CN207426562U CN201721494616.4U CN201721494616U CN207426562U CN 207426562 U CN207426562 U CN 207426562U CN 201721494616 U CN201721494616 U CN 201721494616U CN 207426562 U CN207426562 U CN 207426562U
Authority
CN
China
Prior art keywords
winding head
chute
power cable
mounting frame
management device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721494616.4U
Other languages
Chinese (zh)
Inventor
高天山
吾甫尔·卡斯木
张曦
王新星
史宝剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
National Network Xinjiang Electric Power Co Ltd Training Center
State Grid Corp of China SGCC
Original Assignee
National Network Xinjiang Electric Power Co Ltd Training Center
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by National Network Xinjiang Electric Power Co Ltd Training Center, State Grid Corp of China SGCC filed Critical National Network Xinjiang Electric Power Co Ltd Training Center
Priority to CN201721494616.4U priority Critical patent/CN207426562U/en
Application granted granted Critical
Publication of CN207426562U publication Critical patent/CN207426562U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

本实用新型涉及电力电缆布线技术领域,是一种电力线缆布线理线装置。包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头。本实用新型结构合理而紧凑,使用方便,使用时,将安装板固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头上,然后再从上限位筒穿出,第二根2M线缆缠绕到第一个下绕线头上,然后再从下限位筒穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。

The utility model relates to the technical field of power cable wiring, in particular to a power cable wiring arrangement device. Including installation plate, upper chute, lower chute, upper winding head, lower winding head, upper mounting frame, lower mounting frame, upper limit cylinder and lower limit cylinder, the upper chute is fixedly installed on the mounting plate from top to bottom , a sliding chute, an upper mounting frame and a lower mounting frame, and at least three upper winding heads are installed at intervals from left to right in the upper chute. The utility model has a reasonable and compact structure and is easy to use. When in use, the installation plate is fixed and installed, and each 2M cable is sorted out, and then the first 2M cable is wound on the first upper winding head, and then Then pass through the upper limit tube, the second 2M cable is wound on the first lower winding head, and then passed out from the lower limit tube, so that it goes out one by one, which not only straightens the 2M cable well, but also There will be a phenomenon that 2M cables are entangled with each other, which effectively improves the efficiency of post-maintenance work.

Description

电力线缆布线理线装置Power cable wiring and management device

技术领域technical field

本实用新型涉及电力电缆布线技术领域,是一种电力线缆布线理线装置。The utility model relates to the technical field of power cable wiring, in particular to a power cable wiring arrangement device.

背景技术Background technique

在电缆施工和线缆布放过程中,由于设备越来越多,2M线缆在单元体后端布线出线长度不同,交叉穿越,造成布线混乱,布线施工时,通常用扎带完成多条2M线缆的绑扎,容易造成线缆之间相互缠绕,当需更换某条线缆时,需将所有扎带剪断,对线缆进行重新梳理并找到目标线缆后方可更换,这样就造成后期维护工作效率低的问题。In the process of cable construction and cable laying, due to more and more equipment, the lengths of 2M cables at the rear end of the unit body are different, crossing and crossing, causing wiring confusion. During wiring construction, multiple 2M cables are usually completed with cable ties. The binding of cables is easy to cause the cables to be entangled with each other. When a certain cable needs to be replaced, all the cable ties need to be cut off, the cables can be reorganized and the target cable can be found before replacement, which will cause later maintenance. The problem of low work efficiency.

发明内容Contents of the invention

本实用新型提供了一种电力线缆布线理线装置,克服了上述现有技术之不足,其能有效解决由于线缆布线混乱、后期维护工作效率低的问题。The utility model provides a power cable wiring and management device, which overcomes the above-mentioned deficiencies in the prior art, and can effectively solve the problem of low maintenance efficiency due to chaotic cable wiring.

本实用新型的技术方案是通过以下措施来实现的:一种电力线缆布线理线装置,包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头,在下滑槽内自左至右间隔安装有至少三个与上绕线头上下间隔错开的下绕线头,在上安装架上固定安装有与上绕线头上下一一对应的上限位筒,在下安装架上固定安装有与下绕线头上下一一对应的下限位筒。The technical solution of the utility model is achieved by the following measures: a power cable wiring and management device, including a mounting plate, an upper chute, a lower chute, an upper winding head, a lower winding head, an upper mounting frame, and a lower mounting frame , the upper limit cylinder and the lower limit cylinder, the upper chute, the lower chute, the upper mounting frame and the lower mounting frame are fixedly installed on the mounting plate at intervals from top to bottom, and at least three are installed in the upper chute at intervals from left to right There are two upper winding heads, and at least three lower winding heads that are spaced apart from the upper winding head are installed in the sliding groove from left to right, and upper winding heads are fixedly installed on the upper mounting bracket with upper and lower upper limit positions corresponding to each other The cylinder is fixedly installed with the lower limit cylinder corresponding to the upper and lower sides of the lower winding head on the lower mounting frame.

下面是对上述实用新型技术方案的进一步优化或/和改进:Below is the further optimization or/and improvement to above-mentioned utility model technical scheme:

上述上滑槽和下滑槽均由一对上下对应并有间距的槽钢构成,上绕线头和下绕线头均为水平放置状的T形头,且上绕线头和下绕线头的小头呈左宽右窄的台阶状,上绕线头的小头的左部位于上滑槽内,下绕线头的小头的左部位于下滑槽内。The above-mentioned upper chute and lower chute are both composed of a pair of channel steel corresponding to the upper and lower sides and with a distance between them. The upper winding head and the lower winding head are T-shaped heads placed horizontally, and the small ends of the upper winding head and the lower winding head are in the shape of The left side is wide and the right is narrow step shape, the left part of the small end of the upper winding head is located in the upper chute, and the left part of the small end of the lower winding head is located in the sliding groove.

上述上绕线头和下绕线头的大头外侧均设有限位环台。Limiting rings are provided on the outer sides of the upper and lower winding heads.

上述上绕线头通过螺钉固定安装在上滑槽内,下绕线头通过螺钉固定安装在下滑槽内。The above-mentioned upper winding head is fixedly installed in the upper chute by screws, and the lower winding head is fixedly installed in the lower chute by screws.

上述上限位筒和下限位筒均为C形弹性筒。The upper limit cylinder and the lower limit cylinder are all C-shaped elastic cylinders.

上述安装板的四周设有安装通孔。Mounting through holes are arranged around the above-mentioned mounting plate.

本实用新型结构合理而紧凑,使用方便,使用时,将安装板固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头上,然后再从上限位筒穿出,第二根2M线缆缠绕到第一个下绕线头上,然后再从下限位筒穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。The utility model has a reasonable and compact structure and is easy to use. When in use, the installation plate is fixed and installed, and each 2M cable is sorted out, and then the first 2M cable is wound on the first upper winding head, and then Then pass through the upper limit tube, the second 2M cable is wound on the first lower winding head, and then passed out from the lower limit tube, so that the 2M cables are well straightened out, and the There will be a phenomenon that 2M cables are entangled with each other, which effectively improves the efficiency of post-maintenance work.

附图说明Description of drawings

附图1为本实用新型最佳实施例的主视结构示意图。Accompanying drawing 1 is the schematic diagram of the front view of the preferred embodiment of the utility model.

附图2为附图1的左视结构示意图。Accompanying drawing 2 is the left view structural diagram of accompanying drawing 1.

附图中的编码分别为:1为安装板,2为上滑槽,3为下滑槽,4为上绕线头,5为下绕线头,6为上安装架,7为下安装架,8为上限位筒,9为下限位筒,10为限位环台,11为螺钉,12为安装通孔。The codes in the drawings are: 1 is the mounting plate, 2 is the upper chute, 3 is the lower chute, 4 is the upper winding head, 5 is the lower winding head, 6 is the upper mounting frame, 7 is the lower mounting frame, 8 is the Upper limit tube, 9 is the lower limit tube, 10 is the limit ring platform, 11 is the screw, and 12 is the installation through hole.

具体实施方式Detailed ways

本实用新型不受下述实施例的限制,可根据本实用新型的技术方案与实际情况来确定具体的实施方式。The utility model is not limited by the following examples, and the specific implementation manner can be determined according to the technical scheme of the utility model and actual conditions.

在本实用新型中,为了便于描述,各部件的相对位置关系的描述均是根据说明书附图2的布图方式来进行描述的,如:上、下、左、右等的位置关系是依据说明书附图2的布图方向来确定的。In this utility model, for the convenience of description, the description of the relative positional relationship of each component is described according to the layout method of the accompanying drawing 2 of the specification, such as: the positional relationship of upper, lower, left, right, etc. is based on the specification It is determined by the layout direction of accompanying drawing 2.

下面结合实施例及附图对本实用新型作进一步描述:Below in conjunction with embodiment and accompanying drawing, the utility model is further described:

如附图1、2所示,该电力线缆布线理线装置包括安装板1、上滑槽2、下滑槽3、上绕线头4、下绕线头5、上安装架6、下安装架7、上限位筒8和下限位筒9,在安装板1上自上而下间隔固定安装有上滑槽2、下滑槽3、上安装架6和下安装架7,在上滑槽2内自左至右间隔安装有至少三个上绕线头4,在下滑槽3内自左至右间隔安装有至少三个与上绕线头4上下间隔错开的下绕线头5,在上安装架6上固定安装有与上绕线头4上下一一对应的上限位筒8,在下安装架7上固定安装有与下绕线头5上下一一对应的下限位筒9。使用时,将安装板1固定安装好,将每根2M线缆梳理好,然后首先将第一根2M线缆缠绕到第一个上绕线头4上,然后再从上限位筒8穿出,第二根2M线缆缠绕到第一个下绕线头5上,然后再从下限位筒9穿出,就这样依次穿出,不仅很好地理顺了2M线缆,不会出现2M线缆相互缠绕的现象,有效提高了后期维护工作效率。As shown in Figures 1 and 2, the power cable wiring management device includes a mounting plate 1, an upper chute 2, a lower chute 3, an upper winding head 4, a lower winding head 5, an upper mounting frame 6, and a lower mounting frame 7 , the upper limit cylinder 8 and the lower limit cylinder 9, the upper chute 2, the lower chute 3, the upper mounting frame 6 and the lower mounting frame 7 are fixedly installed at intervals from top to bottom on the mounting plate 1, and the upper chute 2 automatically At least three upper winding heads 4 are installed at intervals from left to right, and at least three lower winding heads 5 staggered up and down with the upper winding heads 4 are installed in the sliding groove 3 from left to right, and are fixed on the upper mounting frame 6 An upper limit cylinder 8 corresponding to the upper winding head 4 is installed, and a lower limiting cylinder 9 corresponding to the lower winding head 5 is fixedly installed on the lower mounting frame 7 . When in use, fix and install the mounting plate 1, comb each 2M cable, and then first wind the first 2M cable on the first upper winding head 4, and then pass it out from the upper limit tube 8, The second 2M cable is wound on the first lower winding head 5, and then passed out from the lower limit cylinder 9, and passed out sequentially in this way, which not only straightens the 2M cables well, but also prevents the 2M cables from interacting with each other. The phenomenon of winding effectively improves the efficiency of post-maintenance work.

可根据实际需要,对上述电力线缆布线理线装置作进一步优化或/和改进:According to actual needs, the above-mentioned power cable routing device can be further optimized or/and improved:

如附图1、2所示,上滑槽2和下滑槽3均由一对上下对应并有间距的槽钢构成,上绕线头4和下绕线头5均为水平放置状的T形头,且上绕线头4和下绕线头5的小头呈左宽右窄的台阶状,上绕线头4的小头的左部位于上滑槽2内,下绕线头5的小头的左部位于下滑槽3内。这样,便于将上绕线头4和下绕线头5安装到上滑槽2和下滑槽3内。As shown in Figures 1 and 2, the upper chute 2 and the lower chute 3 are composed of a pair of channel steel corresponding to the upper and lower sides and with a distance between them. The upper winding head 4 and the lower winding head 5 are T-shaped heads placed horizontally. And the small head of the upper winding head 4 and the lower winding head 5 is in the step shape of left wide and right narrow, the left part of the small head of the upper winding head 4 is located in the upper chute 2, and the left part of the small head of the lower winding head 5 is located in In the chute 3. In this way, it is convenient to install the upper winding head 4 and the lower winding head 5 into the upper chute 2 and the lower chute 3 .

如附图2所示,上绕线头4和下绕线头5的大头外侧均设有限位环台10。这样能起到很好的限位作用。As shown in accompanying drawing 2, the outer sides of the big ends of the upper winding head 4 and the lower winding head 5 are provided with a limiting ring platform 10 . This can play a very good limit effect.

如附图2所示,上绕线头4通过螺钉11固定安装在上滑槽2内,下绕线头5通过螺钉11固定安装在下滑槽3内。这样,便与定位。As shown in accompanying drawing 2, upper winding head 4 is fixedly installed in upper chute 2 by screw 11, and lower winding head 5 is fixedly installed in sliding groove 3 by screw 11. In this way, it is related to positioning.

根据需要,上限位筒8和下限位筒9均为C形弹性筒。且C形弹性筒的开口应稍微小于2M线缆的直径,这样,便于在维修时取出和放入2M线缆。According to requirements, both the upper limit cylinder 8 and the lower limit cylinder 9 are C-shaped elastic cylinders. And the opening of the C-shaped elastic cylinder should be slightly smaller than the diameter of the 2M cable, so that it is convenient to take out and put in the 2M cable during maintenance.

为了便于安装,安装板1的四周设有安装通孔12。In order to facilitate installation, installation through holes 12 are provided around the installation board 1 .

以上技术特征构成了本实用新型的最佳实施例,其具有较强的适应性和最佳实施效果,可根据实际需要增减非必要的技术特征,来满足不同情况的需求。The above technical features constitute the best embodiment of the utility model, which has strong adaptability and best implementation effect, and non-essential technical features can be increased or decreased according to actual needs to meet the needs of different situations.

Claims (10)

1.一种电力线缆布线理线装置,其特征在于包括安装板、上滑槽、下滑槽、上绕线头、下绕线头、上安装架、下安装架、上限位筒和下限位筒,在安装板上自上而下间隔固定安装有上滑槽、下滑槽、上安装架和下安装架,在上滑槽内自左至右间隔安装有至少三个上绕线头,在下滑槽内自左至右间隔安装有至少三个与上绕线头上下间隔错开的下绕线头,在上安装架上固定安装有与上绕线头上下一一对应的上限位筒,在下安装架上固定安装有与下绕线头上下一一对应的下限位筒。1. A power cable wiring management device, characterized in that it includes a mounting plate, an upper chute, a lower chute, an upper winding head, a lower winding head, an upper mounting frame, a lower mounting frame, an upper limit cylinder and a lower limit cylinder, The upper chute, the lower chute, the upper mounting frame and the lower mounting frame are fixedly installed on the mounting plate at intervals from top to bottom, and at least three upper winding heads are installed at intervals from left to right in the upper chute. From left to right, there are at least three lower winding heads that are staggered from the upper and lower intervals of the upper winding head. On the upper mounting frame, there are fixedly installed upper limit cylinders corresponding to the upper and lower ends of the upper winding head. On the lower mounting frame, there are The lower limit cylinder corresponding to the upper and lower sides of the lower winding head. 2.根据权利要求1所述的电力线缆布线理线装置,其特征在于上滑槽和下滑槽均由一对上下对应并有间距的槽钢构成,上绕线头和下绕线头均为水平放置状的T形头,且上绕线头和下绕线头的小头呈左宽右窄的台阶状,上绕线头的小头的左部位于上滑槽内,下绕线头的小头的左部位于下滑槽内。2. The power cable wiring and management device according to claim 1, characterized in that the upper chute and the lower chute are composed of a pair of channel steel corresponding to the upper and lower sides and with a distance between them, and the upper winding head and the lower winding head are both horizontal Placement-shaped T-shaped head, and the small ends of the upper winding head and the lower winding head are in the shape of a step with a wide left and a narrow right. The part is located in the chute. 3.根据权利要求2所述的电力线缆布线理线装置,其特征在于上绕线头和下绕线头的大头外侧均设有限位环台。3. The power cable wiring and management device according to claim 2, characterized in that both the upper winding head and the lower winding head are provided with limiting rings on the outer sides of the big ends. 4.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于上绕线头通过螺钉固定安装在上滑槽内,下绕线头通过螺钉固定安装在下滑槽内。4. The power cable wiring and management device according to claim 1, 2 or 3, characterized in that the upper winding head is fixed and installed in the upper chute by screws, and the lower winding head is fixed and installed in the lower chute by screws. 5.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于上限位筒和下限位筒均为C形弹性筒。5. The power cable routing device according to claim 1, 2 or 3, characterized in that both the upper limit cylinder and the lower limit cylinder are C-shaped elastic cylinders. 6.根据权利要求4或所述的电力线缆布线理线装置,其特征在于上限位筒和下限位筒均为C形弹性筒。6. The power cable routing device according to claim 4, characterized in that both the upper limit cylinder and the lower limit cylinder are C-shaped elastic cylinders. 7.根据权利要求1或2或3所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。7. The power cable wiring and management device according to claim 1, 2 or 3, characterized in that installation through holes are provided around the installation plate. 8.根据权利要求4所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。8. The power cable wiring and management device according to claim 4, characterized in that there are installation through holes around the installation plate. 9.根据权利要求5所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。9. The power cable routing device according to claim 5, characterized in that there are installation through holes around the installation plate. 10.根据权利要求6所述的电力线缆布线理线装置,其特征在于安装板的四周设有安装通孔。10. The power cable wiring and management device according to claim 6, characterized in that installation through holes are provided around the installation plate.
CN201721494616.4U 2017-11-10 2017-11-10 Electric power cable connects up wire-management device Active CN207426562U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721494616.4U CN207426562U (en) 2017-11-10 2017-11-10 Electric power cable connects up wire-management device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721494616.4U CN207426562U (en) 2017-11-10 2017-11-10 Electric power cable connects up wire-management device

Publications (1)

Publication Number Publication Date
CN207426562U true CN207426562U (en) 2018-05-29

Family

ID=62305532

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721494616.4U Active CN207426562U (en) 2017-11-10 2017-11-10 Electric power cable connects up wire-management device

Country Status (1)

Country Link
CN (1) CN207426562U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658791A (en) * 2017-11-10 2018-02-02 国网新疆电力有限公司培训中心 Electric power cable connects up wire-management device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107658791A (en) * 2017-11-10 2018-02-02 国网新疆电力有限公司培训中心 Electric power cable connects up wire-management device

Similar Documents

Publication Publication Date Title
CN204615273U (en) A cable bending device
CN102306920B (en) Anti-oscillation arrangement and configuration method for phase-to-phase spacers of ultrahigh-voltage compact power transmission line
CN207896584U (en) Automate ship cable extension bracket
CN207426562U (en) Electric power cable connects up wire-management device
CN201904593U (en) Pre-stranded two-bundle spacer
CN203456833U (en) Splitting-type telescoping damping spacer
CN103594964A (en) Pole tower lead supporting frame
CN203260976U (en) Cable termination tower
CN204738737U (en) an insulating step ladder
CN107658791A (en) Electric power cable connects up wire-management device
CN203859448U (en) Special tool for righting two-gang board during live working on double bundle conductor
CN203596582U (en) Power transmission equipment transiting overhead line into cable line
CN208978657U (en) Rail traction power supply unit
CN212094122U (en) Secondary cable organizer for substation station
CN104141403A (en) Bird-repellent telegraph pole
CN203596587U (en) Preformed vibration damper
CN204946645U (en) A kind of two-stub transformer stand
CN105977860B (en) A kind of replacement overhead transmission line composite cross-arm insulator device and method
CN110499951B (en) Iron tower cross arm rope ladder hanging point extension device and application
CN208797510U (en) A kind of combination gantry
CN206878422U (en) A variable length jumper bracket
CN103615189B (en) Rope ladder connecting structure for aerial cable
CN202550415U (en) Cable laying distributor
CN208016177U (en) Communication distribution cabinet wire arrangement device
CN202474705U (en) Electrified installation tool for bird scarer

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant