CN207593660U - The pre-assembled tooling of spring energy storage circle - Google Patents

The pre-assembled tooling of spring energy storage circle Download PDF

Info

Publication number
CN207593660U
CN207593660U CN201721426738.XU CN201721426738U CN207593660U CN 207593660 U CN207593660 U CN 207593660U CN 201721426738 U CN201721426738 U CN 201721426738U CN 207593660 U CN207593660 U CN 207593660U
Authority
CN
China
Prior art keywords
energy storage
rod
spring energy
storage circle
circle
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721426738.XU
Other languages
Chinese (zh)
Inventor
潘立军
张汉国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI XINLIAN VALVE CO Ltd
Original Assignee
SHANGHAI XINLIAN VALVE CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI XINLIAN VALVE CO Ltd filed Critical SHANGHAI XINLIAN VALVE CO Ltd
Priority to CN201721426738.XU priority Critical patent/CN207593660U/en
Application granted granted Critical
Publication of CN207593660U publication Critical patent/CN207593660U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to oil and natural gas parts production field, the pre-assembled tooling of specifically a kind of spring energy storage circle;It is characterized in that:Including the body of rod, heelpiece, gasket ring, handle;The body of rod is vertically arranged, and heelpiece is set on the body of rod, and handle has two, is threaded through respectively on the body of rod and above heelpiece, the top and bottom of handle set gasket ring respectively;Spring energy storage snare is located on the body of rod and passes through two handles respectively by the spring energy storage circle press-in body of rod and the extraction body of rod so as to fulfill the pre-assembled purpose to spring energy storage circle.This tooling uses above-mentioned design, and pre-assembled is carried out to spring energy storage circle before practical set, so as to which spring energy storage circle be made to be stretched under slave mode, consequently facilitating the assembling work of follow-up spring energy storage circle and valve rod.

Description

The pre-assembled tooling of spring energy storage circle
Technical field
The utility model is related to oil and natural gas parts production field, specifically a kind of installation spring energy storage circle bar is filled out Expect tooling.
Background technology
In assembling process, due to the WKM valve rods of PR2 driving thread segment major diameter and the straight of accumulation of energy circle part is installed Diameter is identical size, and accumulation of energy circle can only be installed from the end of thread, so as to accumulation of energy circle lip in installation process easy quilt It destroys, eventually leads to accumulation of energy circle and be destroyed and seal failure.
Invention content
To accumulation of energy when being used for accumulation of energy circle pre-assembled the purpose of the utility model is to provide one kind so as to avoid practical set Enclose the tooling damaged.
In order to achieve the above object, the utility model is realized in this way:
A kind of pre-assembled tooling of spring energy storage circle, including the body of rod, heelpiece, gasket ring, handle;The body of rod is vertically arranged, heelpiece It is set on the body of rod, handle has two, is threaded through respectively on the body of rod and above heelpiece, the top and bottom of handle are set respectively Put gasket ring;Spring energy storage snare is located on the body of rod and passes through two handles, spring energy storage circle is pressed into the body of rod and pull rod respectively Body is so as to fulfill the pre-assembled purpose to spring energy storage circle.
In the above process, the effect of gasket ring is spring energy storage circle to be protected to avoid it when handle exerts a force to spring energy storage circle It is subject to crushing.
This tooling uses above-mentioned design, pre-assembled is carried out to spring energy storage circle before practical set, so as to make spring energy storage Circle is stretched under slave mode, consequently facilitating the assembling work of follow-up spring energy storage circle and valve rod.
Description of the drawings
Fig. 1 is the structure diagram of this tooling.
Specific embodiment
The utility model is further illustrated below by way of specific embodiment.
As shown in Figure 1, a kind of pre-assembled tooling of spring energy storage circle, including the body of rod 1, heelpiece 2, gasket ring 3, handle 4;The body of rod 1 is vertically arranged, and heelpiece 2 is set on the body of rod 1, and handle 4 has two, is threaded through respectively on the body of rod 1 and positioned at 2 top of heelpiece, hand The top and bottom of handle 4 set gasket ring 3 respectively;Spring energy storage snare is located on the body of rod 1 and passes through two handles 4 respectively by bullet Property the accumulation of energy circle press-in body of rod 1 and extract the body of rod 1 so as to fulfill the pre-assembled purpose to spring energy storage circle.
In the above process, the effect of gasket ring is spring energy storage circle to be protected to avoid it when handle exerts a force to spring energy storage circle It is subject to crushing.
This tooling uses above-mentioned design, pre-assembled is carried out to spring energy storage circle before practical set, so as to make spring energy storage Circle is stretched under slave mode, consequently facilitating the assembling work of follow-up spring energy storage circle and valve rod.

Claims (1)

1. a kind of pre-assembled tooling of spring energy storage circle, it is characterized in that:Including the body of rod, heelpiece, gasket ring, handle;The body of rod is set vertically It puts, heelpiece is set on the body of rod, and handle has two, is threaded through respectively on the body of rod and above heelpiece, the top surface and bottom of handle Face sets gasket ring respectively;Spring energy storage snare is located on the body of rod and passes through two handles, spring energy storage circle is pressed into the body of rod respectively With the extraction body of rod so as to fulfill the pre-assembled purpose to spring energy storage circle.
CN201721426738.XU 2017-10-31 2017-10-31 The pre-assembled tooling of spring energy storage circle Expired - Fee Related CN207593660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721426738.XU CN207593660U (en) 2017-10-31 2017-10-31 The pre-assembled tooling of spring energy storage circle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721426738.XU CN207593660U (en) 2017-10-31 2017-10-31 The pre-assembled tooling of spring energy storage circle

Publications (1)

Publication Number Publication Date
CN207593660U true CN207593660U (en) 2018-07-10

Family

ID=62758196

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721426738.XU Expired - Fee Related CN207593660U (en) 2017-10-31 2017-10-31 The pre-assembled tooling of spring energy storage circle

Country Status (1)

Country Link
CN (1) CN207593660U (en)

Similar Documents

Publication Publication Date Title
CN203614963U (en) Unidirectional blocking valve for pressure gauge
CN207593660U (en) The pre-assembled tooling of spring energy storage circle
CN203115279U (en) Graphite gland packing box
CN203962006U (en) Manual backwashing filter device core assembly
CN201972649U (en) Polish rod screwing pressing sealing device for oil sucking machine
CN205330597U (en) Sealing device for oil recovery
CN204371194U (en) A kind of well-head optical-lever sealer of pumping unit and packing
CN203743124U (en) Threaded connection structure for piston
CN203622348U (en) Extractor for rod-pumped well opening packing
CN204312010U (en) The quick self-balancing well mouth sealing device of a kind of machine water-pumping/draining gas recovery well
CN204061274U (en) The rapid dismounting type understructure of straight cylinder type Multiple Sinking Pump
CN204115702U (en) Safety valve effective sealing diameter inquiry unit
CN204827365U (en) Multi -functional bottom ball seat
CN204512476U (en) A kind of support rotation prevention structure of large-diameter butterfly valve
CN204226706U (en) A kind of Novel high-temperature high-pressure ball valve
CN202690087U (en) Hydraulic prop with long stroke
CN204152472U (en) Two spacing metal sealing boll-weevil hanger
CN201826797U (en) Anti-spouting day lighting rod sealer
CN202812650U (en) Removing device of oil robbing clamp in crude oil pipeline
CN204610890U (en) Three eccentric two-way hard seal butterfly valve
CN204113180U (en) Righting well testing mouth sealing device
CN205422642U (en) Quick water injection well head device
CN202731801U (en) Spherical open-hole drift size gauge tool
CN206299829U (en) A kind of upper-mounting type ball valve valve seat construction
CN202187736U (en) Grind shoe

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180710

Termination date: 20201031