CN207487682U - A kind of construction is used and automatically keeps vertical overcasting staff - Google Patents

A kind of construction is used and automatically keeps vertical overcasting staff Download PDF

Info

Publication number
CN207487682U
CN207487682U CN201721534344.6U CN201721534344U CN207487682U CN 207487682 U CN207487682 U CN 207487682U CN 201721534344 U CN201721534344 U CN 201721534344U CN 207487682 U CN207487682 U CN 207487682U
Authority
CN
China
Prior art keywords
fixed
sleeve
pedestal
hole
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721534344.6U
Other languages
Chinese (zh)
Inventor
刘杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201721534344.6U priority Critical patent/CN207487682U/en
Application granted granted Critical
Publication of CN207487682U publication Critical patent/CN207487682U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model is related to architectural mapping technical fields, and in particular to a kind of construction is with vertical overcasting staff is automatically kept, and including pedestal, the pedestal lower surface is hinged with first support bar and second support bar;The pedestal is internally provided with material storage room, the upper surface of the pedestal offers first through hole, the top of the first through hole rolls and is connected with ball, the lower end of the ball is fixed with the montant across the first through hole, the lower wall of the montant offer with matched second through-hole of hanging rod, the lower end of the hanging rod is fixed with load-bearing plate;The upper surface of the ball is fixed with sleeve, and the lower wall of the sleeve is fixed with lantern ring, and the both ends of the lantern ring are equipped with balancing pole, and the outer wall of the lantern ring is fixed with air level;The inside of the sleeve is socketed with telescopic shaft, and the upper end of the telescopic shaft is equipped with mark post;Whether the utility model solves the problems, such as that mark post easily rocks, also solve the problems, such as that mark post can not be judged in plumbness.

Description

A kind of construction is used and automatically keeps vertical overcasting staff
Technical field
The utility model is related to architectural mapping technical fields, and in particular to a kind of construction is used and automatically keeps vertical survey Measure mark post.
Background technology
Overcasting staff is the apparatus measured, is made of rod, is coated with paint red and white above, is mainly used to instruction and surveys Measure point, common method is with the use of measuring using spirit level and mark post, and requirement mark post and horizontal plane hang down during measurement Nogata can ensure measurement accuracy, and at present in the measurements, mark post ensures the correct of mark post often by manually holding, with the feeling of operator Angle, therefore the complexity of shape landforms and the technical merit of operator are inconsistent, mark post and horizontal plane it is difficult to ensure that vertical, so as to Cause to measure inaccurately, cannot be guaranteed construction quality.
Such as China Patent No. CN201620869493.7, the applying date is on 08 09th, 2016, and the day for announcing is 2017 04 A kind of construction overcasting staff is disclosed in the utility model on the moon 12, including stent, set is installed above the stent Ring, the stent are rotatablely connected by axis pin and lantern ring, and battery is equipped with below the lantern ring, control is provided with above the battery Device processed, the control device inside are provided with intercommunication microphone, and the intercommunication microphone is electrically connected by conducting wire and control device, Ball is installed inside the lantern ring, the ball lower part is fixedly connected with connecting rod, and the connecting rod bottom end is fixedly connected with hanging block, Flexible axle sleeve is fixedly connected with above the ball, telescopic inner axis, the telescopic inner axis top are installed inside the flexible axle sleeve End is provided with corner block, and the telescopic shaft, which is put on, is equipped with lock screw.But still there are many problems for the utility model, first First, mark post easily rocks;Secondly, mark post can not be judged whether in plumbness;Finally, do not have storage clump weight and its The function of its drawing tool.
Utility model content
The technical issues of solution
For the disadvantages mentioned above present in the prior art, it is vertical with automatically keeping that the utility model provides a kind of construction Straight overcasting staff, the problem of easily being rocked efficiently against mark post present in the prior art, also solving can not judge The problem of whether mark post is in plumbness;Meanwhile it also solves and does not have storage clump weight and other drawing tool functions Problem.
Technical solution
In order to achieve the above object, the utility model is achieved by the following technical programs:
A kind of construction is with vertical overcasting staff is automatically kept, and including pedestal, the pedestal lower surface is hinged with the One supporting rod and second support bar are connected with the first company between the first support bar and the second support bar by articulation piece Bar and second connecting rod;The pedestal is internally provided with material storage room, and the upper surface of the pedestal offers first through hole, and described first The top of through-hole rolls and is connected with ball, and the lower end of the ball is fixed with the montant across the first through hole, the montant Lower wall offer and be fixed with load-bearing plate with matched second through-hole of hanging rod, the lower end of the hanging rod, the load-bearing plate Upper surface is equipped with clump weight;The upper surface of the ball is fixed with sleeve, and the lower wall of the sleeve is fixed with lantern ring, the set The both ends of ring are equipped with balancing pole, and the outer wall of the lantern ring is fixed with air level;The inside of the sleeve is socketed with telescopic shaft, institute The upper end for stating telescopic shaft is equipped with mark post.
Further, the upper side wall of the sleeve is equipped with clamping screw.
Further, the upper surface of the clump weight offers and the matched card slot of the hanging rod, the clump weight Diameter be less than the load-bearing plate diameter.
Further, the montant, the sleeve and the telescopic shaft are on same vertical line.
Further, the outside of the material storage room is equipped with door-plate.
Advantageous effect
Using technical solution provided by the utility model, compared with known publicly-owned technology, have the advantages that:
1st, the utility model is by increasing the design of balancing pole, and reaching can quickly make under mark post stopping rocks and stablize Come.
2nd, for the utility model by increasing ball, clump weight and the design of load-bearing plate, reaching can make mark post automatically in vertical Straight state, at the same clump weight take it is also very convenient.
3rd, for the utility model by increasing the design of air level, reaching can judge whether mark post is in the effect of plumbness Fruit.
4th, for the utility model by increasing the design of material storage room and door-plate, clump weight and other drawing tools can be stored by reaching Effect.
5th, for the utility model by increasing the design of first connecting rod and second connecting rod, pedestal lower end supporting rod can be improved by reaching The effect of stability.
Description of the drawings
It in order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment Or needed in description of the prior art;Attached drawing to be used is briefly described.It should be evident that the accompanying drawings in the following description is only It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the internal structure schematic diagram of the utility model;
Fig. 2 is the front view of the utility model;
Fig. 3 is the left view of the utility model;
Fig. 4 is the vertical view of the utility model clump weight.
Label in figure represents respectively:1- first connecting rods;2- first support bars;3- clump weights;4- hanging rods;5- pedestals;6- Ball;7- lantern rings;8- clamping screws;9- mark posts;10- telescopic shafts;11- sleeves;12- air levels;13- balancing poles;14- storings Room;15- montants;16- load-bearing plates;17- second support bars;18- second connecting rods;19- first through hole;The second through-holes of 20-;21- cards Slot;22- door-plates.
Specific embodiment
Purpose, technical scheme and advantage to make the utility model embodiment are clearer, new below in conjunction with this practicality Attached drawing in type embodiment, the technical scheme in the utility model embodiment is clearly and completely described.Obviously, it is retouched The embodiment stated is the utility model part of the embodiment, instead of all the embodiments.Based on the implementation in the utility model Example, those of ordinary skill in the art's all other embodiments obtained without creative efforts, belongs to The range of the utility model protection.
With reference to embodiment, the utility model will be further described.
Embodiment
A kind of construction of the present embodiment is with vertical overcasting staff is automatically kept, including pedestal 5,5 lower surface of pedestal First support bar 2 and second support bar 17 are hinged with, is connected between first support bar 2 and second support bar 17 by articulation piece First connecting rod 1 and second connecting rod 18;Pedestal 5 is internally provided with material storage room 14, and the upper surface of pedestal 5 offers first through hole 19, The top of first through hole 19 rolls and is connected with ball 6, and the lower end of ball 6 is fixed with the montant 15 across first through hole 19, montant 15 lower wall offer with 4 matched second through-hole 20 of hanging rod, the lower end of hanging rod 4 is fixed with load-bearing plate 16, load-bearing plate 16 Upper surface be equipped with clump weight 3;The upper surface of ball 6 is fixed with sleeve 11, and the lower wall of sleeve 11 is fixed with lantern ring 7, lantern ring 7 Both ends be equipped with balancing pole 13, the outer wall of lantern ring 7 is fixed with air level 12;The inside of sleeve 11 is socketed with telescopic shaft 10, stretches The upper end of contracting axis 10 is equipped with mark post 9;The upper side wall of sleeve 11 is equipped with clamping screw 8;The upper surface of clump weight 3 offers and hanging rod 4 matched card slots 21, the diameter of clump weight 3 are less than the diameter of load-bearing plate 16;Montant 15, sleeve 11 and telescopic shaft 10 are in same On one vertical line;The outside of material storage room 14 is equipped with door-plate 22.
In use, the hinged first support bar 2 in 5 lower surface of pedestal and second support bar 17 are unfolded first, by the first support Bar 2 and the stabilizer blade of second support bar 17 are separately fixed on ground, be equipped between first support bar 2 and second support bar 17 One connecting rod 1 and second connecting rod 18 can improve the stability of device, then adjust telescopic shaft 10 to specified altitude assignment, pass through sleeve 11 The clamping screw 8 of upper side wall setting locks telescopic shaft 10 so that mark post 9 highly determines;The upper surface of pedestal 5 offers first Through-hole 19, the top of first through hole 19 is spherical surface, and spherical surface roll inside is connected with ball 6, and 6 lower section of ball is equipped with hanging rod 4 and holds Disk 16 again, the upper surface of clump weight 3 offer with 4 matched card slot 21 of hanging rod, so as to which clump weight 3 is placed on load-bearing plate 16 upper surfaces since montant 15, sleeve 11 and telescopic shaft 10 are on same vertical line, under the action of clump weight 3, can make mark Bar 9 is automatically in plumbness, while clump weight 3 is taken also very convenient, and the quantity of clump weight 3 can be with one or more It is a;The lower wall of sleeve 11 is fixed with lantern ring 7, and the both ends of lantern ring 7 are equipped with balancing pole 13, and balancing pole 13 can quickly make mark post 9 Stopping is rocked and is settled out, and the outer wall of lantern ring 7 is fixed with air level 12, and whether air level 12 can judge mark post 9 in vertical Straight state can be adjusted ball 6 if not plumbness, and mark post 9 is made to be in plumbness, so as to make measurement result more It is accurate to add.
After use, clamping screw 8 is first unscrewed, then telescopic shaft 10 is stored to sleeve 11, then remove clump weight 3 The material storage room 14 of the inside of pedestal 5 is put into, while other drawing tools can also be put into material storage room 14, shuts door-plate 22;So First support bar 2 and second support bar 17 are taken out from ground afterwards, then by first support bar 2, second support bar 17, first connecting rod 1 and second connecting rod 18 store.
Above example is only to illustrate the technical solution of the utility model, rather than its limitations;Although with reference to aforementioned reality Example is applied the utility model is described in detail, it will be understood by those of ordinary skill in the art that:It still can be to preceding The technical solution recorded in each embodiment is stated to modify or carry out equivalent replacement to which part technical characteristic;And these Modification or replace, can't make corresponding technical solution essence be detached from various embodiments of the utility model technical solution spirit and Range.

Claims (5)

1. a kind of construction is with vertical overcasting staff is automatically kept, including pedestal (5), which is characterized in that the pedestal (5) Lower surface is hinged with first support bar (2) and second support bar (17), the first support bar (2) and the second support bar (17) first connecting rod (1) and second connecting rod (18) are connected with by articulation piece between;The pedestal (5) is internally provided with material storage room (14), the upper surface of the pedestal (5) offers first through hole (19), and the top of the first through hole (19), which rolls to be connected with, to be turned Pearl (6), the lower end of the ball (6) are fixed with the montant (15) across the first through hole (19), under the montant (15) Side wall offers and matched second through-hole (20) of hanging rod (4), and the lower end of the hanging rod (4) is fixed with load-bearing plate (16), institute The upper surface for stating load-bearing plate (16) is equipped with clump weight (3);The upper surface of the ball (6) is fixed with sleeve (11), the sleeve (11) lower wall is fixed with lantern ring (7), and the both ends of the lantern ring (7) are equipped with balancing pole (13), the outer wall of the lantern ring (7) It is fixed with air level (12);The inside of the sleeve (11) is socketed with telescopic shaft (10), and the upper end of the telescopic shaft (10) is equipped with Mark post (9).
2. a kind of construction according to claim 1, which is used, automatically keeps vertical overcasting staff, which is characterized in that described The upper side wall of sleeve (11) is equipped with clamping screw (8).
3. a kind of construction according to claim 1, which is used, automatically keeps vertical overcasting staff, which is characterized in that described The upper surface of clump weight (3) is offered to be less than with the hanging rod (4) matched card slot (21), the diameter of the clump weight (3) The diameter of the load-bearing plate (16).
4. a kind of construction according to claim 1, which is used, automatically keeps vertical overcasting staff, which is characterized in that described Montant (15), the sleeve (11) and the telescopic shaft (10) are on same vertical line.
5. a kind of construction according to claim 1, which is used, automatically keeps vertical overcasting staff, which is characterized in that described The outside of material storage room (14) is equipped with door-plate (22).
CN201721534344.6U 2017-11-16 2017-11-16 A kind of construction is used and automatically keeps vertical overcasting staff Expired - Fee Related CN207487682U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721534344.6U CN207487682U (en) 2017-11-16 2017-11-16 A kind of construction is used and automatically keeps vertical overcasting staff

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721534344.6U CN207487682U (en) 2017-11-16 2017-11-16 A kind of construction is used and automatically keeps vertical overcasting staff

Publications (1)

Publication Number Publication Date
CN207487682U true CN207487682U (en) 2018-06-12

Family

ID=62473639

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721534344.6U Expired - Fee Related CN207487682U (en) 2017-11-16 2017-11-16 A kind of construction is used and automatically keeps vertical overcasting staff

Country Status (1)

Country Link
CN (1) CN207487682U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111174769A (en) * 2020-01-07 2020-05-19 郑州蓝图土地环境规划设计有限公司 Measure more accurate engineering survey sighting rod
CN111609257A (en) * 2020-03-26 2020-09-01 桂林电子科技大学 A device for quickly maintaining verticality of a benchmark for engineering measurement

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111174769A (en) * 2020-01-07 2020-05-19 郑州蓝图土地环境规划设计有限公司 Measure more accurate engineering survey sighting rod
CN111609257A (en) * 2020-03-26 2020-09-01 桂林电子科技大学 A device for quickly maintaining verticality of a benchmark for engineering measurement

Similar Documents

Publication Publication Date Title
CN207487682U (en) A kind of construction is used and automatically keeps vertical overcasting staff
CN206291905U (en) A kind of accurate levelling formula plotting board
CN207113889U (en) A kind of wall, column template perpendicularity Simple measurement device
CN206177275U (en) Independent utility levelling rod
CN210533379U (en) Easy fixed marker post for architectural survey
CN203893848U (en) Corner squareness measurement ruler
CN206410659U (en) Column template verticality measurement device
CN205718981U (en) A kind of overcasting staff
CN207066436U (en) A kind of road and bridge construction measurement apparatus
CN207487889U (en) Rudder boom hoisting and rudder measuring system
CN206540549U (en) A kind of suspension type land surveying Sopwith staff
CN211853399U (en) Surveying, mapping and lofting device
CN206803998U (en) A kind of Sopwith staff tripod type support
CN203550942U (en) Leveling ruler frame
CN206362351U (en) A kind of old room room structure measurement servicing unit
CN207232387U (en) Laser radar keeps the device of horizontal attitude
CN207600442U (en) A kind of backsight levelling rod fixing device of bridge static loading test deflection metrology
CN207798104U (en) A kind of mark post of engineering survey
CN220104109U (en) Building construction is surveyed and is used mark post
CN205255840U (en) Compasses of fixed angle that mathematical education was used
CN204479070U (en) Hand steered rapid water leveling device exempted from by a kind of levelling pole
CN211085240U (en) Geological information engineering is with surveying pole
CN206864019U (en) A kind of foreign language teaching exhibiting device
CN206907342U (en) Map displaying device
CN210603325U (en) Sighting rod base for surveying and mapping

Legal Events

Date Code Title Description
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180612

Termination date: 20181116

CF01 Termination of patent right due to non-payment of annual fee