CN207553308U - A kind of rack Lifting Equipment - Google Patents

A kind of rack Lifting Equipment Download PDF

Info

Publication number
CN207553308U
CN207553308U CN201721637288.9U CN201721637288U CN207553308U CN 207553308 U CN207553308 U CN 207553308U CN 201721637288 U CN201721637288 U CN 201721637288U CN 207553308 U CN207553308 U CN 207553308U
Authority
CN
China
Prior art keywords
jacking
frame
plate
lifting
adjacent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721637288.9U
Other languages
Chinese (zh)
Inventor
闫育智
王远柱
任永贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanxi Fenyang Fengyuan Net Frame Steel Structure Co Ltd
Original Assignee
Shanxi Fenyang Fengyuan Net Frame Steel Structure Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanxi Fenyang Fengyuan Net Frame Steel Structure Co Ltd filed Critical Shanxi Fenyang Fengyuan Net Frame Steel Structure Co Ltd
Priority to CN201721637288.9U priority Critical patent/CN207553308U/en
Application granted granted Critical
Publication of CN207553308U publication Critical patent/CN207553308U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of rack Lifting Equipments, including several jacking frames, for connecting the jacking post of adjacent jacking frame, raising plate, pedestal and jacking pyrometric cone, the jacking frame includes the equilateral triangle stent being made of 3 connecting rods, it is removably connected by ring flange between adjacent connecting rod, it is arranged above and below between several jacking frames, the jacking post removably connects vertically adjacent ring flange, the raising plate is equilateral triangle, its center of gravity is equipped with jacking cylinder, when the raising plate is placed in inside the jacking frame, 3 corners of raising plate are not extended at 3 ring flanges, the jacking pyrometric cone is connect with top layer jacking frame, the pedestal is connect with lowest level jacking frame, the base center is equipped with the pedestal for fixer cylinder pressure.The utility model is simple in structure, and single-unit jacking frame is strong using triangular structure stability, convenient for disassembly and assembly, sets up multiple fulcrums and can be synchronized by hydraulic cylinder and whole steps up rack to setting position.

Description

一种网架顶升设备A grid lifting device

技术领域technical field

本实用新型涉及一种网架顶升设备。The utility model relates to a grid lifting device.

背景技术Background technique

网架是由多根杆件按照一定的网格形式通过节点连结而成的空间结构。构成网架的基本单元有三角锥,三棱体,正方体,截头四角锥等,由这些基本单元可组合成平面形状的三边形,四边形,六边形,圆形或其他任何形体。具有空间受力、重量轻、刚度大、抗震性能好等优点;可用作体育馆、影剧院、展览厅、候车厅、体育场看台雨篷、飞机库、双向大柱网架结构距车间等建筑的屋盖。缺点是汇交于节点上的杆件数量较多,制作安装较平面结构复杂。The grid frame is a space structure formed by connecting multiple rods through nodes according to a certain grid form. The basic units that make up the grid include triangular pyramids, triangular bodies, cubes, truncated quadrangular pyramids, etc. These basic units can be combined into planar triangles, quadrilaterals, hexagons, circles or any other shapes. It has the advantages of space force, light weight, high rigidity, and good seismic performance; it can be used as a roof for gymnasiums, theaters, exhibition halls, waiting halls, stadium stand awnings, hangars, two-way large-column grid structures and workshops, etc. cover. The disadvantage is that the number of rods that meet at the nodes is large, and the fabrication and installation are more complicated than the planar structure.

网架结构的施工安装方法分两类:一类是在地面拼装的整体顶升法、整体吊装法;另一类是高空就位的散装、分条分块就位组装和高空滑移就位组装等方法。The construction and installation methods of grid structure are divided into two categories: one is the overall jacking method and overall hoisting method assembled on the ground; Assembling and other methods.

现有的安装方法使用的设备较为笨重,起升速度慢,成本高,长途运输费用昂高。为克服上述缺点,需要开发一种结构简单、成本较低且施工难度低的网架提升设备。The equipment used in the existing installation method is relatively heavy, the lifting speed is slow, the cost is high, and the long-distance transportation cost is high. In order to overcome the above shortcomings, it is necessary to develop a grid lifting device with simple structure, low cost and low construction difficulty.

实用新型内容Utility model content

本实用新型针对现有技术的不足设计了一种网架顶升设备。The utility model designs a network frame jacking device aiming at the deficiencies of the prior art.

本实用新型为实现以上目的,采用如下方案:一种网架顶升设备,包括若干顶升架、用于连接相邻顶升架的顶升柱、顶升板、底座和顶升三角锥,所述顶升架包括由3条连接杆组成的正三角形支架,相邻连接杆之间通过法兰盘可拆卸的连接,所述若干顶升架之间上下排列,所述顶升柱可拆卸的连接垂直方向上相邻的法兰盘,所述顶升板为正三角形,其重心处设有顶升筒,当所述顶升板置于所述顶升架内部时,顶升板的3个角部别延伸至3个法兰盘处,所述顶升三角锥与最上层顶升架连接,所述底座与最下层顶升架连接,所述底座中心设有用于固定液压缸的基座。In order to achieve the above purpose, the utility model adopts the following scheme: a network frame jacking device, including several jacking frames, jacking columns for connecting adjacent jacking frames, a jacking plate, a base and a jacking triangular cone, The jacking frame includes an equilateral triangle bracket composed of 3 connecting rods, the adjacent connecting rods are detachably connected by flanges, the jacking frames are arranged up and down, and the jacking columns are detachable Connect the adjacent flanges in the vertical direction. The lifting plate is an equilateral triangle with a lifting cylinder at its center of gravity. When the lifting plate is placed inside the lifting frame, the lifting plate The three corners respectively extend to the three flanges, the lifting triangular cone is connected to the uppermost lifting frame, the base is connected to the lowermost lifting frame, and the center of the base is provided with a mounting bracket for fixing the hydraulic cylinder. base.

进一步的,所述连接杆的两端设有连接板,所述连接板上设有通孔一,所述法兰盘上设有与所述通孔一配合的通孔二。Further, the two ends of the connecting rod are provided with a connecting plate, the connecting plate is provided with a through hole 1, and the flange is provided with a through hole 2 matched with the through hole 1.

进一步的,所述连接板具有与所述法兰盘配合的弧形。Further, the connecting plate has an arc matching the flange.

进一步的,所述顶升三角锥的顶部设有上弦球。Further, the top of the lifting triangular cone is provided with a winding ball.

进一步的,所述顶升板上沿其3条中垂线设有3条筋板。Further, the lifting plate is provided with three ribs along its three vertical lines.

本实用新型和现有技术相比,具有如下优点和有益效果:结构简单,单节顶升架采用三角形结构稳定性强,拆装方便,设立多个支点通过液压缸可以同步整体将网架逐步提升到设定位置。Compared with the prior art, the utility model has the following advantages and beneficial effects: the structure is simple, the single-section jacking frame adopts a triangular structure with strong stability, easy disassembly and assembly, multiple fulcrums can be set up to synchronously move the grid frame gradually through the hydraulic cylinder Raise to the set position.

附图说明Description of drawings

图1为本实用新型顶升架结构示意图;Fig. 1 is the structural schematic diagram of jacking frame of the present utility model;

图2为本实用新型连接杆结构示意图;Fig. 2 is a structural schematic diagram of the utility model connecting rod;

图3为本实用新型顶升柱立面结构示意图;Fig. 3 is a schematic diagram of the facade structure of the jacking column of the present invention;

图4为本实用新型顶升板设置在顶升架内的示意图;Fig. 4 is a schematic diagram of the utility model jacking plate arranged in the jacking frame;

图5为本实用新型底座结构示意图;Fig. 5 is a schematic diagram of the structure of the base of the utility model;

图6为本实用新型顶升三角锥立面结构示意图;Fig. 6 is a schematic diagram of the facade structure of the jacking triangular cone of the utility model;

图7为图6的A-A视图。Fig. 7 is the A-A view of Fig. 6 .

具体实施方式Detailed ways

结合图1至图7,一种网架顶升设备,包括若干顶升架1、用于连接相邻顶升架的顶升柱2、顶升板3、底座4和顶升三角锥5,所述顶升架1包括由3条连接杆11组成的正三角形支架,相邻连接杆11之间通过法兰盘12可拆卸的连接,所述若干顶升架1之间上下排列,所述顶升柱2可拆卸的连接垂直方向上相邻的法兰盘12,所述顶升板3为正三角形,其重心处设有顶升筒31,当所述顶升板3置于所述顶升架1内部时,顶升板3的3个角部别延伸至3个法兰盘12处,可以将顶升板3通过螺栓等零件可拆卸的设置在顶升架1内,所述顶升三角锥5与最上层顶升架连接,所述底座4与最下层顶升架连接,所述底座4中心设有用于固定液压缸的基座41。如图5所示,底座4内设置米字型支架用于加固,并设置与顶升架1连接的对应的法兰盘。With reference to Figures 1 to 7, a network frame jacking device includes a number of jacking frames 1, a jacking column 2 for connecting adjacent jacking frames, a jacking plate 3, a base 4 and a jacking triangular cone 5, The jacking frame 1 includes an equilateral triangle bracket composed of three connecting rods 11, and the adjacent connecting rods 11 are detachably connected by flanges 12, and the jacking frames 1 are arranged up and down. The jacking column 2 is detachably connected to the adjacent flanges 12 in the vertical direction. The jacking plate 3 is an equilateral triangle, and a jacking cylinder 31 is provided at its center of gravity. When the jacking plate 3 is placed on the When the jacking frame 1 is inside, the three corners of the jacking plate 3 extend to the three flanges 12, and the jacking plate 3 can be detachably arranged in the jacking frame 1 through bolts and other parts. The jacking triangular cone 5 is connected with the uppermost jacking frame, the base 4 is connected with the lowermost jacking frame, and the center of the base 4 is provided with a base 41 for fixing the hydraulic cylinder. As shown in FIG. 5 , a rice-shaped support is provided in the base 4 for reinforcement, and a corresponding flange connected to the jacking frame 1 is provided.

如图2所示,所述连接杆11的两端设有连接板13,所述连接板13上设有通孔一,所述法兰盘12上设有与所述通孔一配合的通孔二。所述连接板11具有与所述法兰盘12配合的弧形。图中,通孔一的数量为2个,且2个通孔一的排列与法兰盘12上相邻的2个通孔二相配合,即连接板11的一端部通过2只螺栓即可完成与法兰盘12的固定,可实现快速的拆装。As shown in Figure 2, the two ends of the connecting rod 11 are provided with a connecting plate 13, the connecting plate 13 is provided with a through hole, and the flange 12 is provided with a through hole matched with the through hole. hole two. The connecting plate 11 has an arc matching the flange 12 . In the figure, the number of through holes 1 is 2, and the arrangement of the 2 through holes 1 matches with the 2 adjacent through holes 2 on the flange 12, that is, one end of the connecting plate 11 can pass through 2 bolts. The fixing with the flange plate 12 is completed, and quick disassembly and assembly can be realized.

如图6和图7所示,顶升三角锥5为正三角锥,由焊接球和钢管焊接而成,其顶部设有上弦球51,用于顶起待顶升的网架,其下部的3个角部设有法兰盘,用于和下层的顶升架连接。As shown in Figures 6 and 7, the jacking triangular cone 5 is an equilateral triangular cone, which is welded by welding balls and steel pipes, and its top is provided with a string ball 51 for jacking up the grid frame to be lifted. The three corners are provided with flanges for connection with the jacking frame on the lower floor.

如图4所示,所述顶升板3上沿其3条中垂线设有3条筋板32,用于加强顶升板3。As shown in FIG. 4 , the lifting plate 3 is provided with three ribs 32 along its three vertical lines for strengthening the lifting plate 3 .

在实际施工时,选取若干合适的支点,将底座4固定在地面上,在底座4中心的基座41上安装液压缸,然后设置如图4所示的带有顶升板3的顶升架1,顶升架的下方通过其3个角部的法兰盘12固定顶升柱2,使顶升柱2的下端对准底座4上的法兰盘。顶升架1的上方安装顶升三角锥5,顶升三角锥5支撑待顶升的网架。同步开启液压缸,将网架顶起一段距离,距离大致略高于顶升柱2的高度。然后在被顶起的顶升架的下方通过顶升柱安装下一节顶升架,降下液压缸。最后,拆下顶升板3,将其安装在最下层顶升架内,继续上述过程。由此,网架被一层一层的提升。In actual construction, select some suitable fulcrums, fix the base 4 on the ground, install a hydraulic cylinder on the base 41 in the center of the base 4, and then set the jacking frame with the jacking plate 3 as shown in Figure 4 1. The lower part of the jacking frame fixes the jacking column 2 through the flanges 12 at its three corners, so that the lower end of the jacking column 2 is aligned with the flange on the base 4. A jacking triangular cone 5 is installed above the jacking frame 1, and the jacking triangular cone 5 supports the network frame to be lifted. Simultaneously open the hydraulic cylinders to lift the net frame for a certain distance, which is roughly slightly higher than the height of the jacking column 2. Then install the next section of the jacking frame by the jacking column under the jacked up jacking frame, and lower the hydraulic cylinder. Finally, remove the jacking plate 3, install it in the lowermost jacking frame, and continue the above process. As a result, the grid is lifted layer by layer.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型技术原理的前提下,还可以做出若干改进和变型,这些改进和变型也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the technical principle of the utility model, some improvements and modifications can also be made. And modification should also be regarded as the protection scope of the present utility model.

Claims (5)

1.一种网架顶升设备,包括若干顶升架、用于连接相邻顶升架的顶升柱、顶升板、底座和顶升三角锥,其特征在于:所述顶升架包括由3条连接杆组成的正三角形支架,相邻连接杆之间通过法兰盘可拆卸的连接,所述若干顶升架之间上下排列,所述顶升柱可拆卸的连接垂直方向上相邻的法兰盘,所述顶升板为正三角形,其重心处设有顶升筒,当所述顶升板置于所述顶升架内部时,顶升板的3个角部别延伸至3个法兰盘处,所述顶升三角锥与最上层顶升架连接,所述底座与最下层顶升架连接,所述底座中心设有用于固定液压缸的基座。1. A network frame jacking device, comprising several jacking frames, a jacking column for connecting adjacent jacking frames, a jacking plate, a base and a jacking triangular cone, it is characterized in that: the jacking frame includes An equilateral triangular bracket composed of 3 connecting rods, adjacent connecting rods are detachably connected by flanges, the jacking frames are arranged up and down, and the jacking columns are detachably connected to each other in the vertical direction The adjacent flange, the lifting plate is an equilateral triangle, and a lifting cylinder is provided at its center of gravity. When the lifting plate is placed inside the lifting frame, the three corners of the lifting plate extend At the three flanges, the lifting triangular cone is connected to the uppermost jacking frame, the base is connected to the lowermost jacking frame, and the center of the base is provided with a base for fixing the hydraulic cylinder. 2.如权利要求1所述的一种网架顶升设备,其特征在于:所述连接杆的两端设有连接板,所述连接板上设有通孔一,所述法兰盘上设有与所述通孔一配合的通孔二。2. A network frame jacking device as claimed in claim 1, characterized in that: the two ends of the connecting rod are provided with a connecting plate, the connecting plate is provided with a through hole 1, and the flange plate is There is a second through hole matched with the first through hole. 3.如权利要求2所述的一种网架顶升设备,其特征在于:所述连接板具有与所述法兰盘配合的弧形。3. The network frame jacking device according to claim 2, characterized in that: the connecting plate has an arc shape matched with the flange. 4.如权利要求1所述的一种网架顶升设备,其特征在于:所述顶升三角锥的顶部设有上弦球。4. A grid lifting device as claimed in claim 1, characterized in that: the top of the lifting triangular cone is provided with a string ball. 5.如权利要求1所述的一种网架顶升设备,其特征在于:所述顶升板上沿其3条中垂线设有3条筋板。5. A network frame jacking device as claimed in claim 1, characterized in that: said jacking plate is provided with three ribs along its three vertical lines.
CN201721637288.9U 2017-11-30 2017-11-30 A kind of rack Lifting Equipment Active CN207553308U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721637288.9U CN207553308U (en) 2017-11-30 2017-11-30 A kind of rack Lifting Equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721637288.9U CN207553308U (en) 2017-11-30 2017-11-30 A kind of rack Lifting Equipment

Publications (1)

Publication Number Publication Date
CN207553308U true CN207553308U (en) 2018-06-29

Family

ID=62678248

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721637288.9U Active CN207553308U (en) 2017-11-30 2017-11-30 A kind of rack Lifting Equipment

Country Status (1)

Country Link
CN (1) CN207553308U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005574A (en) * 2019-12-18 2020-04-14 徐州中煤(宁夏)钢结构建设有限公司 A swinging jack
CN112211292A (en) * 2020-10-20 2021-01-12 智远谋 Method for lifting and mounting net rack for building construction

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111005574A (en) * 2019-12-18 2020-04-14 徐州中煤(宁夏)钢结构建设有限公司 A swinging jack
CN112211292A (en) * 2020-10-20 2021-01-12 智远谋 Method for lifting and mounting net rack for building construction
CN112211292B (en) * 2020-10-20 2021-09-14 平湖市恒鑫建设开发有限公司 Method for lifting and mounting net rack for building construction

Similar Documents

Publication Publication Date Title
CN201460242U (en) Assembly jig frame with net rack structure
CN111764686A (en) A floor deck support device
CN207553308U (en) A kind of rack Lifting Equipment
CN202745397U (en) Lifting device for large-span space truss
CN201665992U (en) Whole lifting platform of large steel net frame
CN216866034U (en) Large area high-altitude grid structure aluminum grille ceiling construction device
CN110565928B (en) Fast-assembling, quick detach formula scaffold frame for construction of building outer wall
CN114319860A (en) Movable beam-bottom tower support device and construction method
CN219241510U (en) A spiral landscape tower
CN216616258U (en) A detachable built-in grid jacking device
CN219174983U (en) Circular pedestrian bridge structure with oblique arch and single cable surface and inclined pulling inner side
CN207526141U (en) Small-section tower-shaped steel structure assembled operating platform
CN204040431U (en) Movable triangular frame
CN212866337U (en) Inverted pyramid-shaped steel roof structure
CN111749384B (en) Steel structure roof structure of tower and construction method thereof
CN214401372U (en) an assembled bridge
CN209009971U (en) A kind of spiral duct lifting moulding bed
CN223468858U (en) Large-span special-shaped double-layer forward-placed quadrangular pyramid grid roof
CN111895369B (en) Movable solar lighting lamp post installation method
CN223593768U (en) Scaffold for outdoor decoration
CN216341070U (en) Auxiliary positioning device for installation of steel structure net rack
CN223983404U (en) Hydraulic jacking device for installing steel mesh frame
CN216276848U (en) Corner double-rod type high-altitude operation hanging basket counterweight-free overhanging device
CN104675093B (en) Dish-type node type scaffold
CN113085432B (en) Construction method of large semi-landscape painting canvas in scene restoration construction