CN207404700U CN201721375748.5U CN201721375748U CN207404700U CN 207404700 U CN207404700 U CN 207404700U CN 201721375748 U CN201721375748 U CN 201721375748U CN 207404700 U CN207404700 U CN 207404700U
Authority
CN
China
Prior art keywords
supporting rod
crossbeam
suspender
hanging axis
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721375748.5U
Other languages
Chinese (zh)
Inventor
刘其杰
王迎
李坚
王沛晨
王斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Port Engineering Group Co Ltd
Original Assignee
China State Construction Port Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Port Engineering Group Co Ltd filed Critical China State Construction Port Engineering Group Co Ltd
Priority to CN201721375748.5U priority Critical patent/CN207404700U/en
Application granted granted Critical
Publication of CN207404700U publication Critical patent/CN207404700U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

A kind of dyke barrier board suspender, is related to water conservancy construction technical field, hangs wall, two groups of telescoping mechanisms and two groups of supporting mechanisms including crossbeam, two groups, hangs wall and be hingedly made of two cantilevers, the end of cantilever is connected with suspension hook;Telescoping mechanism is made of hanging axis and two connecting rods, and hanging axis and two connecting rods are mutually hinged, and the other end of two connecting rods is respectively hinged on two cantilevers, and the other end of hanging axis is stretched out through crossbeam, and spring is cased on the hanging axis of crossbeam lower part;Supporting mechanism includes supporting rod one, supporting rod two and U-shaped pin, one end of supporting rod one is respectively hinged at the end of two cantilevers with one end of supporting rod two, one other end of supporting rod is plugged in the endoporus of two other end of supporting rod, and the U-shaped pin is injected in the through hole that the supporting rod one is overlapped with the supporting rod two.The utility model can realize the semi-automation of lifting, reduce the construction risk degree of operating personnel, while ensure to be damaged during barrier board lifting.

Description

A kind of dyke barrier board suspender
Technical field
The utility model is related to water conservancy construction technical fields, and in particular to a kind of dyke barrier board suspender.
Background technology
The larger area of many stormy waves, the dyke of particularly coastal area are rearranged frequently with barrier board both at home and abroad at present Mask carries out the protection of side slope, and with higher aesthetic effect.Common barrier board be a kind of both sides be side bar, centre is several Item is parallel and the armored concrete plate structure of rib that arranges at a certain distance, rib section configuration are generally rectangular or terraced Shape.When being lifted to barrier board, lifting is fixed through barrier board surrounding usually using suspender belt, lifting the degree of automation is low, So as to inefficiency, wasting manpower and material resources;Because at least needing fixed point at three during lifting, operating personnel will lean on for a long time It nearly component and walks up and down, hazard index is larger, and because tying tight for suspender belt easily causes barrier board in hoisting process Damage, influences aesthetics;In addition, barrier board is typically close-packed arrays on dyke, because the suspender belt of surrounding when being lifted using suspender belt It can cause to arrange and larger gap easily occur, not only influence construction effect, it is bad to be easy to cause dyke protection, while influences dyke Overall aesthetics.
The content of the invention
In order to solve above-mentioned problem of the prior art, the utility model provides a kind of dyke barrier board suspender, realizes lifting Semi-automation, reduce the construction risk degree of operating personnel, at the same ensure barrier board lifting when will not be damaged, ensure dyke Whole aesthetic feeling.
The purpose of this utility model can be realized by following technical proposal:A kind of dyke barrier board suspender, including crossbeam, Two groups are hung wall, two groups of telescoping mechanisms and two groups of supporting mechanisms, described to hang that wall is hingedly made of two cantilevers and hinge joint fixation is set It puts on the crossbeam, the free end of the cantilever is rotatably connected to suspension hook, and the suspension hook deviates from the crossbeam;The telescopic machine Structure is made of hanging axis and two connecting rods, one end of the hanging axis and the mutually hinged connection in one end of two connecting rods, two institutes The other end for stating connecting rod is respectively hinged at the medium position of two cantilevers, and the other end of the hanging axis passes through institute from the bottom to top Crossbeam stretching is stated, spring is cased on the hanging axis of the crossbeam lower part;The supporting mechanism includes supporting rod one, support Bar two and U-shaped pin, one end of the supporting rod one and one end of the supporting rod two are hingedly connected in two cantilevers End, one other end of supporting rod is plugged in the endoporus of two other end of supporting rod, the supporting rod one with it is described Several through holes are provided on supporting rod two, the U-shaped pin reeve supporting rod one overlaps described logical with the supporting rod two In hole.
Preferably, bull stick is fixedly connected on the suspension hook, the bull stick upper end is equipped with handle;When suspender unloads, turn Suspension hook is rotated 180 degree by fixed handle, can by suspender it is direct on be brought up progress next time;In addition, suspender is when not in use, rotate Handle, so as to which the suspension hook rotation for being oriented outside inwardly be withdrawn, security protection suspension hook is without damage, while prevents personnel from drawing again Wound improves security performance.
Preferably, in the U-shaped pin Open Side Down the insertion through hole;When suspender in use, U-shaped pin can be in self gravitation Under the action of ensure will not fall off, so that it is guaranteed that the stability of suspender hoisting process, ensure the safety of operating personnel.
Preferably, two limited blocks are fixed on the hanging axis, two limited blocks are respectively positioned at the crossbeam Both sides;When suspender in use, the distance between suspension hook can be limited, and then ensure that suspender will not outrange lifting, while can prevent again Only the cantilever opening of suspender it is excessive or it is too small cause to lift it is time-consuming and laborious.
Preferably, the both ends of the crossbeam are respectively equipped with lifting lug, when suspender when not in use, by suspender suspension pack up, save Parking space.
The utility model in use, carry out in accordance with the following steps:
1st, the upper end of two hanging axises with the lifting rope on crane is fixedly connected, first extracts U-shaped pin, make supporting rod one and branch Strut two is in sliding plug state;
2nd, crane slings suspender, and two groups of cantilevers are to contract under gravity at this time, until the lower section on hanging axis The state of construction;
3rd, suspender is transferred at barrier board, the hand steered adjustment suspender of operating personnel puts in four suspension hooks inside barrier board In the rib spacing of corner, until suspension hook is contacted with placing the surface of barrier board;
4th, the lifting rope on crane is slowly transferred, in decentralization process, hanging axis moves down under the action of spring compression force, And then two connecting rod hinge angles increase, and cantilever are promoted to be displaced outwardly, so that suspension hook puts in the side bar of barrier board both sides Lower end;
5th, after suspension hook puts in side bar lower end, by fixation in the through hole that is overlapped with supporting rod two of U-shaped pin reeve supporting rod one It supports, carries entire suspender on crane, barrier board is sling, designated position is placed under the collaboration of staff;
6th, after the completion of placing, rotational handle rotates suspension hook to towards inside, and crane pulls hawser directly to carry suspender It rises, completes a lifting construction operation;
7th, after the completion of lifting, U-shaped pin is pulled up, supporting rod one hangs down naturally with supporting rod two, and suspension hook is towards inside, afterwards Suspender suspension is packed up by lifting lug.
Resultant effect includes caused by the utility model:
1st, the utility model simple structure is reasonable, easy to use, realizes the semi-automation of lifting, and operation is not required in when lifting The hand steered suspension hook of personnel or barrier board, it is only necessary to which an operating personnel assists, it is ensured that the personal safety of operating personnel.
2nd, suspension hook is directly held in the palm on the lower face of barrier board, and the contact surface of suspender and barrier board is only a face, is reduced Damage of the suspender to barrier board, it is ensured that the integrality of barrier board ensures dyke overall aesthetics after construction.
3rd, three bars of telescoping mechanism are mutually hinged and the compression recovery performance of spring, it is ensured that cantilever can suspender conduct oneself with dignity with And realize and put in automatically on the downside of barrier board side bar under the action of recoil of spring, it need not manually fix, be further ensured that operation people The security of member, while save manpower.
4th, supporting mechanism can ensure that suspension hook is put in behind barrier board side bar lower face in holding state, it is ensured that suspension hook will not be It is slid during lifting, it is ensured that the safety of lifting and the safety of operating personnel.
5th, suspension hook is rotatably provided on the free end of cantilever, suspender unload when rotational handle can by suspender it is direct on put on Lifted next time, it is convenient and simple, while while lifting the barrier board of unified specification need not adjust the length of supporting mechanism again It is short, it is ensured that high construction efficiency rate;In addition, rotational handle during hanger storage, suspension hook is rotated and is inwardly withdrawn, security protection suspension hook from Damage, while prevent personnel from scratching again, further improve security performance.
6th, two limited blocks on hanging axis, can limit the distance between suspension hook, and then ensure that suspender will not outrange lifting, Simultaneously again the cantilever opening of suspender can be prevented excessive or it is too small cause to lift it is time-consuming and laborious.
7th, because lifting suspension hook is located in the interior channel of barrier board, the outside surrounding of barrier board is without any obstacle during construction Object, the arrangement of dyke is close when can ensure that construction, ensure that the overall aesthetics of dyke and actual use performance.
Description of the drawings
Fig. 1 is the main structure diagram of the utility model embodiment suspender.
Fig. 2 is the overlooking the structure diagram of the utility model embodiment suspender.
Fig. 3 is the supporting mechanism structure diagram of the utility model embodiment suspender.
Fig. 4 is the structure diagram of the hanging axis of the utility model embodiment suspender.
Fig. 5 is the structure diagram of the crossbeam of the utility model embodiment suspender.
Fig. 6 is the structure diagram of the cantilever of the utility model embodiment suspender.
Wherein, the identical reference numeral of component identical in the accompanying drawings;Attached drawing is not drawn according to actual ratio.
Specific embodiment
The utility model is further illustrated with reference to the accompanying drawings and examples.
Embodiment
A kind of dyke barrier board suspender hangs 2, two groups of telescoping mechanisms 3 of wall and two groups of supporting mechanisms 4 for 1, two group including crossbeam, It is described to hang that wall 2 is hingedly made of two cantilevers 21 and hinge joint is fixed on the crossbeam 1, the free end of the cantilever 21 Suspension hook 22 is rotatably connected to, the suspension hook 22 deviates from the crossbeam 1;The telescoping mechanism 3 is by hanging axis 31 and two 32 groups of connecting rods Into, one end of the hanging axis 31 and the mutually hinged connection in one end of two connecting rods 32, the other end of two connecting rods 32 The medium position of two cantilevers 21 is respectively hinged at, the other end of the hanging axis 31 is stretched from the bottom to top through the crossbeam 1 Go out, spring 33 is cased on the hanging axis 31 of 1 lower part of crossbeam;The supporting mechanism 4 includes supporting rod 1, support Bar 2 42 and U-shaped pin 43, one end of the supporting rod 1 and one end of the supporting rod 2 42 are hingedly connected at two The end of the cantilever 21, one 41 other end of supporting rod is plugged in the endoporus of 2 42 other end of supporting rod, described Be provided with several through holes 44 on supporting rod 1 and the supporting rod 2 42, the U-shaped pin 43 inject the supporting rod 1 with In the through hole 44 that the supporting rod 2 42 overlaps.
Bull stick 5 is fixedly connected on the suspension hook 22,5 upper end of bull stick is equipped with handle 6;When suspender unloads, rotate Suspension hook 22 is rotated 180 degree by handle 6, can by suspender it is direct on be brought up progress next time;In addition, suspender is when not in use, rotate Handle 6, so as to which the suspension hook 22 for being oriented outside is rotated inside withdrawal, security protection suspension hook 22 is without damage, while prevents again Personnel scratch, and improve security performance.
In the U-shaped pin 43 Open Side Down the insertion through hole 44;When suspender in use, U-shaped pin 43 can be in self gravitation Under the action of ensure will not fall off, so that it is guaranteed that the stability of suspender hoisting process, ensure the safety of operating personnel.
Two limited blocks 311 are fixed on the hanging axis 31, two limited blocks 311 are located at the crossbeam 1 respectively Both sides;When suspender in use, the distance between suspension hook 22 can be limited, and then ensure that suspender will not outrange lifting, while again Can prevent suspender cantilever 21 be open it is excessive or it is too small cause to lift it is time-consuming and laborious.
The both ends of the crossbeam 1 are respectively equipped with lifting lug 7, when suspender when not in use, suspender suspension is packed up, it is empty to save storage Between.
The utility model in use, carry out in accordance with the following steps:
1st, the upper end of two hanging axises 31 with the lifting rope on crane is fixedly connected, first U-shaped pin 43 is extracted, makes supporting rod one 41 are in sliding plug state with supporting rod 2 42;
2nd, crane slings suspender, and two groups of cantilevers 21 are to contract under gravity at this time, until on hanging axis 31 The state of lower section construction;
3rd, suspender is transferred at barrier board, the hand steered adjustment suspender of operating personnel puts in four suspension hooks 22 in barrier board In the rib spacing of portion corner, until suspension hook 22 is contacted with placing the surface of barrier board;
4th, the lifting rope on crane is slowly transferred, in decentralization process, hanging axis 31 is downward under the action of 33 compression stress of spring It is mobile, and then two connecting rod hinge angles increase, and cantilever 21 are promoted to be displaced outwardly, so that suspension hook 22 puts in barrier board two The side bar lower end of side;
5th, after suspension hook 22 puts in side bar lower end, by U-shaped pin 43 inject that supporting rod 1 overlaps with supporting rod 2 42 it is logical It is fixed in hole 44 to support, entire suspender is carried on crane, barrier board is sling, specific bit is placed under the collaboration of staff It puts;
6th, after the completion of placing, rotational handle 6 rotates suspension hook 22 to towards inside, and crane pulls hawser that suspender is direct Lift, complete a lifting construction operation;
7th, after the completion of lifting, U-shaped pin 43 is pulled up, supporting rod 1 hangs down naturally with supporting rod 2 42,22 direction of suspension hook Suspender suspension is afterwards packed up by lifting lug 7 in inside.
The utility model is described above with reference to preferred embodiment, but the scope of protection of the utility model is not Limited to this, any all technical solutions for falling within the scope of the appended claims are within the protection scope of the present utility model. In the case of not departing from the scope of the utility model, various improvement can be carried out to it and can be replaced with equivalent therein Component.Especially, as long as there is no structural conflicts, items technical characteristic mentioned in the various embodiments can be in any way It combines.

Claims (5)

1. a kind of dyke barrier board suspender, which is characterized in that hang wall, two groups of telescoping mechanisms and two groups of supports including crossbeam, two groups Mechanism, it is described to hang that wall is hingedly made of two cantilevers and hinge joint is fixed on the crossbeam, the free end of the cantilever Suspension hook is rotatably connected to, the suspension hook deviates from the crossbeam;The telescoping mechanism is made of hanging axis and two connecting rods, the hanging axis One end and two connecting rods the mutually hinged connection in one end, the other end of two connecting rods is respectively hinged at described in two The medium position of cantilever, the other end of the hanging axis stretch out from the bottom to top through the crossbeam, the institute positioned at the crossbeam lower part It states and spring is cased on hanging axis;The supporting mechanism includes supporting rod one, supporting rod two and U-shaped pin, one end of the supporting rod one It is hingedly connected with one end of the supporting rod two in the end of two cantilevers, one other end of supporting rod is plugged on In the endoporus of two other end of supporting rod, the supporting rod one is described U-shaped with being provided with several through holes on the supporting rod two Pin is injected in the through hole that the supporting rod one is overlapped with the supporting rod two.
2. suspender according to claim 1, which is characterized in that bull stick is fixedly connected on the suspension hook, on the bull stick End is equipped with handle.
3. suspender according to claim 1, which is characterized in that in the U-shaped pin Open Side Down the insertion through hole.
4. suspender according to claim 1, which is characterized in that two limited blocks, two institutes are fixed on the hanging axis State the both sides that limited block is located at the crossbeam respectively.
5. according to claim 1-4 any one of them suspenders, which is characterized in that the both ends of the crossbeam are respectively equipped with lifting lug.
CN201721375748.5U 2017-10-24 2017-10-24 A kind of dyke barrier board suspender Expired - Fee Related CN207404700U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721375748.5U CN207404700U (en) 2017-10-24 2017-10-24 A kind of dyke barrier board suspender

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721375748.5U CN207404700U (en) 2017-10-24 2017-10-24 A kind of dyke barrier board suspender

Publications (1)

Publication Number Publication Date
CN207404700U true CN207404700U (en) 2018-05-25

Family

ID=62321258

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721375748.5U Expired - Fee Related CN207404700U (en) 2017-10-24 2017-10-24 A kind of dyke barrier board suspender

Country Status (1)

Country Link
CN (1) CN207404700U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108821089A (en) * 2018-07-02 2018-11-16 合肥市春华起重机械有限公司 A kind of crane that balance is high hoist cable bracket
CN119191057A (en) * 2024-11-27 2024-12-27 芜湖永达科技有限公司 A manual rotating sand core dipping and coating hanger

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108821089A (en) * 2018-07-02 2018-11-16 合肥市春华起重机械有限公司 A kind of crane that balance is high hoist cable bracket
CN108821089B (en) * 2018-07-02 2020-08-28 合肥市春华起重机械有限公司 Hoist cable support that equilibrium is high for machine
CN119191057A (en) * 2024-11-27 2024-12-27 芜湖永达科技有限公司 A manual rotating sand core dipping and coating hanger

Similar Documents

Publication Publication Date Title
CN207404700U (en) A kind of dyke barrier board suspender
CN112173955A (en) Anti-hook-off mechanism for hoisting tower crane
CN209779260U (en) Clothes airing assembly with quilt airing rod and clothes airing machine
CN203007676U (en) Clothes hanger
CN202426187U (en) Structurally modified lengthened clothes hanger stable in hanging
CN206137811U (en) Multifunctional chest hangs clothes hanger
CN201517172U (en) Outdoor clothing and quilt drying rack
CN203428792U (en) Retractable type high rise hoisting machine
CN202897908U (en) Filter Element Lifting Device
CN213569159U (en) Steel structure steel net rack hoisting device
CN211713453U (en) Expandable suspension of clothes hanger
CN201571870U (en) Expansion controllable clothes rod
CN209359267U (en) A kind of external hanging type rabbit production case with folder function
CN208837453U (en) Textile cloth Simple storage rack
CN106032639A (en) Portable clothes airing pole used on balcony
CN214269926U (en) Anti-swing device of hoisting equipment
CN203493340U (en) Folding clothes rack
CN216687099U (en) Lifting hook for tower crane
CN105595699A (en) Flowerpot hanger
CN107244637B (en) Folding flowerpot moving rack
CN214167095U (en) Foldable telescopic hoisting sling for unloading bulk pipeline
CN216665212U (en) A convenient fence device
CN108436870A (en) Rack-style safety device
CN202296827U (en) Lifting appliance suitable for hollow cylinder hanger
CN218952984U (en) Protective fence for municipal road construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee