CN207633788U - A kind of jacking construction counter-force holder - Google Patents
A kind of jacking construction counter-force holder Download PDFInfo
- Publication number
- CN207633788U CN207633788U CN201721764530.9U CN201721764530U CN207633788U CN 207633788 U CN207633788 U CN 207633788U CN 201721764530 U CN201721764530 U CN 201721764530U CN 207633788 U CN207633788 U CN 207633788U
- Authority
- CN
- China
- Prior art keywords
- pipe jacking
- jacking
- pipe
- support plate
- hoop
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 20
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 24
- 239000010959 steel Substances 0.000 claims abstract description 24
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型功能公开了一种顶管施工反力支架,包括支撑机构和牵引机构,所述的支撑机构包括顶管抱箍、中心撑板和横向支架,所述的顶管抱箍设置在混凝土顶管的端部,所述的中心撑板位于混凝土顶管的一侧并与混凝土顶管的端面正对,所述的横向支架连接顶管抱箍和中心撑板,横向支架的一端固定在抱箍上,横向支架的另一端固定在中心撑板上;所述的牵引机构包括卷扬机、牵引绳和导向滑轮,所述的导向滑轮设置在中心撑板上,导向滑轮与混凝土顶管的中心正对,所述的牵引绳绕过导向滑轮连接卷扬机和钢结构顶管。本实用新型减少了顶管施工的设备投入成本,而且有效提高了工作效率。
The function of the utility model discloses a reaction support for pipe jacking construction, which includes a support mechanism and a traction mechanism. The support mechanism includes a pipe jacking hoop, a central support plate and a transverse bracket. At the end of the pipe jacking, the central support plate is located on one side of the concrete pipe jacking and is facing the end face of the concrete pipe jacking. The horizontal bracket is connected to the pipe jacking hoop and the central support plate, and one end of the horizontal support is fixed on the On the hoop, the other end of the transverse bracket is fixed on the center support plate; the traction mechanism includes a winch, a traction rope and a guide pulley, and the guide pulley is arranged on the center support plate, and the center of the guide pulley and the concrete jacking On the opposite side, the traction rope goes around the guide pulley to connect the winch and the steel structure jacking pipe. The utility model reduces the equipment input cost of pipe jacking construction, and effectively improves the working efficiency.
Description
技术领域technical field
本实用新型涉及遗址保护建筑工程技术领域,尤其涉及一种顶管施工反力支架。The utility model relates to the technical field of site protection construction engineering, in particular to a counterforce support for pipe jacking construction.
背景技术Background technique
遗址保护展示工程需要在混凝土顶管内设置钢结构顶管,目前现场顶管施工采用液压千斤顶提供很大的反力,将钢结构顶管顶入混凝土顶管内。然而液压千斤顶必须使用泵站和钢绞线作为牵引设备,投入成本高,且由于自身移动速度较慢,进行钢结构顶管施工时,施工效率很低。The site protection exhibition project needs to install steel structure pipe jacking in the concrete jacking pipe. At present, the on-site pipe jacking construction uses hydraulic jacks to provide a large counter force to push the steel structure pipe jacking into the concrete jacking pipe. However, hydraulic jacks must use pump stations and steel strands as traction equipment, which has high investment costs, and due to their slow moving speed, the construction efficiency is very low when performing steel structure pipe jacking.
实用新型内容Utility model content
本实用新型的目的在于提供一种顶管施工反力支架,能够减少顶管施工的设备成本,并且提高工作效率。The purpose of the utility model is to provide a pipe jacking construction reaction force bracket, which can reduce the equipment cost of pipe jacking construction and improve work efficiency.
为实现上述目的,本实用新型采用的技术方案是:For realizing above-mentioned object, the technical scheme that the utility model adopts is:
一种顶管施工反力支架,包括支撑机构和牵引机构,所述的支撑机构包括顶管抱箍、中心撑板和横向支架,所述的顶管抱箍设置在混凝土顶管的端部,所述的中心撑板位于混凝土顶管的一侧并与混凝土顶管的端面正对,所述的横向支架连接顶管抱箍和中心撑板,横向支架的一端固定在抱箍上,横向支架的另一端固定在中心撑板上;所述的牵引机构包括卷扬机、牵引绳和导向滑轮,所述的导向滑轮设置在中心撑板上,导向滑轮与混凝土顶管的中心正对,所述的牵引绳绕过导向滑轮连接卷扬机和钢结构顶管。A pipe jacking construction reaction force support, including a support mechanism and a traction mechanism, the support mechanism includes a pipe jacking hoop, a central support plate and a transverse bracket, and the pipe jacking hoop is arranged at the end of a concrete pipe jacking, The central support plate is located on one side of the concrete jacking pipe and is facing the end face of the concrete pipe jacking. The horizontal support connects the hoop of the pipe jacking and the central support plate. One end of the horizontal support is fixed on the hoop, and the horizontal support the other end of which is fixed on the center support plate; the traction mechanism includes a winch, a traction rope and a guide pulley, the guide pulley is arranged on the center support plate, and the guide pulley is directly opposite to the center of the concrete jacking pipe. The traction rope goes around the guide pulley to connect the winch and the steel structure jacking pipe.
所述的横向支架包括三个底座和三根撑杆,所述的三个底座沿周向均匀设置在顶管抱箍上,所述的三根撑杆的一端分别设置在三个底座上,三根撑杆的另一端共同设置在中心撑板的中部。The transverse support includes three bases and three struts, the three bases are evenly arranged on the hoop of the jacking pipe along the circumferential direction, one end of the three struts is respectively set on the three bases, and the three struts The other ends of the rods are jointly arranged in the middle of the center support plate.
所述的顶管抱箍包括两个半圆形钢板,两个半圆形钢板通过螺栓紧固连接。The pipe jacking hoop includes two semicircular steel plates, and the two semicircular steel plates are fastened and connected by bolts.
所述的牵引绳为钢丝绳。The traction rope is a steel wire rope.
所述的底座和撑杆采用条型钢材制成。The base and the struts are made of strip steel.
本实用新型利用横向支架固定中心撑板,并通过顶管抱箍将横向支架固定在混凝土顶管上,使得反力支架能够循环使用,大大降低了施工成本;本实用新型利用卷扬机作为牵引设备,不仅减少了设备投入成本,而且有效提高了工作效率。The utility model uses the horizontal bracket to fix the central support plate, and fixes the horizontal bracket on the concrete jacking pipe through the jacking hoop, so that the reaction force bracket can be recycled and greatly reduces the construction cost; the utility model uses the hoist as the traction device, Not only reduces equipment input cost, but also effectively improves work efficiency.
更近一步地,本实用新型利用三个底座和三根撑杆使反力支架成为三角锥形,增强了支架结构的稳定性。Further, the utility model utilizes three bases and three struts to make the reaction force bracket into a triangular cone shape, which enhances the stability of the bracket structure.
附图说明Description of drawings
图1为本实用新型的主视图;Fig. 1 is the front view of the utility model;
图2为本实用新型的左视图。Fig. 2 is a left view of the utility model.
具体实施方式Detailed ways
如图1和图2所示,本实用新型所述的一种顶管施工反力支架,包括支撑机构和牵引机构,支撑机构包括顶管抱箍3、中心撑板5和横向支架4,顶管抱箍3由两个10mm厚的半圆形钢板组成,两个半圆形钢板安装在混凝土顶管1的端部,两端通过螺栓11紧固连接。中心撑板5位于混凝土顶管1的一侧并与混凝土顶管1的端面正对,中心撑板5通过横向支架4固定在顶管抱箍3上。本实用新型的横向支架4包括三个底座7和三根撑杆8,三个底座7沿周向均匀焊接在顶管抱箍3上,三根撑杆8的一端分别焊接在三个底座7上,三根撑杆8的另一端共同焊接在中心撑板5的中部,形成三角锥形支架,有效提高反力支架的稳定性。本实用新型的底座7和撑杆8均采用条型钢材制成,材料常见且价格低廉。As shown in Figure 1 and Figure 2, a pipe jacking construction reaction force support described in the utility model includes a support mechanism and a traction mechanism. The pipe hoop 3 is composed of two semicircular steel plates with a thickness of 10mm. The two semicircular steel plates are installed at the end of the concrete jacking pipe 1, and the two ends are fastened and connected by bolts 11. The central support plate 5 is located on one side of the concrete jacking pipe 1 and faces the end face of the concrete jacking pipe 1 , and the central support plate 5 is fixed on the pipe jacking hoop 3 through the transverse bracket 4 . The horizontal bracket 4 of the utility model includes three bases 7 and three struts 8, the three bases 7 are uniformly welded on the hoop 3 of the jacking pipe along the circumferential direction, and one ends of the three struts 8 are respectively welded on the three bases 7, The other ends of the three braces 8 are jointly welded to the middle of the center brace 5 to form a triangular conical bracket, which effectively improves the stability of the counterforce bracket. The base 7 and the strut 8 of the utility model are all made of bar-shaped steel, and the materials are common and cheap.
本实用新型的牵引机构包括卷扬机10、牵引绳9和导向滑轮6,导向滑轮6固定在中心撑板5上,并与混凝土顶管1的中心正对,牵引绳9绕过导向滑轮6连接卷扬机10和钢结构顶管2,本实用新型的牵引绳9采用钢丝绳。本实用新型的工作原理是:混凝土顶管1施工完成后,使其端部漏出遗址区土层0.5m左右,作为顶管抱箍3的固定位置,将顶管抱箍3通过螺栓11箍紧在混凝土顶管1上,则横向支架4连接的中心撑板5正对混凝土顶管1的端面,将导向滑轮6固定在中心撑板5上,使其正对混凝土顶管1的中心,将卷扬机10连接的牵引绳9绕过导向滑轮6连接位于混凝土顶管1另一端的钢结构顶管2,通过卷扬机10的运转将钢结构顶管2逐渐拉入混凝土顶管1内。The traction mechanism of the utility model includes a hoist 10, a traction rope 9 and a guide pulley 6, the guide pulley 6 is fixed on the center support plate 5, and is facing the center of the concrete jacking pipe 1, and the traction rope 9 bypasses the guide pulley 6 to connect the hoist 10 and steel structure jacking pipe 2, traction rope 9 of the present utility model adopts steel wire rope. The working principle of the utility model is: after the construction of the concrete pipe jacking 1 is completed, the end of the pipe is leaked out of the soil layer of the relic area by about 0.5m, and as the fixed position of the pipe jacking hoop 3, the pipe jacking hoop 3 is tightened by bolts 11 On the concrete jacking pipe 1, the central support plate 5 connected by the transverse bracket 4 faces the end face of the concrete jacking pipe 1, and the guide pulley 6 is fixed on the central support plate 5 so that it faces the center of the concrete jacking pipe 1, and the The traction rope 9 connected to the winch 10 bypasses the guide pulley 6 to connect the steel structure jacking pipe 2 at the other end of the concrete jacking pipe 1 , and the steel structure jacking pipe 2 is gradually pulled into the concrete jacking pipe 1 by the operation of the hoist 10 .
本实用新型结构简单,使用方便,利用常见钢材制作反力支架,利用混凝土顶管1支撑反力支架,有效降低了设备、施工成本,通过卷扬机10牵引钢结构顶管2穿入混凝土顶管1,大大提高了施工效率。The utility model has a simple structure and is easy to use. Common steel materials are used to make the counter force bracket, and the concrete jacking pipe 1 is used to support the counter force bracket, which effectively reduces equipment and construction costs. The hoist 10 pulls the steel structure jacking pipe 2 into the concrete jacking pipe 1 , greatly improving the construction efficiency.
Claims (5)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721764530.9U CN207633788U (en) | 2017-12-18 | 2017-12-18 | A kind of jacking construction counter-force holder |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721764530.9U CN207633788U (en) | 2017-12-18 | 2017-12-18 | A kind of jacking construction counter-force holder |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207633788U true CN207633788U (en) | 2018-07-20 |
Family
ID=62863484
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721764530.9U Expired - Fee Related CN207633788U (en) | 2017-12-18 | 2017-12-18 | A kind of jacking construction counter-force holder |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207633788U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115823347A (en) * | 2022-09-30 | 2023-03-21 | 中国化学工程第十四建设有限公司 | Double-channel jacking pipe inner penetrating steel pipe dragging jacking combined construction method for penetrating wide and large highway |
-
2017
- 2017-12-18 CN CN201721764530.9U patent/CN207633788U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN115823347A (en) * | 2022-09-30 | 2023-03-21 | 中国化学工程第十四建设有限公司 | Double-channel jacking pipe inner penetrating steel pipe dragging jacking combined construction method for penetrating wide and large highway |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201923783U (en) | Half mould lifting appliance of tubular pile mould | |
| CN206786135U (en) | A kind of pipeline waterborne and π type compensator hoisting bracket | |
| CN207633788U (en) | A kind of jacking construction counter-force holder | |
| CN204434123U (en) | Tower body in tower crane resistance to deformation | |
| CN204199667U (en) | Detachable builder's jack corner tripod | |
| CN209066848U (en) | A kind of external hanging type hanging basket holder device | |
| CN204717227U (en) | For the pipe supporting device at large diameter pipeline inner lining steel material | |
| CN204661146U (en) | That lifts by crane for auxiliary large-scale component stands up bearing | |
| CN209503897U (en) | Hydraulic steel pipe group is to instrument | |
| CN203808097U (en) | An offshore wind power jacket foundation structure | |
| CN204062157U (en) | A kind of glass fibre reinforced plastics fixing device for tube | |
| CN217620541U (en) | A kind of pipe fitting storage rack for civil engineering | |
| CN206769350U (en) | Outer on large-sized station boiler Steel Structure chooses net scaffold | |
| CN205132926U (en) | Special well word hoist of hydroelectric set tail water ell | |
| CN206109965U (en) | Steel plank road in water and electricity building site | |
| CN104045014A (en) | Pole arraying frame for pole welding | |
| CN212077954U (en) | A Portable Assembled and Turnable Deep Foundation Pit Steel Box Supporting Structure | |
| CN102277957B (en) | Overhaul platform of desulfurizing tower | |
| CN202467221U (en) | Power plant main workshop steel roof truss hoisting lifting device | |
| CN202467234U (en) | Large-scale engineering crack pouring slip casting device | |
| CN205777810U (en) | A kind of steel tower being applicable to high slope | |
| CN208363674U (en) | A kind of dam packaged type high-rise working protective net apparatus | |
| CN207296454U (en) | Edge protection system | |
| CN206417797U (en) | Large diameter pipeline counterpart apparatus | |
| CN206722856U (en) | A kind of construction working platform for vertical shaft grouting behind shaft or drift lining |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180720 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |