CN207609392U - A kind of full-automatic petroleum well workover rod tube operation industrial robot - Google Patents
A kind of full-automatic petroleum well workover rod tube operation industrial robot Download PDFInfo
- Publication number
- CN207609392U CN207609392U CN201721401481.2U CN201721401481U CN207609392U CN 207609392 U CN207609392 U CN 207609392U CN 201721401481 U CN201721401481 U CN 201721401481U CN 207609392 U CN207609392 U CN 207609392U
- Authority
- CN
- China
- Prior art keywords
- rod
- rod tube
- conveying device
- pipe
- mechanical arm
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Manipulator (AREA)
Abstract
本实用新型公开了一种全自动石油修井杆管作业工业机器人,该机器人包括主体杆管处理机构、杆管码垛机构、杆管输送装置、附属液压油管卡瓦、抽油杆卡瓦、杆管在线探伤装置和GPS定位装置;主体杆管处理机构包括主体底盘、导轨装置和机械臂装置;杆管码垛装置设有码垛底座、移动机构和机械手装置;码垛底座上设有用于搁置油管和抽油杆的横担,杆管输送装置包括输送装置一和输送装置二;输送装置一设置在主体底盘的左侧且位于柔性机械手装置的下方,在输送装置一的后侧设置有编码器测长装置,输送装置二位于杆管码垛机构的前端,与输送装置一处于同一直线上实现油管和抽油杆的传输。
The utility model discloses a fully automatic oil workover rod and pipe operation industrial robot. The robot includes a main rod and pipe processing mechanism, a rod and pipe stacking mechanism, a rod and pipe conveying device, an auxiliary hydraulic oil pipe slip, a sucker rod slip, Rod and tube online flaw detection device and GPS positioning device; the main rod and tube processing mechanism includes the main chassis, guide rail device and mechanical arm device; the rod and tube stacking device is equipped with a stacking base, a moving mechanism and a manipulator device; The cross arm of the oil pipe and the sucker rod is put on hold, and the rod and pipe conveying device includes conveying device 1 and conveying device 2; Encoder length measuring device, conveying device 2 is located at the front end of the rod and pipe stacking mechanism, and is on the same straight line as conveying device 1 to realize the transmission of oil pipes and sucker rods.
Description
技术领域technical field
本实用新型涉及石油修井设备智能控制技术领域,具体涉及一种全自动石油修井杆管作业工业机器人。The utility model relates to the technical field of intelligent control of oil well workover equipment, in particular to a fully automatic oil workover rod pipe operation industrial robot.
背景技术Background technique
在油田生产过程中,由于油井或设备故障减产或停产时,或者由于油井工作条件发生变化,需要根据新情况改变生产工艺措施时,必须对油井进行修井作业施工。如自喷井转抽油井、改变抽油泵下入深度、型号或遇到油管漏失、抽油杆断裂等情况时都需要起下油管进行修井作业。这些工作通常需修井机设备来完成。现有技术中原有的井口修井机是每班现场至少要有4-6人组成,其中1人开绞车,井口2人交替操作油管卡瓦及更换油管吊卡并操作液压油管钳,现场油管人工排放1-2人,存在工人劳动强度大,工作环境恶劣,现场安全性差,工作效率低,容易造成环境污染等,技术工人流情况严重。In the process of oil field production, when the production is reduced or stopped due to oil well or equipment failure, or when the working conditions of the oil well change and the production process measures need to be changed according to the new situation, the workover operation must be carried out on the oil well. For example, when changing from a gushing well to a pumping well, changing the running depth and model of the oil well pump, or encountering oil pipe leakage, sucker rod fracture, etc., it is necessary to lift and lower the oil pipe for workover operations. These tasks usually need workover rig equipment to complete. The original wellhead workover rig in the prior art is composed of at least 4-6 people on site per shift, one of whom drives the winch, and two people at the wellhead alternately operate the tubing slips and replace the tubing elevators and operate the hydraulic tubing tongs. Manually discharge 1-2 people, there are labor intensity of workers, harsh working environment, poor site safety, low work efficiency, easy to cause environmental pollution, etc. The flow of skilled workers is serious.
近几年来国内针对这种情况陆续推出了杆管远程控制自动排放系统和半自动的修井机器人,例如申请号为201320473958.3的实用新型专利公开了一种修井油套管输送装置,包括管柱、移动小车、机架主体、下料机构、升降支腿、小车夹紧液缸、小车移动滚筒机构、上料机构、液压管汇、液压站及控制柜总成、折叠机构。所述移动小车安装于机架主体上,移动小车内安装有小车夹紧液缸,下料机构安装在机架主体内侧,小车移动滚筒机构安装于移动小车一边的机架主体内,升降支腿安装于机架主体的两端部,上料机构安装于机架主体的一侧,折叠机构安装于机架主体的一端,液压管汇分别与小车夹紧液缸和液压站及控制柜总成相连接。该文献公开的技术虽然一定程度上降低了现场人工排放油套管的劳动强度,但井口作业人员的数量并没有得到减少。又如申请号为201210370190.7的发明专利文献公开了一种设有油管接送滑道的半自动油管机械手装置,依靠遥控方法实现的开环控制修井作业自动化生产线,但是仍没有从根本上减少工人劳动强度,提高作业效率,井队工人数量配置也没有变化。再如申请号为201410584164.3的发明专利文献公开了一种具有撬装底座和传送装置的修井作业辅机,提高了修井作业自动化程度,但其料库主体只能暂时储存一定数量的油管抽油杆,不具备处理全部抽油杆和油管的能力,且该发明也没有针对抽油杆起下和拆卸的专用设备,没有实现对所有油管和抽油杆的全自动修井作业施工。In recent years, China has successively introduced rod and pipe remote control automatic discharge systems and semi-automatic workover robots in response to this situation. For example, the utility model patent with application number 201320473958.3 discloses a well workover tubing and casing delivery device, including pipe strings, Mobile trolley, frame main body, unloading mechanism, lifting legs, trolley clamping cylinder, trolley moving roller mechanism, feeding mechanism, hydraulic manifold, hydraulic station and control cabinet assembly, folding mechanism. The mobile trolley is installed on the frame main body, the trolley clamping liquid cylinder is installed in the mobile trolley, the unloading mechanism is installed inside the frame main body, the trolley moving roller mechanism is installed in the frame main body on one side of the mobile trolley, and the lifting legs Installed on both ends of the frame body, the feeding mechanism is installed on one side of the frame body, the folding mechanism is installed on one end of the frame body, and the hydraulic manifold is respectively connected with the trolley clamping cylinder, hydraulic station and control cabinet assembly connected. Although the technology disclosed in this document reduces the labor intensity of manually draining the oil casing on site to a certain extent, the number of wellhead operators has not been reduced. Another example is the invention patent document with the application number of 201210370190.7 disclosing a semi-automatic tubing manipulator equipped with a tubing pick-up and delivery slideway, relying on the remote control method to realize the open-loop control workover operation automation production line, but it still does not fundamentally reduce the labor intensity of workers , improve operating efficiency, and the configuration of the number of well crews has not changed. Another example is the invention patent document with application number 201410584164.3, which discloses a workover operation auxiliary machine with a skid-mounted base and a transmission device, which improves the automation of workover operations, but its main body can only temporarily store a certain number of tubing pumps. The oil rod does not have the ability to handle all sucker rods and oil pipes, and the invention does not have special equipment for lifting and dismantling the sucker rods, and does not realize the fully automatic workover operation for all oil pipes and sucker rods.
实用新型内容Utility model content
为了克服现有技术中存在的问题,针对现有技术所存在的缺陷,本实用新型提供了一种适用于全部油管和抽油杆的闭环控制的全自动石油修井杆管作业工业机器人。In order to overcome the problems existing in the prior art and aim at the defects existing in the prior art, the utility model provides a fully automatic oil workover rod and pipe operation industrial robot suitable for closed-loop control of all oil pipes and sucker rods.
为实现上述目的,本实用新型所述的全自动石油修井杆管作业工业机器人包括主体杆管处理机构、杆管码垛机构、杆管输送装置、附属液压油管卡瓦、抽油杆卡瓦、杆管在线探伤装置和GPS定位装置;所述主体杆管处理机构包括主体底盘、导轨装置和机械臂装置;所述主体底盘底部通过液压支腿支撑在地面上,所述导轨装置上安装有液压吊卡和液压杆管钳,导轨装置铰接在主体底盘的前端,所述机械臂装置包括大臂摆动装置和柔性机械手装置,所述大臂摆动装置铰接安装于主体底盘前端的摆动座上,所述柔性机械手装置铰接在大臂摆动装置的顶端,柔性机械手装置可以随大臂摆动装置摆动至完全水平或完全竖直的位置;所述杆管码垛装置设有码垛底座、移动机构和机械手装置;所述码垛底座上设有用于搁置油管和抽油杆的横担,所述移动机构连接在码垛底座的后端可以前后移动,所述机械手装置设置在移动机构上;所述杆管输送装置包括输送装置一和输送装置二;所述输送装置一和输送装置二分别固定在主体杆管处理机构和杆管码垛机构上,所述输送装置一设置在主体底盘的左侧且位于柔性机械手装置的下方,在输送装置一的后侧设置有编码器测长装置,所述输送装置二位于杆管码垛机构的前端,与输送装置一处于同一直线上实现油管和抽油杆的传输,下油管或下抽油杆操作时,所述杆管码垛装置上的机械手装置将油管或抽油杆抓取到输送装置二上,油管或抽油杆由输送装置二经输送装置一输送给主体杆管处理机构并由机械臂装置完成下放;反之,起油管或抽油杆操作时,主体杆管处理机构将从井内起出的油管或抽油杆经输送装置一送出到杆管码垛装置的输送装置二上,杆管码垛装置对起出的杆管进行排列码垛并自动存储到计算机系统。In order to achieve the above purpose, the fully automatic industrial robot for oil workover rod and pipe operation described in the utility model includes a main rod and pipe processing mechanism, a rod and pipe stacking mechanism, a rod and pipe conveying device, an auxiliary hydraulic oil pipe slip, and a sucker rod slip , rod and tube online flaw detection device and GPS positioning device; the main rod and tube processing mechanism includes a main body chassis, a guide rail device and a mechanical arm device; the bottom of the main body chassis is supported on the ground by hydraulic legs, and the guide rail device is equipped with The hydraulic elevator and the hydraulic rod pipe wrench, the guide rail device is hinged at the front end of the main chassis, the mechanical arm device includes a boom swing device and a flexible manipulator device, the boom swing device is hingedly installed on the swing seat at the front end of the main chassis, The flexible manipulator device is hinged on the top of the boom swing device, and the flexible manipulator device can swing with the boom swing device to a completely horizontal or completely vertical position; the rod tube palletizing device is provided with a stacking base, a moving mechanism and Manipulator device; the stacking base is provided with a cross arm for shelving oil pipes and sucker rods, the moving mechanism is connected to the rear end of the stacking base and can move forward and backward, and the manipulator device is arranged on the moving mechanism; The rod and tube conveying device includes conveying device 1 and conveying device 2; the conveying device 1 and conveying device 2 are respectively fixed on the main rod and pipe processing mechanism and the rod and pipe stacking mechanism, and the conveying device 1 is arranged on the left side of the main body chassis And it is located under the flexible manipulator device, and an encoder length measuring device is installed on the rear side of the first conveying device. The second conveying device is located at the front end of the rod and pipe stacking mechanism, and is on the same straight line as the conveying device one to realize oil pipe and oil pumping. Rod transmission, when lowering the oil pipe or the lower sucker rod operation, the manipulator device on the rod stacking device grabs the oil pipe or sucker rod to the second conveying device, and the oil pipe or sucker rod is conveyed by the second conveying device Device 1 is delivered to the main rod and pipe processing mechanism and lowered by the mechanical arm device; on the contrary, when the oil pipe or sucker rod is operated, the main rod and pipe processing mechanism will send the tubing or sucker rod pulled out from the well through the conveying device 1 to On the second conveying device of the rod and tube palletizing device, the rod and tube palletizing device arranges and stacks the lifted rods and tubes and automatically stores them in the computer system.
所述附属液压油管卡瓦安装在井口法兰或防喷器法兰上,所述液压抽油杆卡瓦安装在井口固定的油管接箍上。The auxiliary hydraulic oil pipe slips are installed on the wellhead flange or blowout preventer flange, and the hydraulic sucker rod slips are installed on the fixed oil pipe collar at the wellhead.
所述杆管在线监测探伤装置安装在井口液压油管卡瓦或液压抽油杆卡瓦上部位置,GPS定位装置设在主体杆管处理机构的底部可以实现远程定位。The rod and pipe online monitoring and flaw detection device is installed on the upper part of the wellhead hydraulic oil pipe slip or the hydraulic sucker rod slip, and the GPS positioning device is installed at the bottom of the main rod and pipe processing mechanism to realize remote positioning.
特别的,所述杆管码垛装置上的码垛底座包括码垛底架和立柱,立柱固定在码垛底架后端;所述杆管码垛装置上的移动机构包括固定导架、移动导架和方框形机械手支架,固定导架水平焊接在立柱上,移动导架设置在固定导架下方,移动导架通过齿条传动可沿固定导架前后移动,所述移动导架两边的外侧均设有滑块,所述方框形机械手支架内侧设有滑槽,机械手支架通过滑槽与移动导架外侧的滑块连接,机械手支架在液压缸带动下可沿移动导架上、下移动;所述杆管码垛装置上的机械手装置包括机械手臂和码垛机械手,机械手臂的一端设置有码垛机械手,机械手臂的另一端铰接在机械手支架的两侧下方并可绕铰接轴水平转动,码垛机械手可以将油管或抽油杆输送到输送装置二上。In particular, the palletizing base on the rod and tube palletizing device includes a palletizing chassis and a column, and the column is fixed on the rear end of the palletizing chassis; the moving mechanism on the rod and tube palletizing device includes a fixed guide frame, a moving The guide frame and the square frame-shaped manipulator support, the fixed guide frame is welded on the column horizontally, the movable guide frame is arranged under the fixed guide frame, and the movable guide frame can move forward and backward along the fixed guide frame through rack drive, and the two sides of the mobile guide frame There are sliders on the outside, and a chute is provided on the inside of the box-shaped manipulator bracket. The manipulator bracket is connected with the slider on the outside of the moving guide frame through the chute. The manipulator bracket can go up and down along the moving guide frame under the drive of the hydraulic cylinder. Move; the manipulator device on the rod tube stacking device includes a manipulator and a stacking manipulator, one end of the manipulator is provided with a manipulator for stacking, and the other end of the manipulator is hinged below the two sides of the manipulator bracket and can be horizontally wound around the hinge axis Rotating, the stacking manipulator can transport the oil pipe or sucker rod to the second conveying device.
特别的,所述主体杆管处理机构上的导轨装置包括导正导轨、液压吊卡、液压杆管钳,所述液压吊卡和液压杆管钳设置在导正导轨上,所述导正导轨由上导轨、下导轨和折叠机构三部分折叠而成,所述上导轨和下导轨之间通过折叠机构连接,上导轨在液压缸二的驱动下通过折叠机构可折叠180°,所述导正导轨底部铰接在导轨底座上,导轨底座固定在主体底盘上,所述导正导轨在液压缸一的驱动下可摆动90°。In particular, the guide rail device on the main rod pipe processing mechanism includes a guide rail, a hydraulic elevator, and a hydraulic rod pipe wrench. The hydraulic elevator and hydraulic rod pipe wrench are arranged on the guide rail, and the guide rail It is composed of three parts: the upper guide rail, the lower guide rail and the folding mechanism. The upper guide rail and the lower guide rail are connected by the folding mechanism. The upper guide rail can be folded by 180° through the folding mechanism driven by the hydraulic cylinder two. The bottom of the guide rail is hinged on the guide rail base, and the guide rail base is fixed on the chassis of the main body. The guide rail can swing 90° under the drive of hydraulic cylinder one.
特别的,所述大臂摆动装置包括机械臂、摆座、摆动油缸和锁紧油缸,所述摆座固定在主体底盘上,所述机械臂铰接在摆座上并由摆动油缸驱动绕摆座旋转;所述柔性机械手装置通过摆轴与机械臂连接。In particular, the boom swing device includes a mechanical arm, a swing base, a swing cylinder and a locking cylinder, the swing base is fixed on the chassis of the main body, the mechanical arm is hinged on the swing base and driven by the swing cylinder to rotate around the swing base. Rotation; the flexible manipulator device is connected with the mechanical arm through the pendulum shaft.
特别的,所述输送装置一和输送装置二均包括固定导轨,所述固定导轨上方设有多组输送辊。In particular, the first conveying device and the second conveying device both include fixed guide rails, and multiple sets of conveying rollers are arranged above the fixed guide rails.
特别的,所述的杆管在线探伤装置固定安装在附属液压油管卡瓦上或抽油杆卡瓦,杆管在线探伤装置采集信号自动输入到后台计算机管理系统。In particular, the online rod and pipe flaw detection device is fixedly installed on the attached hydraulic oil pipe slips or sucker rod slips, and the signals collected by the rod and pipe online flaw detection device are automatically input to the background computer management system.
特别的,GPS定位装置设置在主体杆管处理机构的底部,能够实现全自动石油修井杆管作业工业机器人的远程定位和控制。In particular, the GPS positioning device is set at the bottom of the main rod and pipe processing mechanism, which can realize the remote positioning and control of the industrial robot for fully automatic oil well workover rod and pipe operations.
特别的,所述的测长装置的端部设置有杆管身份识别装置,通过在抽油杆或油管接箍处预留识别标识,能够有效地在线识别不同抽油杆或油管的身份并摆放到不同位置,并实时输入到后台计算机系统,建立油井杆管全生命周期管理数据库。In particular, the end of the length measuring device is provided with a rod and tube identification device. By reserving identification marks at the sucker rod or tubing couplings, the identities of different sucker rods or tubing can be effectively identified online and rotated. Put them in different locations and input them into the background computer system in real time to establish a life cycle management database for oil well rods and tubes.
本实用新型具有如下优点:本实用新型所述的全自动石油修井杆管作业工业机器人与现有技术相比,自动化程度高、全闭环控制且控制监控功能齐全,配合修井机绞车的上、下动作可以实现井口油管和抽油杆的全自动起、下操作和杆管使用状态在线监测建立数据库工作,彻底克服了修井作业人员劳动强度大、井口安全性能差、生产效率低、能耗高、操作性差等缺陷,有利于建立油井杆管的全生命周期管理,同时将井口4-5人的传统体力操作型模式转为1人的辅助看管型操作模式,实现生产过程的自动化、智能化,实现了设备的物联网远程监控。The utility model has the following advantages: compared with the prior art, the full-automatic petroleum workover rod and pipe operation industrial robot described in the utility model has a high degree of automation, full closed-loop control, and complete control and monitoring functions. , down action can realize the fully automatic lifting and lowering operation of the wellhead tubing and sucker rod and the online monitoring of rod and pipe use status to establish a database, which completely overcomes the heavy labor intensity of workover operators, poor wellhead safety performance, low production efficiency, and energy efficiency. High energy consumption, poor operability and other defects are conducive to the establishment of the full life cycle management of oil well rods and pipes. At the same time, the traditional physical operation mode of 4-5 people at the wellhead is transformed into an auxiliary guarding operation mode of 1 person to realize the automation of the production process. Intelligent, realize the remote monitoring of the Internet of things of the equipment.
附图说明Description of drawings
图1为本实用新型的全自动石油修井杆管作业工业机器人的总体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the fully automatic oil well workover rod and pipe operation industrial robot of the present utility model.
图2为本实用新型的主体杆管处理机构的结构示意图;Fig. 2 is a structural schematic diagram of the main body rod tube processing mechanism of the present invention;
图3为本实用新型的杆管码垛机构的总体结构示意图;3 is a schematic diagram of the overall structure of the rod tube stacking mechanism of the present invention;
图4为本实用新型的杆管码垛机构的结构示意主视图;Fig. 4 is a schematic front view of the structure of the rod and tube stacking mechanism of the present invention;
图5为本实用新型的导轨装置的结构示意图;Fig. 5 is the structural representation of the guide rail device of the present utility model;
图6为本实用新型的机械臂装置的结构示意图;Fig. 6 is the structural representation of the mechanical arm device of the present utility model;
图7为本实用新型的输送装置二的结构示意图。Fig. 7 is a structural schematic diagram of the second conveying device of the present invention.
图8为本实用新型的附属液压油管卡瓦和抽油杆卡瓦的结构示意图。Fig. 8 is a structural schematic diagram of the auxiliary hydraulic oil pipe slips and the sucker rod slips of the present invention.
图中:I主体杆管处理机构、II杆管码垛机构、III杆管输送装置、液压油管卡瓦IV、抽油杆卡瓦V、1主体底盘、2导轨装置、3机械臂装置、4输送装置一、5液压吊卡、6液压杆管钳、7大臂摆动装置、8柔性机械手装置、9码垛底座、10移动机构、11机械手装置、12输送装置二、13油管和抽油杆、14横担、15底架、16立柱、17固定导架、18移动导架、19机械手支架、20机械手臂、21码垛机械手、22导正导轨、23液压吊卡、24液压杆管钳、25导轨底座、26机械臂、27摆座、28摆动油缸、29锁紧油缸、30固定导轨、31输送辊、32链条。In the figure: I main body rod tube processing mechanism, II rod tube stacking mechanism, III rod tube conveying device, hydraulic oil pipe slip IV, sucker rod slip V, 1 main body chassis, 2 guide rail device, 3 mechanical arm device, 4 Conveying device 1, 5 hydraulic elevators, 6 hydraulic rod pipe tongs, 7 arm swing device, 8 flexible manipulator device, 9 stacking base, 10 moving mechanism, 11 manipulator device, 12 conveying device 2, 13 oil pipe and sucker rod . , 25 guide rail base, 26 mechanical arm, 27 swing seat, 28 swing cylinder, 29 lock cylinder, 30 fixed guide rail, 31 conveying roller, 32 chain.
具体实施方式Detailed ways
以下实施例用于说明本实用新型,但不用来限制本实用新型的范围。The following examples are used to illustrate the utility model, but not to limit the scope of the utility model.
图1为本实用新型的全自动石油修井杆管作业工业机器人的总体结构示意图。Fig. 1 is a schematic diagram of the overall structure of the fully automatic oil well workover rod and pipe operation industrial robot of the present utility model.
本实用新型所述的全自动石油修井杆管作业工业机器人包括主体杆管处理机构I、杆管码垛机构II、杆管输送装置III、附属油管液压卡瓦IV、抽油杆卡瓦V、在线监测装置VI和GPS定位装置等,每个部分均由若干个功能模块组成,每个模块采用各种机构、液压、电气等单独控制;杆管输送装置III包括输送装置一4和输送装置二12,输送装置一4和输送装置二12分别设置在主体杆管处理机构I和杆管码垛机构II上,油管和抽油杆13通过输送装置一4和输送装置二12实现由杆管码垛机构II传送给主体杆管处理机构I,或由主体杆管处理机构I传送给杆管码垛机构II。The fully automatic oil workover rod and pipe operation industrial robot described in the utility model includes a main rod and pipe processing mechanism I, a rod and pipe stacking mechanism II, a rod and pipe conveying device III, an auxiliary oil pipe hydraulic slip IV, and a sucker rod slip V , online monitoring device VI and GPS positioning device, etc., each part is composed of several functional modules, and each module is individually controlled by various mechanisms, hydraulic pressure, and electricity; Two 12, conveying device one 4 and conveying device two 12 are respectively arranged on the main rod tube processing mechanism I and the rod tube stacking mechanism II, the oil pipe and the sucker rod 13 are realized by the conveying device one 4 and the two conveying device 12 The palletizing mechanism II is sent to the main body rod tube processing mechanism I, or the main body rod tube processing mechanism I is sent to the rod tube palletizing mechanism II.
图2所示为本实用新型的主体杆管处理机构的结构示意图。FIG. 2 is a schematic structural view of the main rod tube processing mechanism of the present invention.
所述主体杆管处理机构I包括主体底盘1、导轨装置2和机械臂装置3,所述主体底盘1底部通过液压支腿支撑在地面上,所述导轨装置2上安装有液压吊卡5和液压杆管钳6,所述导轨装置2铰接在主体底盘1的前端;所述机械臂装置3包括大臂摆动装置7和柔性机械手装置8,所述大臂摆动装置7铰接安装于主体底盘1前端的摆动座上,所述柔性机械手装置8铰接在大臂摆动装置7的顶端,柔性机械手装置8可随大臂摆动装置7摆动至完全水平或完全竖直的位置;所述输送装置一4设置在主体底盘1的左侧且位于柔性机械手装置8的下方,在输送装置一4的后侧设置有编码器测长装置。The main rod tube processing mechanism 1 includes a main body chassis 1, a guide rail device 2 and a mechanical arm device 3, the bottom of the main body chassis 1 is supported on the ground by hydraulic legs, and a hydraulic elevator 5 and a hydraulic elevator are installed on the guide rail device 2. Hydraulic rod pipe wrench 6, the guide rail device 2 is hinged on the front end of the main chassis 1; the mechanical arm device 3 includes a boom swing device 7 and a flexible manipulator device 8, and the boom swing device 7 is hingedly installed on the main chassis 1 On the swing seat at the front end, the flexible manipulator device 8 is hinged on the top of the boom swing device 7, and the flexible manipulator device 8 can swing with the boom swing device 7 to a completely horizontal or completely vertical position; It is arranged on the left side of the main body chassis 1 and below the flexible manipulator device 8 , and an encoder length measuring device is arranged on the rear side of the first conveying device 4 .
所述主体杆管处理机构I的主体底盘1用于支撑整个主体部分,其它的主体部分模块均安装在主体底盘1上,凭借液压支腿的伸缩功能可以把整个主体部分升高到工程运输车底盘上面,方便运输;井场安装时,驱动液压支腿伸缩的液压缸,可以调整液压支腿的展开位置。可根据作业现场的情况调整驱动液压缸位置并调整展开,根据井口高度可以调整液压支腿的相对高度,实现主体与井口的对接,主体杆管处理机构I液压支腿具有收缩范围广(收缩后体积小,展开面积可调),运输方便,场地实用性强等特点。The main body chassis 1 of the main rod pipe processing mechanism 1 is used to support the whole main body, and other main body modules are all installed on the main body chassis 1, and the whole main body can be raised to the engineering transport vehicle by virtue of the telescopic function of the hydraulic support legs. The top of the chassis is convenient for transportation; when the well site is installed, the hydraulic cylinder that drives the hydraulic outriggers to expand and extend can adjust the expansion position of the hydraulic outriggers. The position of the driving hydraulic cylinder can be adjusted and the deployment can be adjusted according to the situation on the job site. The relative height of the hydraulic outriggers can be adjusted according to the height of the wellhead to realize the docking between the main body and the wellhead. Small size, adjustable expansion area), convenient transportation, and strong site practicability.
图3所示为本实用新型的杆管码垛机构的总体结构示意图。FIG. 3 is a schematic diagram of the overall structure of the rod and tube palletizing mechanism of the present invention.
图4所示为本实用新型的杆管码垛机构的结构示意主视图。Figure 4 is a schematic front view of the structure of the rod and tube palletizing mechanism of the present invention.
所述杆管码垛装置II设有码垛底座9、移动机构10和机械手装置11,码垛底座9上方设有用于搁置油管和抽油杆13的横担14,移动机构10固定在码垛底座9的后端且可以前后移动,机械手装置11设置在移动机构10上,输送装置二12设置在码垛底座9的前端。The rod and tube stacking device II is provided with a stacking base 9, a moving mechanism 10 and a manipulator device 11, and a cross arm 14 for placing oil pipes and sucker rods 13 is arranged above the stacking base 9, and the moving mechanism 10 is fixed on the stacking base 9. The rear end of the base 9 can move back and forth, the manipulator device 11 is arranged on the moving mechanism 10, and the conveying device two 12 is arranged on the front end of the palletizing base 9.
所述输送装置二12与输送装置一4处于同一直线上实现油管和抽油杆13的传输;机械手装置11将油管和抽油杆13送到输送装置二12上,油管和抽油杆13由输送装置二12经输送装置一4输送给主体杆管处理机构I并完成下放;反之,主体杆管处理机构I将从井内起出的油管和抽油杆13经输送装置一4送出到杆管码垛装置II的输送装置二12上,杆管码垛装置II对接受的油管和抽油杆13进行排列码垛并将信息自动存储到后台计算机系统。The delivery device two 12 and the delivery device one 4 are on the same straight line to realize the transmission of the oil pipe and the sucker rod 13; Conveying device two 12 is conveyed to the main rod and pipe processing mechanism I through the conveying device one 4 and completes the lowering; otherwise, the main rod and pipe processing mechanism I sends the oil pipe and sucker rod 13 taken out from the well to the rod pipe through the conveying device one 4 On the conveying device 2 12 of the palletizing device II, the rod and pipe palletizing device II arranges and palletizes the accepted oil pipes and sucker rods 13 and automatically stores the information in the background computer system.
特别的,所述杆管码垛装置II上的码垛底座9包括码垛底架15和立柱16,立柱16固定在码垛底架15后端;所述杆管码垛装置II上的移动机构10包括固定导架17、移动导架18和方框形的机械手支架19,固定导架17水平焊接在立柱16上,移动导架18设置在固定导架17下方,移动导架18通过齿条传动可沿固定导架17前后移动,所述移动导架18两外侧均设有滑块,所述方框形机械手支架19内侧设有滑槽;所述杆管码垛装置II上的机械手支架19通过滑槽与移动导架18两侧的滑块连接,机械手支架19在液压缸带动下可沿移动导架18上、下移动;所述杆管码垛装置II上的机械手装置11包括机械手臂20和码垛机械手21,码垛机械手21设置在机械手臂20的端部,机械手臂20的另一端铰接在机械手支架19的两侧下方、并可绕铰接轴水平转动;码垛机械手21将油管和抽油杆13输送到输送装置二12上。Particularly, the palletizing base 9 on the described rod and tube palletizing device II includes a palletizing chassis 15 and a column 16, and the column 16 is fixed on the rear end of the palletizing chassis 15; the movement on the described rod and tube palletizing device II Mechanism 10 comprises fixed guide frame 17, mobile guide frame 18 and the manipulator support 19 of square frame, and fixed guide frame 17 is welded on the column 16 horizontally, and mobile guide frame 18 is arranged on fixed guide frame 17 below, and mobile guide frame 18 passes tooth The strip transmission can move back and forth along the fixed guide frame 17, the two outer sides of the mobile guide frame 18 are provided with slide blocks, and the inner side of the square frame-shaped manipulator support 19 is provided with a chute; the manipulator on the rod tube stacking device II The support 19 is connected with the sliders on both sides of the mobile guide frame 18 through a chute, and the manipulator support 19 can move up and down along the mobile guide frame 18 under the drive of the hydraulic cylinder; the manipulator device 11 on the rod tube palletizing device II includes Manipulator 20 and stacking manipulator 21, stacking manipulator 21 is arranged on the end of manipulator 20, and the other end of manipulator 20 is hinged below the both sides of manipulator support 19, and can rotate horizontally around hinge shaft; Palletizing manipulator 21 The oil pipe and the sucker rod 13 are delivered to the delivery device 2 12 .
特别的,所述杆管码垛装置II的主要作用是存储油管和抽油杆13,当工业机器人对油井进行维修时,需要先把油管和抽油杆13从井内起出并输送到杆管码垛装置II,杆管码垛装置II通过自动化机械手装置11对接收的油管和抽油杆13进行有序排列,完成修井作业后再通过机械手把杆管输送给主机完成下放。In particular, the main function of the rod and pipe stacking device II is to store oil pipes and sucker rods 13. When an industrial robot performs maintenance on an oil well, it is necessary to lift the oil pipes and sucker rods 13 out of the well and transport them to the rod and pipe The stacking device II, the rod and tube stacking device II arranges the received oil pipes and sucker rods 13 in an orderly manner through the automatic manipulator device 11, and after the workover operation is completed, the rods and tubes are transported to the main engine through the manipulator to complete the lowering.
本实用新型结构简单、合理、可靠,可以自动接收或送出杆管系统,在存储杆管的过程中码垛机械手自动排放杆管系统并自动输入到后台计算机管理系统。该装置的特点是能够较大幅度地降低工人劳动强度,系统全闭环控制,安全可靠性高,不需要操作人员摆放和运输油管或抽油杆,节省了大量的人力、物力,减少了石油杆管排放时间,提高了杆管系统计算机信息管理水平。The utility model has a simple, reasonable and reliable structure, and can automatically receive or send out the rod tube system, and the stacking manipulator automatically discharges the rod tube system and automatically inputs it into the background computer management system during the storage process of the rod tubes. The feature of this device is that it can greatly reduce the labor intensity of workers. The system is fully closed-loop controlled, with high safety and reliability. It does not require operators to place and transport oil pipes or sucker rods, which saves a lot of manpower and material resources, and reduces oil consumption. The discharge time of the rod and tube improves the computer information management level of the rod and tube system.
图5所示为本实用新型的导轨装置的结构示意图。FIG. 5 is a schematic structural view of the guide rail device of the present invention.
所述主体杆管处理机构I上的导轨装置2包括导正导轨22、液压吊卡23、液压杆管钳24,所述液压吊卡23和液压杆管钳24设置在导正导轨22上,所述导正导轨22由上导轨、下导轨和折叠机构三部分折叠而成,所述上导轨和下导轨之间通过折叠机构连接,上导轨在液压缸二的驱动下通过折叠机构可折叠180°;所述导正导轨22底部铰接在导轨底座25上,导轨底座25固定在主体底盘1上,所述导正导轨22在液压缸一的驱动下可摆动90°。The guide rail device 2 on the main rod tube processing mechanism 1 comprises a guide rail 22, a hydraulic elevator 23, a hydraulic rod pipe clamp 24, and the hydraulic elevator 23 and the hydraulic rod pipe clamp 24 are arranged on the guide rail 22, The guide rail 22 is folded from three parts: an upper guide rail, a lower guide rail and a folding mechanism. The upper guide rail and the lower guide rail are connected by a folding mechanism, and the upper guide rail can be folded 180° by the folding mechanism under the drive of the hydraulic cylinder two. °; the bottom of the guide rail 22 is hinged on the guide rail base 25, and the guide rail base 25 is fixed on the main body chassis 1, and the guide guide rail 22 can swing 90° under the drive of the hydraulic cylinder one.
特别的,所述导轨装置2的主要作用是调整井口位置,对液压吊卡23的提升和下放起到导向作用,导轨装置2集成了液压吊卡导轨、上下移动导轨、液压杆管钳24、导轨调整装置等。导轨装置摆动范围0-90°,可以旋转90°后平放到主体杆管处理机构I上,结构简单、合理、可靠,显著特点是劳动强度降低,安全可靠性提高,不需要操作人员站到井口操作,节省了大量的人力、物力,提高了起下油管或抽油杆工作效率。In particular, the main function of the guide rail device 2 is to adjust the position of the wellhead and guide the lifting and lowering of the hydraulic elevator 23. Rail adjustment device, etc. The swing range of the guide rail device is 0-90°, and it can be rotated 90° and placed flat on the main rod tube processing mechanism I. The structure is simple, reasonable and reliable. The notable feature is that the labor intensity is reduced, and the safety and reliability are improved. The wellhead operation saves a lot of manpower and material resources, and improves the working efficiency of lifting and lowering tubing or sucker rods.
图6所示为本实用新型的机械臂装置的结构示意图。FIG. 6 is a schematic structural view of the mechanical arm device of the present invention.
所述机械臂装置3包括大臂摆动装置7和柔性机械手装置8。The manipulator device 3 includes a boom swing device 7 and a flexible manipulator device 8 .
所述大臂摆动装置7包括机械臂26、摆座27、摆动油缸28和锁紧油缸29,所述摆座27固定在主体底盘1上,所述机械臂26铰接在摆座27上并由摆动油缸28驱动绕摆座27旋转;所述柔性机械手装置8通过摆轴与机械臂26连接。The boom swing device 7 includes a mechanical arm 26, a swing seat 27, a swing oil cylinder 28 and a locking oil cylinder 29, the swing seat 27 is fixed on the main body chassis 1, the mechanical arm 26 is hinged on the swing seat 27 and is The swing oil cylinder 28 is driven to rotate around the swing seat 27; the flexible manipulator device 8 is connected with the mechanical arm 26 through the swing shaft.
特别的,所述机械臂装置3在起油管或抽油杆时,将杆管自井口立式状态下用柔性机械手8夹紧杆管,通过大臂从105°开始摆动,到85°时,柔性机械手8开始从90°转动,当大臂摆动装置7摆动到40°时,柔性机械手8转动到水平0°状态,大臂摆动装置7继续摆动到水平0°状态。大臂摆动装置7和柔性机械手8均是水平状态后,把油管和抽油杆13水平放到输送装置接、送杆管的位置;下油管或抽油杆过程中杆管进入到输送装置后,柔性机械手8将杆管从输送装置摆放杆管位置抓取并夹紧杆管,大臂摆动装置7开始从水平0°开始摆动,当大臂摆动装置7摆动到35°时,柔性机械手8开始从0°转动,当大臂摆动装置7摆动到85°时柔性机械手8完成90°转动,大臂摆动装置7继续摆动到105°将杆管送到井口垂直位置。大臂摆动装置7摆动范围0-105°,柔性机械手8转动范围0-90°。所述机械臂装置3结构简单、合理、可靠,可以轻松将杆管从水平位置放到井口垂直位置,显著降低劳动强度,提高安全可靠性,不需要操作人员到井口操作,节省了大量的人力、物力,提高了工作效率。In particular, when the mechanical arm device 3 lifts the oil pipe or the sucker rod, the flexible manipulator 8 clamps the pipe from the vertical state of the wellhead, and swings from 105° to 85° through the big arm. The flexible manipulator 8 starts to rotate from 90°, and when the boom swing device 7 swings to 40°, the flexible manipulator 8 rotates to the horizontal 0° state, and the boom swing device 7 continues to swing to the horizontal 0° state. After the big arm swing device 7 and the flexible manipulator 8 are both in a horizontal state, place the oil pipe and the sucker rod 13 horizontally on the position where the delivery device connects and sends the rod pipe; , the flexible manipulator 8 grabs and clamps the rod tube from the position of the rod tube placed in the conveying device, and the big arm swing device 7 starts to swing from the horizontal 0°. When the big arm swing device 7 swings to 35°, the flexible manipulator 8 starts to rotate from 0 °, when the big arm swing device 7 swings to 85 °, the flexible manipulator 8 completes the 90 ° rotation, and the big arm swing device 7 continues to swing to 105 ° to send the rod pipe to the vertical position of the well head. The swing range of the big arm swing device 7 is 0-105°, and the rotation range of the flexible manipulator 8 is 0-90°. The mechanical arm device 3 has a simple, reasonable and reliable structure, and can easily place the rod tube from the horizontal position to the vertical position of the wellhead, significantly reducing labor intensity, improving safety and reliability, and not requiring operators to operate at the wellhead, saving a lot of manpower , Material resources, improved work efficiency.
图7所示为本实用新型的输送装置二的结构示意图。FIG. 7 is a schematic structural view of the second conveying device of the present invention.
所述杆管输送装置III包括输送装置一4和输送装置二12。所述输送装置一4和输送装置二12均包括固定导轨30,所述固定导轨30上方设有多组输送辊31。所述输送辊(31)通过链条(32)传动。The rod tube conveying device III includes a conveying device one 4 and a conveying device two 12 . The first conveying device 4 and the second conveying device 12 both include a fixed guide rail 30 , and multiple sets of conveying rollers 31 are arranged above the fixed guide rail 30 . The conveying roller (31) is driven by a chain (32).
特别的,所述杆管输送装置III在使用杆管码垛装置II部分的情况下,把油管和抽油杆13从杆管码垛装置II输送到主体杆管处理机构I的左侧,当杆管端部碰触测长装置的固定端开关后随即发出测长信号,杆管测长完成后输送装置一4的顶升液压缸顶起杆管到指定位置,接下来即可运行机械臂模块的动作。杆管输送装置III适用于起、下杆管两种模式,有效地将输送和测长两种功能结合到一起,缩短起下杆管时间,提高工作效率,结构更紧凑合理。In particular, when the rod and tube delivery device III uses the rod and tube stacking device II, it transports the oil pipe and sucker rod 13 from the rod and tube stacking device II to the left side of the main rod and tube processing mechanism I. After the end of the rod tube touches the fixed end switch of the length measuring device, a length measurement signal is sent out. After the length measurement of the rod tube is completed, the jacking hydraulic cylinder of the conveying device-4 lifts the rod tube to the designated position, and then the mechanical arm can be operated The action of the module. Rod tube conveying device III is suitable for two modes of lifting and lowering rod tubes. It effectively combines the two functions of conveying and length measurement, shortens the time for lifting and lowering rod tubes, improves work efficiency, and has a more compact and reasonable structure.
特别的,所述测长装置在起、下杆管过程中对杆管实现测长功能,包含测长固定装置和测长移动装置两部分,当油管和抽油杆13进入到输送装置二12后,测长移动装置在液压缸驱动下把推杆摆到辊道上方,液压马达驱动丝杠,丝杠带动推杆移动,配合输送辊道的动作,测长固定装置在液压缸驱动下向移动端伸出并到达指定位置,当推动的油管或抽油杆顶到固定端的法兰盘时,压缩弹簧的空间使接触开关发讯,移动端得到信号后停止动作,编码器输出推动杆的移动距离,这样就可以得到每根油管或抽油杆的长度,测长装置应用于起、下油管或抽油杆的两种模式,自动测量油管或抽油杆的长度,具有测长精度高、记录数据快等特点,抽油杆或油管接箍处预留识别标识,在测长装置端部设置有杆管身份识别装置,能够有效识别不同抽油杆或油管的身份,建立油井杆管全生命周期管理数据库,提高油井物联网管理水平。该杆管输送装置III有效地将杆管输送和测长、在线识别三种功能结合到一起,降低了工人劳动强度,提高了工作效率,结构更紧凑合理。In particular, the length measuring device realizes the length measuring function on the rod pipe during the process of lifting and lowering the rod pipe, and includes two parts: the length measuring fixed device and the length measuring mobile device. When the oil pipe and the sucker rod 13 enter the conveying device 2 Finally, the length measuring mobile device swings the push rod above the roller table driven by the hydraulic cylinder, the hydraulic motor drives the lead screw, and the lead screw drives the push rod to move. The mobile end stretches out and reaches the designated position. When the pushed oil pipe or sucker rod pushes against the flange plate of the fixed end, the space of the compressed spring makes the contact switch send a signal. Move the distance, so that the length of each oil pipe or sucker rod can be obtained. The length measuring device is used in two modes of lifting and lowering the oil pipe or sucker rod, and automatically measures the length of the oil pipe or sucker rod, with high accuracy of length measurement , record data quickly, etc., the identification mark is reserved at the sucker rod or tubing coupling, and the rod and tube identification device is installed at the end of the length measuring device, which can effectively identify the identity of different sucker rods or tubing, and establish an oil well rod and tube Full life cycle management database, improve oil well IoT management level. The rod and tube conveying device III effectively combines the three functions of rod and tube conveying, length measurement and online identification, reduces the labor intensity of workers, improves work efficiency, and has a more compact and reasonable structure.
图8是本实用新型的附属液压油管卡瓦和抽油杆卡瓦的结构示意图。Fig. 8 is a structural schematic diagram of the auxiliary hydraulic oil pipe slip and the sucker rod slip of the present invention.
所述液压油管卡瓦IV和抽油杆卡瓦V均包括卡瓦座、卡瓦体和卡瓦牙等,液压油管卡瓦IV通过油管卡瓦座法兰固定安装在井口法兰或防喷器法兰上,利用计算机控制液压缸升降起到自动卡持油管的作用,抽油杆卡瓦V通过油管接箍固定安装在油管上,通过自动控制液压缸的起升动作起到卡持抽油杆本体的作用。卡持不同尺寸的油管或抽油杆均可通过更换不同尺寸的卡瓦牙来实现。所述在线探伤装置固定在卡瓦装置的上部位置,在起升油管或抽油杆时可以在线监测杆管的使用情况,对有损伤的杆管及时报警并特殊处理。The hydraulic tubing slip IV and the sucker rod slip V both include a slip seat, a slip body and a slip tooth, etc., and the hydraulic tubing slip IV is fixed and installed on the wellhead flange or the blowout preventer through the tubing slip seat flange. On the flange of the oil tank, the computer controls the lifting of the hydraulic cylinder to automatically hold the oil pipe. The sucker rod slip V is fixed and installed on the oil pipe through the oil pipe coupling, and the lifting action of the hydraulic cylinder is automatically controlled to hold the oil pipe The function of the oil rod body. The clamping of oil pipes or sucker rods of different sizes can be realized by replacing slip teeth of different sizes. The on-line flaw detection device is fixed on the upper part of the slip device, and can monitor the use of the rod and tube online when the oil pipe or sucker rod is lifted, and timely alarm and special treatment for the damaged rod or tube.
本实用新型所述的全自动石油修井杆管作业工业机器人的自动化程度高,可实现石油修井作业的自动化、智能化操作,克服了传统石油修井工人劳动强度大、现场安全性能差、工效率低、能耗高,操作性差、污染环境等缺陷,同时将多人体力操作型(4-5人)转换为1人的看管性操作,实现了生产过程的自动化和智能化控制和物联网监控。The fully automatic industrial robot for oil well workover rod and pipe operation described in the utility model has a high degree of automation, can realize the automation and intelligent operation of oil well workover operations, and overcomes the traditional oil workover workers with high labor intensity, poor on-site safety performance, Low labor efficiency, high energy consumption, poor operability, environmental pollution and other defects, at the same time, the multi-person manual operation (4-5 people) is converted into a one-person supervisory operation, realizing the automation and intelligent control of the production process and material Network monitoring.
上文所列出的一系列的详细说明仅仅是针对本实用新型的可行性实施方式的具体说明,它们并非用以限制本实用新型的保护范围,凡未脱离本实用新型技艺精神所作的等效实施方式或变更均应包含在本实用新型的保护范围之内。The series of detailed descriptions listed above are only specific descriptions for the feasible implementation modes of the present utility model, and they are not used to limit the protection scope of the present utility model. Embodiments or modifications should be included within the protection scope of the present utility model.
此外,应当理解,虽然本说明书按照实施方式加以描述,但并非每个实施方式仅包含一个独立的技术方案,说明书的这种叙述方式仅仅是为清楚起见,本领域技术人员应当将说明书作为一个整体,各实施例中的技术方案也可以经适当组合,形成本领域技术人员可以理解的其他实施方式。In addition, it should be understood that although this specification is described according to implementation modes, not each implementation mode only contains an independent technical solution, and this description in the specification is only for clarity, and those skilled in the art should take the specification as a whole , the technical solutions in the various embodiments can also be properly combined to form other implementations that can be understood by those skilled in the art.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721401481.2U CN207609392U (en) | 2017-10-27 | 2017-10-27 | A kind of full-automatic petroleum well workover rod tube operation industrial robot |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721401481.2U CN207609392U (en) | 2017-10-27 | 2017-10-27 | A kind of full-automatic petroleum well workover rod tube operation industrial robot |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207609392U true CN207609392U (en) | 2018-07-13 |
Family
ID=62794235
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721401481.2U Active CN207609392U (en) | 2017-10-27 | 2017-10-27 | A kind of full-automatic petroleum well workover rod tube operation industrial robot |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207609392U (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025858A (en) * | 2018-08-06 | 2018-12-18 | 中国石油天然气股份有限公司 | On-site tubing transportation and loading method in oil field |
| CN110259396A (en) * | 2019-07-01 | 2019-09-20 | 济南芯乐智能设备有限公司 | An intelligent workover rod and pipe tripping process for realizing unmanned operation of oilfield wellheads |
| CN112855047A (en) * | 2021-01-22 | 2021-05-28 | 任伟 | Deep-buried punching auxiliary equipment for ground source heat pump |
-
2017
- 2017-10-27 CN CN201721401481.2U patent/CN207609392U/en active Active
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109025858A (en) * | 2018-08-06 | 2018-12-18 | 中国石油天然气股份有限公司 | On-site tubing transportation and loading method in oil field |
| CN109025858B (en) * | 2018-08-06 | 2019-12-10 | 中国石油天然气股份有限公司 | oil field on-site oil pipe transporting and loading method |
| CN110259396A (en) * | 2019-07-01 | 2019-09-20 | 济南芯乐智能设备有限公司 | An intelligent workover rod and pipe tripping process for realizing unmanned operation of oilfield wellheads |
| CN112855047A (en) * | 2021-01-22 | 2021-05-28 | 任伟 | Deep-buried punching auxiliary equipment for ground source heat pump |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN107701128A (en) | A fully automatic oil well workover rod and pipe operation industrial robot | |
| CN109322628B (en) | Unmanned operation equipment for minor workover wellheads | |
| CN108301794B (en) | Petroleum workover robot | |
| CN203939463U (en) | A kind of novel hydraulic dynamic catwalk | |
| CN108252664B (en) | Tunnel drilling machine for automatic loading and unloading of drill pipes by remote control | |
| CN111927347A (en) | Wellhead positioning integrated guide type vertical operation well repairing catwalk and using method thereof | |
| CN105114015B (en) | Lifting type hydraulic power catwalk system | |
| CN207609392U (en) | A kind of full-automatic petroleum well workover rod tube operation industrial robot | |
| CN103821464B (en) | Tubing string vertical vehicular full-automatic smart hydraulic workover rig | |
| CN110454100A (en) | An industrial robot device and method for drilling and workover super single root operation | |
| CN206722778U (en) | A kind of petroleum well workover Work robot | |
| CN209025626U (en) | The unmanned working equipment of light maintenance well head | |
| CN209704511U (en) | Tube rod conveyer for well site automated job | |
| CN111520088A (en) | Vehicle-mounted small workover wellhead operation device and method | |
| CN107178326A (en) | One kind is used for well workover lower oil tube, sucker rod integrative machine and its application method | |
| CN110485939A (en) | A kind of automatic petroleum well workover machine people | |
| CN106475714A (en) | A kind of automotive plate step conveying device | |
| CN218117717U (en) | Drilling platform automatic feeding and unloading drill pipe device | |
| CN202788679U (en) | Novel automatic tubular rod conveying machine | |
| CN206972178U (en) | A kind of ground drilling rod lifting device | |
| CN205591850U (en) | Full -automatic oil pipe post calandria moves a tub device | |
| CN109339722A (en) | A kind of guiding pipe clamp device | |
| CN205225102U (en) | Automatic workover machine of skid -mounted formula | |
| CN207660559U (en) | Workover rig and well workover system | |
| CN116065979B (en) | A drilling rig pipe string automatic processing system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20200922 Granted publication date: 20180713 |
|
| PP01 | Preservation of patent right | ||
| PD01 | Discharge of preservation of patent |
Date of cancellation: 20220922 Granted publication date: 20180713 |
|
| PD01 | Discharge of preservation of patent | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20221121 Granted publication date: 20180713 |
|
| PP01 | Preservation of patent right | ||
| PD01 | Discharge of preservation of patent |
Date of cancellation: 20251121 Granted publication date: 20180713 |
|
| PD01 | Discharge of preservation of patent | ||
| PP01 | Preservation of patent right |
Effective date of registration: 20251121 Granted publication date: 20180713 |
|
| PP01 | Preservation of patent right |