CN207445422U - The support construction of trampoline - Google Patents

The support construction of trampoline Download PDF

Info

Publication number
CN207445422U
CN207445422U CN201721346440.8U CN201721346440U CN207445422U CN 207445422 U CN207445422 U CN 207445422U CN 201721346440 U CN201721346440 U CN 201721346440U CN 207445422 U CN207445422 U CN 207445422U
Authority
CN
China
Prior art keywords
section
trampoline
tube
group
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721346440.8U
Other languages
Chinese (zh)
Inventor
向华炉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dragon Thai (jiangxi) Sports Technology Co Ltd
Original Assignee
Dragon Thai (jiangxi) Sports Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dragon Thai (jiangxi) Sports Technology Co Ltd filed Critical Dragon Thai (jiangxi) Sports Technology Co Ltd
Priority to CN201721346440.8U priority Critical patent/CN207445422U/en
Application granted granted Critical
Publication of CN207445422U publication Critical patent/CN207445422U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tents Or Canopies (AREA)

Abstract

A kind of support construction of trampoline, comprising one there are a longitudinally mounted hole and two groups for being transversely mounted portion to take over, one has the first endless tube of one first assembling section and one first linkage section, one the second endless tube and a support tube with one the 3rd assembling section with one second assembling section and one second linkage section, wherein first endless tube and second endless tube be utilized respectively the first assembling section and the second assembling section is assemblied in that the group takes over two this be transversely mounted portion, the support tube is assemblied in using the 3rd assembling section in the longitudinally mounted hole that the group takes over, the wherein group is taken over as yi word pattern pipe fitting, material cost can be simplified, promote packaging efficiency.

Description

The support construction of trampoline
Technical field
The utility model is related to a kind of support construction of trampoline, espespecially one kind can save material cost, can also simplify group Fill the support construction that program promotes the trampoline of packaging efficiency.
Background technology
It presses, trampoline now has a trampoline framework to support a spring net, and the trampoline framework is filled by plural number support It puts and assembles, such as a kind of China's bulletin revealed trampoline of CN2930768 Patent Cases, it is characterised in that:Connector is adopted It is connected with T-shaped threeway transverse tube with trampoline frame, trampoline leg, positioning through hole is radially provided on the side wall of T-shaped threeway transverse tube, in T Guardrail insertion hole is provided on shape threeway transverse tube top surface, each section of trampoline border tube both ends top and bottom are provided with guardrail insertion hole, from T-shaped three The two trampoline border tubes that logical transverse tube both ends are inserted into respectively form grafting, and two trampoline border tube guardrails insertion hole is made to be inserted with transverse tube guardrail The axis for entering hole overlaps, and the positioning through hole of two trampoline border tubes is overlapped with T-shaped threeway transverse tube positioning through hole, the insertion of guardrail pipe lower end The guardrail insertion hole of two trampoline border tube inserted terminals, guardrail pipe positioning in guardrail insertion hole and transverse tube above T-shaped threeway transverse tube Through hole is overlapped with transverse tube positioning through hole, and penetrating bolt in each positioning through hole fixes.The letter of the connection structure of trampoline stent and guardrail It is single, reliable, connecting component can be reduced, saves material, reduces cost, installation, convenient disassembly, fast.
For another example, No. 201482040 revealed a kind of cross connecting piece for trampoline of Patent Case of China's bulletin, including One transverse tube, a upper vertical tube to connect with transverse tube upper surface and a lower vertical tube to connect with transverse tube lower face, the upper and lower vertical tube pressure Cast solid.The cross connecting piece is simple in structure, easy to manufacture, and during installation, for installing trampoline frame circle, upper vertical tube is used for transverse tube Protecting net pipe is installed, lower vertical tube is for installing trampoline foot, so as to facilitate the installation of each support member of trampoline.
In addition, China bulletin a kind of No. 201250829 revealed trampoline frame pipe connection structure of Patent Case, including frame pipe, Foot tube, guardrail pipe and four parts of connection, four parts are made of vertical tube with the transverse tube for being welded on riser upper end, and foot tube is longitudinally worn Enter vertical tube, vertical perforating on transverse tube, frame pipe stub end stretches into transverse tube and reinforced by the reinforcing pipe in hole, and the small head end of frame pipe stretches into transverse tube And connect together, guardrail pipe is inserted perpendicularly into reinforcing pipe and is reinforced with screw.The structure not only makes assembling become faster, more It is good, and be readily transported and store after dismantling, while can effectively improve bond strength, it is not easy to knot is rocked, skids or made in generation Close the phenomenon that position is impaired.
Only, those foregoing Patent Cases are all to do the company of frame pipe and foot tube using a T words connector or cross connecting piece It connects, and the T words connector or the cross connecting piece are mostly after being arranged in a mutually vertical manner using two pipe fittings, then passes through and weld etc. Processing method connects to complete the group between two pipe fittings, so can not only cause the burden in cost, will also result in tired in processing Difficulty, in addition probably due to welding point is not welded really, and the possibility that the intensity deficiency between two pipe fittings is caused to produce fracture.
Utility model content
Therefore, the main purpose of the utility model, is that one kind can save material cost, can also simplify assembly program and carry Rise the support construction of the trampoline of packaging efficiency.
In order to achieve the above object, the utility model provides a kind of support construction of trampoline, to form a trampoline framework, one is made Spring component is installed on it.The support construction of the trampoline be characterized in that including one group take over, one first endless tube, one second ring Pipe and a support tube.The group takes over integrated molding in a yi word pattern pipe fitting, is respectively perpendicular with a longitudinally mounted hole and two Extend in the longitudinally mounted hole and in the opposite direction and be transversely mounted portion for spring component installation.First endless tube is assemblied in The group is taken over, and is had one to be arranged in any this and is transversely mounted the first assembling section in portion and one is extended and supplied by the first assembling section First linkage section of spring component installation.Second endless tube is assemblied in the group and takes over, and has one to be arranged in another transverse direction peace The second of dress portion assembles section and second linkage section for extending and supplying the spring component to install by the second assembling section.The support Pipe is assemblied in the group and takes over and support to arrive in a plane, has a 3rd assembling section for being arranged in the longitudinally mounted hole, makes the spring Component be respectively arranged in two this be transversely mounted portion, first linkage section and second linkage section and form one between the plane Cushion space.
In an embodiment, the support construction of the trampoline, which further includes one and is assemblied in the group, takes over for an anti-encirclement The purse seine bar that net is installed on it, the purse seine bar have one be arranged in the support tube the 3rd assembling section fixed section and one by The fixed section extends and supplies the extended segment of protection purse seine assembling thereon.
In an embodiment, the aperture in the longitudinally mounted hole is more than the caliber of the 3rd assembling section, and the 3rd assembling section Caliber be more than the fixed section caliber.
In an embodiment, which is taken over being linked using one first fixation kit between the support tube It is fixed, and a limiting slot worn for the fixation kit is further includeed on the fixed section of the purse seine bar.
In an embodiment, between the purse seine bar and the support tube linked using one second fixation kit It is fixed.
In an embodiment, the group take over two this be transversely mounted portion, first endless tube the first connecting portion and The second connecting portion of second endless tube is respectively arranged with the first installation hole for spring component installing.
In an embodiment, the first assembling section of first endless tube and the second assembling section of second endless tube have respectively There is the second installation hole that one and two first installation hole for being transversely mounted portion is located at same axis.
In an embodiment, the aperture of second installation hole is more than the aperture of first installation hole.
By the utility model the above embodiment, had the characteristics that compared to prior art:
The utility model group is taken over as yi word pattern pipe fitting, can save material cost, can also simplify assembly program promotion Packaging efficiency;And the group is taken over, the 3rd assembling section and the fixed section form the tubular structure of a multiple-layer overlapped, and then can be with Increase the support force that the purse seine bar is taken in the group.
Description of the drawings
Fig. 1 is the structure diagram of the utility model first embodiment.
Fig. 2 is the structural decomposition diagram of the utility model first embodiment.
Fig. 3 is the diagrammatic cross-section of the utility model first embodiment.
Fig. 4 is the schematic diagram that the utility model first embodiment is implemented on trampoline.
Fig. 5 is the structure diagram of the utility model second embodiment.
Fig. 6 is the structural decomposition diagram of the utility model second embodiment.
Fig. 7 is the diagrammatic cross-section of the utility model second embodiment.
Fig. 8 is the schematic diagram that the utility model second embodiment is implemented on trampoline.
Specific embodiment
Detailed description and technology contents on the utility model, now just cooperation schema is described as follows:
As shown in Figures 1 to 4, it is first embodiment aspect of the utility model, a kind of support construction 10 of trampoline is provided, it should The support construction 10 of trampoline includes one group of take over 20, one first endless tube 30, one second endless tube 40 and a support tube 50.The group Take over 20 have a longitudinally mounted hole 21 and two be transversely mounted portion 22, the longitudinally mounted hole 21 be located at two this be transversely mounted portion 22 Between, two this be transversely mounted vertical and opposite towards each other with the longitudinally mounted hole 21 direction extension respectively of portion 22, and it is each should It is transversely mounted in portion 22 and is provided with one first installation hole 23.First endless tube 30 is assemblied in the group take over 20, has one to be arranged in Any first assembling section 31 and one for being transversely mounted portion 22 is directed away from the longitudinally mounted hole 21 by the first assembling section 31 First linkage section 32 of direction extension, and the first assembling section 31 has one and corresponding second dress of first installation hole 23 Apertured 33.Second endless tube 40 is similarly assemblied on the group take over 20, is had one to be arranged in another this and is transversely mounted portion 22 Second assembling section 41 and one is directed away from the second linkage section of longitudinally mounted 21 direction of the hole extension by the second assembling section 41 42, in other words, which is from the longitudinally mounted hole 21 direction opposite toward each other with second linkage section 42 Extension, and the second assembling section 41 similarly has one and 23 corresponding second installation hole 43 of the first installation hole.The support Pipe 50 is similarly assemblied on the group take over 20, has a 3rd assembling section 51 for being arranged in the longitudinally mounted hole 21.
The support construction 10 of the trampoline is in assembling process, first, first by the first assembling section 31 of first endless tube 30 It is arranged in any this and is transversely mounted portion 22, order is right against this positioned at second installation hole 33 of the first assembling section 31 and is transversely mounted First installation hole 23 in portion 22, then the second assembling section 41 of the second endless tube 40 is arranged in another this and is transversely mounted portion 22, Second installation hole 43 that order is located at the second assembling section 41 is right against first installation hole 23 for being transversely mounted portion 22, finally The 3rd assembling section 51 of the support tube 50 is arranged in the longitudinally mounted hole 21 again, you can completion the utility model trampoline The assembling of support construction 10.In the present embodiment, which mainly passes through one first fixation kit with the support tube 50 53 are mutually assembled fixation, for enable first fixation kit 53 it is certain the group take over 20 and the support tube 50 are subjected to group It connects, thus first mounting hole 24 by the longitudinally mounted hole 21 is provided on the group take over 20, and in the support tube 50 On be provided with one second mounting hole 52 at position compared with first mounting hole 24, and first mounting hole 24 is second solid with this Determining hole 52, to be located at same axis online, first fixation kit 53 to be made to pass through first mounting hole 24 and second mounting hole 52 And the group take over 20 and the support tube 50 are mutually assembled fixation.
In addition, in the present embodiment, when the support tube 50 when being assemblied in the group take over 20, is by the longitudinally mounted hole 21 Enable what the support tube 50 consolidated to be assemblied on the group take over 20, therefore be provided with one on the group take over 20 and be stretched on this The outside of group take over 20 is simultaneously located on first barricade 25 and one in the longitudinally mounted hole 21 and is stretched on 20 inside of group take over and ring The second barricade 26 arranged on the longitudinally mounted hole 21, with by first barricade 25 and 26 Auxiliary support of the second barricade this Three assembling sections 51.In addition, in the present embodiment, the support construction 10 of the trampoline has further included a protection suite 54, the protective case Part 54 is one last first barricade 25 outside by being stretched on behind the longitudinally mounted hole 21 to be set in the 3rd assembling section 51 End, in addition to it can close the support tube 50, while to avoid collide accidentally the 3rd assembling section 51 the end and caused by wound Evil.
Again as shown in Fig. 2, on first endless tube 30 this first assembling section 31 and second endless tube 40 on this second The caliber of assembling section 41 be smaller than the group take over 20 two this be transversely mounted the aperture in portion 22.Meanwhile first linkage section 32 Caliber is slightly larger than the caliber of the first assembling section 31, and the caliber of second linkage section 42 is slightly larger than the pipe of the second assembling section 41 Footpath.Therefore, when first endless tube 30 and second endless tube 40 are connected on the group take over 20, the first assembling section can be passed through 31 with this second assembling section 41 be mounted on respectively two this be transversely mounted in portion 22, two ora terminalis for being transversely mounted portion 22 is made to support respectively Terminate in first linkage section 32 and second linkage section 42.On the other hand, the first assembling section 31, the second assembling section 41 and two It is a square hole with fillet respectively that this, which is transversely mounted portion 22, so that the first assembling section 31 and the second assembling section 41 exist Be arranged in two this be transversely mounted portion 22 after can not rotate.In addition, being provided on first endless tube 30 22 phase of portion is transversely mounted with this With first installation hole 34, be also provided on second endless tube 40 and first installation hole that be transversely mounted portion 22 identical 44。
Please refer to shown in Fig. 2 and Fig. 4, when the utility model is used for one trampoline of construction, the plural trampoline is provided first Support construction 10 to form a trampoline framework, one spring component 60 is installed then at the trampoline framework.Specifically it is multiple, it should First endless tube 30 and multiple second endless tubes 40 are annular around composition one by multiple group take overs 20, and the spring component 60 With a bullet face 61 and plural number be installed in 61 outer rim of bullet face elastic component 62 (such as:Spring), wherein, multiple elastic components 62 be to be assembled by the bullet face 61 in multiple group take overs 20, multiple first endless tubes 30 and multiple second endless tubes 40, So that the bullet face 61 by stay bolt in 40 inside of multiple group take overs 20, multiple first endless tubes 30 and multiple second endless tubes. And the both ends of each elastic component 62 are respectively provided with a first connecting portion 621 and a second connecting portion 622, and each elasticity Part 62 is to be connected to each group take over 20 of assembling, first endless tube 30 and second endless tube by the first connecting portion 621 40 inside, and the bullet face 61 is connected to by the second connecting portion 622.
When multiple elastic components 62 are assembled on first endless tube 30 and second endless tube 40, the plurality of elastic component 62 Be be connected to the plurality of first installation hole 34,44 by multiple first connecting portions 621 be connected to first endless tube 30 and On second endless tube 40.When multiple elastic components 62 are assembled on the group take over 20, multiple elastic components 62 pass through respectively Each first connecting portion 621 be connected to each group take over 20 two this be transversely mounted first installation hole 23 in portion 22, The second assembling section of second installation hole 33 and second endless tube 40 in the first assembling section 31 of first endless tube 30 Second installation hole 43 on 41 is connected with the plurality of group of take over 20, due to first installation hole 23 and second installation hole 33, 43 is online positioned at same axis, according to this can be by multiple elastic components 62 simultaneously to the first assembling section 31 and the second assembling section 41 Form pulling force, and avoid the first assembling section 31 with this second assemble section 41 from two this be transversely mounted in portion 22 and come off.The opposing party Face, the plurality of support tube 50 can be supported to arrive in a plane (not shown), are made and are formed one between the spring component 60 and the plane Cushion space (not shown).Furthermore in the present embodiment, the aperture of second installation hole 33,43 is greater than first dress The aperture of apertured 23, thus after each first connecting portion 621 is by first installation hole 23 can more smoothly with this Second installation hole 33,43 formation groups connect.A foot stool 55 is equiped in addition, can more link in adjacent two 50 bottoms of support tube, with Increase the forced area of the trampoline bottom.
When user carries out spring-like movement in the bullet face 61, the plurality of elastic component 62 can be pullled by the bullet face 61 and generated Telescopic deformation, and provide the spring by multiple group take overs 20, multiple first endless tubes 30 and multiple second endless tubes 40 60 1 support force of component bounces so that user is sustainable in the bullet face 61.Further, since the group take over 20 be one into Type, and first endless tube 30, second endless tube 40 and the support tube 50 are fixed with inserting mode rather than with welding manner In the longitudinally mounted hole 21 and two, this is transversely mounted portion 22, thereby passes through the support construction 10 of the 20 reinforcement trampoline of the group take over Overall package intensity.
For another example shown in Fig. 5 to Fig. 8, in the present embodiment, the support construction 10 of the trampoline further includes a purse seine bar 70, and the 3rd assembling section 51 is then the outside for extending the group take over 20 by the longitudinally mounted hole 21, the purse seine bar 70 Fixed section 71 and one inside the 3rd assembling section 51 is inserted in from the fixed section 71 towards separate 20 side of the group take over one To the extended segment 72 of extension, and the fixed section 71 has a limiting slot 73 at the front end in 20 direction of group take over.When this is solid Determine section 71 be inserted in the 3rd assembling 51 inside of section when, which can be by first fixation kit 53, this to be made to fix Section 71 can be inserted in completely in the 3rd assembling section 51, can be increased according to this between the 3rd assembling section 51 and the fixed section 71 Overlapping area.In addition, further more connected between the purse seine bar 70 and the support tube 50 using one second fixation kit 74, It is connect so as to be able to the firm group that carries out between the purse seine bar 70 and the support tube 50.On the other hand, the hole in the longitudinally mounted hole 21 Footpath is more than the caliber of the 3rd assembling section 51, and the 3rd assembling section 51 is more than the caliber of the fixed section 71, meanwhile, the 3rd group Dress section 51 is subject to the support of first barricade 25 and second barricade 26, makes the group take over the 20, the 3rd assembling section 51 and is somebody's turn to do Fixed section 71 forms the tubular structure of a multiple-layer overlapped, and then can increase the purse seine bar 70 in the support on the group take over 20 Power.
Therefore, the utility model further can be provided with a protection purse seine 80 on the trampoline using the purse seine bar 70, With by the protection purse seine 80 around around user, to prevent user from being popped up by the bullet face 61 on the outside of the trampoline framework, To promote the security when trampoline uses.
It is compared with the prior art, the group take over 20 of the utility model is yi word pattern pipe fitting, can save material cost, Assembly program can be simplified and promote packaging efficiency;And the group take over the 20, the 3rd assembling section 51 and the fixed section 71 form more than one The tubular structure of layer overlapping, and then the purse seine bar 70 can be increased in the support force on the group take over 20.

Claims (8)

1. a kind of support construction of trampoline to form a trampoline framework, makes a spring component be installed on it, the support of the trampoline Structure is characterized in that including:
One group is taken over, and is integrally formed in a yi word pattern pipe fitting, and longitudinal direction peace is respectively perpendicular to a longitudinally mounted hole and two Dress hole simultaneously extends and is transversely mounted portion for spring component installation in the opposite direction;
One first endless tube is assemblied in the group and takes over, have one be arranged in it is any this be transversely mounted portion first assembling section and one Extended by the first assembling section and supply the first linkage section of spring component installation;
One second endless tube is assemblied in the group and takes over, have one be arranged in it is another this be transversely mounted portion second assembling section and one Extended by the second assembling section and supply the second linkage section of spring component installation;And
One support tube is assemblied in the group and takes over and support to arrive in a plane, has the 3rd assembling for being arranged in the longitudinally mounted hole Section, make the spring component be respectively arranged in two this be transversely mounted portion, first linkage section and second linkage section and flat with this A cushion space is formed between face.
2. the support construction of trampoline as described in claim 1, which is characterized in that the support construction of the trampoline further includes one It is assemblied in the group and takes over the purse seine bar being installed on it for a protection purse seine, which has one to be arranged in being somebody's turn to do for the support tube The fixed section of 3rd assembling section and one extended by the fixed section and the protection purse seine supply to assemble extended segment thereon.
3. the support construction of trampoline as claimed in claim 2, which is characterized in that the aperture in the longitudinally mounted hole is more than the 3rd group The caliber of section is filled, and the caliber of the 3rd assembling section is more than the caliber of the fixed section.
4. the support construction of trampoline as claimed in claim 2, which is characterized in that the group is taken over being further between the support tube Fixation is linked using one first fixation kit, and it is first solid for this that one is further includeed on the fixed section of the purse seine bar Determine the limiting slot that component is worn.
5. the support construction of trampoline as claimed in claim 2, which is characterized in that be further between the purse seine bar and the support tube Fixation is linked using one second fixation kit.
6. the support construction of trampoline as claimed in claim 1 or 2, which is characterized in that the group take over two this be transversely mounted portion, The second connecting portion of the first connecting portion of first endless tube and second endless tube is respectively arranged with for spring component installing First installation hole.
7. the support construction of trampoline as claimed in claim 6, which is characterized in that first endless tube this first assembling section and should Second assembling section of the second endless tube is respectively provided with one and two first installation hole for being transversely mounted portion and is located at same axis Second installation hole.
8. the support construction of trampoline as claimed in claim 7, which is characterized in that the aperture of second installation hole is more than first dress The aperture of apertured.
CN201721346440.8U 2017-10-16 2017-10-16 The support construction of trampoline Active CN207445422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721346440.8U CN207445422U (en) 2017-10-16 2017-10-16 The support construction of trampoline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721346440.8U CN207445422U (en) 2017-10-16 2017-10-16 The support construction of trampoline

Publications (1)

Publication Number Publication Date
CN207445422U true CN207445422U (en) 2018-06-05

Family

ID=62249743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721346440.8U Active CN207445422U (en) 2017-10-16 2017-10-16 The support construction of trampoline

Country Status (1)

Country Link
CN (1) CN207445422U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108744389A (en) * 2018-08-08 2018-11-06 刘运伟 Buffer unit and trampoline for trampoline

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108744389A (en) * 2018-08-08 2018-11-06 刘运伟 Buffer unit and trampoline for trampoline

Similar Documents

Publication Publication Date Title
US9444395B2 (en) Support assembly for mounting a solar panel unit
CN207445422U (en) The support construction of trampoline
CN206327495U (en) Electric ATV frame
CN106828213A (en) A kind of modular assembly formula automotive seat for being easy to assemble and disassemble and repair
CN102011465A (en) Netlike assembled protection fence
CN201030927Y (en) Bicycle frame tube structure made of carbon fiber composite material
CN202722146U (en) Planting greenhouse bracket convenient to install
CN107812344A (en) Trampoline support
CN205688786U (en) A kind of means for fastening scaffolding
CN205338294U (en) Environmental protection chair
CN209395580U (en) A kind of novel bottom sets that steel bottle filled with compressed natural gas combination is fixed and protective device
CN220147494U (en) Frame structure
CN207268435U (en) A kind of stainless steel lamp stand
CN207296185U (en) Sleeve nest plate combined reinforced bar attachment device
CN201882196U (en) Motorcycle frame of cross country motorcycle
CN206071218U (en) Information screen, radiation shield tent
CN215331837U (en) Self-supporting sleeve chimney that suspends in midair
CN208237811U (en) Street lamp mounting rack
CN205578086U (en) Two segmentation blast pipes
CN208475651U (en) Water heater
CN206964347U (en) It is easy to the desk for assembling and transporting
CN206888193U (en) A kind of high strength steel structure node
CN206942494U (en) A kind of combined door frame
CN206928187U (en) The combined type floriculture guardrail reinforced based on netting
CN205591997U (en) Car exhaust system hot junction support assembly and car

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant