CN207547956U - A kind of pre-buried channel flow robot welding system - Google Patents
A kind of pre-buried channel flow robot welding system Download PDFInfo
- Publication number
- CN207547956U CN207547956U CN201721519141.XU CN201721519141U CN207547956U CN 207547956 U CN207547956 U CN 207547956U CN 201721519141 U CN201721519141 U CN 201721519141U CN 207547956 U CN207547956 U CN 207547956U
- Authority
- CN
- China
- Prior art keywords
- welding
- plate
- cylinder
- channel steel
- baffle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Butt Welding And Welding Of Specific Article (AREA)
Abstract
本实用新型涉及到一种预埋槽道自动焊接系统,包括锚杆传送机构,位于所述锚杆传送机构输出端的转送机构,位于所述转送机构端部的焊接机构,位于所述焊接机构一侧的槽钢输送机构以及位于所述焊接机构一端的收集机构。本实用新型技术方案,在对槽钢与锚杆进行焊接时,利用槽钢输送机构将槽钢输送至焊接机构处,同时,锚杆传送机构将锚杆传送至转送机构,再由转送机构将锚杆转送至焊接机构,槽钢与锚杆在完成焊接后,收集机构自动将焊接完成的成品工件收集,之后进行下一工件的焊接,从而实现了槽钢与锚杆的自动焊接作业,减小了焊接工人的工作量,并且,由于整个焊接过程均为机械操作,其提高了焊接质量的稳定性。
The utility model relates to an automatic welding system for a pre-buried channel, which comprises a bolt transmission mechanism, a transfer mechanism located at the output end of the bolt transmission mechanism, a welding mechanism located at the end of the transmission mechanism, and a welding mechanism located at the end of the welding mechanism. The channel steel conveying mechanism on the side and the collecting mechanism at one end of the welding mechanism. The technical scheme of the utility model, when welding the channel steel and the anchor rod, uses the channel steel conveying mechanism to convey the channel steel to the welding mechanism; The anchor rod is transferred to the welding mechanism. After the channel steel and the anchor rod are welded, the collecting mechanism automatically collects the welded finished workpieces, and then the next workpiece is welded, thus realizing the automatic welding operation of the channel steel and the anchor rod. The workload of welding workers is reduced, and because the entire welding process is mechanically operated, it improves the stability of welding quality.
Description
技术领域technical field
本实用新型涉及一种金属焊接工装,特别涉及一种预埋槽道自动焊接系统。The utility model relates to a metal welding tool, in particular to an automatic welding system for a pre-embedded channel.
背景技术Background technique
焊接是一种以加热、高温或者高压的方式接合金属或其他热塑性材料如塑料的制造工艺及技术。Welding is a manufacturing process and technology that uses heat, high temperature or high pressure to join metal or other thermoplastic materials such as plastics.
槽钢是一种长条形钢材,属建造用和机械用碳素结构钢,其主要用于建筑结构、幕墙工程、机械设备和车辆制造等。实际工程中,常需要在槽钢表面焊接锚杆,锚杆呈工字形,焊接完成的成品一般称为预埋槽道,预埋槽道预先埋藏于建筑体中,以方便后续与其它结构固定。而目前的焊接技术通常是人工将锚杆放置在槽钢表面需要焊接的部位,再人为将两者焊接连接。但是,这种焊接方式不仅工作效率底,劳动强度大,而且,由于锚杆与槽钢的焊接位置是焊接工人主观判断,因此,容易造成焊接位置发生偏移,并且,人工焊接容易造成焊接质量不稳定的情况。Channel steel is a long strip of steel, which is a carbon structural steel for construction and machinery. It is mainly used in building structures, curtain wall engineering, mechanical equipment and vehicle manufacturing. In actual engineering, it is often necessary to weld anchor rods on the surface of channel steel. The anchor rods are I-shaped. The finished product after welding is generally called a pre-embedded channel. The pre-embedded channel is pre-buried in the building to facilitate subsequent fixation with other structures. . The current welding technology is usually to manually place the anchor rod on the surface of the channel steel to be welded, and then artificially weld the two together. However, this welding method not only has low work efficiency and high labor intensity, but also, because the welding position of the anchor rod and the channel steel is subjectively judged by the welder, it is easy to cause the welding position to shift, and the manual welding is likely to cause poor welding quality. unstable situation.
实用新型内容Utility model content
本实用新型的目的是提供一种预埋槽道自动焊接系统,其可以实现槽钢与锚杆的自动焊接作业,从而减小了焊接工人的劳动强度,并且焊接质量的稳定性。The purpose of this utility model is to provide an automatic welding system for pre-buried channels, which can realize the automatic welding operation of channel steel and anchor rods, thereby reducing the labor intensity of welders and ensuring the stability of welding quality.
本实用新型的上述技术目的是通过以下技术方案得以实现的:The above-mentioned technical purpose of the utility model is achieved through the following technical solutions:
一种预埋槽道自动焊接系统,包括设于工作台上的焊接板,设置在焊接板一侧的用于将槽钢送至焊接板上的槽钢输送机构,位于焊接板另一侧的用于将锚杆送至槽钢上方并压紧的锚杆传送机构;还包括将焊接完毕的预埋槽道从焊接板上输出的收集机构,所述焊接台侧面设有将槽钢以及锚杆焊接在一起的焊接机构。An automatic welding system for pre-buried channels, including a welding plate arranged on a workbench, a channel steel conveying mechanism arranged on one side of the welding plate for sending channel steel to the welding plate, and a channel steel conveying mechanism located on the other side of the welding plate The anchor conveying mechanism is used to send the anchor to the top of the channel steel and compress it; it also includes a collection mechanism for outputting the welded pre-buried channel from the welding plate, and the side of the welding table is equipped with channel steel and anchor A welding mechanism in which the rods are welded together.
通过采用上述技术方案,在对槽钢与锚杆进行焊接时,利用槽钢输送机构将槽钢输送至焊接板,同时,锚杆传送机构将锚杆传送至焊接板上并压紧,焊接机构对槽钢与锚杆进行焊接,收集机构自动将焊接完成的预埋槽道收集,之后进行下一工件的焊接,从而实现了槽钢与锚杆的自动焊接作业,减小了焊接工人的工作量,并且,由于整个焊接过程均为机械操作,其提高了焊接质量的稳定性。By adopting the above-mentioned technical scheme, when the channel steel and the anchor rod are welded, the channel steel conveying mechanism is used to convey the channel steel to the welding plate. At the same time, the anchor rod conveying mechanism conveys the anchor rod to the welding plate and compresses it. The channel steel and the anchor rod are welded, and the collection mechanism automatically collects the welded pre-buried channel, and then the next workpiece is welded, thereby realizing the automatic welding operation of the channel steel and the anchor rod, reducing the work of the welder Quantity, and, because the whole welding process is mechanical operation, it improves the stability of welding quality.
进一步的,所述槽钢输送机构包括两个相对设置的U形卡板,以及设置在两个所述U形卡板一侧的第一气缸,两个所述U形卡板竖直设置,其开口相对,槽钢两端卡嵌在两个所述U形卡板的凹槽内,在两个所述U形卡板背离所述第一气缸的一侧,靠近所述U形卡板底部开有槽钢滑出口,所述第一气缸驱动所述槽钢移动,所述焊接板与所述U形卡板之间设有第一滑轨。Further, the channel steel conveying mechanism includes two oppositely arranged U-shaped clips, and a first cylinder arranged on one side of the two U-shaped clips, the two U-shaped clips are vertically arranged, The openings are opposite, and the two ends of the channel steel are embedded in the grooves of the two U-shaped clamps. On the side of the two U-shaped clamps away from the first cylinder, close to the U-shaped clamps There is a channel steel sliding outlet at the bottom, the first cylinder drives the channel steel to move, and a first slide rail is provided between the welding plate and the U-shaped clamping plate.
通过采用上述技术方案,多个槽钢堆叠卡嵌在两U形卡板内,通过第一气缸驱动槽钢移动,从而将位于最下方的槽钢向背离第一气缸方向推动,位于最下方的槽钢从槽钢滑出口滑出,从而脱离两U形卡板的限制,进而能够将槽钢移动至焊接机构,以便进行后续作业。By adopting the above technical scheme, multiple channel steels are stacked and embedded in the two U-shaped clamping plates, and the channel steels are driven to move by the first cylinder, thereby pushing the lowermost channel steel away from the first cylinder, and the lowermost channel steel is pushed away from the first cylinder. The channel steel slides out from the channel steel sliding outlet, thereby breaking away from the restriction of the two U-shaped clamping plates, and then the channel steel can be moved to the welding mechanism for subsequent operations.
进一步的,所述焊接机构包括设置在所述焊接板的一侧的焊接机器人。Further, the welding mechanism includes a welding robot arranged on one side of the welding plate.
通过采用上述技术方案,第一气缸将槽钢从U形卡板内推出后,继续推动其沿滑轨移动,并进一步滑移至焊接板上,等待锚杆输送至焊接机构处后,利用焊接机器人将槽钢与锚杆焊接连接。By adopting the above technical scheme, after the first cylinder pushes the channel steel out of the U-shaped clamping plate, it continues to push it to move along the slide rail, and further slides to the welding plate, and waits for the anchor rod to be transported to the welding mechanism. The robot welds the channel steel to the anchor rod.
进一步的,所述锚杆传送机构包括传送带和位于传送带输出端的转送机构,所述传送带上方设有与所述锚杆配合的倒T形输送轨道。Further, the anchor rod transmission mechanism includes a conveyor belt and a transfer mechanism located at the output end of the conveyor belt, and an inverted T-shaped conveying track matched with the anchor rod is arranged above the conveyor belt.
通过采用上述技术方案,锚杆部分卡嵌在倒T形输送轨道内,并保持直立输送状态,从而方便后续转送机构将锚杆从锚杆传送机构输出端取出,以进行后续焊接作业。By adopting the above-mentioned technical solution, the anchor rod is partially embedded in the inverted T-shaped conveying track, and maintains an upright conveying state, so that the subsequent transfer mechanism can conveniently take out the anchor rod from the output end of the anchor rod transfer mechanism for subsequent welding operations.
进一步的,所述转送机构包括设置在所述锚杆传送机构输出端端部的旋转气缸、设置在所述旋转气缸顶部的第六气缸,位于第六气缸一侧的夹爪气缸以及驱动所述旋转气缸与所述夹爪气缸向所述焊接板方向移动的第四气缸。Further, the transfer mechanism includes a rotary cylinder arranged at the output end of the anchor rod transmission mechanism, a sixth cylinder arranged on the top of the rotary cylinder, a jaw cylinder located on the side of the sixth cylinder and driving the The fourth cylinder that rotates the cylinder and the jaw cylinder moves toward the welding plate.
通过采用上述技术方案,第六气缸驱动夹爪气缸向传送带输出端移动,夹爪气缸将锚杆从锚杆传送机构夹取后,在旋转气缸的作用下,调整夹爪气缸的方向,使锚杆朝向焊接板方向,之后,第四气缸驱动旋转气缸,带动夹爪气缸及锚杆向焊接板方向移动,从而将锚杆转送至焊接机构,进而利用焊接机器人将槽钢与锚杆焊接连接。By adopting the above technical scheme, the sixth cylinder drives the jaw cylinder to move to the output end of the conveyor belt. After the jaw cylinder clamps the anchor rod from the anchor rod transmission mechanism, under the action of the rotating cylinder, the direction of the jaw cylinder is adjusted to make the anchor The rod faces the direction of the welding plate, and then the fourth cylinder drives the rotary cylinder, which drives the jaw cylinder and the anchor rod to move towards the welding plate, so that the anchor rod is transferred to the welding mechanism, and then the channel steel and the anchor rod are welded and connected by the welding robot.
进一步的,所述焊接板与所述工作台滑移连接,并沿所述焊接板长度方向滑移,所述收集机构包括位于所述焊接板底部,并沿所述焊接板长度方向设置的螺杆,所述螺杆通过电机驱动,所述螺杆与所述焊接板底部螺纹连接,所述螺杆的一侧设有第二气缸,其相对侧设有收集板。Further, the welding plate is slidably connected with the workbench, and slides along the length direction of the welding plate, and the collection mechanism includes a screw located at the bottom of the welding plate and arranged along the length direction of the welding plate , the screw is driven by a motor, the screw is screwed to the bottom of the welding plate, a second cylinder is provided on one side of the screw, and a collecting plate is provided on the opposite side.
通过采用上述技术方案,焊接板与支撑板滑移连接,其底部螺纹连接有螺杆,这样,利用电机驱动螺杆转动,即可带动焊接板移动,从而带动焊接完成的成品工件移动,之后,利用第二气缸将成品工件推动至收集板上,实现成品工件的自动收集。By adopting the above technical scheme, the welding plate and the support plate are slidingly connected, and the screw is connected to the screw at the bottom. In this way, the motor drives the screw to rotate, which can drive the welding plate to move, thereby driving the finished workpiece after welding to move. After that, use the first The two cylinders push the finished workpiece to the collecting plate to realize the automatic collection of the finished workpiece.
进一步的,所述焊接板背离所述第一滑轨的一侧设有第一挡板,所述焊接板一端设有第二挡板,另一端滑动设有第三挡板,所述第三挡板沿所述焊接板长度方向滑移,所述第三挡板通过设置在所述焊接板背离所述第二挡板端部的第三气缸驱动。Further, the side of the welding plate away from the first slide rail is provided with a first baffle, one end of the welding plate is provided with a second baffle, and the other end is slidably provided with a third baffle, and the third The baffle slides along the length direction of the welding plate, and the third baffle is driven by a third air cylinder arranged at the end of the welding plate away from the second baffle.
通过采用上述技术方案,第一挡板可以避免第一气缸将槽钢推动至焊接板上后,继续移动,使槽钢脱离焊接板;槽钢滑移至焊接板上后,第三气缸推动第三挡板向第二挡板方向移动,第三挡板将槽钢紧密抵接在第二挡板与第三挡板之间,从而将槽钢与焊接板的相对位置固定,以方便后续焊接机器人对槽钢及锚杆进行焊接。By adopting the above technical scheme, the first baffle plate can prevent the first cylinder from pushing the channel steel to the welding plate, and then continue to move, so that the channel steel is separated from the welding plate; after the channel steel slides to the welding plate, the third cylinder pushes the The third baffle plate moves towards the second baffle plate, and the third baffle plate closely contacts the channel steel between the second baffle plate and the third baffle plate, thereby fixing the relative position of the channel steel and the welding plate to facilitate subsequent welding The robot welds the channel steel and the anchor rod.
进一步的,所述第一气缸的端部设有U形滑板,所述第一气缸置于所述U形滑板的U形槽内,所述第一气缸的活塞杆与所述U形滑板的横板连接,所述U形滑板顶面不高于所述槽钢滑出口的顶面。Further, the end of the first cylinder is provided with a U-shaped slide plate, the first cylinder is placed in the U-shaped groove of the U-shaped slide plate, and the piston rod of the first cylinder is connected to the U-shaped slide plate. The horizontal plate is connected, and the top surface of the U-shaped slide plate is not higher than the top surface of the channel steel sliding outlet.
通过采用上述技术方案,在将两U形卡板内位于最下方的槽钢推出U形卡板后,U形滑板可以避免位于上方的槽钢在重力作用下下降,卡嵌在第一气缸活塞杆的顶面,影响其回程,进而影响第一气缸推动后续槽钢移动,造成后续工作无法正常进行的情况。By adopting the above-mentioned technical scheme, after the lowermost channel steel in the two U-shaped clamping plates is pushed out of the U-shaped clamping plate, the U-shaped sliding plate can prevent the upper channel steel from falling under the action of gravity and be embedded in the piston of the first cylinder. The top surface of the rod affects its return stroke, and then affects the first cylinder to push the follow-up channel steel to move, resulting in the failure of follow-up work.
进一步的,所述第一滑轨的两侧设有限位板,所述限位板一端与所述槽钢滑出口的外侧壁连接,另一端与所述焊接板背离所述第一挡板的侧壁抵接,所述限位板垂直所述槽钢设置。Further, both sides of the first slide rail are provided with limiting plates, one end of the limiting plate is connected to the outer side wall of the channel steel slide outlet, and the other end is connected to the side wall of the welding plate away from the first baffle plate. The side walls are in contact with each other, and the limiting plate is arranged vertically to the channel steel.
通过采用上述技术方案,第一气缸推动槽钢从槽钢滑出口滑出,进而沿第一滑轨滑移至焊接板,限位板可以避免槽钢在沿第一滑轨移动过程中,移动方向发生偏转,从而保证槽钢可以顺利滑移至焊接板上。By adopting the above technical scheme, the first cylinder pushes the channel steel to slide out from the channel steel slide outlet, and then slides to the welding plate along the first slide rail, and the limit plate can prevent the channel steel from moving along the first slide rail. The direction is deflected, so as to ensure that the channel steel can slide smoothly to the welding plate.
进一步的,所述传送带输出端活动设有第五挡板,所述第五挡板通过设置在所述传送带侧壁的第五气缸驱动。Further, the output end of the conveyor belt is movably provided with a fifth baffle, and the fifth baffle is driven by a fifth air cylinder arranged on the side wall of the conveyor belt.
通过采用上述技术方案,常态下第五挡板抵接在锚杆传送机构的输出端的输出口,避免传送带上的锚杆从输出口滑落,在需要将锚杆移送至转送机构时,第五气缸驱动第五挡板与输出端脱离,从而方便转送机构将锚杆从传送带上移出。By adopting the above technical scheme, under normal conditions, the fifth baffle abuts against the output port of the output end of the bolt transmission mechanism, preventing the bolt on the conveyor belt from slipping from the output port. When the bolt needs to be transferred to the transfer mechanism, the fifth cylinder The fifth baffle plate is driven to disengage from the output end, so that the transfer mechanism is convenient for the bolt to be removed from the conveyor belt.
综上所述,本实用新型具有以下有益效果:In summary, the utility model has the following beneficial effects:
1.通过设置两个相对放置的U形卡板,并在U形卡板靠近焊接机构的一侧,靠近U形卡板底部开设槽钢滑出口,从而,能够利用背离槽钢滑出口一侧的第一气缸将放置于U形卡板内的多个槽钢依次推向焊接机构,实现槽钢的自动、有序输送;1. By setting two oppositely placed U-shaped clamping plates, and setting up a channel steel sliding outlet on the side of the U-shaped clamping plate close to the welding mechanism and near the bottom of the U-shaped clamping plate, the side away from the channel steel sliding outlet can be used The first cylinder pushes multiple channel steels placed in the U-shaped clamping plate to the welding mechanism one by one to realize the automatic and orderly delivery of channel steels;
2.通过将焊接板滑移设置在支撑板上,并在其底部设置螺纹连接的螺杆,进而,通过电机驱动螺杆转动即可带动焊接板移动,再利用第二气缸将位于焊接板上的成品工件推动至收集板上,从而实现成品工件的自动收集作业。2. Set the welding plate on the support plate by sliding, and set the threaded screw at the bottom, and then drive the screw to move through the motor, and then use the second cylinder to move the finished product on the welding plate The workpieces are pushed onto the collecting plate, thus realizing the automatic collection of finished workpieces.
附图说明Description of drawings
图1是一种预埋槽道自动焊接系统整体结构俯视图;Fig. 1 is a top view of the overall structure of a pre-buried channel automatic welding system;
图2是一种预埋槽道自动焊接系统整体结构示意图;Fig. 2 is a schematic diagram of the overall structure of a pre-buried channel automatic welding system;
图3是一种预埋槽道自动焊接系统局部结构示意图,主要用于展示槽钢输送机构与焊接机构的位置关系;Fig. 3 is a partial structural schematic diagram of an automatic welding system for embedded channels, which is mainly used to show the positional relationship between the channel steel conveying mechanism and the welding mechanism;
图4是一种预埋槽道自动焊接系统局部结构示意图,主要用于展示U形滑板与槽钢的位置关系;Figure 4 is a partial structural schematic diagram of an automatic welding system for embedded channels, which is mainly used to show the positional relationship between the U-shaped slide plate and the channel steel;
图5是传送带及Z形挡板横向剖视图;Fig. 5 is a transverse sectional view of a conveyor belt and a Z-shaped baffle;
图6是一种预埋槽道自动焊接系统局部结构示意图,主要用于展示锚杆传送机构和转送机构的位置关系;Fig. 6 is a partial structural schematic diagram of an automatic welding system for embedded channels, which is mainly used to show the positional relationship between the bolt transmission mechanism and the transfer mechanism;
图7是收集机构剖视图,主要用于展示螺杆与焊接板的连接方式。Fig. 7 is a cross-sectional view of the collection mechanism, which is mainly used to show the connection mode between the screw rod and the welding plate.
图中:0、工作台;01、槽钢;02、锚杆;1、锚杆传送机构;11、传送带;12、Z形挡板;13、第五挡板;14、第五气缸;2、转送机构;21、旋转气缸;22、夹爪气缸;221、夹爪臂;23、第二滑轨;24、第四气缸;25、滑移板;26、第六气缸;3、焊接机构;30、焊接板;31、第一挡板;32、第二挡板;33、第三挡板;34、第三气缸;35、连接板;36、第一滑轨;37、焊接机器人;38、限位板;4、槽钢输送机构;41、U形卡板;411、槽钢滑出口;42、U形滑板;43、第一气缸;5、收集机构;51、螺杆;52、支撑板;53、电机;54、螺杆保护板;55、第二气缸;56、抵推板;57、收集板;58、挡块。In the figure: 0, workbench; 01, channel steel; 02, anchor rod; 1, anchor rod transmission mechanism; 11, conveyor belt; 12, Z-shaped baffle; 13, fifth baffle; 14, fifth cylinder; 2 , transfer mechanism; 21, rotary cylinder; 22, gripper cylinder; 221, gripper arm; 23, second slide rail; 24, fourth cylinder; 25, sliding plate; 26, sixth cylinder; 3, welding mechanism ; 30, welding plate; 31, the first baffle; 32, the second baffle; 33, the third baffle; 34, the third cylinder; 35, connecting plate; 36, the first slide rail; 37, welding robot; 38, limit plate; 4, channel steel conveying mechanism; 41, U-shaped clamping plate; 411, channel steel sliding outlet; 42, U-shaped slide plate; 43, first cylinder; 5, collection mechanism; 51, screw rod; 52, Support plate; 53, motor; 54, screw protection plate; 55, second cylinder; 56, thrust plate; 57, collecting plate; 58, block.
具体实施方式Detailed ways
以下结合附图对本实用新型作进一步详细说明。Below in conjunction with accompanying drawing, the utility model is described in further detail.
实施例:Example:
一种预埋槽道自动焊接系统,参照图1,安装在工作台0上的焊接板30,位于焊接板30一侧的锚杆传送机构1,位于焊接板30另一侧的槽钢输送机构4以及位于焊接板30一端的收集机构5。焊接板30的一端设有焊接机构3,焊接机构3包括一焊接机器人37,焊接机器人37为本领域技术人员公知技术。在对槽钢01与锚杆02进行自动焊接时,槽钢01通过槽钢输送机构4输送至焊接板30上,锚杆02通过锚杆传送机构1传送到位于焊接板上的槽钢上,利用焊接机器人37将槽钢01与锚杆02焊接连接,最后利用收集机构5自动将焊接完成的成品工件收集。A pre-buried channel automatic welding system, referring to Figure 1, a welding plate 30 installed on the workbench 0, a bolt transmission mechanism 1 located on one side of the welding plate 30, and a channel steel conveying mechanism located on the other side of the welding plate 30 4 and a collection mechanism 5 located at one end of the welding plate 30. One end of the welding plate 30 is provided with a welding mechanism 3, and the welding mechanism 3 includes a welding robot 37, and the welding robot 37 is a well-known technique for those skilled in the art. When the channel steel 01 and the anchor rod 02 are automatically welded, the channel steel 01 is conveyed to the welding plate 30 through the channel steel conveying mechanism 4, and the anchor rod 02 is conveyed to the channel steel on the welding plate through the anchor rod conveying mechanism 1, The channel steel 01 and the anchor rod 02 are welded and connected by the welding robot 37 , and finally the finished workpiece after welding is automatically collected by the collection mechanism 5 .
参照图2和图3,槽钢输送机构4包括两个相对设置的U形卡板41,两个U形卡板41竖直设置,且其开口相对,槽钢01两端卡嵌在两个U形卡板41的凹槽内,在两个U形卡板41一侧,靠近其底部方向开有槽钢滑出口411。槽钢滑出口411用于供滑移在两个U形卡板41内,并位于U形卡板41最下方的槽钢01滑出。Referring to Fig. 2 and Fig. 3, the channel steel conveying mechanism 4 includes two U-shaped clamping plates 41 arranged oppositely. The two U-shaped clamping plates 41 are arranged vertically, and their openings are opposite. In the groove of the U-shaped clamping plate 41, a channel steel sliding outlet 411 is provided on one side of the two U-shaped clamping plates 41 near the bottom thereof. The channel steel sliding outlet 411 is used for sliding in the two U-shaped clamping plates 41 and the channel steel 01 located at the bottom of the U-shaped clamping plates 41 to slide out.
参照图3和图4,在两个U形卡板41背离槽钢滑出口411的一侧滑移设有一U形滑板42,U形滑板42的开口朝向背离槽钢01方向,在U形滑板42的U形槽内设置有驱动U形滑板42滑移的第一气缸43,第一气缸43的活塞杆与U形滑板42的横板连接,U形滑板42的两个支臂位于第一气缸43的两侧,U形滑板42顶面不高于位于最下方槽钢01的顶面。Referring to Fig. 3 and Fig. 4, a U-shaped slide plate 42 is provided for sliding on the side of the two U-shaped clamping plates 41 away from the channel steel sliding outlet 411, and the opening of the U-shaped slide plate 42 faces away from the direction of the channel steel 01. The U-shaped groove of 42 is provided with the first cylinder 43 that drives the U-shaped slide plate 42 to slide, the piston rod of the first cylinder 43 is connected with the horizontal plate of the U-shaped slide plate 42, and the two arms of the U-shaped slide plate 42 are located on the first On both sides of the cylinder 43, the top surface of the U-shaped slide plate 42 is not higher than the top surface of the lowermost channel steel 01.
参照图2和图3,在焊接板30与两个U形卡板41之间设置有方便槽钢01从槽钢滑出口411滑动至焊接板30上的第一滑轨36,在两个槽钢滑出口411的外侧壁连接有限位板38,限位板38一端与槽钢滑出口411的外侧壁连接,另一端与焊接板30侧壁抵接,限位板38垂直槽钢01设置。多个槽钢01堆叠卡嵌在两U形卡板41内,第一气缸43驱动U形滑板42向槽钢01方向移动,从而将位于最下方的槽钢01向背离U形滑板42方向推动,位于最下方的槽钢01从槽钢滑出口411滑出,从而脱离两U形卡板41的限制,进而沿第一滑轨36向焊接板30方向滑移。限位板38可以避免槽钢01在沿第一滑轨36移动过程中,移动方向发生偏转,从而保证槽钢01可以顺利滑移至焊接板30上。第一气缸43在推动位于最下方的槽钢01移出U形卡板41时,U形滑板42的两个支臂可以避免上方的槽钢01在重力作用下下降,卡嵌在第一气缸43活塞杆的顶面,影响其回程,进而影响第一气缸43推动后续槽钢01移动,造成后续工作无法正常进行。With reference to Fig. 2 and Fig. 3, between welding plate 30 and two U-shaped clamping plates 41, be provided with the first slide rail 36 that facilitates channel steel 01 to slide on the welding plate 30 from channel steel sliding outlet 411, in two grooves The outer sidewall of the steel sliding outlet 411 is connected with the limiting plate 38, and one end of the limiting plate 38 is connected with the outer sidewall of the channel steel sliding outlet 411, and the other end abuts against the side wall of the welding plate 30, and the limiting plate 38 is arranged vertically to the channel steel 01. A plurality of channel steel 01 are stacked and embedded in two U-shaped clamping plates 41, and the first cylinder 43 drives the U-shaped sliding plate 42 to move toward the direction of the channel steel 01, thereby pushing the lowermost channel steel 01 away from the U-shaped sliding plate 42 , the channel steel 01 located at the bottom slides out from the channel steel sliding outlet 411 , thereby breaking away from the restriction of the two U-shaped clamping plates 41 , and then slides along the first slide rail 36 toward the welding plate 30 . The limiting plate 38 can prevent the channel steel 01 from deflecting in the moving direction during the movement along the first slide rail 36 , thereby ensuring that the channel steel 01 can slide onto the welding plate 30 smoothly. When the first cylinder 43 pushes the channel steel 01 located at the bottom to move out of the U-shaped clamping plate 41, the two arms of the U-shaped slide plate 42 can prevent the upper channel steel 01 from falling under the action of gravity and be embedded in the first cylinder 43. The top surface of the piston rod affects its return stroke, and then affects the first cylinder 43 to push the follow-up channel steel 01 to move, causing follow-up work to fail.
参照图2和图3,焊接机构3包括安装在焊接板30一侧的焊接机器人37。焊接板30背离槽钢01的一侧固定连接有第一挡板31,第一挡板31用于限制槽钢01在滑移至焊接板30上后继续移动。焊接板30一端固定连接有第二挡板32,另一端滑移连接有第三挡板33,第三挡板33背离第二挡板32的一侧设置有第三气缸34,第三气缸34固定安装在焊接板30端部,并驱动第三挡板33沿焊接板30长度方向滑移。第一气缸43推动槽钢01移动至焊接板30上后,槽钢01一侧与第一挡板31抵接,第三气缸34驱动第三挡板33滑移,从而将槽钢01紧密抵接在第二挡板32与第三挡板33之间,从而槽钢01与焊接板30的相对位置被固定,待锚杆02被移送至需要与槽钢01焊接的部位后,利用焊接机器人37将两者焊接连接。Referring to FIGS. 2 and 3 , the welding mechanism 3 includes a welding robot 37 installed on one side of the welding plate 30 . The side of the welding plate 30 away from the channel steel 01 is fixedly connected with a first baffle 31 , and the first baffle 31 is used to limit the channel steel 01 to continue moving after sliding onto the welding plate 30 . One end of the welding plate 30 is fixedly connected with a second baffle 32, and the other end is slidably connected with a third baffle 33. The third baffle 33 is provided with a third cylinder 34 on the side away from the second baffle 32. The third cylinder 34 It is fixedly installed at the end of the welding plate 30 and drives the third baffle plate 33 to slide along the length direction of the welding plate 30 . After the first cylinder 43 pushes the channel steel 01 to move onto the welding plate 30, one side of the channel steel 01 abuts against the first baffle plate 31, and the third cylinder 34 drives the third baffle plate 33 to slide, thereby tightly pressing the channel steel 01 Connected between the second baffle plate 32 and the third baffle plate 33, so that the relative position of the channel steel 01 and the welding plate 30 is fixed, and after the anchor rod 02 is transferred to the position that needs to be welded with the channel steel 01, the welding robot 37 connect the two by welding.
参照图2和图6,锚杆传送机构1包括传送带11和位于传送带11输出端的转送机构2。在传送带11两侧相对设置有Z形挡板12,传送带11与两个Z形挡板12围成倒T形输送轨道,锚杆02部分卡嵌在倒T形输送轨道内,并在两个Z形挡板12的限制下保持直立。参照图2和图6,在锚杆传送机构1的输出端活动连接有一第五挡板13,输出端侧壁安装有第五气缸14,第五气缸14用于驱动第五挡板13沿锚杆02移动方向滑移。常态下第五挡板13抵接在锚杆传送机构1的输出端的输出口,避免传送带11上的锚杆02从输出口滑落,在需要将锚杆02移送至转送机构2时,第五气缸14驱动第五挡板13向远离传送带11的方向移动,从而方便转送机构2将锚杆02从传送带11上移出。Referring to FIG. 2 and FIG. 6 , the bolt transmission mechanism 1 includes a transmission belt 11 and a transmission mechanism 2 located at the output end of the transmission belt 11 . Z-shaped baffles 12 are oppositely arranged on both sides of the conveyor belt 11. The conveyor belt 11 and the two Z-shaped baffles 12 form an inverted T-shaped conveying track. Keep upright under the restriction of Z-shaped baffle plate 12. 2 and 6, a fifth baffle 13 is movably connected to the output end of the bolt transmission mechanism 1, and a fifth cylinder 14 is installed on the side wall of the output end, and the fifth cylinder 14 is used to drive the fifth baffle 13 along the anchor. Rod 02 slides in the moving direction. Under normal conditions, the fifth baffle plate 13 abuts against the output port of the output end of the anchor rod transmission mechanism 1 to prevent the anchor rod 02 on the conveyor belt 11 from slipping from the output port. When the anchor rod 02 needs to be transferred to the transfer mechanism 2, the fifth cylinder 14 drives the fifth baffle 13 to move away from the conveyor belt 11, so that the transfer mechanism 2 can move the anchor rod 02 out of the conveyor belt 11.
参照图2和图6,转送机构2包括旋转气缸21、安装在旋转气缸21顶部的第六气缸26,位于第六气缸26的活塞杆一侧的夹爪气缸22,夹爪气缸22的两夹爪的相对侧呈螺纹结构。旋转气缸21的底部连接有滑移板25,滑移板25滑移设置在两个第二滑轨23上,第二滑轨23一端位于传送带11的输出端,另一端指向焊接板30方向。在第二滑轨23一侧,平行于第二滑轨23设置有第四气缸24,第四气缸24的活塞杆与滑移板25连接,第四气缸24驱动滑移板25带动旋转气缸21和夹爪气缸22,沿第二滑轨23向焊接板30方向移动。第六气缸26驱动夹爪气缸22向传送带11的输出端移动,夹爪气缸22驱动夹爪臂221将锚杆02从传送带11端部夹出,旋转气缸21调整夹爪气缸22的方向,使锚杆02朝向焊接板30方向,第四气缸24驱动滑移板25向焊接板30方向移动。从而将锚杆02转送至焊接机构3,将其放置在需要与槽钢01焊接连接的部位并压紧,进而,利用焊接机器人37将两者焊接连接。两夹爪的相对侧呈凸纹结构,这样可以使夹爪臂221在夹取锚杆02时更稳固,防止锚杆02在两夹爪臂221之间滑动,造成后续将锚杆02放置在槽钢01上时,与槽钢01的相对位置发生偏转,影响焊接质量。With reference to Fig. 2 and Fig. 6, transfer mechanism 2 comprises rotary cylinder 21, the sixth cylinder 26 that is installed on the top of rotary cylinder 21, the jaw cylinder 22 that is positioned at the piston rod side of sixth cylinder 26, the two clips of jaw cylinder 22 The opposite side of the claw is threaded. The bottom of the rotary cylinder 21 is connected with a sliding plate 25 , which slides and is arranged on two second slide rails 23 , one end of the second slide rail 23 is located at the output end of the conveyor belt 11 , and the other end points to the direction of the welding plate 30 . On one side of the second slide rail 23, a fourth cylinder 24 is arranged parallel to the second slide rail 23, the piston rod of the fourth cylinder 24 is connected with the sliding plate 25, and the fourth cylinder 24 drives the sliding plate 25 to drive the rotating cylinder 21 And the jaw cylinder 22 moves toward the welding plate 30 along the second slide rail 23. The sixth cylinder 26 drives the jaw cylinder 22 to move towards the output end of the conveyor belt 11, the jaw cylinder 22 drives the jaw arm 221 to clamp the anchor rod 02 from the end of the conveyor belt 11, and the rotating cylinder 21 adjusts the direction of the jaw cylinder 22, so that The anchor rod 02 faces toward the welding plate 30 , and the fourth air cylinder 24 drives the sliding plate 25 to move toward the welding plate 30 . Thereby, the anchor rod 02 is transferred to the welding mechanism 3 , placed on the part that needs to be welded and connected with the channel steel 01 and pressed tightly, and then the two are welded and connected by the welding robot 37 . The opposite sides of the two jaws are embossed, which can make the jaw arm 221 more stable when clamping the anchor rod 02, and prevent the anchor rod 02 from sliding between the two jaw arms 221, resulting in subsequent placement of the anchor rod 02 on the When the channel steel 01 is on, the relative position to the channel steel 01 is deflected, which affects the welding quality.
参照图3,焊接板30底部两侧固定设置有支撑板52,焊接板30底面与支撑板52顶面滑移连接,并能够沿支撑板52长度方向滑移,支撑板52一端超出焊接板30,其超出长度不小于焊接板30的长度。参照图2和图7,收集机构5包括转动设置在焊接板30底部,并沿焊接板30长度方向设置的螺杆51,螺杆51置于两支撑板52之间,并与支撑板52长度相等,螺杆51超出焊接板30一端的端部连接有驱动其转动的电机53。焊接板30底部、远离电机53的一端固定连接有连接板35,连接板35与焊接板30垂直,螺杆51穿过连接板35,并与连接板35螺纹连接。两支撑板52超出焊接板30部分的顶面固定连接有螺杆保护板54,从而避免焊接过程中产生的焊渣粘连在螺杆51上,影响螺杆51的使用。参照图2、图3和图4,在支撑板52超出焊接板30部分的一侧设置有第二气缸55,第二气缸55的活塞杆的端部连接有抵推板56,第二气缸55驱动抵推板56沿垂直支撑板52方向移动。在支撑板52背离第二气缸55的一侧,与支撑板52外侧壁固定连接有两个收集板57,两个收集板57垂直支撑板52长度方向设置,其远离支撑板52的一端固定连接有挡块58。在焊接机器人37将槽钢01与锚杆02焊接完毕后,电机53驱动螺杆51转动,从而使焊接板30带动焊接完成的成品工件沿支撑板52向电机53方向滑移;当焊接板30滑移至支撑板52靠近电机53一端时,第三气缸34驱动第三挡板33向背离第二挡板32的方向滑移,从而第二气缸55驱动抵推板56移动,能够将槽钢01从焊接板30上推移至收集板57,收集板57端部的挡块58可以避免槽钢01滑移至收集板57上时,从收集板57的端部滑落;之后,焊接板30在电机53的驱动下原路返回,以便进行下一工件的焊接。With reference to Fig. 3, support plates 52 are fixedly arranged on both sides of the bottom of the welding plate 30, the bottom surface of the welding plate 30 is slidingly connected with the top surface of the support plate 52, and can slide along the length direction of the support plate 52, and one end of the support plate 52 exceeds the welding plate 30 , and its excess length is not less than the length of the welded plate 30 . With reference to Fig. 2 and Fig. 7, collection mechanism 5 comprises the screw rod 51 that is arranged on the bottom of welding plate 30 and is arranged along the length direction of welding plate 30, and screw rod 51 is placed between two support plates 52, and is equal to the length of support plate 52, The end of the screw 51 beyond the end of the welding plate 30 is connected with a motor 53 to drive it to rotate. The bottom of the welding plate 30 and the end away from the motor 53 are fixedly connected with a connecting plate 35 , the connecting plate 35 is perpendicular to the welding plate 30 , and the screw rod 51 passes through the connecting plate 35 and is threadedly connected with the connecting plate 35 . The top surfaces of the two support plates 52 beyond the welding plate 30 are fixedly connected with a screw protection plate 54 , so as to prevent welding slag generated during welding from adhering to the screw 51 and affecting the use of the screw 51 . Referring to Fig. 2, Fig. 3 and Fig. 4, a second air cylinder 55 is provided on the side of the support plate 52 beyond the welding plate 30 part, and the end of the piston rod of the second air cylinder 55 is connected with a thrust plate 56, and the second air cylinder 55 The pushing plate 56 is driven to move along the direction vertical to the supporting plate 52 . On the side of the supporting plate 52 away from the second cylinder 55, two collecting plates 57 are fixedly connected to the outer wall of the supporting plate 52. The two collecting plates 57 are arranged vertically to the length direction of the supporting plate 52, and one end away from the supporting plate 52 is fixedly connected. There is a stopper 58 . After the welding robot 37 has welded the channel steel 01 and the anchor rod 02, the motor 53 drives the screw rod 51 to rotate, so that the welded plate 30 drives the welded finished workpiece to slide along the support plate 52 to the direction of the motor 53; when the welded plate 30 slides When moving to the end of the support plate 52 close to the motor 53, the third cylinder 34 drives the third baffle plate 33 to slide in a direction away from the second baffle plate 32, so that the second cylinder 55 drives the push plate 56 to move, and the channel steel 01 can be moved. Push away from the welding plate 30 to the collecting plate 57, the stopper 58 at the collecting plate 57 end can prevent the channel steel 01 from slipping on the collecting plate 57, and slide off from the end of the collecting plate 57; 53 under the driving of the original path back, so that the welding of the next workpiece.
工作原理:在对槽钢01与锚杆02进行焊接时,将槽钢01依次放置于两U形卡板41的凹槽内,启动第一气缸43,第一气缸43推动U形滑板42移动,从而将槽钢01从两U形卡板41的凹槽内推出,并进一步将其推动至焊接板30上;同时,锚杆传送机构1将锚杆02传送至靠近转送机构2的一端,夹爪气缸22将锚杆02夹取后,在旋转气缸21的作用下旋转,使锚杆02朝向焊接板30方向,之后,第四气缸24驱动滑移板25移动,带动旋转气缸21和夹爪气缸22向焊接板30方向移动,将锚杆02移送至已在焊接板30上等待焊接的槽钢01顶面,进而,焊接机器人37对两者进行焊接;焊接完成后,第一气缸43、第四气缸24、夹爪气缸22及旋转气缸21均恢复至原状态,等待对下一工件进行操作,此时,电机53启动,带动焊接板30及焊接完成的成品工件向电机53方向靠近,随后,第三气缸34恢复原状态,解除对槽钢01的抵接作用,第二气缸55启动,驱动抵推板56移动,利用抵推板56将成品工件推至收集板57上,第二气缸55恢复原状态,电机53再次驱动焊接板30,使其沿支撑板52滑移至远离电机53的一端,从而完成一个完整的工件焊接过程,后续焊接重复此焊接过程即可。Working principle: When welding the channel steel 01 and the anchor rod 02, place the channel steel 01 in the grooves of the two U-shaped clamping plates 41 in turn, start the first cylinder 43, and the first cylinder 43 pushes the U-shaped slide plate 42 to move , so that the channel steel 01 is pushed out from the grooves of the two U-shaped clamping plates 41, and further pushed onto the welding plate 30; at the same time, the anchor rod transmission mechanism 1 transmits the anchor rod 02 to an end close to the transfer mechanism 2, After the jaw cylinder 22 clamps the anchor rod 02, it rotates under the action of the rotating cylinder 21, so that the anchor rod 02 faces the direction of the welding plate 30. After that, the fourth cylinder 24 drives the sliding plate 25 to move, driving the rotating cylinder 21 and the gripper. The claw cylinder 22 moves toward the welding plate 30, and the anchor rod 02 is transferred to the top surface of the channel steel 01 waiting to be welded on the welding plate 30, and then the welding robot 37 welds the two; after the welding is completed, the first cylinder 43 , the fourth cylinder 24, the jaw cylinder 22 and the rotary cylinder 21 all return to the original state, waiting for the next workpiece to be operated. At this time, the motor 53 is started, driving the welding plate 30 and the finished workpiece after welding to approach the motor 53 direction , subsequently, the third cylinder 34 is restored to its original state, and the abutting effect on the channel steel 01 is released, the second cylinder 55 is started, and the pushing plate 56 is driven to move, and the finished workpiece is pushed onto the collecting plate 57 by using the pushing plate 56, and the first The second cylinder 55 returns to the original state, and the motor 53 drives the welding plate 30 again to slide along the support plate 52 to an end away from the motor 53, thereby completing a complete workpiece welding process, and the subsequent welding repeats this welding process.
以上所述仅是本实用新型的优选实施方式,本实用新型的保护范围并不仅局限于上述实施例,凡属于本实用新型思路下的技术方案均属于本实用新型的保护范围。应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理前提下的若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above descriptions are only preferred implementations of the present utility model, and the protection scope of the present utility model is not limited to the above-mentioned embodiments, and all technical solutions under the idea of the present utility model all belong to the protection scope of the present utility model. It should be pointed out that for those skilled in the art, some improvements and modifications without departing from the principle of the utility model should also be regarded as the protection scope of the utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721519141.XU CN207547956U (en) | 2017-11-14 | 2017-11-14 | A kind of pre-buried channel flow robot welding system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721519141.XU CN207547956U (en) | 2017-11-14 | 2017-11-14 | A kind of pre-buried channel flow robot welding system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207547956U true CN207547956U (en) | 2018-06-29 |
Family
ID=62682997
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721519141.XU Expired - Fee Related CN207547956U (en) | 2017-11-14 | 2017-11-14 | A kind of pre-buried channel flow robot welding system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207547956U (en) |
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109226990A (en) * | 2018-10-23 | 2019-01-18 | 中建钢构广东有限公司 | A kind of process using welding robot welding built-in fitting |
| CN109434337A (en) * | 2018-12-19 | 2019-03-08 | 浙江大学自贡创新中心 | A kind of feeding device when the beam welding for carrier roller of belt conveyer |
| CN111168406A (en) * | 2020-01-09 | 2020-05-19 | 山东金博利达精密机械有限公司 | Embedded channel welding production line, riveting production line and production system |
| CN111558789A (en) * | 2020-04-28 | 2020-08-21 | 青岛鳌福机械有限公司 | Welding method and welding system for lifting machine stand column |
| CN112975065A (en) * | 2021-03-09 | 2021-06-18 | 洛阳固岳轨道科技有限公司 | Pre-buried anchor slot channel production line |
| CN117506247A (en) * | 2023-12-12 | 2024-02-06 | 江苏恒尚节能科技股份有限公司 | Supporting part welding equipment for double-layer decoration component of glass curtain wall |
| CN120755627A (en) * | 2025-07-18 | 2025-10-10 | 青岛卡文迪轨道交通工程有限公司 | Pre-buried channel manufacturing method and production line |
-
2017
- 2017-11-14 CN CN201721519141.XU patent/CN207547956U/en not_active Expired - Fee Related
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109226990A (en) * | 2018-10-23 | 2019-01-18 | 中建钢构广东有限公司 | A kind of process using welding robot welding built-in fitting |
| CN109226990B (en) * | 2018-10-23 | 2021-07-16 | 中建钢构广东有限公司 | Process method for welding embedded part by using welding robot |
| CN109434337A (en) * | 2018-12-19 | 2019-03-08 | 浙江大学自贡创新中心 | A kind of feeding device when the beam welding for carrier roller of belt conveyer |
| CN109434337B (en) * | 2018-12-19 | 2024-03-29 | 浙江大学自贡创新中心 | Feeding device used for welding carrier roller cross beams of belt conveyor |
| CN111168406A (en) * | 2020-01-09 | 2020-05-19 | 山东金博利达精密机械有限公司 | Embedded channel welding production line, riveting production line and production system |
| CN111168406B (en) * | 2020-01-09 | 2022-03-08 | 山东金博利达精密机械有限公司 | Embedded channel welding production line, riveting production line and production system |
| CN111558789B (en) * | 2020-04-28 | 2021-07-20 | 青岛鳌福机械有限公司 | Welding method and welding system for lifting machine stand column |
| CN111558789A (en) * | 2020-04-28 | 2020-08-21 | 青岛鳌福机械有限公司 | Welding method and welding system for lifting machine stand column |
| CN112975065A (en) * | 2021-03-09 | 2021-06-18 | 洛阳固岳轨道科技有限公司 | Pre-buried anchor slot channel production line |
| CN112975065B (en) * | 2021-03-09 | 2022-04-26 | 洛阳固岳轨道科技有限公司 | Pre-buried anchor slot channel production line |
| CN117506247A (en) * | 2023-12-12 | 2024-02-06 | 江苏恒尚节能科技股份有限公司 | Supporting part welding equipment for double-layer decoration component of glass curtain wall |
| CN117506247B (en) * | 2023-12-12 | 2024-05-31 | 江苏恒尚节能科技股份有限公司 | Supporting part welding equipment for double-layer decoration component of glass curtain wall |
| CN120755627A (en) * | 2025-07-18 | 2025-10-10 | 青岛卡文迪轨道交通工程有限公司 | Pre-buried channel manufacturing method and production line |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN207547956U (en) | A kind of pre-buried channel flow robot welding system | |
| CN108568609B (en) | Mirror stainless steel sheet fully automatic loading and unloading laser efficient cutting system | |
| CN106425051A (en) | Full-automatic box plate and screw welding device for anchoring box | |
| CN109702404B (en) | Aluminum template welding rib equipment | |
| CN114044310B (en) | An automatic flow device for metal hose manufacturing process | |
| WO2018032932A1 (en) | Steel bar transverse stepping conveying equipment and control method | |
| CN103753000B (en) | Positioning welding device for inner sealing plate of standard section | |
| CN203791856U (en) | Automatic welding machine | |
| CN107538130B (en) | Automatic assembly machine for outer water cutting end cover of automobile front door | |
| CN115744225B (en) | Automatic pipe stopper-beating machine | |
| CN108638519A (en) | A kind of multistation sweating soldering device | |
| CN202479705U (en) | Adjustable soldering clamp for batteries and battery soldering equipment | |
| CN207593149U (en) | Steel plate wall smallclothes erection welding machine | |
| CN118455857B (en) | An integral welding device for processing pipeline support and hanger | |
| CN105720455B (en) | The insert row line bundling device of insert row line binding machine | |
| CN110270753B (en) | Automatic ultrasonic welding equipment for valve-regulated lead-acid battery cover | |
| CN105057936B (en) | A kind of automatic welding device of T-bolt | |
| CN117415374A (en) | Device for cutting multiple steel pipes at equal distances | |
| CN205309627U (en) | Candlestick welding equipment | |
| WO2021042475A1 (en) | Automatic spot welder | |
| CN215970174U (en) | Feeding structure of edge bonding machine for hollow plate | |
| CN206326289U (en) | Pressing plate special welding machine | |
| CN116786886A (en) | An automatic cutting device for steel pipes | |
| CN114770024A (en) | Fixed butt-joint mechanism for welding metal round pipes | |
| CN210911194U (en) | Plastic door and window welding machine |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180629 |