CN207422345U - Hot-water heating system comprising bath water waste heat recovery and water resource heat pump - Google Patents

Hot-water heating system comprising bath water waste heat recovery and water resource heat pump Download PDF

Info

Publication number
CN207422345U
CN207422345U CN201721512110.1U CN201721512110U CN207422345U CN 207422345 U CN207422345 U CN 207422345U CN 201721512110 U CN201721512110 U CN 201721512110U CN 207422345 U CN207422345 U CN 207422345U
Authority
CN
China
Prior art keywords
water
water tank
bath
pipeline
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721512110.1U
Other languages
Chinese (zh)
Inventor
黎德明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongxin Keyuan Technology Co Ltd
Original Assignee
Beijing Zhongxin Keyuan Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongxin Keyuan Technology Co Ltd filed Critical Beijing Zhongxin Keyuan Technology Co Ltd
Priority to CN201721512110.1U priority Critical patent/CN207422345U/en
Application granted granted Critical
Publication of CN207422345U publication Critical patent/CN207422345U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/18Domestic hot-water supply systems using recuperated or waste heat
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B30/00Energy efficient heating, ventilation or air conditioning [HVAC]
    • Y02B30/52Heat recovery pumps, i.e. heat pump based systems or units able to transfer the thermal energy from one area of the premises or part of the facilities to a different one, improving the overall efficiency

Landscapes

  • Heat-Pump Type And Storage Water Heaters (AREA)

Abstract

The utility model provides a kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, including bath wastewater collecting part, water resource heat pump heating part and heating press-bearing water tank, the bath wastewater collecting part includes at least one bathing unit, pipeline primary filter, waste water water supply pump sum aggregate waste water tank, and the bath water with residual temperature flowed out through bathing unit passes sequentially through pipeline primary filter, waste water water supply pump reaches collection waste water tank;The water resource heat pump heating part includes evaporator, compressor, condenser, throttle valve and heat cycles pump, the collection waste water tank enters in evaporator carries out heat exchange with refrigerant therein, it reaches after refrigerant heat absorption evaporation in evaporator and is compressed and as the heat source of condenser in compressor, water into condenser in heating press-bearing water tank is heated, the water supply bathing unit heated in press-bearing water tank uses.It realizes and the waste heat of bath water is fully recycled, achieved the effect that energy-saving and emission-reduction.

Description

Hot-water heating system comprising bath water waste heat recovery and water resource heat pump
Technical field
It is more particularly to a kind of to include bath water waste heat recovery the utility model is related to waste heat recovery hot water system technical field With the hot-water heating system of water resource heat pump.
Background technology
Traditional water source heat pump water heater, the low level heat energy utilized are surface water or underground water, simply be make use of merely The thermal energy of water in natural river, due to the difference of four seasons weather, fluctuating temperature is larger, and the efficiency of water resource heat pump is it is difficult to ensure that one A higher level run.In addition if merely using instant electric water heater, power is all larger, for the machine of bathing, work( Rate at least more than 8KW has higher requirement to installation electric wire, larger using limitation.
Utility model content
Technical problem to be solved in the utility model is:It provides a kind of comprising bath water waste heat recovery and water resource heat pump Hot-water heating system efficiently uses the heat in bath wastewater, greatly improves water source heat pump units efficiency, energy-saving and environment-friendly so as to reach Purpose, while cause high request limitation of the product from installation electric wire, applicability is stronger.
In order to solve the above-mentioned technical problem, the technical solution adopted in the utility model is:
A kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, including bath wastewater collecting part, water source Heat pump part and heating press-bearing water tank, at the beginning of the bath wastewater collecting part includes at least one bathing unit, pipeline Grade filter, waste water water supply pump sum aggregate waste water tank, the bath water with residual temperature through bathing unit outflow is reached by pipeline manages Road primary filter, then the water inlet by pipeline arrival waste water water supply pump, the water outlet of waste water water supply pump pass through pipeline and institute State collection waste water tank connection;The water resource heat pump heating part includes evaporator, compressor, condenser, throttle valve and heat cycles Pump, the collection waste water tank are connected by pipeline with the water inlet of the evaporator, also pass through the water outlet of pipeline and the evaporator Mouthful connection, the gas vent of the evaporator connects with the gas access of the compressor, the gas vent of the compressor and The gas access connection of the condenser, the liquid outlet of the condenser pass through throttle valve and the refrigerant liquid of the evaporator Entrance connect, it is described heating press-bearing water tank connected by pipeline with the water inlet of the condenser, also by pipeline with it is described cold The water outlet connection of condenser, the heating press-bearing water tank are also connected by pipeline with the water inlet end of the bathing unit.
Further, the bathing unit includes bathroom, thermal-arrest pond and hair filter screen, the water inlet end of the bathing unit Positioned at the top in the bathroom, the ground in the bathroom is equipped with thermal-arrest pond, and the hair filter screen is mounted on the thermal-arrest pond At upper end opening, the thermal-arrest pond is connected by pipeline with the pipeline primary filter.
Further, the bath wastewater collecting part further includes liquid-level switch and blowdown water valve, and the liquid-level switch is set It puts on the side wall of the collection waste water tank, the blowdown water valve is arranged on the bottom of the collection waste water tank.
Further, the bath wastewater collecting part further includes secondary conduit filter and waste heat recovery circulating pump, institute State collection waste water tank connected by pipeline with the secondary conduit filter, the secondary conduit filter by pipeline with it is described remaining The water inlet connection of heat recovery cycle pump, the water outlet of the waste heat recovery circulating pump pass through the water inlet of pipeline and the evaporator Mouth connection.
Further, the secondary conduit filter is screen pack.
Further, the pipeline primary filter is screen pack.
Further, press-bearing water tank water compensating valve and relief valve are further included, the press-bearing water tank water compensating valve is arranged on described add On the side wall of hot press-bearing water tank, the relief valve is arranged on the heating press-bearing water tank.
Further, heating partial is further included, the heating partial includes instant-heating electric water heater, the heating pressure-bearing Water tank is connected by pipeline with the water inlet of the instant-heating electric water heater, the water outlet of the instant-heating electric water heater by pipeline with The water inlet end connection of the bathing unit.
Further, the first temperature sensor is further included, first temperature sensor is mounted on heating press-bearing water tank.
Further, the bath wastewater collecting part further includes second temperature sensor, second temperature sensor installation On collection waste water tank.
The beneficial effects of the utility model are:The bath water with residual temperature of bathing unit outflow passes through pipeline primary mistake Filter reaches waste water water supply pump after being filtered, the bath water of bathing unit is pumped into collection waste water tank and carried out by waste water water supply pump Storage, the water collected in waste water tank are flow in evaporator, carry out heat exchange with the refrigerant liquid in evaporator, the system in evaporator Drained into after cold liquid endothermic gasification into the gas that high temperature and pressure is compressed into compressor in condenser, with into condenser plus Water in hot press-bearing water tank carries out heat exchange, heats the water in press-bearing water tank and enters condenser and absorbs high temperature and high pressure gas It is returned to after heat in heating press-bearing water tank, the medium temperature highly pressurised liquid flowed out in condenser reaches evaporator after the throttle throttling In be continuing with, with water resource heat pump heating part come absorb collection waste water tank in bath water temperature, also to heat press-bearing water tank In water heated, realize the waste heat recovery to bath water, achieve the effect that energy-saving and emission-reduction, while added by water resource heat pump Hot part can reach requirement to ensure to heat the water temperature in press-bearing water tank.
Description of the drawings
Fig. 1 is that the structure of the hot-water heating system comprising bath water waste heat recovery and water resource heat pump of the utility model embodiment is shown It is intended to.
Label declaration:
1st, compressor;2nd, evaporator;3rd, throttle valve;4th, condenser;5th, heat cycles pump;6th, relief valve;7th, pressure-bearing is heated Water tank;8th, waste heat recovery circulating pump;9th, secondary conduit filter;10th, liquid-level switch;11st, blowdown water valve;12nd, press-bearing water tank is mended Water valve;13rd, pipeline primary filter;14th, waste water tank is collected;15th, waste water water supply pump;16th, instant-heating electric water heater;17th, bathing unit;
171st, bathroom;172nd, hair filter screen;173rd, thermal-arrest pond.
Specific embodiment
For the technology contents of the utility model, the objects and the effects are described in detail, below in conjunction with embodiment and match somebody with somebody Attached drawing is closed to be explained.
Fig. 1 is refer to, the utility model provides a kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, Include including bath wastewater collecting part, water resource heat pump heating part and heating press-bearing water tank 7, the bath wastewater collecting part At least one bathing unit 17, pipeline primary filter 13,15 sum aggregate waste water tank 14 of waste water water supply pump, flow through bathing unit 17 The bath water with residual temperature gone out reaches pipeline primary filter 13 by pipeline, then reaches waste water water supply pump 15 by pipeline Water inlet, the water outlet of waste water water supply pump 15 are connected by pipeline with the collection waste water tank 14;The water resource heat pump heating part Including evaporator 2, compressor 1, condenser 4, throttle valve 3 and heat cycles pump 5, it is described collection waste water tank 14 by pipeline with it is described The water inlet connection of evaporator 2, is also connected, the gas vent of the evaporator 2 by pipeline with the water outlet of the evaporator 2 It being connected with the gas access of the compressor 1, the gas vent of the compressor 1 is connected with the gas access of the condenser 4, The liquid outlet of the condenser 4 is connected by throttle valve 3 with the refrigerant liquid entrance of the evaporator 2, the heating pressure-bearing Water tank 7 is connected by pipeline with the water inlet of the condenser 4, is also connected by pipeline with the water outlet of the condenser 4, institute Heating press-bearing water tank 7 is stated also to be connected with the water inlet end of the bathing unit 17 by pipeline.
Seen from the above description, the operation principle of the water resource heat pump heating part is:Compressor 1 is low by low temperature working medium Body of calming the anger is compressed into high temperature and high pressure gas, and the liquid of medium temperature high pressure is condensed into using condenser 4, after the throttling of throttle valve 3, then As the liquid of low-temp low-pressure.The liquid refrigerant of low-temp low-pressure is sent into evaporator 2, absorbs heat in evaporator 2 and evaporates and become low The steam of warm low pressure is once again entrained into compressor 1, so as to complete refrigeration cycle.The operation principle of hot-water heating system is:Waste water supplies water The bath water with residual temperature that pump 15 flows out bathing unit 17 is pumped into collection waste water tank 14 and stored, in bathing unit 17 When water enters waste water water supply pump 15, be also filtered through piping primary filter 13, collect in waste water tank 14 with residual temperature Bath water is used as the heat source of evaporator 2, so as to provide heat source, water resource heat pump heating part for water resource heat pump heating part After also being heated to the clean water in heating press-bearing water tank 7, bathing unit 17 is supplied again and is used.
Further, the bathing unit 17 includes bathroom 171, thermal-arrest pond 173 and hair filter screen 172, the bathing The water inlet end of unit 17 is located at the top in the bathroom 171, and the ground in the bathroom 171 is equipped with thermal-arrest pond 173, the hair mistake Strainer 172 is mounted at the upper end opening in the thermal-arrest pond 173, and the thermal-arrest pond 173 passes through pipeline and the pipeline primary mistake Filter 13 connects.
Seen from the above description, the water trickled down from the water inlet end of bathing unit 17 is filtered by hair filter screen 172 It reaches thermal-arrest pond 173 afterwards to be collected, the bath water with residual temperature in thermal-arrest pond 173 reaches primary filter by pipeline again It is filtered, rational in infrastructure, timely convenient for the bath water to carrying residual temperature is collected and discharged.
Further, the bath wastewater collecting part further includes liquid-level switch 10 and blowdown water valve 11, and the liquid level is opened It closes 10 to be arranged on the side wall of the collection waste water tank 14, the blowdown water valve 11 is arranged on the bottom of the collection waste water tank 14.
Seen from the above description, the liquid-level switch 10 is used for the height of the bath water to being stored in the collection waste water tank 14 It is detected, when the height of bath water reaches certain value, waste water water supply pump 15 is closed, stop continuing into collection waste water tank 14 Bath water is conveyed, prevents the water too spill-over in collection waste water tank 14 from going out;The blowdown water valve 11 is used for discharging in heat collection water tank Water, when the temperature of the water in heat collection water tank is reduced to a certain extent, can not just continue as water resource heat pump heating part Heat source just needs to bleed off in the water in heat collection water tank at this time, only needs to open blowdown water valve 11 at this time.
Further, the bath wastewater collecting part further includes secondary conduit filter 9 and waste heat recovery circulating pump 8, The collection waste water tank 14 is connected by pipeline with the secondary conduit filter 9, the secondary conduit filter 9 by pipeline and The water inlet connection of the waste heat recovery circulating pump 8, the water outlet of the waste heat recovery circulating pump 8 pass through pipeline and the evaporation The water inlet connection of device 2.
Seen from the above description, control whether the bath water collected in waste water tank 14 being sent by waste heat recovery circulating pump 8 It is used in evaporator 2, control operation is convenient;Before the bath water in collecting waste water tank 14 enters waste heat recovery circulating pump 8 It is filtered again once by secondary conduit filter 9, prevents the sundries in bath water from entering waste heat recovery circulating pump 8, structure Rationally.
Further, the secondary conduit filter 9 is screen pack.
Seen from the above description, the impurity such as the hair in bath water are filtered by screen pack.
Further, the pipeline primary filter 13 is screen pack.
Seen from the above description, the impurity such as the hair in bath water are filtered by screen pack.
Further, press-bearing water tank water compensating valve 12 and relief valve 6 are further included, the press-bearing water tank water compensating valve 12 is arranged on institute On the side wall for stating heating press-bearing water tank 7, the relief valve 6 is arranged on the heating press-bearing water tank 7.
Seen from the above description, by press-bearing water tank water compensating valve 12 to heating press-bearing water tank 7 in supplying clean water, these Clean water supplies bathing unit 17 after water resource heat pump heating part is heated and is used;By relief valve 6 to heating Press-bearing water tank 7 carries out pressure release, prevents the hypertonia in heating press-bearing water tank 7.
Further, heating partial is further included, the heating partial includes instant-heating electric water heater 16, and the heating is held Pressure water tank 7 is connected by pipeline with the water inlet of the instant-heating electric water heater 16, and the water outlet of the instant-heating electric water heater 16 leads to Piping is connected with the water inlet end of the bathing unit 17.
Seen from the above description, by instant-heating electric water heater 16 to from heating press-bearing water tank 7 hot water that flows out continue into Supply bathing unit 17 is used after row heating immediately, on the one hand can be by the temperature of the water flowed out from heating press-bearing water tank 7 Degree improves, and on the other hand can reduce the heating requirements to water resource heat pump heating part, for example, will by water resource heat pump heating part Water in heating press-bearing water tank 7 is heated to 35 DEG C, then by instant-heating electric water heater 16 will heat the water flowed out in press-bearing water tank 7 into Row is heated to 45 DEG C immediately, so that the unit efficiency of water resource heat pump heating part is high.
Further, the first temperature sensor is further included, first temperature sensor is mounted on heating press-bearing water tank 7 On.
Seen from the above description, it is detected with the first temperature sensor come the temperature to water in heating press-bearing water tank 7, When heating the temperature in press-bearing water tank 7 and reaching the temperature of setting, the water heated in press-bearing water tank 7 is just directly fed into bathing list Water is supplied bathing unit 17 by member 17 after instant-heating electric water heater 16, can be used to ensure 17 accurate constant temperature of bathing unit It supplies water, avoids generating sometimes hot and sometimes cold bad experience.
Further, the bath wastewater collecting part further includes second temperature sensor, second temperature sensor installation On collection waste water tank 14.
Seen from the above description, it is detected with second temperature sensor come the temperature to water in collection waste water tank 14, works as collection Water temperature in waste water tank 14 down to setting temperature when, the water collected in waste water tank 14 is discharged, so that is more renewed in time washes Bath water is come in.
Fig. 1 is refer to, the embodiment one of the utility model is:
A kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, including bath wastewater collecting part, water source Heat pump part and heating press-bearing water tank 7, the bath wastewater collecting part include at least one bathing unit 17, pipeline Primary filter 13,15 sum aggregate waste water tank 14 of waste water water supply pump, the bath water with residual temperature flowed out through bathing unit 17 pass through Pipeline reaches pipeline primary filter 13, then the water inlet of waste water water supply pump 15 is reached by pipeline, and waste water water supply pump 15 goes out The mouth of a river is connected by pipeline with the collection waste water tank 14;The water resource heat pump heating part includes evaporator 2, compressor 1, condensation Device 4, throttle valve 3 and heat cycles pump 5, the collection waste water tank 14 is connected by pipeline with the water inlet of the evaporator 2, also logical Piping is connected with the water outlet of the evaporator 2, the gas access of the gas vent of the evaporator 2 and the compressor 1 Connection, the gas vent of the compressor 1 are connected with the gas access of the condenser 4, and the liquid outlet of the condenser 4 leads to The refrigerant liquid entrance that throttle valve 3 is crossed with the evaporator 2 connects, and the heating press-bearing water tank 7 passes through pipeline and the condensation The water inlet connection of device 4, is also connected by pipeline with the water outlet of the condenser 4, and the heating press-bearing water tank 7 also passes through pipe Road is connected with the water inlet end of the bathing unit 17.
Fig. 1 is refer to, the embodiment two of the utility model is:
A kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, it is described to wash on the basis of embodiment one Bathing unit 17 includes bathroom 171, thermal-arrest pond 173 and hair filter screen 172, and the water inlet end of the bathing unit 17 is located at the bath The top of room 171, the ground in the bathroom 171 are equipped with thermal-arrest pond 173, and the hair filter screen 172 is mounted on the thermal-arrest pond At 173 upper end opening, the thermal-arrest pond 173 is connected by pipeline with the pipeline primary filter 13;
The bath wastewater collecting part further includes liquid-level switch 10, blowdown water valve 11, secondary conduit filter 9 and waste heat Circulating pump 8 is recycled, the liquid-level switch 10 is arranged on the side wall of the collection waste water tank 14, and the blowdown water valve 11 is arranged on institute The bottom of collection waste water tank 14 is stated, the collection waste water tank 14 is connected by pipeline with the secondary conduit filter 9, the secondary pipes Road filter 9 is connected by pipeline with the water inlet of the waste heat recovery circulating pump 8, the water outlet of the waste heat recovery circulating pump 8 It mouthful is connected by pipeline with the water inlet of the evaporator 2, the secondary conduit filter 9 is screen pack, at the beginning of the pipeline Grade filter 13 is screen pack;
Press-bearing water tank water compensating valve 12, relief valve 6, the first temperature sensor are further included, the press-bearing water tank water compensating valve 12 is set It puts on the side wall of the heating press-bearing water tank 7, the relief valve 6 is arranged on the heating press-bearing water tank 7, first temperature Sensor is spent to be mounted on heating press-bearing water tank 7;The bath wastewater collecting part further includes second temperature sensor, the second temperature Sensor is spent to be mounted on collection waste water tank 14.
Fig. 1 is refer to, the embodiment three of the utility model is:
A kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, on the basis of embodiment one or two, also Including heating partial, the heating partial includes instant-heating electric water heater 16, and the heating press-bearing water tank 7 passes through pipeline and institute The water inlet connection of instant-heating electric water heater 16 is stated, the water outlet of the instant-heating electric water heater 16 passes through pipeline and the bathing unit 17 water inlet end connection.
The operation principle of the above-mentioned hot-water heating system comprising bath water waste heat recovery and water resource heat pump is:When bathing unit 17 has When generating bath wastewater, bath wastewater that band has surplus heat first passes through hair filter screen 172 and filters hair, then drops to thermal-arrest pond In 173, wherein bathing unit 17 can be 1 or multiple, and the bath water collected in thermal-arrest pond 173 is supplied by waste water Water pump 15 is extracted into collection waste water tank 14, and is first passed through before the bath water arrival waste water water supply pump 15 in thermal-arrest pond 173 One pipeline primary filter 13 carries out filtering hair, detects whether the liquid level in collection waste water tank 14 reaches by liquid-level switch 10 The height of setting if reaching the height of setting, closes waste water water supply pump 15, stops pumping into collection waste water tank 14;Water source After heat pump part is opened, the waste water collected in waste water tank 14 is extracted into evaporator 2 by waste heat recovery circulating pump 8, Waste water in collection waste water tank 14 first passes through secondary conduit filter 9 before reaching waste heat recovery circulating pump 8 and carries out filtering hair, After collecting the waste water arrival evaporator 2 in waste water tank 14, the waste heat in waste water is then absorbed by the refrigerant in evaporator 2, evaporator 2 In refrigerant endothermic gasification after reach compressor 1 in be compressed the gas for becoming high temperature and pressure, then reach condenser 4 in, And the water that condenser 4 is reached in heating press-bearing water tank 7 is heated in condenser 4;By press-bearing water tank water compensating valve 12 to Heating press-bearing water tank 7 in supply clean water, by heat cycles pump 5 by heat press-bearing water tank 7 in clean water extract to It is heated, is then back to again in heating press-bearing water tank 7, when the pressure heated in press-bearing water tank 7 reaches certain value in condenser 4 When, relief valve 6 automatically turns on pressure release;When bathing unit 17 is needed using hot water, then the water inlet end for opening bathing unit 17 is opened It closes or valve, the clean water by heating in heating press-bearing water tank 7 is flowed directly to bathing unit 17 or by i.e. Heating electric water heater 16 reaches bathing unit 17 after carrying out reheating, and supply user uses.
The above-mentioned hot-water heating system comprising bath water waste heat recovery and water resource heat pump when in use, further, general bathing Water temperature afterwards at least also has 25-30 DEG C, therefore makes in bath wastewater containing enough energy supply water resource heat pump heating parts With, when second temperature sensor detect collection waste water tank 14 in water temperature be less than 15 DEG C after, then by blowdown water valve 11 will collect Waste water in waste water tank 14 exhausts, and reopens the bathing that extraction belt has residual temperature into collection waste water tank 14 of waste water water supply pump 15 and boil Water;Reach design temperature when heating the water in press-bearing water tank 7, such as at 55 DEG C, open water inlet end positioned at bathing unit 17 Switch just has the hot water outflow by heating;Alternatively, when the water in heating press-bearing water tank 7 reaches design temperature, such as 35 DEG C When, it will be opened positioned at the switch of the water inlet end of bathing unit 17, the water for reaching design temperature then enters in instant-heating electric water heater 16 Reach bathing unit 17 after continuing heating immediately, and ensure accurate constant temperature, avoid generating when using it is sometimes hot and sometimes cold not Good experience, in this way when, why heat press-bearing water tank 7 setting heating temperature be set to 35 DEG C, mainly from water source The unit operation efficiency of heat pump part considers, it is well known that when water temperature is less than 35 DEG C, the unit of water resource heat pump heating part It can be always held under high energy efficiency state and run, be very useful for the whole energy consumption for reducing system, further, since water Water temperature is referred to 35 DEG C by source heat pump part, as long as power of the instant-heating electric water heater 16 less than 3.5KW, it becomes possible to full The general bathing of foot requires, therefore the requirement for installing electric wire is also just less high, use area of section for 1.5~ 2.5 square millimeters of cable can meet installation requirement, and the adaptability of product is improved, while has also reached energy saving and subtracted The effect of row.
In conclusion the hot-water heating system provided by the utility model comprising bath water waste heat recovery and water resource heat pump, passes through Bath wastewater collecting part is collected the bath wastewater of bathing unit 17, and with hair filter screen 172, pipeline primary filter Device 13, secondary conduit filter 9 are filtered the hair in bath wastewater, are convenient for by collecting waste water tank 14 to bath wastewater It is concentrated use in, the residual temperature for the bath wastewater being located in collection waste water tank 14 is on the one hand drawn by water resource heat pump heating part, it is another Aspect heats the clean water in heating press-bearing water tank 7, even if being also used as auxiliary thermal source by electric heater, to from adding Water in hot press-bearing water tank 7 out carries out auxiliary heating, so that water resource heat pump heating part keeps higher energy efficiency operation, system The heat in bath wastewater is efficiently used on the whole, greatly improves water source heat pump units efficiency, it is energy-saving and environment-friendly so as to reach Purpose, while cause high request limitation of the product from installation electric wire, applicability is stronger.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every Equivalents made based on the specification and figures of the utility model are directly or indirectly used in relevant technology neck Domain is equally included in the patent within the scope of the utility model.

Claims (10)

1. a kind of hot-water heating system comprising bath water waste heat recovery and water resource heat pump, which is characterized in that including bath wastewater thermal-arrest Partly, water resource heat pump heating part and heating press-bearing water tank, the bath wastewater collecting part include at least one bathing list Member, pipeline primary filter, waste water water supply pump sum aggregate waste water tank, the bath water with residual temperature flowed out through bathing unit pass through pipe Road reaches pipeline primary filter, then the water inlet of waste water water supply pump is reached by pipeline, and the water outlet of waste water water supply pump passes through Pipeline is connected with the collection waste water tank;The water resource heat pump heating part include evaporator, compressor, condenser, throttle valve and Heat cycles pump, and the collection waste water tank is connected by pipeline with the water inlet of the evaporator, also passes through pipeline and the evaporation The water outlet connection of device, the gas vent of the evaporator are connected with the gas access of the compressor, the gas of the compressor Body outlet is connected with the gas access of the condenser, and the liquid outlet of the condenser passes through throttle valve and the evaporator Refrigerant liquid entrance connects, and the heating press-bearing water tank is connected by pipeline with the water inlet of the condenser, also passes through pipeline It is connected with the water outlet of the condenser, the heating press-bearing water tank is also connected by the water inlet end of pipeline and the bathing unit It connects.
2. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that institute Stating bathing unit includes bathroom, thermal-arrest pond and hair filter screen, and the water inlet end of the bathing unit is located at the top in the bathroom, The ground in the bathroom is equipped with thermal-arrest pond, and the hair filter screen is mounted at the upper end opening in the thermal-arrest pond, the thermal-arrest Pond is connected by pipeline with the pipeline primary filter.
3. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that institute It states bath wastewater collecting part and further includes liquid-level switch and blowdown water valve, the liquid-level switch is arranged on the side of the collection waste water tank On wall, the blowdown water valve is arranged on the bottom of the collection waste water tank.
4. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that institute State bath wastewater collecting part and further include secondary conduit filter and waste heat recovery circulating pump, the collection waste water tank by pipeline with The secondary conduit filter connection, the secondary conduit filter pass through pipeline and the water inlet of the waste heat recovery circulating pump Connection, the water outlet of the waste heat recovery circulating pump are connected by pipeline with the water inlet of the evaporator.
5. the hot-water heating system according to claim 4 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that institute Secondary conduit filter is stated as screen pack.
6. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that institute Pipeline primary filter is stated as screen pack.
7. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that also Including press-bearing water tank water compensating valve and relief valve, the press-bearing water tank water compensating valve is arranged on the side wall of the heating press-bearing water tank, The relief valve is arranged on the heating press-bearing water tank.
8. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that also Including heating partial, the heating partial include instant-heating electric water heater, it is described heating press-bearing water tank by pipeline with it is described The water inlet connection of instant-heating electric water heater, the water outlet of the instant-heating electric water heater pass through the water inlet of pipeline and the bathing unit End connection.
9. the hot-water heating system comprising bath water waste heat recovery and water resource heat pump according to claim 1 or 8, feature exist In further including the first temperature sensor, first temperature sensor is mounted on heating press-bearing water tank.
10. the hot-water heating system according to claim 1 comprising bath water waste heat recovery and water resource heat pump, which is characterized in that The bath wastewater collecting part further includes second temperature sensor, and second temperature sensor is mounted on collection waste water tank.
CN201721512110.1U 2017-11-13 2017-11-13 Hot-water heating system comprising bath water waste heat recovery and water resource heat pump Active CN207422345U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721512110.1U CN207422345U (en) 2017-11-13 2017-11-13 Hot-water heating system comprising bath water waste heat recovery and water resource heat pump

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721512110.1U CN207422345U (en) 2017-11-13 2017-11-13 Hot-water heating system comprising bath water waste heat recovery and water resource heat pump

Publications (1)

Publication Number Publication Date
CN207422345U true CN207422345U (en) 2018-05-29

Family

ID=62306024

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721512110.1U Active CN207422345U (en) 2017-11-13 2017-11-13 Hot-water heating system comprising bath water waste heat recovery and water resource heat pump

Country Status (1)

Country Link
CN (1) CN207422345U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806123A (en) * 2019-10-24 2020-02-18 江苏正理电器有限公司 A waste water heat recovery, conversion and reuse device
CN110925864A (en) * 2019-12-04 2020-03-27 江苏恒信诺金科技股份有限公司 System for efficiently utilizing building collected and dispersed bathing waste water to prepare hot water
CN112240645A (en) * 2020-10-23 2021-01-19 天津城建大学 Sewage waste heat recovery system and control method thereof
CN115046307A (en) * 2021-03-08 2022-09-13 王晓雨 Heat recovery instant water heater

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110806123A (en) * 2019-10-24 2020-02-18 江苏正理电器有限公司 A waste water heat recovery, conversion and reuse device
CN110925864A (en) * 2019-12-04 2020-03-27 江苏恒信诺金科技股份有限公司 System for efficiently utilizing building collected and dispersed bathing waste water to prepare hot water
CN112240645A (en) * 2020-10-23 2021-01-19 天津城建大学 Sewage waste heat recovery system and control method thereof
CN112240645B (en) * 2020-10-23 2021-10-12 天津城建大学 Sewage waste heat recovery system and control method thereof
CN115046307A (en) * 2021-03-08 2022-09-13 王晓雨 Heat recovery instant water heater

Similar Documents

Publication Publication Date Title
CN207422345U (en) Hot-water heating system comprising bath water waste heat recovery and water resource heat pump
CN102287861B (en) Heating afterheat automatically reclaiming system
CN201964612U (en) Sewage waste heat recycling heat pump water heater
CN107960849A (en) Steam box water cycle utilization device
CN206803549U (en) A kind of integrated form waste heat recovery sewage source heat pump unit
CN105276665B (en) Sanitary wastewater waste heat recovery domestic heating system
CN107726617A (en) A kind of waste heat recovery hot water system
CN202747603U (en) Instant heating type heat recovery hot water system
CN207422671U (en) A kind of waste heat recovery hot water system
CN201396836Y (en) Household solar central heating device
CN201293455Y (en) Cycle instantaneous water heater
CN201059768Y (en) Dual-source double-effect heat recovery heat pump water heater
CN202057040U (en) Sewage heat pump circulation system
CN208059044U (en) Double-source heat pump tier building double water tank splits the hot-water heating system of water conditions in soil layers
CN206235177U (en) A kind of dyeing and finishing steam condensate recovery system
CN202853109U (en) Domestic waste hot water source heat pump hot water system
CN207121610U (en) Blast furnace slag quenching water steam waste heat recycling system
CN201615470U (en) Energy-saving electric heating steam generator
CN110108144A (en) A kind of bigeminy waste heat recovery of circulatory system
CN206347553U (en) A kind of boiler blow-off heat reclaim unit
CN203914825U (en) For the bootstrap system of dining room or dining room dish-washing machine
CN201508035U (en) Double-tank air source thermal pump water heater
CN202928116U (en) Non-pressure-bearing balcony wall-mounted solar water heater
CN202581794U (en) Waste water waste heat recovering water heater
CN202203917U (en) Steam tail gas recycling system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant