CN207589769U - Building solid pig raising system - Google Patents

Building solid pig raising system Download PDF

Info

Publication number
CN207589769U
CN207589769U CN201721343768.4U CN201721343768U CN207589769U CN 207589769 U CN207589769 U CN 207589769U CN 201721343768 U CN201721343768 U CN 201721343768U CN 207589769 U CN207589769 U CN 207589769U
Authority
CN
China
Prior art keywords
several
building
house
layer
pig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721343768.4U
Other languages
Chinese (zh)
Inventor
杨翔
陈小兰
施亮
张从林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Soo Polytron Technologies Inc
Original Assignee
Guangxi Soo Polytron Technologies Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Soo Polytron Technologies Inc filed Critical Guangxi Soo Polytron Technologies Inc
Priority to CN201721343768.4U priority Critical patent/CN207589769U/en
Application granted granted Critical
Publication of CN207589769U publication Critical patent/CN207589769U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of building solid pig raising systems, are related to cattle breeding field.Including an at least building multi-storey building, aisle, lift and stair are equipped in every first floor room for the building solid pig raising system, and the both sides in each layer of aisle are installed with several pig houses, and expects pipe, water pipe and register are equipped in every first floor room;The air intake passage and air-out passage of connection pig house are offered per first floor room, and each layer air-out passage communicates;The ground of each layer of pig house is spaced apart and is equipped with several raceway grooves, several through-holes are offered on each raceway groove, day face interval per first floor room is installed with several excrement collecting pipes, several through-holes connect low one layer of several excrement collecting pipes, and total soil pipe that each layer of several excrement collecting pipes are converged on building wall simultaneously passes through the manure pit that total soil pipe is communicated in outside building.The utility model building solid pig raising system builds pig farm using multi-storey building, improves land utilization ratio, convenient to carry out scale management to pig farm.

Description

Building solid pig raising system
Technical field
The utility model is related to cattle breeding fields, and in particular to a kind of building solid pig raising system.
Background technology
China's pig house is mostly individual layer, and spacing is big, occupies a large amount of soils.And pig house structure is bad, the functions such as wind resistance, snow Difference.Can not be closed using gas depoisoning, disinfection is not thorough.Only equipped with cascade cooling installation, can not four seasons constant temperature, constant humidity, automatically Change ventilation, winter pig house harmful gas concentration is high.Pig manure innoxious on the spot can not be fermented into organic fertilizer, pig urinal flush water after doing clearly Qualified discharge is not easy after biogas fermentation, and environmental protection investments are big, and operating cost is high.Exhaust gas is cultivated without purified treatment, pig house and periphery are smelly Taste is big, and mosquitos and flies is more, and environment is bad.It is fed using siccative, though equipped with water fountain, swinery amount of drinking water is insufficient, unhealthful.Due to Environment is poor, and feed mode is improper, and swinery is in half stress situation, easily falls ill, therefore raising family is added in feed, drinking water A large amount of antibiotic, pork medicament residue can not be up to standard, and food security is shouldered heavy responsibilities.It is although current there are many pig house and various new Feeding pattern occur, but still can not systematically solve the above problems.
Utility model content
In view of the above-mentioned problems, it is necessary to provide a kind of building solid pig raising systems.The building solid pig raising system, using more Pig farm is built in floor room, convenient while improving land utilization ratio to carry out scale management to pig farm.
To achieve these goals, the technical solution adopted in the utility model is as follows:
A kind of building solid pig raising system, including an at least building building, building described in per building includes multilayer, described in each layer The aisle at a connection same layer both ends is equipped in building, the opposite end of each layer building is offered multiplies load for pig Lift and the stair for people's walking, the opposite sides in each layer aisle, which is spaced, is installed with several pig houses, each layer of institute The expects pipe and water pipe for being distributed with and leading in each pig house in length and breadth in building are stated, each layer building is interior in the pig house Around be installed with register;The opposite sides of each layer building, which offers, to be connected the air inlet of the pig house and leads to Road, each layer building offers the air-out passage for connecting the pig house on the aisle, and the outlet air of each layer is led to Road communicates;The ground of each layer pig house, which is spaced apart, is equipped with several raceway grooves, is offered on each raceway groove several Through-hole, the day face interval of each layer building are installed with several excrement collecting pipes, and several through-holes connect low one layer of several institutes State excrement collecting pipe, total soil pipe that each layer of several excrement collecting pipes are converged on the building wall simultaneously passes through described Total soil pipe is communicated in the manure pit outside the building.
Preferably, building described in every building includes at least three layers.
Preferably, several pig houses of each layer building include several incubation houses, several fattening houses, Ruo Ganpei Kind house and several gestation are given up;Several house and several fattening truncations of being bred as in the opposite sides of described aisle the same end, Several breeding houses and several pregnant truncations are in the opposite sides of the aisle other end.
Preferably, it is each described to be bred as being equipped in house, the fattening house, the breeding house and the gestation house and connecting institute State the feeding area of expects pipe and described water pipe one end.
Preferably, the other end of several expects pipes connects a material pond being located at outside the pig house, several water pipes The other end connect one be located at the pig house outside pond.
Preferably, the register is several temperature adjustment water pipes, is installed in several incubation houses and several fattenings The temperature adjustment water pipe around house leads to hot water, the temperature adjustment being installed in around several breeding houses and several gestation houses Water pipe leads to cold water.
Preferably, the house and the length of the fattening house of being bred as is 1.8~2.2m, and width is 0.5~0.7m;Institute The length for stating breeding house and the gestation house is 2.2~2.6m, and width is 1.7~1.9m.
Preferably, the one side of the air-out passage of each layer building towards the pig house offers several outlet air Mouthful, it is mounted on exhaust fan on each air outlet.
Preferably, one end connection that the ground inclination of the relatively described pig house of several raceway grooves is set and the raceway groove is low is low One layer of the excrement collecting pipe, inclined angle are 10 °~30 °.
Preferably, one end of each layer building is additionally provided with disinfection room and electric control chamber for a person to use.
Due to the adoption of the above technical scheme, the utility model has the advantages that:
Building solid pig raising system provided by the utility model, including multi-storey building, if being both provided in per first floor room Dry pig house and the expects pipe to match with pig house, water pipe, ventilation device, sewage-treatment plant and register, not only greatly improve The utilization rate in unit area soil alleviates the situation of soil anxiety, and corresponding corollary equipment is complete, conducive to the building The scale management of room solid pig raising system.
Building solid pig raising system provided by the utility model, several pig houses per first floor room include several incubations House, several fattening houses, several breeding houses and several gestation houses so that the porkling of same layer can stay in the different development growth phases It in corresponding pig house, is sold until bringing out house hair up, avoids porkling and go downstairs on high-storey and hurry back and forth and be not suitable with new environment.Installing Lead to hot water in the temperature adjustment water pipe for being bred as house and fattening my humble abode side, be weaker because of the piglet defence capability in growth period, therefore need Logical hot water warming;And the temperature adjustment water pipe for being installed in breeding house and pregnant my humble abode side leads to cold water, is because in breeding season and the gestational period Sow body temperature it is relatively high, therefore cold water is needed to cool down.Appropriate method of temperature control, more efficient promotion pig are selected for different swinerys The healthy growth of group.
Description of the drawings
Fig. 1 is the structural representation in the every first floor room for the building solid pig raising system that the utility model embodiment provides Figure;
Fig. 2 is the partial enlargement in the every first floor room for the building solid pig raising system that the utility model embodiment provides Figure;
Fig. 3 is the structure diagram for the building solid pig raising system that the utility model embodiment provides.
In attached drawing, 1- buildings, 2- lifts, 3- stair, 4- aisle, 5- pig houses, 51- incubation houses, 52-, which is fattened, to be given up, and 53- matches Kind house, 54- gestation house, 8- air intake passages, 9- air inlets, 10- air-out passages, 11- raceway grooves, 12- disinfection rooms, 13- electric control chambers, 14- air outlets, 15- exhaust fans.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work All other embodiments obtained shall fall within the protection scope of the present invention.
It should be noted that when component is referred to as " being fixed on " another component, it can be directly on another component Or there may also be components placed in the middle.When a component is considered as " connection " another component, it can be directly connected to To another component or it may be simultaneously present component placed in the middle.When a component is considered as " being set to " another component, it Can be set up directly on another component or may be simultaneously present component placed in the middle.Term as used herein is " vertical ", " horizontal ", "left", "right" and similar statement for illustrative purposes only.
Unless otherwise defined, all of technologies and scientific terms used here by the article is led with belonging to the technology of the utility model The normally understood meaning of technical staff in domain is identical.It is only in the term used in the description of the utility model herein The purpose of description specific embodiment, it is not intended that in limitation the utility model.Term as used herein " and/or " include The arbitrary and all combination of one or more relevant Listed Items.
Please referring also to Fig. 1, Fig. 2 and Fig. 3, the utility model embodiment provide a kind of building solid pig raising system, packet An at least building building 1 is included, includes multilayer per building building 1.Include at least three layers per building building 1.In the present embodiment, per building building Room 1 includes seven layers.Opposite end per first floor room 1 offers the lift 2 for multiplying load for pig and the stair 3 for people's walking, The aisle 4 at a connection same layer both ends is equipped in per first floor room 1.The opposite sides in each layer of aisle 4, which is spaced, to be installed with Several pig houses 5, several pig houses 5 per first floor room 1 are bred as giving up 51, several fattening houses 52, several houses 53 of breeding including several With several gestation houses 54.Several opposite sides for being bred as house 51 and several fattening houses 52 positioned at 4 the same end of aisle, several breeding houses 53 and it is several gestation house 54 be located at 4 other end of aisle opposite sides.In the present embodiment, it is several to be bred as house 51 and several educate Fertilizer house 52 is located at the opposite sides of 4 left end of aisle, and several breeding houses 53 and several gestation houses 54 are located at opposite the two of 4 right end of aisle Side.The length for being bred as house 51 and fattening house 52 is 1.8~2.2m, and width is 0.5~0.7m;Breeding house 53 and gestation house 54 Length be 2.2~2.6m, width is 1.7~1.9m.In the present embodiment, the length for being bred as house 51 is 1.8m, wide It spends for 0.5m;The length of fattening house 52 is 2.2m, width 0.7m;The length of breeding house 53 is 2.2m, width 1.7m;Gestation The length of house 54 is 2.6m, width 1.9m.
The expects pipe (not shown) and water pipe (not shown) led in each pig house 5 are distributed in length and breadth in per first floor room 1, It is each be bred as being equipped in house 51, fattening house 52, breeding house 53 and gestation house 54 connect the expects pipe and described water pipe one end Feeding area (not shown).The other end of several expects pipes connects a material pond (not shown) being located at outside pig house 5, several described The other end of water pipe connects a pond (not shown) being located at outside pig house 5.It is filled around pig house 5 in per first floor room 1 Equipped with register (not shown).In the present embodiment, the register is several temperature adjustment water pipes, is installed in several incubations The temperature adjustment water pipe around house 51 and several fattening houses 52 leads to hot water, enables piglet warming.It is installed in several breeding houses 53 And the temperature adjustment water pipe around several gestation houses 54 leads to cold water, so as to cool down in breeding season and gravidic sow in due course.
Opposite sides per first floor room 1 offers the air intake passage 8 of connection pig house 5, and air intake passage 8 passes through air inlet 9 connections are extraneous, to be passed through fresh air into building 1.The outlet air of connection pig house 5 is offered on aisle 4 per first floor room 1 Channel 10, and each layer air-out passage 10 communicates.The one side of air-out passage 10 towards pig house 5 per first floor room 1 offers Several air outlets 14 are mounted on exhaust fan 15 on each air outlet 14, for taking the breathing exhaust gas in building 1 away.
The ground of each layer of pig house 5, which is spaced apart, is equipped with several raceway grooves 11, and several through-holes are offered on each raceway groove 11 (not shown), the day face interval per first floor room 1 are installed with several excrement collecting pipe (not shown), and several through-hole connections are one layer low Several excrement collecting pipes, several raceway grooves 11 with respect to pig house 5 ground inclination setting and raceway groove 11 it is low one end connection it is low one layer The excrement collecting pipe, inclined angle be 10 °~30 °.In the present embodiment, several raceway grooves 11 are with respect to 5 inclined angle of pig house Spend is 20 °.Total soil pipe (not shown) that each layer of several excrement collecting pipes are converged on 1 metope of building simultaneously passes through Total soil pipe is communicated in the manure pit (not shown) outside building 1.One end per first floor room 1 is additionally provided with disinfection for a person to use Room 12 and electric control chamber 13.Staff arrives first the beam worker that whole body sterilizing is carried out in disinfection room 12 before pig house 5 is entered Make, in order to avoid bacterium infection pig house 5 with oneself.The electric control chamber 13 of each floor is used to control the circuit in flood building.
The building solid pig raising system of the utility model is placed in incubation house 51 when in use, by weanling immature porkling In, the porkling in growth period is then placed in fattening house 52, is bred and is given up the 53 big pigs for being used to dispose oestrus, and gestation house 54 For disposing the sow in stages of gestation.Feed is led to corresponding pig house to staff by fixed point respectively by the expects pipe daily In 5 feeding area, so that pig feed is used.After feeding is complete, staff delivers water into each pig house 5 by the water pipe In the feeding area, so that pig is drunk.Staff adjusts pig by the register in due course according to the temperature in pig house 5 Temperature in house 5, to allow pig there are one appropriate temperature environment.It is installed in the temperature adjustment for being bred as 52 lower section of house 51 and fattening house Water pipe leads to hot water, is weaker because of the porkling defence capability in growth period, therefore needs logical hot water warming;And it is installed in breeding house 53 With gestation house 54 lower section the temperature adjustment water pipe lead to cold water, be because in breeding season and gravidic sow body temperature it is relatively high, therefore Cold water is needed to cool down.Appropriate method of temperature control, the more efficient healthy growth for promoting swinery are selected for different swinerys.
In addition, the air intake passage 8 per first floor room 1 connects fresh air by air inlet 9, fresh air is sent into Pig house 5 in building 1, the exhaust gas after then swinery breathes pump to air-out passage 10 by exhaust fan 15, are finally led to by outlet air It discharges outside building 1 in road 10 so that dirty breathing exhaust gas is effectively discharged while being able to be replenished in time fresh air in pig house 5. The slurry of feces and urine of pig house 5 per first floor room 1 is collected into low one layer of several collection excrement by the through-hole of raceway groove 11 Guan Zhong is uniformly processed outside finally by total soil pipe discharge building 1.
It is understood that being not limited to seven layers per building building 1, in other embodiments, seven layers can be less than, Seven layers can be more than.
Above description is the detailed description for the preferable possible embodiments of the utility model, but embodiment is not limited to The patent claim of the utility model, the equal variation or modification completed under the technical spirit suggested by all the utility model Change, should all belong to the utility model and cover the scope of the claims.

Claims (10)

1. a kind of building solid pig raising system, including an at least building building, building includes multilayer, each floor building described in per building The aisle at a connection same layer both ends is equipped in room, it is characterised in that:The opposite end of each layer building offers The lift and the stair for people's walking for multiplying load for pig, the opposite sides in each layer aisle, which is spaced, is installed with several pigs It gives up, the expects pipe and water pipe led in each pig house, each layer building is distributed in length and breadth in each layer building Register is installed with around the inherent pig house;The opposite sides of each layer building offers the connection pig The air intake passage of house, each layer building offer the air-out passage for connecting the pig house, and each layer on the aisle The air-out passage communicates;The ground of each layer pig house, which is spaced apart, is equipped with several raceway grooves, on each raceway groove Several through-holes are offered, the day face interval of each layer building is installed with several excrement collecting pipes, several through-hole connections low one Several excrement collecting pipes of layer, each layer of several excrement collecting pipes converge at total soil pipe on the building wall And pass through the manure pit that total soil pipe is communicated in outside the building.
2. building solid pig raising system as described in claim 1, it is characterised in that:Building includes at least three layers described in per building.
3. building solid pig raising system as described in claim 1, it is characterised in that:Several pigs of each layer building House is bred as house, several fattening houses, several house and several pregnant houses of breeding including several;It is several it is described be bred as house and it is several described Truncation is fattened in the opposite sides of described aisle the same end, several breeding houses and several pregnant truncations are in the aisle The opposite sides of the other end.
4. building solid pig raising system as claimed in claim 3, it is characterised in that:Each incubation is given up, the fattening is given up, The feeding area for connecting the expects pipe and described water pipe one end is equipped in the breeding house and the gestation house.
5. building solid pig raising system as claimed in claim 4, it is characterised in that:The other end of several expects pipes connects One is located at the material pond outside the pig house, and the other end of several water pipes connects a pond being located at outside the pig house.
6. building solid pig raising system as claimed in claim 3, it is characterised in that:The register is several tempered waters Pipe is installed in several temperature adjustment water pipes being bred as around house and several fattening houses and leads to hot water, is installed in several institutes The temperature adjustment water pipe stated around breeding house and several gestation houses leads to cold water.
7. building solid pig raising system as claimed in claim 3, it is characterised in that:The length for being bred as house and the fattening house Degree is 1.8~2.2m, and width is 0.5~0.7m;The length of the breeding house and the gestation house is 2.2~2.6m, Width is 1.7~1.9m.
8. building solid pig raising system as described in claim 1, it is characterised in that:The outlet air of each layer building is led to The one side of road towards the pig house offers several air outlets, and exhaust fan is mounted on each air outlet.
9. building solid pig raising system as described in claim 1, it is characterised in that:Several relatively described pig houses of the raceway groove One end that ground inclination is set and the raceway groove is low connects low one layer of the excrement collecting pipe, and inclined angle is 10 °~30 °.
10. building solid pig raising system as described in claim 1, it is characterised in that:One end of each layer building is also set There are disinfection room and electric control chamber for a person to use.
CN201721343768.4U 2017-10-18 2017-10-18 Building solid pig raising system Active CN207589769U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721343768.4U CN207589769U (en) 2017-10-18 2017-10-18 Building solid pig raising system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721343768.4U CN207589769U (en) 2017-10-18 2017-10-18 Building solid pig raising system

Publications (1)

Publication Number Publication Date
CN207589769U true CN207589769U (en) 2018-07-10

Family

ID=62756187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721343768.4U Active CN207589769U (en) 2017-10-18 2017-10-18 Building solid pig raising system

Country Status (1)

Country Link
CN (1) CN207589769U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109964823A (en) * 2019-04-11 2019-07-05 广西扬翔股份有限公司 The control method and emergency system of emergency system
CN111528108A (en) * 2020-06-08 2020-08-14 西藏新好科技有限公司 Building type pig farm and production group configuration method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109964823A (en) * 2019-04-11 2019-07-05 广西扬翔股份有限公司 The control method and emergency system of emergency system
CN111528108A (en) * 2020-06-08 2020-08-14 西藏新好科技有限公司 Building type pig farm and production group configuration method

Similar Documents

Publication Publication Date Title
CN107926727A (en) Building solid pig raising system
CN101889553B (en) Original ecological pig farm and original ecological pig breeding method
CN201771224U (en) Single-span automatic controlled planting and raising balanced ecological greenhouse
CN101933462B (en) Negative-pressure ventilation type pig raising system based on biological fermenting bed
CN104285828A (en) Energy-saving and environment-friendly hog house
CN208402802U (en) Fattening house
CN207589769U (en) Building solid pig raising system
CN207151534U (en) A kind of single-column type carries the fermentation bed piggery of air hole
CN204443542U (en) Unsettled ventilation animal room
CN206547545U (en) One boar and the stereo ecological receptacle of chicken
CN204837453U (en) Simple and easy cattle and sheep child care house heat preservation device
CN105941166A (en) A goat house and goat breeding system
CN112273239A (en) Ecological environment-friendly floor pig-raising integrated system and pig-raising method thereof
US20210267174A1 (en) Multi-storey animal house
CN106417047B (en) A kind of novel environment friendly pig house and nuisanceless intensive pig production method
CN201690888U (en) Semi-underground breeding system
CN201621811U (en) Energy-saving type reverse circulating forced ventilation system
CN101564020B (en) Boar artificial insemination three-in-one feeding method and device thereof
CN204860488U (en) Hot house pork pig fattening house
CN204259585U (en) A kind of pig house of energy-saving and environmental protecting
KR20070013422A (en) Integrated sanitizing system for cattle shed
CN101790964A (en) Semi-underground breeding system
CN111685079A (en) Healthy ecological cattle raising method
CN205727525U (en) A kind of novel environment friendly pig house
CN106417042B (en) With the nested circle building pig house and method for culturing pigs for setting air-out passage and air intake passage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant