower
CN215888020U (en) Novel rotatable traffic pole
CN208181622U (en) A kind of bearing machining transferring box

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180724

Termination date: 20201221

CF01 Termination of patent right due to non-payment of annual fee