CN207597545U - Prefabricated assembled ecology intercepting ditch - Google Patents

Prefabricated assembled ecology intercepting ditch Download PDF

Info

Publication number
CN207597545U
CN207597545U CN201721392721.7U CN201721392721U CN207597545U CN 207597545 U CN207597545 U CN 207597545U CN 201721392721 U CN201721392721 U CN 201721392721U CN 207597545 U CN207597545 U CN 207597545U
Authority
CN
China
Prior art keywords
intercepting ditch
plate member
water
intercepting
ditches
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721392721.7U
Other languages
Chinese (zh)
Inventor
代明星
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Original Assignee
Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Municipal Engineering Design Insitute Group Co Ltd filed Critical Shanghai Municipal Engineering Design Insitute Group Co Ltd
Priority to CN201721392721.7U priority Critical patent/CN207597545U/en
Application granted granted Critical
Publication of CN207597545U publication Critical patent/CN207597545U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a kind of prefabricated assembled ecological intercepting ditch, including the irrigation canals and ditches that intercept water dug in advance, it is characterized in that in the irrigation canals and ditches both sides setting armored concrete intercepting ditch prefabricated component that intercepts water of the pre- digging, reserved steel bar at the top of the armored concrete intercepting ditch prefabricated component, pass through the reserved steel bar at the top of the armored concrete intercepting ditch prefabricated component, entirety is formed with intercepting ditch peripheral floor Pouring concrete at the same time, intercept water irrigation canals and ditches both sides armored concrete intercepting ditch prefabricated component between form intercepting ditch, intercepting ditch bottom setting graded sand and stone pervious bed.The utility model patent combines the advantages of both cast-in-place and prefabricated assembled, both saves template, reduce engineering cost, and can improve the globality of engineering by the intercepting ditch of assembled integral reinforced concrete structure.Bottom plate by the water stored " release " and is used when needed using the good material water suction of water penetration, water storage, infiltration, water purification, the theory in realization sponge city.

Description

Prefabricated assembled ecology intercepting ditch
Technical field
The utility model is related to a kind of permeable ecology intercepting ditch, specially a kind of prefabricated assembled ecological intercepting ditch is main It the advantages of graded sand and stone pervious bed being used to intercepting ditch bottom, combining cast-in-place monoblock type and prefabricated assembled the two, realizes The sponge the idea of the city of water storage plumbing.
Background technology
Cast-in-place concrete intercepting ditch needs a large amount of template, casting concrete, maintenance, finally form removal again.Due to collection Well size disunity and template are disposable, this not only waste of resource but also time-consuming and laborious.
As society and the paces of development in science and technology constantly accelerate, prefabrication structure is transported extensively in recent years With, mainly include it is prefabricated with assembling two processes, fundamentally innovated the mode of building element, ensure safety in utilization While with stability, construction period is shortened to greatest extent.
Urban construction simultaneously should in line with principles such as green, environmental protection, ecology, sustainable developments, based on this, the utility model weight Point solves green ecological city sponge urban construction thinking, it is desirable to can improve China's sponge urban construction efficiency whereby with building matter Amount.
Invention content
The purpose of this utility model be for above-mentioned present situation there are the problem of, design a kind of novel prefabricated assembled ecology Intercepting ditch while safety in utilization is ensured with stability, shortens construction period to greatest extent.
To achieve these goals, the technical solution of the utility model is:A kind of prefabricated assembled ecological intercepting ditch, including The irrigation canals and ditches that intercept water dug in advance, it is characterised in that in the irrigation canals and ditches both sides of intercepting water of the pre- digging, armored concrete intercepting ditch prefabricated component is set, Reserved steel bar at the top of the armored concrete intercepting ditch prefabricated component, by pre- at the top of the armored concrete intercepting ditch prefabricated component Reinforcing bar is stayed, forms entirety with intercepting ditch peripheral floor Pouring concrete at the same time, the armored concrete intercepting ditch for irrigation canals and ditches both sides of intercepting water Intercepting ditch, intercepting ditch bottom setting graded sand and stone pervious bed are formed between prefabricated component.
Further, planting soil is set on the graded sand and stone pervious bed, for planting water resistance plant, in order to To purify sewage well, while water conservation can be played the role of again, can realize in this way the green in sponge city, environmental protection, ecology, Sustainable development idea.
Further, the bottom setting ground of the irrigation canals and ditches that intercept water, graded sand and stone pervious bed are arranged on ground.
Further, the armored concrete intercepting ditch prefabricated component includes base plate member and lateral plate member, the bottom plate structure Part is vertically installed in the bottom of lateral plate member, and base plate member extends to the both sides of lateral plate member, forms the toe to both sides protrusion Plate.
Further, the armored concrete intercepting ditch prefabricated component of the irrigation canals and ditches both sides of intercepting water is oppositely arranged, opposite toe There are gaps between plate.
Further, the base plate member is equipped with bottom reinforcement bars and top rebars, and the both ends of top rebars are bent downward, shape Vertical reinforcement in into bottom plate is additionally provided with the bottom plate transverse direction steel being connect with the bottom reinforcement bars and top rebars in the base plate member Muscle;The lateral plate member includes setting up two side plate vertical reinforcements in side plate both sides, two side plate vertical reinforcements extension separately It is bent into base plate member, and towards interlaced direction, lateral plate member is stretched out at the top of two side plate vertical reinforcements Upper end after, bent towards interlaced direction, and extend to outside the range of lateral plate member, form reserved steel bar.
The utility model patent combines cast-in-place and prefabricated dress by the intercepting ditch of assembled integral reinforced concrete structure The advantages of with both formulas, both saves template, reduces engineering cost, and can improve the globality of engineering.Bottom plate uses water penetration Good material water suction, water storage, infiltration, water purification by the water stored " release " and are used when needed, realize sponge city Theory.The utility model advantageous effect:It can be economized on resources by prefabrication armored concrete intercepting ditch and expense.It is prefabricated The factory's mold and production equipment of armored concrete intercepting ditch, which can be recycled, reduces template consumption, not only time saving and energy saving also to have There is the feature of environmental protection, economize on resources and expense.The bottom plate of ecological intercepting ditch prefabricated assembled simultaneously is not fully sealed, saturating in the rainy day Aqueous good rubble and coarse sand can be very good, extra rain penetration to underground, to have the function that water storage;It is attacked when heavy rain When, rainwater can be discharged again by intercepting ditch in time, not only facilitate water delivery but also can be with water storage.
Description of the drawings
Fig. 1 is the structure diagram of the utility model.
Fig. 2 is that the intercepting ditch factory of the utility model makes detail drawing.
In figure:Intercepting ditch periphery concrete floor 1, armored concrete intercepting ditch prefabricated component 2, planting soil 3, graded sand Stone pervious bed 4, ground 5, bottom plate transverse steel 6, bottom plate longitudinal reinforcement 7, side plate vertical reinforcement 8, reserved steel bar 9.
Specific embodiment
Below in conjunction with the accompanying drawings and example, specific embodiment of the present utility model is described in further detail.It lifts real Example is served only for explaining the utility model, is not intended to limit the scope of the utility model.
As shown in Figure 1, prefabricated assembled ecology intercepting ditch is mainly permeable by armored concrete intercepting ditch prefabricated component and inside Sandstone two parts form.The affiliated facilities such as planting soil, water resistance plant are added in addition forges into green, ecology, the feature of environmental protection Intercepting ditch.
Intercepting ditch periphery concrete floor 1 can be reinforced concrete soil library ramp bottom plate or outdoor plain concrete building Terrace, square terrace etc..
Armored concrete intercepting ditch prefabricated component 2:Using C30 concrete and select trade mark band " E " hot-rolled reinforced bar HRB400, It is produced in batches in the factory according to Fig. 2.2 top setting reserved steel bar of armored concrete intercepting ditch prefabricated component.It is reserved using described The reserved steel bar is cast in intercepting ditch periphery concrete floor 1 by reinforcing bar, integral cast-in-situ intercepting ditch periphery concrete floor 1 It is interior, it is formed whole.
Planting soil 3:Using short texture, ventilation, water conservation, fertilizer-preserving ability are strong, are suitable for the soil of garden plant growth Earth.
Graded sand and stone pervious bed 4:It is levelling using the good rubble of water penetration and coarse sand progress intercepting ditch bottom, make its tool There is the function of permeable, water storage, draining.
Ground 5:Can be banketing for undisturbed soil or rammed earth.
As shown in Fig. 2, the armored concrete intercepting ditch prefabricated component includes base plate member and lateral plate member, the bottom plate structure Part is vertically installed in the bottom of lateral plate member, and base plate member extends to the both sides of lateral plate member, forms the toe to both sides protrusion Plate.
When the armored concrete intercepting ditch prefabricated component of the irrigation canals and ditches both sides of intercepting water is oppositely arranged, stayed between opposite toe board There is gap so that the blow-by of intercepting ditch bottom sets graded sand and stone pervious bed in intercepting ditch bottom in this way, good in rainy day water penetration Good rubble and coarse sand can be very good extra rain penetration to underground, have the function that water storage.
The base plate member is equipped with bottom plate transverse steel 6, and the transverse steel includes bottom reinforcement bars and top rebars, top The both ends of reinforcing bar are bent downward, and form vertical reinforcement in bottom plate, and the bottom reinforcement bars and top rebars use the reinforcing bar of Φ 12, institute State the bottom plate longitudinal reinforcement 7 for being additionally provided in base plate member and being connect with the bottom reinforcement bars and top rebars, the bottom plate transverse direction steel Muscle uses the reinforcing bar of Φ 10;The lateral plate member includes setting up two side plate vertical reinforcements 8 in side plate both sides, two sides separately Plate vertical reinforcement is extended in base plate member, and is bent towards interlaced direction, the top of two side plate vertical reinforcements It after the upper end of lateral plate member is stretched out in portion, bends, and extend to outside the range of lateral plate member, is formed pre- towards interlaced direction Reinforcing bar 9 is stayed, the side plate vertical reinforcement uses the reinforcing bar of Φ 12.
Schematically the utility model and embodiments thereof are described above, this describes no restricted, attached drawing Shown only one of embodiment of the utility model.Therefore, if others skilled in the art create without departing from the utility model In the case of objective, within the spirit and principle of the utility model, any modification, equivalent substitution, improvement and etc. done are adopted With the means of structural connection and case study on implementation similar to the technical solution, the scope of protection of the utility model is belonged to.

Claims (6)

1. a kind of prefabricated assembled ecological intercepting ditch, including the irrigation canals and ditches that intercept water dug in advance, it is characterised in that in intercepting water for the pre- digging Irrigation canals and ditches both sides set armored concrete intercepting ditch prefabricated component, and armored concrete intercepting ditch prefabricated component top reserved steel bar leads to The reserved steel bar at the top of the armored concrete intercepting ditch prefabricated component is crossed, is formed with intercepting ditch peripheral floor Pouring concrete at the same time It is whole, intercepting ditch, intercepting ditch bottom setting graded sand are formed between the armored concrete intercepting ditch prefabricated component for irrigation canals and ditches both sides of intercepting water Stone pervious bed.
2. prefabricated assembled ecological intercepting ditch as described in claim 1, it is characterised in that set on the graded sand and stone pervious bed Planting soil is put, for planting water resistance plant.
3. prefabricated assembled ecological intercepting ditch as described in claim 1, it is characterised in that the bottom setting of the irrigation canals and ditches that intercept water Ground, graded sand and stone pervious bed are arranged on ground.
4. prefabricated assembled ecological intercepting ditch as described in claim 1, it is characterised in that the armored concrete intercepting ditch is pre- Product includes base plate member and lateral plate member, and the base plate member is vertically installed in the bottom of lateral plate member, and base plate member to The both sides extension of lateral plate member, forms the toe board to both sides protrusion.
5. prefabricated assembled ecological intercepting ditch as claimed in claim 4, it is characterised in that the reinforcing bar of the irrigation canals and ditches both sides of intercepting water Concrete intercepting ditch prefabricated component is oppositely arranged, and there are gaps between opposite toe board.
6. prefabricated assembled ecological intercepting ditch as claimed in claim 4, it is characterised in that the base plate member is equipped with bottom steel Muscle and top rebars, the both ends of top rebars are bent downward, and form vertical reinforcement in bottom plate, be additionally provided in the base plate member with The bottom plate transverse steel that the bottom reinforcement bars are connected with top rebars;The lateral plate member includes setting up two in side plate both sides separately Side plate vertical reinforcement, two side plate vertical reinforcements are extended in base plate member, and are bent towards interlaced direction, institute Behind the upper end for stating the top stretching lateral plate member of two side plate vertical reinforcements, bent towards interlaced direction, and extend to Outside the range of lateral plate member, reserved steel bar is formed.
CN201721392721.7U 2017-10-26 2017-10-26 Prefabricated assembled ecology intercepting ditch Active CN207597545U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721392721.7U CN207597545U (en) 2017-10-26 2017-10-26 Prefabricated assembled ecology intercepting ditch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721392721.7U CN207597545U (en) 2017-10-26 2017-10-26 Prefabricated assembled ecology intercepting ditch

Publications (1)

Publication Number Publication Date
CN207597545U true CN207597545U (en) 2018-07-10

Family

ID=62755825

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721392721.7U Active CN207597545U (en) 2017-10-26 2017-10-26 Prefabricated assembled ecology intercepting ditch

Country Status (1)

Country Link
CN (1) CN207597545U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794341A (en) * 2020-08-06 2020-10-20 国投信开水环境投资有限公司 Channel for sewage treatment plant and construction method
CN112538839A (en) * 2021-02-02 2021-03-23 河南省水利勘测设计研究有限公司 Construction method of composite ecological slope protection
CN113106991A (en) * 2021-04-22 2021-07-13 南京振高建设有限公司 Prefabricated assembled ecological intercepting ditch

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111794341A (en) * 2020-08-06 2020-10-20 国投信开水环境投资有限公司 Channel for sewage treatment plant and construction method
CN112538839A (en) * 2021-02-02 2021-03-23 河南省水利勘测设计研究有限公司 Construction method of composite ecological slope protection
CN112538839B (en) * 2021-02-02 2022-04-01 河南省水利勘测设计研究有限公司 Construction method of composite ecological slope protection
CN113106991A (en) * 2021-04-22 2021-07-13 南京振高建设有限公司 Prefabricated assembled ecological intercepting ditch

Similar Documents

Publication Publication Date Title
CN101914925B (en) Basement by using optimized composite prefabricated arch wall as external wall
CN101418569B (en) Optimization complex arch wall combining prefabricated arch leaf, support and major structure
CN207597545U (en) Prefabricated assembled ecology intercepting ditch
CN204125814U (en) A kind of garden path structure
CN201581411U (en) Inclined inserting sheet pile wall
CN106012971A (en) Vegetation concrete protection slope and construction method thereof
CN207143633U (en) A kind of pervious concrete grass planting land earth construction
CN205276212U (en) River course ecological block barricade
CN203603525U (en) Reinforcing structure with clamp plate girder and clamp plate column externally arranged for stone structure
CN207904939U (en) A kind of ecological revetment grass planting plane
CN207959240U (en) A kind of groove slope retaining device
CN206070485U (en) Assembled ecological revetment
CN110241847A (en) It is a kind of ecology cantilevered and buttress type assemble retaining wall
CN206457838U (en) A kind of assembling type base for power transmission tower
CN109853323A (en) A kind of sponge urban ecology diafiltration ground structure and its construction method
CN205530324U (en) Cold-formed thin-wall section steel micro pile
CN204780507U (en) Drainage garden way
CN210482182U (en) Double-river structure for constructing ecological circulating water system
CN204919568U (en) Compound supporting construction of shallow foundation ditch
CN200996149Y (en) Irrigation-engineering structural component
CN208363444U (en) A kind of light fill manually makes somebody a mere figurehead basal disc greening structure
CN107060380A (en) A kind of memorial archway being built on ancient building shelter bridge and its construction method
CN207032286U (en) Arch form counterfort vertical type soil-baffling structure
CN208762948U (en) A kind of Prefabricated composite stake Ecological Retaining Wall and the waterway system using the Ecological Retaining Wall
CN207537965U (en) A kind of hydraulic engineering earth-retaining bank protection with scour resistance

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant