CN207469291U - A kind of ventilation of underground pipe gallery and escape structure - Google Patents

A kind of ventilation of underground pipe gallery and escape structure Download PDF

Info

Publication number
CN207469291U
CN207469291U CN201721151732.6U CN201721151732U CN207469291U CN 207469291 U CN207469291 U CN 207469291U CN 201721151732 U CN201721151732 U CN 201721151732U CN 207469291 U CN207469291 U CN 207469291U
Authority
CN
China
Prior art keywords
cabin
ventilation
underground pipe
pipe gallery
drainage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721151732.6U
Other languages
Chinese (zh)
Inventor
张延年
庚佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Jianzhu University
Original Assignee
Shenyang Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Jianzhu University filed Critical Shenyang Jianzhu University
Priority to CN201721151732.6U priority Critical patent/CN207469291U/en
Application granted granted Critical
Publication of CN207469291U publication Critical patent/CN207469291U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Ventilation (AREA)

Abstract

本实用新型涉及一种地下管廊的通风及逃生结构,属于地下建筑技术领域,包括地下管廊壁,检修舱,防爆层,检修车道,检修车,电动上升底板,高强钢绞线,吊车口,通风舱,大型抽风换气机,钢支架等,地下管廊共分为上中下三层,上层中间设置有检修舱,左右两侧分别设置通风舱,检修舱内壁设置防爆层,底部安装检修车道,每个安全段内设置一个吊车口,吊车口上方设有第一盖板,在每一个吊车口下方对应处设置电动上升底板,用高强钢绞线与吊车口连接,电动上升底板处检修车道与其连接一体,与检修车道的其他部分分离可拆卸。本实用新型优点是将通风和逃生功能结合在一起,满足安全要求的同时,最大化降低工程造价,具有很强的实用性。

The utility model relates to a ventilation and escape structure for an underground pipe gallery, which belongs to the technical field of underground buildings, and includes an underground pipe gallery wall, an inspection cabin, an explosion-proof layer, an inspection driveway, an inspection vehicle, an electric rising floor, a high-strength steel strand, and a crane port , ventilation cabin, large exhaust ventilator, steel bracket, etc. The underground pipe gallery is divided into upper, middle and lower floors. There is an inspection cabin in the middle of the upper floor, ventilation cabins are set on the left and right sides, and an explosion-proof layer is installed on the inner wall of the inspection cabin. For the maintenance lane, a crane port is set in each safety section, and a first cover plate is provided above the crane port, and an electric rising bottom plate is installed at the corresponding place below each crane port, connected to the crane port with high-strength steel strands, and the electric lifting bottom plate is The maintenance lane is connected with it as a whole, and it is separated and detachable from other parts of the maintenance lane. The utility model has the advantages of combining the functions of ventilation and escape, meeting the safety requirements, and at the same time reducing the engineering cost to the greatest extent, and has strong practicability.

Description

一种地下管廊的通风及逃生结构A ventilation and escape structure for an underground utility gallery

技术领域technical field

本实用新型属于地下建筑技术领域,特别是涉及一种地下管廊的通风及逃生结构。The utility model belongs to the technical field of underground buildings, in particular to a ventilation and escape structure for an underground pipe gallery.

背景技术Background technique

伴随着当代科技水平的不断进步,城市人居环境的功能需求、能源紧缺与环保生态相互平衡等客观问题的存在,旧城文化保护区与城市新区整体协调发展的新领域拓展等等,均需要城市基础设施走向技术综合之路。根据规范,综合管廊必须分别设置通风口、人员出入口、管线接出口、投料口等众多节点同时,从确保综合管廊内巡检、维修施工人员安全的角度出发,综合管廊还必须设置必要的逃生口。With the continuous advancement of contemporary science and technology, the existence of objective problems such as the functional requirements of urban living environment, the balance between energy shortage and environmental protection, and the expansion of new areas for the overall coordinated development of old city cultural protection areas and new urban areas, etc., all require Urban infrastructure is on the road to technological integration. According to the regulations, the integrated pipe gallery must be equipped with many nodes such as ventilation openings, personnel entrances and exits, pipeline outlets, and feeding ports. At the same time, from the perspective of ensuring the safety of inspection and maintenance construction personnel in the comprehensive escape port.

由此可见,各种节点间隔布置,没有合理的统一协调,使得综合管廊沿线密布各种露出地坪的检修井、风井、出入口等设施,除了工程造价的提高之外,还将进一步对城市景观、市容环境等造成较大影响,进而偏离了综合管廊改善城市道路、景观的初衷,社会影响较差。It can be seen that various nodes are arranged at intervals without reasonable unified coordination, which makes various maintenance shafts, air shafts, entrances and exits and other facilities exposed to the ground densely distributed along the comprehensive pipe corridor. The urban landscape, city appearance environment, etc. caused a great impact, and then deviated from the original intention of the comprehensive utility corridor to improve urban roads and landscapes, and the social impact was relatively poor.

因此,如何合理的将上述节点,尤其是通风口与逃生口进行统一协调,是地下综合管廊设计的一个难题。Therefore, how to reasonably unify and coordinate the above nodes, especially the ventilation openings and escape openings, is a difficult problem in the design of the underground comprehensive pipe gallery.

实用新型内容Utility model content

本实用新型目的是克服了现有技术中的不足,提供了一种地下管廊的通风及逃生结构,可以实现通风口及逃生口的统一协调,优化节点设计,改善综合管廊节点对城市道路及景观的影响。The purpose of the utility model is to overcome the deficiencies in the prior art, and provide a ventilation and escape structure for an underground pipe gallery, which can realize the unified coordination of the ventilation opening and the escape opening, optimize the node design, and improve the impact of the comprehensive pipe gallery nodes on urban roads. and landscape effects.

本实用新型采用的技术方案如下:The technical scheme that the utility model adopts is as follows:

本实用新型一种地下管廊的通风及逃生结构,包括地下管廊壁,检修舱,防爆层,检修车道,检修车,电动上升底板,高强钢绞线,吊车口,第一盖板,通风舱,大型抽风换气机,钢支架,排气口,金属百叶窗,第二盖板,第一管线舱,第二管线舱,第一排水舱,第二排水舱,出水口,金属网格排水板,直爬梯,舱门和安全段;地下管廊共分为上中下三层,上层中间设置有检修舱,左右两侧分别设置通风舱,检修舱内壁设置防爆层,底部安装检修车道,每个安全段内设置一个吊车口,吊车口上方设有第一盖板,在每一个吊车口下方对应处设置电动上升底板,用高强钢绞线与吊车口连接,通风舱每个安全段内设置排气口,排气口上方设有第二盖板,左右两侧均设置金属百叶窗,排气口下方设置大型抽风换气机和钢支架;地下管廊中层从左到右,分为第一管线舱、第二管线舱、第一管线舱,三个舱室内部均设立直爬梯,位置与地下管廊上层三个舱室底面的舱门位置对应;地下管廊下层从左到右,分为第一排水舱、第二排水舱、第一排水舱,三个舱室顶部均设置金属网格排水板,与地下管廊中层的三个舱室对应连接,第一排水舱与第二排水舱之间设置排水口,在安全段内隔段设置。The utility model relates to a ventilation and escape structure for an underground pipe gallery, which includes an underground pipe gallery wall, an inspection cabin, an explosion-proof layer, an inspection driveway, an inspection vehicle, an electric rising floor, high-strength steel strands, a crane port, a first cover plate, and a ventilation system. Cabin, large exhaust ventilator, steel bracket, exhaust port, metal shutter, second cover plate, first pipeline compartment, second pipeline compartment, first drainage compartment, second drainage compartment, water outlet, metal grid drainage board, straight ladder, hatch and safety section; the underground pipe gallery is divided into upper, middle and lower layers, with an inspection cabin in the middle of the upper layer, ventilation cabins on the left and right sides, an explosion-proof layer on the inner wall of the inspection cabin, and an inspection lane at the bottom. A crane opening is set in each safety section, and a first cover plate is provided above the crane opening, and an electric rising bottom plate is installed at the corresponding place below each crane opening, which is connected to the crane opening with high-strength steel strands. In each safety section of the ventilation cabin Set the exhaust port, the second cover plate is set above the exhaust port, the metal shutters are set on the left and right sides, and the large exhaust ventilator and steel bracket are set under the exhaust port; the middle layer of the underground pipe gallery is divided into the first The first pipeline cabin, the second pipeline cabin, and the first pipeline cabin. Straight ladders are installed inside the three cabins, and the positions correspond to the positions of the hatch doors on the bottom of the three cabins on the upper floor of the underground pipe gallery; the lower floor of the underground pipe gallery is divided into The first drainage cabin, the second drainage cabin, the first drainage cabin, and the top of the three cabins are equipped with metal grid drainage boards, which are connected with the three cabins in the middle layer of the underground pipe corridor. Set up the drain outlet, and set it at intervals within the safety section.

进一步地,所述的检修舱内的电动上升底板由舱内和舱外的开关并联控制,电动上升底板处地面向下凹陷,电动上升底板上表面与防爆层底面齐平,电动上升底板处的检修车道设置在电动上升底板之上并与其连接一体,该处检修车道与其他部分可分离拆卸。Further, the electric rising bottom plate in the maintenance cabin is controlled by the switches inside and outside the cabin in parallel, the ground at the electric rising bottom plate is sunken downwards, the upper surface of the electric rising bottom plate is flush with the bottom surface of the explosion-proof layer, and the electric rising bottom plate is The maintenance lane is set on the electric rising floor and connected with it, and the maintenance lane can be separated and disassembled from other parts.

进一步地,地下管廊的每一安全段内设置对应一组排气口,两组排气口中点处设置一个吊车口,在满足使用要求的同时,将地下管廊开口最大化利用。Furthermore, a corresponding set of exhaust outlets is provided in each safety section of the underground pipe gallery, and a crane port is provided at the midpoint of the two sets of exhaust outlets, so as to meet the requirements of use and maximize the utilization of the openings of the underground pipe gallery.

进一步地,地下管廊内的舱门均采用高强抗火材料。Furthermore, the hatches in the underground pipe gallery are all made of high-strength fire-resistant materials.

进一步地,所述的通风舱内设置的大型抽风换气机尺寸占整体排气口尺寸的1/2到1/3,危险情况下,维修人员可从排气口内的空隙逃出。Further, the size of the large exhaust ventilator installed in the ventilation cabin accounts for 1/2 to 1/3 of the size of the overall exhaust port, and maintenance personnel can escape from the gap in the exhaust port in case of danger.

进一步地,地下管廊上层通风舱内排气口处的金属百叶窗高出地面。Furthermore, the metal louvers at the exhaust outlets in the ventilation cabin on the upper floor of the underground pipe gallery are higher than the ground.

本实用新型的有益效果:The beneficial effects of the utility model:

本实用新型的优点效果是既具有通风换气功能,又具有吊车逃生功能,同时将两者结合在一起,协调设置,改善了综合管廊节点对城市道路及景观的影响,降低工程造价的同时,还将进一步降低综合管廊各节点对城市景观、市容环境等的影响,进而体现综合管廊改善城市道路、景观的初衷,具有良好的社会效应,具有很强的实用性。本实用新型提出安全段的概念,在保证使用安全的情况下,将通风口与吊车口在同一平面上交错布置,吊车口可起到通风换气的作用,通风口也可起到逃生通道的作用(在紧急情况下),这样不仅可以满足管廊规范的要求,也可将管廊出口最大化利用,从而降低施工难度、减小工程投资,使其便于管廊建成后的管道安装、运行管理。The advantages and effects of the utility model are that it not only has the function of ventilation, but also has the function of escaping from a crane. At the same time, the two are combined and set up in a coordinated manner, which improves the influence of the nodes of the comprehensive pipe gallery on urban roads and landscapes, and reduces the construction cost. , and will further reduce the impact of each node of the comprehensive utility corridor on the urban landscape, city appearance, etc., and then reflect the original intention of the comprehensive utility corridor to improve urban roads and landscapes, have a good social effect, and have strong practicability. The utility model proposes the concept of a safety section. Under the condition of ensuring the safety of use, the ventilation openings and the crane openings are arranged alternately on the same plane. The crane openings can play the role of ventilation, and the ventilation openings can also serve as escape routes. Function (in case of emergency), it can not only meet the requirements of the pipe gallery specification, but also maximize the use of the pipe gallery outlet, thereby reducing the construction difficulty, reducing the project investment, and making it convenient for the pipeline installation and operation after the pipe gallery is completed manage.

附图说明Description of drawings

图1为一种地下管廊的通风及逃生结构的剖面图。Fig. 1 is a cross-sectional view of a ventilation and escape structure of an underground utility gallery.

图2为一种地下管廊的通风及逃生结构的俯视图。Fig. 2 is a top view of a ventilation and escape structure of an underground utility gallery.

图3为图1的A-A剖面示意图。FIG. 3 is a schematic cross-sectional view along line A-A of FIG. 1 .

图4为图1的B-B剖面示意图。FIG. 4 is a schematic cross-sectional view along line B-B of FIG. 1 .

图5为图1的C-C剖面示意图。FIG. 5 is a schematic cross-sectional view of C-C in FIG. 1 .

图中,1为地下管廊壁,2为检修舱,2-1为防爆层,2-2为检修车道,2-3为检修车,2-4为电动上升底板,2-5为高强钢绞线,2-6为吊车口,2-7为第一盖板,3为通风舱,3-1为大型抽风换气机,3-2为钢支架,3-3为排气口,3-4为金属百叶窗,3-5为第二盖板,4为第一管线舱,5为第二管线舱,6为第一排水舱,7为第二排水舱,7-1为出水口,7-2金属网格排水板,8为直爬梯,9为舱门,10为安全段,11为地面。In the figure, 1 is the wall of the underground pipe corridor, 2 is the maintenance cabin, 2-1 is the explosion-proof layer, 2-2 is the maintenance lane, 2-3 is the maintenance vehicle, 2-4 is the electric lifting floor, and 2-5 is high-strength steel Stranded wire, 2-6 is the crane port, 2-7 is the first cover plate, 3 is the ventilation cabin, 3-1 is the large exhaust ventilator, 3-2 is the steel bracket, 3-3 is the exhaust port, 3 -4 is the metal shutter, 3-5 is the second cover plate, 4 is the first pipeline compartment, 5 is the second pipeline compartment, 6 is the first drainage compartment, 7 is the second drainage compartment, 7-1 is the water outlet, 7-2 metal grid drainage board, 8 is a straight ladder, 9 is a hatch, 10 is a safety section, and 11 is a ground.

具体实施方式Detailed ways

下面结合附图和实施例对本实用新型进行详细描述:Below in conjunction with accompanying drawing and embodiment the utility model is described in detail:

实施例Example

如图1~5所示,一种地下管廊的通风及逃生结构,包括地下管廊壁1,检修舱2,防爆层2-1,检修车道2-2,检修车2-3,电动上升底板2-4,高强钢绞线2-5,吊车口2-6,第一盖板2-7,通风舱3,大型抽风换气机3-1,钢支架3-2,排气口3-3,金属百叶窗3-4,第二盖板3-5,第一管线舱4,第二管线舱5,第一排水舱6,第二排水舱7,出水口7-1,金属网格排水板7-2,直爬梯8,舱门9,安全段10。地下管廊共分为上中下三层,上层中间设置有检修舱2,左右两侧分别设置通风舱3,检修舱2内壁设置防爆层2-1,底部安装检修车道2-2,每个安全段10内设置一个吊车口2-6,吊车口2-6上方设有第一盖板2-7,在每一个吊车口2-6下方对应处设置电动上升底板2-4,用高强钢绞线2-5与吊车口2-6连接。通风舱3每个安全段10内设置排气口3-3,排气口3-3上方设有第二盖板3-5,左右两侧均设置金属百叶窗3-4,排气口3-3下方设置大型抽风换气机3-1和钢支架3-2。地下管廊中层从左到右,分为第一管线舱4、第二管线舱5、第一管线舱4,三个舱室内部均设立直爬梯8,位置与地下管廊上层三个舱室底面的舱门9位置对应。地下管廊下层从左到右,分为第一排水舱6、第二排水舱7、第一排水舱6,三个舱室顶部均设置金属网格排水板7-2,与地下管廊中层的三个舱室对应连接,第一排水舱6与第二排水舱7之间设置排水口,在安全段10内隔段设置。检修舱2内的电动上升底板2-4由舱内和舱外的开关并联控制,电动上升底板2-4处地面向下凹陷,电动上升底板2-4上表面与防爆层2-1底面齐平,电动上升底板2-4处的检修车道2-2设置在电动上升底板2-4之上并与其连接一体,该处检修车道2-2与其他部分可分离拆卸。地下管廊的每一安全段10内设置对应一组排气口3-3,两组排气口3-3中点处设置一个吊车口2-6,在满足使用要求的同时,将地下管廊开口最大化利用。地下管廊内的舱门9均采用高强抗火材料,通风舱3内设置的大型抽风换气机3-1尺寸占整体排气口3-3尺寸的1/2到1/3,危险情况下,维修人员可从排气口3-3内的空隙逃出。地下管廊上层通风舱3内排气口3-3处的金属百叶窗3-4高出地面11。As shown in Figures 1 to 5, a ventilation and escape structure for an underground pipe gallery, including an underground pipe gallery wall 1, an inspection cabin 2, an explosion-proof layer 2-1, an inspection lane 2-2, an inspection vehicle 2-3, and an electric lift Bottom plate 2-4, high-strength steel strand 2-5, crane opening 2-6, first cover plate 2-7, ventilation cabin 3, large exhaust ventilator 3-1, steel bracket 3-2, exhaust port 3 -3, metal shutters 3-4, second cover plate 3-5, first pipeline compartment 4, second pipeline compartment 5, first drainage compartment 6, second drainage compartment 7, water outlet 7-1, metal grid Drain board 7-2, straight ladder 8, hatch 9, safety section 10. The underground pipe gallery is divided into upper, middle and lower floors. There is an inspection cabin 2 in the middle of the upper floor, and ventilation cabins 3 are installed on the left and right sides respectively. A crane port 2-6 is set in the safety section 10, a first cover plate 2-7 is arranged above the crane port 2-6, and an electric lifting base plate 2-4 is arranged at the corresponding place below each crane port 2-6, and the high-strength steel Stranded wire 2-5 is connected with crane mouth 2-6. An exhaust port 3-3 is arranged in each safety section 10 of the ventilation cabin 3, a second cover plate 3-5 is arranged above the exhaust port 3-3, metal shutters 3-4 are arranged on the left and right sides, and the exhaust port 3-3 3. Large-scale ventilation ventilator 3-1 and steel support 3-2 are arranged below. From left to right, the middle layer of the underground pipe gallery is divided into the first pipeline cabin 4, the second pipeline cabin 5, and the first pipeline cabin 4. Straight ladders 8 are set inside the three cabins, and the positions are the same as those on the bottom surface of the three cabins on the upper floor of the underground pipeline gallery. The cabin door 9 positions are corresponding. From left to right, the lower floor of the underground pipe gallery is divided into the first drainage cabin 6, the second drainage cabin 7, and the first drainage cabin 6. The metal grid drainage board 7-2 is set on the top of the three cabins, which is consistent with the middle layer of the underground pipe gallery. The three compartments are connected correspondingly, and a drain is set between the first drainage compartment 6 and the second drainage compartment 7 , and is set in a section in the safety section 10 . The electric rising floor 2-4 in the maintenance cabin 2 is controlled by the switches inside and outside the cabin in parallel, the ground of the electric rising floor 2-4 is sunken downwards, and the upper surface of the electric rising floor 2-4 is flush with the bottom surface of the explosion-proof layer 2-1 Flat, the maintenance lane 2-2 at the electric rising base plate 2-4 is arranged on the electric rising base plate 2-4 and connected with it as a whole, and the maintenance lane 2-2 at this place can be separated and disassembled from other parts. Each safety section 10 of the underground pipe gallery is provided with a corresponding group of exhaust outlets 3-3, and a crane outlet 2-6 is provided at the midpoint of the two groups of exhaust outlets 3-3. Maximize the use of corridor openings. The hatches 9 in the underground pipe corridor are all made of high-strength fire-resistant materials, and the size of the large exhaust ventilator 3-1 arranged in the ventilation cabin 3 accounts for 1/2 to 1/3 of the size of the overall exhaust port 3-3. Next, maintenance personnel can escape from the gap in the exhaust port 3-3. The metal louvers 3-4 at the exhaust outlet 3-3 in the ventilation cabin 3 on the upper floor of the underground pipe corridor are higher than the ground 11.

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements and modifications can also be made, these improvements and Retouching should also be regarded as the scope of protection of the present utility model.

Claims (6)

1.一种地下管廊的通风及逃生结构,其特征在于:所述地下管廊包括地下管廊壁(1),检修舱(2),防爆层(2-1),检修车道(2-2),检修车(2-3),电动上升底板(2-4),高强钢绞线(2-5),吊车口(2-6),第一盖板(2-7),通风舱(3),大型抽风换气机(3-1),钢支架(3-2),排气口(3-3),金属百叶窗(3-4),第二盖板(3-5),第一管线舱(4),第二管线舱(5),第一排水舱(6),第二排水舱(7),出水口(7-1),金属网格排水板(7-2),直爬梯(8),舱门(9)和安全段(10);地下管廊共分为上中下三层,上层中间设置有检修舱(2),左右两侧分别设置通风舱(3),检修舱(2)内壁设置防爆层(2-1),底部安装检修车道(2-2),每个安全段(10)内设置一个吊车口(2-6),吊车口(2-6)上方设有第一盖板(2-7),在每一个吊车口(2-6)下方对应处设置电动上升底板(2-4),用高强钢绞线(2-5)与吊车口(2-6)连接,通风舱(3)每个安全段(10)内设置排气口(3-3),排气口(3-3)上方设有第二盖板(3-5),左右两侧均设置金属百叶窗(3-4),排气口(3-3)下方设置大型抽风换气机(3-1)和钢支架(3-2);地下管廊中层从左到右,分为第一管线舱(4)、第二管线舱(5)、第一管线舱(4),三个舱室内部均设立直爬梯(8),位置与地下管廊上层三个舱室底面的舱门(9)位置对应;地下管廊下层从左到右,分为第一排水舱(6)、第二排水舱(7)、第一排水舱(6),三个舱室顶部均设置金属网格排水板(7-2),与地下管廊中层的三个舱室对应连接,第一排水舱(6)与第二排水舱(7)之间设置排水口,在安全段(10)内隔段设置。1. A ventilation and escape structure for an underground pipe gallery, characterized in that: the underground pipe gallery includes an underground pipe gallery wall (1), an inspection cabin (2), an explosion-proof layer (2-1), an inspection driveway (2- 2), maintenance vehicle (2-3), electric lifting base plate (2-4), high-strength steel strand (2-5), crane port (2-6), first cover plate (2-7), ventilation cabin (3), large exhaust ventilator (3-1), steel bracket (3-2), exhaust port (3-3), metal shutter (3-4), second cover plate (3-5), The first pipeline compartment (4), the second pipeline compartment (5), the first drainage compartment (6), the second drainage compartment (7), the water outlet (7-1), the metal grid drainage plate (7-2) , straight ladder (8), hatch (9) and safety section (10); the underground pipe gallery is divided into upper, middle and lower floors, with an inspection cabin (2) in the middle of the upper floor and ventilation cabins (3) on the left and right sides ), an explosion-proof layer (2-1) is installed on the inner wall of the inspection cabin (2), an inspection lane (2-2) is installed at the bottom, a crane opening (2-6) is installed in each safety section (10), and the crane opening (2- 6) There is a first cover plate (2-7) on the top, and an electric lifting base plate (2-4) is installed at the corresponding place below each crane opening (2-6), and the high-strength steel strand (2-5) and the crane (2-6) connection, each safety section (10) of the ventilation cabin (3) is provided with an exhaust port (3-3), and a second cover plate (3-5) is provided above the exhaust port (3-3). ), metal shutters (3-4) are installed on the left and right sides, and a large exhaust ventilator (3-1) and steel brackets (3-2) are installed under the exhaust port (3-3); To the right, it is divided into the first pipeline cabin (4), the second pipeline cabin (5), and the first pipeline cabin (4). Straight ladders (8) are set inside the three cabins, and the positions are the same as those of the upper three cabins of the underground pipeline gallery. The position of the hatch door (9) on the bottom surface corresponds; the lower layer of the underground pipe gallery is divided into the first drainage compartment (6), the second drainage compartment (7) and the first drainage compartment (6) from left to right, and the tops of the three compartments are all Set the metal grid drainage board (7-2), correspondingly connected with the three cabins in the middle layer of the underground pipe gallery, set the drainage port between the first drainage cabin (6) and the second drainage cabin (7), and set up a drainage port in the safety section (10 ) inner compartment setting. 2.根据权利要求1所述的一种地下管廊的通风及逃生结构,其特征在于:所述的检修舱(2)内的电动上升底板(2-4)由舱内和舱外的开关并联控制,电动上升底板(2-4)处地面向下凹陷,电动上升底板(2-4)上表面与防爆层(2-1)底面齐平,电动上升底板(2-4)处的检修车道(2-2)设置在电动上升底板(2-4)之上并与其连接一体,该处检修车道(2-2)与其他部分可分离拆卸。2. The ventilation and escape structure of an underground pipe corridor according to claim 1, characterized in that: the electric lifting floor (2-4) in the maintenance cabin (2) is controlled by a switch inside and outside the cabin Parallel control, the ground at the electric rising floor (2-4) is sunken downwards, the upper surface of the electric rising floor (2-4) is flush with the bottom surface of the explosion-proof layer (2-1), and the maintenance at the electric rising floor (2-4) The driveway (2-2) is arranged on the electric rising base plate (2-4) and is integrally connected with it, where the maintenance driveway (2-2) can be separated and disassembled from other parts. 3.根据权利要求1所述的一种地下管廊的通风及逃生结构,其特征在于:地下管廊的每一安全段(10)内设置对应一组排气口(3-3),两组排气口(3-3)中点处设置一个吊车口(2-6),在满足使用要求的同时,将地下管廊开口最大化利用。3. The ventilation and escape structure of an underground pipe gallery according to claim 1, characterized in that: each safety section (10) of the underground pipe gallery is provided with a corresponding set of exhaust outlets (3-3), two A crane port (2-6) is set at the midpoint of the exhaust port group (3-3) to maximize the utilization of the opening of the underground pipe gallery while meeting the use requirements. 4.根据权利要求1所述的一种地下管廊的通风及逃生结构,其特征在于:地下管廊内的舱门(9)均采用高强抗火材料。4. The ventilation and escape structure of an underground pipe gallery according to claim 1, characterized in that: the hatches (9) in the underground pipe gallery are all made of high-strength fire-resistant materials. 5.根据权利要求1所述的一种地下管廊的通风及逃生结构,其特征在于:所述的通风舱(3)内设置的大型抽风换气机(3-1)尺寸占整体排气口(3-3)尺寸的1/2到1/3,危险情况下,维修人员可从排气口(3-3)内的空隙逃出。5. The ventilation and escape structure of an underground pipe gallery according to claim 1, characterized in that: the size of the large exhaust ventilator (3-1) installed in the ventilation cabin (3) accounts for the overall exhaust 1/2 to 1/3 of the size of the exhaust port (3-3), maintenance personnel can escape from the gap in the exhaust port (3-3) in case of danger. 6.根据权利要求1所述的一种地下管廊的通风及逃生结构,其特征在于:地下管廊上层通风舱(3)内排气口(3-3)处的金属百叶窗(3-4)高出地面(11)。6. The ventilation and escape structure of an underground pipe gallery according to claim 1, characterized in that: the metal shutters (3-4) at the exhaust outlet (3-3) in the upper ventilation cabin (3) of the underground pipe gallery ) above the ground (11).
CN201721151732.6U 2017-09-10 2017-09-10 A kind of ventilation of underground pipe gallery and escape structure Expired - Fee Related CN207469291U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721151732.6U CN207469291U (en) 2017-09-10 2017-09-10 A kind of ventilation of underground pipe gallery and escape structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721151732.6U CN207469291U (en) 2017-09-10 2017-09-10 A kind of ventilation of underground pipe gallery and escape structure

Publications (1)

Publication Number Publication Date
CN207469291U true CN207469291U (en) 2018-06-08

Family

ID=62268597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721151732.6U Expired - Fee Related CN207469291U (en) 2017-09-10 2017-09-10 A kind of ventilation of underground pipe gallery and escape structure

Country Status (1)

Country Link
CN (1) CN207469291U (en)

Similar Documents

Publication Publication Date Title
CN205688459U (en) The ventilation of underground pipe gallery and escape structure
CN110004976B (en) Underground station wind shaft and fire-fighting evacuation stairwell combined construction structure
CN106013221B (en) Four layers of class rectangle Urban Underground Complex
CN107447782A (en) A kind of ventilation of underground pipe gallery and escape structure
CN111379451A (en) Compound parking garage
CN103195083A (en) Crossing node structure of integrated pipe galleries
CN103147461B (en) A kind of pipe gallery and control centre's connecting joint structure
CN202584480U (en) City rail transit station model structure
CN207700219U (en) A kind of pipe gallery in more cabins
CN107142958B (en) Double shield pattern synthesis piping lane node wells
CN204456189U (en) Subway station top Pipe rack
CN211173275U (en) Line-side down-type small and medium-sized high-speed railway station building layout structure
CN115821987A (en) Non-excavation formula buries utility tunnel working well deeply
CN207469291U (en) A kind of ventilation of underground pipe gallery and escape structure
CN106013222B (en) Three circular cross section Urban Underground Complexes
CN204455795U (en) Bridge pipeline crosses the river structure
CN221867180U (en) Fire control device system suitable for marine boost assembly cable conversion layer
CN214695537U (en) Ventilation and escape node structure for natural gas cabin of comprehensive pipe rack
CN211773869U (en) A multifunctional urban underground space refractory structure
CN210369035U (en) A subway station structure
CN211037045U (en) A double-layer comprehensive pipe gallery with shared personnel entrance and exit
CN208347426U (en) Building and garage composite structure under a kind of sandwich type lid
CN114109496B (en) Arrangement form of equipment area pipeline of station hall for single arch structure station
CN205475320U (en) Semi -underground formula utility tunnel
CN110080284A (en) A kind of Metro Station Structure and build engineering method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180608