CN207392412U - One kind is drained off floodwaters, drainage pumping stations structure - Google Patents
One kind is drained off floodwaters, drainage pumping stations structure Download PDFInfo
- Publication number
- CN207392412U CN207392412U CN201721373777.8U CN201721373777U CN207392412U CN 207392412 U CN207392412 U CN 207392412U CN 201721373777 U CN201721373777 U CN 201721373777U CN 207392412 U CN207392412 U CN 207392412U
- Authority
- CN
- China
- Prior art keywords
- forebay
- drainage
- floodwaters
- partition wall
- flood
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A20/00—Water conservation; Efficient water supply; Efficient water use
- Y02A20/20—Controlling water pollution; Waste water treatment
Landscapes
- Revetment (AREA)
Abstract
本实用新型公开了一种排洪、排涝泵站结构,属于水利工程技术领域,包括泵站前池,其特征是,所述泵站前池内沿水流方向设有前池隔墙(4),前池隔墙(4)竖向设置,前池隔墙(4)上设有前池连通闸(8),前池隔墙(4)将泵站前池分隔为排洪前池(5)和排涝前池(6),排洪前池(5)和排涝前池(6)通过前池连通闸(8)相连通;排洪前池(5)上设有排洪闸(1),排涝前池(6)上设有排涝闸(2)。本实用新型能在同一前池内将湖水外排与内涝外排两种功能同时实现,具有互不影响,节约土地的优势;在单一情况流量较大,原排水量达不到要求时,还可以使用辅助排水方案。
The utility model discloses a flood and waterlogging pumping station structure, which belongs to the technical field of water conservancy engineering and includes a pumping station forecourt. The forebay partition wall (4) is set vertically, and the forebay connecting gate (8) is arranged on the forebay partition wall (4), and the forebay partition wall (4) separates the forebay of the pumping station into a flood discharge forebay (5) It is connected with the front pool for flood drainage (6), the front pool for flood drainage (5) and the front pool for drainage (6) through the front pool connecting gate (8); the flood drainage front pool (5) is provided with a flood discharge gate (1), A flood drainage gate (2) is provided on the front pond (6) for flood drainage. The utility model can simultaneously realize the two functions of lake water discharge and internal waterlogging discharge in the same forebay, and has the advantages of not affecting each other and saving land; it can also be used when the flow rate is large in a single case and the original discharge cannot meet the requirements. Auxiliary drainage scheme.
Description
技术领域technical field
本实用新型涉及一种排洪、排涝泵站结构,属于水利工程技术领域。The utility model relates to a flood and waterlogging pumping station structure, which belongs to the technical field of water conservancy engineering.
背景技术Background technique
目前,普通的泵站排水方式单一、结构简单,只是单纯的把河道里或者田间的积水分时段排出,是很难实现洪、涝同时外排且互不影响的这一功能的。特别对于既紧靠重要水域又紧靠农业区的这一类泵站,更是难以同时兼顾两方面。在水域聚集的地方,往往农业发展也是该地区综合开发最至关重要的一部分。如遇到强降雨的季节,常会因为湖水外排与内涝外排无法同时作业,或达不到设计的流量要求而造成大量的财产损失。At present, the ordinary pumping station has a single drainage method and a simple structure. It simply discharges the accumulated water in the river or in the field for a period of time. It is difficult to realize the function of simultaneously discharging floods and waterlogging without affecting each other. Especially for this type of pumping station that is close to both important waters and agricultural areas, it is difficult to take both aspects into consideration at the same time. Where water bodies gather, often agricultural development is also the most crucial part of the comprehensive development of the area. In the season of heavy rainfall, a large amount of property loss will often be caused because the lake water drainage and waterlogging drainage cannot be operated at the same time, or the designed flow requirements cannot be met.
实用新型内容Utility model content
为了克服现有泵站无法同时排出水域内洪水以及田间内涝的不足,本实用新型的目的是提供一种排洪、排涝泵站结构,本实用新型适用于既紧靠重要水域又紧靠农业区的这一类泵站,能在同一前池内将湖水外排与内涝外排两种功能同时实现;当排洪或排涝单一排水需求量较大时,可以使用辅助排水方案。In order to overcome the shortage that the existing pumping stations cannot simultaneously discharge floods in the water area and waterlogging in the fields, the purpose of this utility model is to provide a pumping station structure for flood and flood drainage. This type of pumping station can simultaneously realize the two functions of lake water discharge and internal waterlogging in the same forebay; when the demand for single drainage of flood or waterlogging is large, an auxiliary drainage scheme can be used.
本实用新型解决其技术问题所采用的技术方案是,一种排洪、排涝泵站结构,包括泵站前池,泵站前池内沿水流方向设有前池隔墙,前池隔墙竖向设置,前池隔墙上设有前池连通闸,前池隔墙将泵站前池分隔为排洪前池和排涝前池,排洪前池和排涝前池通过前池连通闸相连通;排洪前池上设有排洪闸,排涝前池上设有排涝闸。The technical scheme adopted by the utility model to solve the technical problem is a pumping station structure for flood drainage and waterlogging, including a pumping station forebay, and a forebay partition wall is arranged in the forebay of the pumping station along the water flow direction, and the forebay partition wall is vertically The forebay connecting gate is set on the partition wall of the forebay, and the forebay partition wall divides the forebay of the pumping station into a flood discharge forebay and a flood drainage forebay, which are connected through the forebay connecting gate; There is a flood discharge sluice on the flood discharge front pond, and a flood drainage sluice on the flood discharge front pond.
优选的,所述前池隔墙宽度是变化的,前池隔墙包括沿水流方向依次设置的第一长条段、渐变段、第二长条段,第一长条段、渐变段、第二长条段宽度逐渐变小,渐变段横截面形状为直角梯形。Preferably, the width of the front pool partition wall is variable, and the front pool partition wall includes a first long section, a gradual change section, and a second long section arranged in sequence along the water flow direction, and the first long strip section, the gradual change section, the second long section The width of the two long strips becomes smaller gradually, and the cross-sectional shape of the gradient section is a right-angled trapezoid.
优选的,所述前池连通闸位于前池隔墙前端,靠近泵站前池进水口。Preferably, the forebay communication gate is located at the front end of the forebay partition wall, close to the water inlet of the forebay of the pumping station.
优选的,所述前池隔墙的第一长条段上设置所述前池连通闸,前池连通闸采用螺杆式启闭机进行启闭。Preferably, the forebay connecting gate is provided on the first long section of the forecourt partition wall, and the forebay communicating gate is opened and closed by a screw hoist.
优选的,所述前池隔墙偏向设置,排涝前池的横截面小于排洪前池的横截面。Preferably, the partition wall of the forebay is biased, and the cross section of the flood drainage forebay is smaller than that of the flood drainage forebay.
优选的,所述前池隔墙前端延伸至引河段并作为引河段的弧形导流墩。Preferably, the front end of the forebay partition wall extends to the diversion section and serves as an arc-shaped diversion pier for the diversion section.
优选的,所述弧形导流墩、前池隔墙均为钢筋混凝土结构。Preferably, the curved diversion pier and the partition wall of the forebay are all reinforced concrete structures.
优选的,所述泵站前池横截面为梯形,所述排涝前池的扩散角略大于所述排洪前池的扩散角。Preferably, the pump station forebay has a trapezoidal cross section, and the diffusion angle of the flood drainage forebay is slightly larger than that of the flood drainage forebay.
优选的,所述排洪闸设置在泵站前池和引河之间,排涝闸设置在泵站前池侧壁上。Preferably, the flood discharge gate is arranged between the forebay of the pumping station and the diversion river, and the flood discharge gate is arranged on the side wall of the forebay of the pumping station.
与现有技术相比,本实用新型的有益效果是:Compared with the prior art, the beneficial effects of the utility model are:
第一,在前池中间设置一道隔墙将前池分为排洪前池和排涝前池,两侧前池通过前池连通闸相连,在需要辅助排水时可以打开。水域与引河相连,后接泵站排洪前池,为正向进水;排涝则利用排涝前池侧向进水,两者互不影响。其优势在于:小流量排洪时,关闭前池连通闸,水从排洪前池进入泵站进水池进行抽排;大流量排洪时,打开前池连通闸,关闭排涝闸,水流入排涝前池进行辅助排洪;小流量排涝时,关闭前池连通闸,水从排涝前池进入泵站进水池进行抽排;大流量排涝时,打开前池连通闸,关闭排洪闸,水流入排洪前池进行辅助排涝;需要排洪、排涝同时进行时,排洪闸、排涝闸一起打开,隔墙中间前池连通闸关闭,各自抽排。隔墙宽度是变化的,从前池连通闸位置到进水池段由宽渐窄,渐变段底面形状为等腰梯形。排洪前池和排涝前池利用隔墙分开,隔墙的前端在引河段设置成弧形导流墩可以对流态起一定优化调整作用。前池的连通闸位置在隔墙前部分,靠近进水口。前池连通闸采用螺杆启闭机。前导流墩、隔墙均为钢筋混凝土结构。前池底面积为梯形,排涝进口处的一边扩散范围略大。本实用新型将泵站前池利用隔墙分为两个部分,中间利用连通闸相连,可以排洪、排涝同时进行,且互相不影响。保证两种功能同时实现。First, a partition wall is set in the middle of the forebay to divide the forebay into a flood discharge forebay and a flood drainage forebay. The forebays on both sides are connected by a forebay connecting gate, which can be opened when auxiliary drainage is required. The water area is connected with the diversion river, followed by the flood discharge front pool of the pumping station, which is positive water inflow; the water drainage uses the lateral water intake of the flood drainage front pool, and the two do not affect each other. Its advantages are: when the flood is discharged with a small flow, the connecting gate of the forebay is closed, and the water enters the inlet pool of the pumping station from the flood discharge forebay for pumping and drainage; when the flood is discharged with a large flow, the connecting gate of the forebay is opened, the drainage gate is closed, and the water flows into the drainage Auxiliary flood drainage in the forebay; when draining water with a small flow, close the connecting gate of the forebay, and the water enters the inlet pool of the pumping station from the drainage forebay for pumping; when draining water with a large flow, open the connecting gate of the forebay, close the flood discharge gate, and the water flows into The flood discharge forebay is used for auxiliary drainage; when flood drainage and waterlogging are required to be carried out at the same time, the flood discharge gate and the flood drainage gate are opened together, and the connecting gate of the forebay in the middle of the partition wall is closed, and the drainage is carried out separately. The width of the partition wall changes, from the position of the connecting gate of the front pool to the section of the inlet pool, the width gradually narrows, and the shape of the bottom surface of the gradual change section is an isosceles trapezoid. The flood discharge forebay and flood drainage forebay are separated by a partition wall, and the front end of the partition wall is set as an arc-shaped diversion pier in the river diversion section, which can optimize and adjust the flow state to a certain extent. The connection gate of the forebay is located in the front part of the partition wall, close to the water inlet. The connecting gate of the forebay adopts a screw hoist. The front diversion piers and partition walls are reinforced concrete structures. The bottom area of the front pool is trapezoidal, and one side of the drainage inlet has a slightly larger diffusion range. The utility model divides the forebay of the pumping station into two parts by a partition wall, and the middle part is connected by a connecting gate, so that flood and waterlogging can be carried out simultaneously without affecting each other. It is guaranteed that both functions are realized at the same time.
第二,本实用新型泵站可以同时进行排涝、排洪,且具有互不影响,节约土地的优势。在单一情况流量较大,原排水量达不到要求时,还可以使用辅助排水方案。本实用新型可以提高排水能力,在遇到极端天气时能够保证水域和农业土地的基本安全,或者在某种程度上将损失降到最低,同时该结构形式能够节约用地,美观大方,方便施工。Second, the pumping station of the utility model can drain waterlogged water and flood water at the same time, and has the advantages of not affecting each other and saving land. In a single situation where the flow rate is large and the original drainage volume cannot meet the requirements, an auxiliary drainage scheme can also be used. The utility model can improve the drainage capacity, and can ensure the basic safety of the water area and agricultural land when encountering extreme weather, or minimize the loss to a certain extent, and at the same time, the structural form can save land, be beautiful and convenient for construction.
附图说明Description of drawings
图1是本实用新型排洪、排涝泵站结构示意图。Fig. 1 is a structural schematic diagram of the pumping station for flood and flood drainage of the utility model.
图中1排洪闸,2排涝闸,3导流墩,4前池隔墙,第一长条段41,渐变段42,第二长条段43,5排洪前池,6排涝前池,7自排流道,8前池连通闸,9水泵机组。In the figure, 1 flood discharge sluice, 2 waterlogging sluice, 3 diversion pier, 4 forebay partition wall, first long section 41, gradual transition section 42, second long section 43, 5 flood drainage forebay, 6 waterlogging forebay , 7 self-drainage channels, 8 forebay connecting gates, 9 water pump units.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型进一步说明。Below in conjunction with accompanying drawing and embodiment the utility model is further described.
如图1所示,一种排洪、排涝泵站结构,包括泵站前池,泵站前池内沿水流方向设有前池隔墙4,前池隔墙4竖向设置,前池隔墙4上设有前池连通闸8,前池隔墙4将泵站前池分隔为排洪前池5和排涝前池6,排洪前池5和排涝前池6通过前池连通闸8相连通;排洪前池5上设有排洪闸1,排涝前池6上设有排涝闸2。As shown in Figure 1, a flood and flood drainage pumping station structure includes a pumping station forebay, a forebay partition wall 4 is arranged in the pumping station forebay along the water flow direction, the forebay partition wall 4 is vertically arranged, and the forebay partition wall 4 is provided with a forebay connecting gate 8, and the forebay partition wall 4 divides the forebay of the pumping station into a flood discharge forebay 5 and a flood drainage forebay 6, and the flood discharge forebay 5 and the flood drainage forebay 6 are connected through the forebay connecting gate 8 pass; the flood discharge front pond 5 is provided with a flood discharge gate 1, and the flood discharge front pond 6 is provided with a flood discharge gate 2.
前池隔墙4宽度是变化的,前池隔墙4包括沿水流方向依次设置的第一长条段41、渐变段42、第二长条段43,第一长条段41、渐变段42、第二长条段43宽度逐渐变小,渐变段42横截面形状为直角梯形。The width of the front pool partition wall 4 is variable, and the front pool partition wall 4 includes a first strip section 41, a gradual transition section 42, a second strip section 43 arranged in sequence along the water flow direction, a first strip section 41, a transition section 42 , The width of the second elongated section 43 becomes smaller gradually, and the cross-sectional shape of the gradual change section 42 is a right-angled trapezoid.
前池连通闸8位于前池隔墙4前端,靠近泵站前池进水口。The forebay connecting gate 8 is located at the front end of the forebay partition wall 4, near the water inlet of the forebay for the pumping station.
前池隔墙4的第一长条段41上设置所述前池连通闸8,前池连通闸8采用螺杆式启闭机进行启闭。The first long section 41 of the forebay partition wall 4 is provided with the forebay connecting gate 8, and the forebay communicating gate 8 is opened and closed by a screw hoist.
池隔墙4偏向设置,排涝前池6的横截面小于排洪前池5的横截面。The pool partition wall 4 is arranged in a biased manner, and the cross section of the front pool 6 for flood drainage is smaller than the cross section of the front pool 5 for flood drainage.
前池隔墙4前端延伸至引河段并作为引河段的弧形导流墩3。The front end of the forebay partition wall 4 extends to the diversion section and serves as an arc-shaped diversion pier 3 for the diversion section.
弧形导流墩3、前池隔墙4均为钢筋混凝土结构。The curved diversion pier 3 and the forebay partition wall 4 are both reinforced concrete structures.
泵站前池横截面为梯形,所述排涝前池6的扩散角略大于所述排洪前池5的扩散角。The cross-section of the forebay of the pumping station is trapezoidal, and the diffusion angle of the flood drainage forebay 6 is slightly larger than that of the flood drainage forebay 5 .
排洪闸1设置在泵站前池和引河之间,排涝闸2设置在泵站前池侧壁上。The flood discharge gate 1 is arranged between the forebay of the pumping station and the diversion river, and the flood discharge gate 2 is arranged on the side wall of the forebay of the pumping station.
在小流量排洪,排洪前池5流量满足要求时,关闭前池连通闸8,水从排洪前池5进入泵站机组9进水池进行抽排;大流量排洪,排洪前池5流量不满足要求时,打开前池连通闸8,关闭排涝闸2,水流入排涝前池6进行辅助排洪;小流量排涝,排涝前池6流量满足要求时,关闭前池连通闸8,水从排涝前池6进入泵站机组9进水池进行抽排;大流量排涝,排涝前池6流量不能满足要求时,打开前池连通闸8,关闭排洪闸1,水流入排洪前池5进行辅助排涝;需要排洪、排涝同时进行时,排洪闸1、排涝闸2一起打开,隔墙中间前池连通闸8关闭,各自抽排。When the flow of the flood discharge forebay 5 meets the requirements for small flow discharge, close the forebay connecting gate 8, and the water enters the water inlet pool of the pumping station unit 9 from the flood discharge forebay 5 for pumping; for large flow flood discharge, the flood discharge forebay 5 When the flow rate does not meet the requirements, open the forebay connecting gate 8, close the drainage gate 2, and water flows into the drainage forebay 6 for auxiliary flood discharge; when the flow rate of the forebay 6 meets the requirements for small flow drainage, close the forebay connecting gate 8, The water enters the water inlet pool of the pump station unit 9 from the drainage forebay 6 for pumping and drainage; when the flow of the flood drainage forebay 6 cannot meet the requirements, open the forebay connecting gate 8 and close the flood discharge gate 1, and the water flows into the flood drainage forebay 5. Perform auxiliary drainage; when flood drainage and drainage are required at the same time, flood drainage gate 1 and flood drainage gate 2 are opened together, and the forebay connecting gate 8 in the middle of the partition wall is closed, and drainage is performed separately.
本实用新型排洪、排涝泵站结构,通过排洪前池5、排涝前池6、前池隔墙4以及前池连通闸8之间的配合完成分排,辅助外排等功能。The flood and waterlogging pumping station structure of the utility model realizes functions such as drainage and auxiliary drainage through cooperation among the flood discharge forebay 5 , the forebay 6 , the forebay partition wall 4 and the forebay connecting gate 8 .
前池隔墙4宽度设置由厚到薄,厚的部分设置前池连通闸8,保证闸门的启闭稳定,在中间段是渐变段,对水流起引导作用,防止出现漩涡等不良流态。The width of the front pool partition wall 4 is set from thick to thin, and the thick part is provided with the front pool connecting gate 8 to ensure the stability of the opening and closing of the gate. The middle section is a gradual section, which guides the water flow and prevents bad flow patterns such as eddies.
在引河段的隔墙演变为弧形导流墩3,能够有效、稳定的进水。The partition wall in the river diversion section evolves into an arc-shaped diversion pier 3, which can effectively and stably enter water.
前池连通闸8设计在隔墙靠前的位置,考虑在辅助排水时水流能够尽快流入辅助排水区,然后平稳的进入机组。The forebay connecting gate 8 is designed at the front of the partition wall, considering that the water flow can flow into the auxiliary drainage area as soon as possible during the auxiliary drainage, and then enter the unit smoothly.
排涝闸2前一般接农田里的泄水涵洞,由闸门启闭控制外排的流量,螺杆启闭机可以方便安装,不占用空间。The drainage sluice 2 is generally connected to the drainage culvert in the farmland, and the discharge flow is controlled by the opening and closing of the gate. The screw hoist can be easily installed and does not take up space.
排洪闸1接地区水域,例如内湖等,在水量过大时可以进行外排。The waters in the flood discharge gate 1 contact area, such as the inner lake, can be discharged when the water volume is too large.
自排流道7是在外河水位低于内湖水位时,可以直接通过自排的方式将地区过多水量排出。The self-drainage channel 7 is when the water level of the outer river is lower than the water level of the inner lake, and the excess water in the area can be discharged directly by self-drainage.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721373777.8U CN207392412U (en) | 2017-10-24 | 2017-10-24 | One kind is drained off floodwaters, drainage pumping stations structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721373777.8U CN207392412U (en) | 2017-10-24 | 2017-10-24 | One kind is drained off floodwaters, drainage pumping stations structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207392412U true CN207392412U (en) | 2018-05-22 |
Family
ID=62329634
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721373777.8U Expired - Fee Related CN207392412U (en) | 2017-10-24 | 2017-10-24 | One kind is drained off floodwaters, drainage pumping stations structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207392412U (en) |
-
2017
- 2017-10-24 CN CN201721373777.8U patent/CN207392412U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103410130B (en) | Multi-purpose tunnel arrangement structure | |
CN112281770B (en) | Flood discharge structure adopting bottom hole and surface hole combined flood discharge and energy dissipation | |
CN202688943U (en) | Self-suction drainage system for barrier lake | |
CN204959682U (en) | Water lowering and waterlogging facility for prevention and control are gushed to regional inland river | |
CN202324058U (en) | Double-layered pump and gate layout structure | |
CN106702968A (en) | Arc type overflow dam capable of automatically washing away sand and reducing siltation and running method of arc type overflow dam | |
CN207582409U (en) | It changes gear the pump station structure of water in a kind of achievable river that intersects | |
CN112726486B (en) | Technical method for synchronously improving river and lake water power of coastal city by utilizing tidal resources | |
CN202440787U (en) | Riverway diversion device | |
CN207392412U (en) | One kind is drained off floodwaters, drainage pumping stations structure | |
CN209025056U (en) | A kind of Floater removing gate and scouring sluice integrated structure | |
CN201169765Y (en) | Automatically-washing silt weir culvert | |
CN217974577U (en) | Off-line rainwater regulation and storage tank | |
CN209891288U (en) | Drainage pump station | |
CN204326026U (en) | A kind of multi-stage telescopic steel dam | |
CN202626933U (en) | Curve type water-binding and sand-dividing guide wall | |
CN212248656U (en) | Combined rainwater pump house with initial rainwater and dry flow mixed-connection sewage interception function | |
CN219825451U (en) | River water intake system along with water level change | |
CN210482455U (en) | Pump station diversion and drainage combined overpass culvert gate | |
CN213062202U (en) | Underground pump station system suitable for river course circulation, moisturizing and drainage of waterlogging | |
CN209493909U (en) | A structure for diverting and taking water from water pipelines across reservoirs | |
CN221072826U (en) | Water taking building structure | |
CN206554031U (en) | It is a kind of sand washing to subtract the arc line type overflow dam of silt automatically | |
CN217204539U (en) | A buoy control rain and sewage diversion well | |
CN219527551U (en) | Anti-freezing flood discharge gate |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180522 Termination date: 20201024 |
|
CF01 | Termination of patent right due to non-payment of annual fee |