CN207386518U CN201721416604.XU CN201721416604U CN207386518U CN 207386518 U CN207386518 U CN 207386518U CN 201721416604 U CN201721416604 U CN 201721416604U CN 207386518 U CN207386518 U CN 207386518U
Authority
CN
China
Prior art keywords
material handle
hold
rack
another side
product
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721416604.XU
Other languages
Chinese (zh)
Inventor
陈俊
邓礼锞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING YUJIANG DIE-CASTING Co Ltd
Original Assignee
CHONGQING YUJIANG DIE-CASTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING YUJIANG DIE-CASTING Co Ltd filed Critical CHONGQING YUJIANG DIE-CASTING Co Ltd
Priority to CN201721416604.XU priority Critical patent/CN207386518U/en
Application granted granted Critical
Publication of CN207386518U publication Critical patent/CN207386518U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sawing (AREA)

Abstract

The utility model provides one kind and removes material handle device and go material handle equipment, is related to the technical field of metal casting.Material handle device is gone to include rack, the first product mounting table, moving mechanism, hold-down mechanism and remove material handle mechanism;The one side of rack is connected with ground, one end of moving mechanism and the another side of rack connect, the other end of moving mechanism is connected with the one side of the first product mounting table, the another side of first product mounting table is used to place product, one end of hold-down mechanism and the another side of rack connect, the other end of hold-down mechanism is located at the top of rack, and the other end of material handle mechanism and hold-down mechanism is gone to connect.It solves the mode in the prior art, manually removing material handle, there is technical issues that time-consuming and laborious.The hold-down mechanism of the utility model is realized with removing material handle mechanism and removes material handle to the automatic of product.

Description

It removes material handle device and goes material handle equipment
Technical field
The utility model is related to the technical fields of metal casting, remove material handle device more particularly, to one kind and material handle is gone to set It is standby.
Background technology
Compression casting, abbreviation die casting refers to molten alloy filling mold cavity under high pressure, high-speed condition, and in height The casting method being cooled and shaped is depressed, is metal fever processing and forming technology method most widely used, with fastest developing speed in casting technique One of.Gear box casing is one of most important part in engine, with continuous to product quality and light-weighted requirement It improves, now mainly uses the full-automatic Die Casting of aluminium alloy.Using the aluminium alloy gear box casing of Die Casting, the qualified effect of part Rate is high, has the characteristics that dimensional accuracy is high, Part Surface Roughness is low and prevents fine and close.
In traditional die-casting process flow, after the completion of processing procedure of the gear box casing after the completion of die casting, typically die casting Die sinking clamps die-casting blank part, then pile natural cooling on vacant lot, after die casting natural cooling, then by artificial It is manually firmly tapped on the table with clamp die casting, removes the attached of the running gate systems such as slag trap and the material handle of die casting Component ensures the quality of die casting produced qualification.
But in production, aluminum alloy die casting mold clearing temperature is generally 200 degree or so, comes from the summary of experience of produce reality It sees, single gearbox body is generally required 50 minutes from mold clearing temperature by naturally cooling to room temperature.By manually tapping taking-up To expect handle, subsequent processing is transferred to finally by transmission line case, single die casting will spend 60-70 minutes on the transmission line, The rate of die casting transfer is so greatly reduced, product is caused to accumulate, affects the efficiency of entire die casting production.Thus may be used See, artificial removal expects the mode of handle, there are problems that time-consuming and laborious inefficiency, inconvenience is brought to the production of die casting.
Utility model content
The purpose of this utility model is to provide one kind to remove material handle device, in the prior art to solve, and manually goes Expect the mode of handle, there is technical issues that time-consuming and laborious.
The utility model additionally provides one kind and goes material handle equipment, in the prior art to solve, and manually removes material handle Mode there is technical issues that time-consuming and laborious.
One kind provided by the utility model removes material handle device, it is described go material handle device include rack, the first product mounting table, Moving mechanism, hold-down mechanism and go material handle mechanism;
The one side of the rack is connected with ground, and one end of the moving mechanism is connected with the another side of the rack, institute The other end for stating moving mechanism is connected with the one side of the first product mounting table, and the another side of the first product mounting table is used In placing product, one end of the hold-down mechanism is connected with the another side of the rack, and the other end of the hold-down mechanism is located at The top of the rack, it is described that material handle mechanism is gone to be connected with the other end of the hold-down mechanism.
Further, the supporting rack of installation hold-down mechanism is further included;
Support frame as described above include hold-down mechanism installing plate and connecting plate, the hold-down mechanism include compression cylinder connecting plate, Compression cylinder, compact heap installing plate and hold-down head;
The one side of the hold-down mechanism installing plate is connected with the another side of the rack, one end of the connecting plate with it is described The another side vertical connection of hold-down mechanism installing plate, the other end of the connecting plate are vertically connected on the compression cylinder connecting plate One end, the compression cylinder is vertically connected on the other end of the compression cylinder connecting plate, and the compression cylinder is through described Compression cylinder connecting plate is connected with the one side of the compact heap installing plate, and the another side of the compact heap installing plate, which is equipped with, to be compressed Head;
The quantity of the hold-down head is multiple, and multiple hold-down heads are distributed on the another side of the compact heap installing plate On.
Further, it is described that material handle mechanism is gone to include the first cylinder and remove material head;
One end of first cylinder is connected with one end of the compression cylinder connecting plate, the other end of first cylinder It is connected with described one end for removing material head, the other end for removing material head is located at the top of the rack.
Further, the hold-down mechanism further includes the lead for guiding;
The compression cylinder connecting plate is equipped with the first pilot hole, and the compact heap installing plate is equipped with the second pilot hole, First pilot hole is oppositely arranged with second pilot hole, and one end of the lead is connected with first pilot hole, The other end of the lead is connected with second pilot hole.
Further, the hold-down mechanism further includes reinforcing rib;
The reinforcing rib is connected on the another side of the compression cylinder connecting plate.
Further, the another side of the rack be equipped with connecting rod, the moving mechanism include the second cylinder, slide and Sliding block;
Second cylinder is connected to the lower section of the connecting rod, and the slide is connected to the top of the connecting rod, institute It states sliding block to be connected on the slide, the one side of the sliding block is connected through the slide with second cylinder, the sliding block Another side be connected with the first product mounting table mechanism, second cylinder does stretching motion, drives the sliding block along institute Slide slip is stated, the first product mounting table is driven to be slided along the slide.
Further, the second product mounting table and saw cutting mechanism are further included;
The second product mounting table is connected on the another side of the rack, and the saw cutting mechanism is connected in the another of the rack On on one side, the saw cutting mechanism is located at the side of the second product mounting table.
Further, support frame as described above further includes saw cutting mechanism installing plate and support plate;
The saw cutting mechanism includes motor mounting plate, motor, saw disc and locking member;
The one side of the saw cutting mechanism installing plate is connected with the another side of the rack, and one end institute of the support plate is with stating The another side vertical connection of saw cutting mechanism installing plate, the one side of the motor mounting plate is vertical with the other end of the support plate to be connected It connects, the another side of the motor mounting plate is connected with the motor, and the locking member is by the output terminal of the motor and the saw Disk connects.
Further, the another side of the rack is equipped with receiver board, is equipped in the rack and accommodates storehouse;
One end of the receiver board is connected with the another side of the rack, the other end of the receiver board and the receiving storehouse Connection, the receiver board are located at the lower section for removing material handle mechanism, so that described go to connect described in the material handle warp of material handle mechanism removal Plate is received to be moved in the receiving storehouse.
The utility model also provides one kind and goes material handle equipment, described that material handle equipment is gone to include body and go to expect as described above Handle device;
Installation position is equipped in the body, it is described that material handle device is gone to be mounted in installation position.
It is provided by the utility model to remove material handle device, it is connected below the rack with ground, described rack the upper surface of With being connected below the moving mechanism, described moving mechanism the upper surface of and the bottom surface of the first product mounting table connect right end It connects, described first product mounting table the upper surface of places product, and the first product mounting table is under the drive of the moving mechanism Along gantry motion so that the product is reached on the station clamped;The hold-down mechanism is vertically arranged, the bottom of the hold-down mechanism End above the rack with being connected, and the upper end of the hold-down mechanism is located at the top of the rack, and the hold-down mechanism is used for Product is compressed, with the fixation product;It is described that material handle mechanism is gone to be vertically arranged, it is described to remove material handle mechanism and the hold-down mechanism Upper end connects, described to remove material handle mechanism after the hold-down mechanism compresses product, vertically moving, cuts off on the product Material handle, realize that product goes the automation of material handle, save artificial participation, improve production efficiency.
It is provided by the utility model to go to expect handle equipment, it is described that material handle device is gone to be mounted in the installation position of body, use pressure Tight mechanism realizes that product goes the automation of material handle, saves artificial participation, improve production efficiency with removing material handle mechanism.
Description of the drawings
It, below will be right in order to illustrate more clearly of specific embodiment of the present invention or technical solution of the prior art Specific embodiment or attached drawing needed to be used in the description of the prior art are briefly described, it should be apparent that, it describes below In attached drawing be the utility model some embodiments, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other attached drawings are can also be obtained according to these attached drawings.
Fig. 1 is the structure diagram one for removing material handle device that the utility model embodiment provides;
Fig. 2 is the structure diagram two for removing material handle device that the utility model embodiment provides;
Fig. 3 is the structure diagram three for removing material handle device that the utility model embodiment provides;
Fig. 4 is the structure diagram for the hold-down mechanism for removing material handle device that the utility model embodiment provides;
Fig. 5 is the side view for the hold-down mechanism for removing material handle device that the utility model embodiment provides;
Fig. 6 is the structure diagram for the moving mechanism for removing material handle device that the utility model embodiment provides;
Fig. 7 is the structure diagram for the saw cutting mechanism for removing material handle device that the utility model embodiment provides.
Icon:100- racks;200- the first product mounting tables;300- moving mechanisms;400- hold-down mechanisms;500- removes material handle Mechanism;600- supporting racks;700- the second product mounting tables;800- saw cutting mechanisms;101- receiver boards;102- accommodates storehouse;301- Two cylinders;302- slides;303- sliding blocks;401- compression cylinder connecting plates;402- compression cylinders;403- compact heap installing plates; 404- hold-down heads;405- leads;406- reinforcing ribs;The first cylinders of 501-;502- removes material head;601- hold-down mechanisms are installed Plate;602- connecting plates;603- saw cutting mechanism installing plates;604- support plates;801- motor mounting plates;802- motors;803- is sawed Disk;804- locking members.
Specific embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with attached drawing, it is clear that described Embodiment is the utility model part of the embodiment, instead of all the embodiments.Based on the embodiment in the utility model, sheet Field those of ordinary skill all other embodiments obtained without making creative work, belong to this practicality Novel protected scope.
, it is necessary to explanation in the description of the utility model, such as occur term " " center ", " on ", " under ", " left side ", The orientation or position relationship of the instructions such as " right side ", " vertical ", " level ", " interior ", " outer " are based on orientation shown in the drawings or position Relation is for only for ease of description the utility model and simplifies description rather than instruction or imply that signified device or element must There must be specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to the utility model.This Outside, such as there is term " first ", " second ", " the 3rd " are only used for description purpose, and it is not intended that instruction or implying relatively heavy The property wanted.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term such as occurs in the description of the utility model " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected or one It connects body;Can be mechanical connection or electrical connection;It can be directly connected, it can also be indirect by intermediary It is connected, can is the connection inside two elements.For the ordinary skill in the art, on being understood with concrete condition State concrete meaning of the term in the utility model.
Fig. 1 is the structure diagram one for removing material handle device that the utility model embodiment provides;Fig. 2 is the utility model What embodiment provided removes the structure diagram two of material handle device;Fig. 3 be the utility model embodiment provide remove material handle device Structure diagram three;Fig. 4 is the structure diagram for the hold-down mechanism for removing material handle device that the utility model embodiment provides;Fig. 5 For the side view for the hold-down mechanism for removing material handle device that the utility model embodiment provides;Fig. 6 carries for the utility model embodiment What is supplied removes the structure diagram of the moving mechanism of material handle device;Fig. 7 be the utility model embodiment provide remove material handle device The structure diagram of saw cutting mechanism.
The utility model provides one kind and removes material handle device, described that material handle device is gone to be put including rack 100, the first product It puts platform 200, moving mechanism 300, hold-down mechanism 400 and removes material handle mechanism 500;The one side of the rack 100 is connected with ground, institute The one end for stating moving mechanism 300 is connected with the another side of the rack 100, the other end of the moving mechanism 300 and described the The one side connection of one product mounting table 200, the another side of the first product mounting table 200 are used to place product, the compression One end of mechanism 400 is connected with the another side of the rack 100, and the other end of the hold-down mechanism 400 is located at the rack 100 Top, it is described go material handle mechanism 500 be connected with the other end of the hold-down mechanism 400.
As shown in Figure 1-Figure 3, the bottom face of the rack 100 is connected with ground, the lower end of the moving mechanism 300 and institute State the upper surface connection of rack 100, the upper surface of the moving mechanism 300 and the lower face of the first product mounting table 200 Connection, the upper surface of the first product mounting table 200 are used for the placement of the product, and the first product mounting table 200 exists Under the drive of the moving mechanism 300, another station can be moved to along the moving mechanism 300;Under the hold-down mechanism 400 End face is connected with the upper surface of the rack 100, and the upper surface of the hold-down mechanism 400 is located at the top of the rack 100, institute It states material handle mechanism 500 to be connected with the upper surface of the hold-down mechanism 400, the product is in the band of the moving mechanism 300 When moving to the downside of the hold-down mechanism 400 under dynamic, the hold-down mechanism 400 is vertically moving, compresses the product; It is described to go material handle mechanism 500 vertically moving, the material handle on product is removed, realizes that product goes the full-automation of material handle, keeps away Exempt from artificial participation, improve production efficiency.
The rack 100 includes the support leg being vertically arranged and horizontally disposed support tablet, the bottom of the support leg Face is connected with ground, and the upper surface of the support leg is with supporting the lower face of tablet to be connected, the moving mechanism 300 and the branch The upper surface connection of tablet is supportted, it is described that material handle mechanism 500 and the upper surface of the support tablet is gone to be connected;The number of the support leg It measures to be multiple, multiple support legs are distributed on the bottom face of the support tablet so that the stability of the rack 100 By force.
Described that material handle device is gone to further include control system and induction system, the control system is microcontroller, the sensing System is sensor, and the control system is connected with the support leg of the rack 100, the induction system and the moving mechanism 300 connections, for receiving the location information of the product, and send the location information of the product to the control system, When the product is located at the station of the underface of the hold-down mechanism 400, the induction system sends location information to control System, the control system control the hold-down mechanism 400 vertically to move, compress the product;The sensor with The hold-down mechanism 400 connects, and the sensor detects the location information of the hold-down mechanism 400, and by the hold-down mechanism 400 location information sends the control system to, and when the hold-down mechanism 400 compresses product, the induction system is sent The location information of hold-down mechanism 400 goes material handle mechanism 500 vertically to transport to control system described in the control system control It is dynamic, the material handle on product is removed, realizes the automation for going material handle process.After the material handle removal of product, the induction system inspection Material handle removal is measured, sends information to the control system, the control system control robot takes product away, and controls shifting Motivation structure 300 is moved to the first station, repeats the above process, and realizes that material handle is removed in the automation of product.
Further, the supporting rack 600 of installation hold-down mechanism 400 is further included;Support frame as described above 600 includes hold-down mechanism Installing plate 601 and connecting plate 602, the hold-down mechanism 400 include compression cylinder connecting plate 401, compression cylinder 402, compact heap Installing plate 403 and hold-down head 404;The one side of the hold-down mechanism installing plate 601 is connected with the another side of the rack 100, institute State one end of connecting plate 602 and the another side vertical connection of the hold-down mechanism installing plate 601, the connecting plate 602 it is another End is vertically connected on one end of the compression cylinder connecting plate 401, and the compression cylinder 402 is vertically connected on the compression cylinder The other end of connecting plate 401, the compression cylinder 402 pass through the compression cylinder connecting plate 401 and the compact heap installing plate 403 one side connection, the another side of the compact heap installing plate 403 are equipped with hold-down head 404;The quantity of the hold-down head 404 is Multiple, multiple hold-down heads 404 are distributed on the another side of the compact heap installing plate 403.
As shown in Figure 4 and Figure 5, the bottom face of the hold-down mechanism installing plate 601 and the upper surface of the rack 100 connect It connects, the hold-down mechanism 400 is fixed in rack 100;The bottom of the connecting plate 602 and the hold-down mechanism installing plate 601 upper surface vertical connection, the upper end of the connecting plate 602 is vertical with the lower face of the compression cylinder connecting plate 401 to be connected It connects, the compression cylinder 402 and the upper surface vertical connection of the compression cylinder connecting plate 401, so that the compression cylinder 402 The top of the rack 100 is located at, the compression cylinder 402 is pacified through the compression cylinder connecting plate 401 and the compact heap The upper surface connection of loading board 403, the bottom face of the compact heap installing plate 403 are equipped with hold-down head 404, the hold-down head 404 Quantity to be multiple, it is multiple to be distributed on the bottom face of the compact heap installing plate 403.The compression cylinder 402 is along vertical side It to stretching motion, drives the compact heap installing plate 403 vertically moving, and then drives the hold-down head 404 along vertical Direction moves so that the hold-down head 404 compresses the product.
Further, it is described that material handle mechanism 500 is gone to include the first cylinder 501 and remove material head 502;First cylinder 501 One end be connected with one end of the compression cylinder connecting plate 401, the other end of first cylinder 501 is with described removing material head 502 one end connection, the other end for removing material head 502 are located at the top of the rack 100.
As shown in Figure 4 and Figure 5, the upper surface of first cylinder 501 and the bottom face of the compression cylinder connecting plate 401 Connection, the lower face of first cylinder 501 are connected with the upper end for removing material head 502, and the lower end for removing material head 502 is set In the top of the rack 100.The hold-down mechanism 400 compresses product, and induction system senses the hold-down mechanism 400 After product is compressed, the control system is passed information to, the control system controls first cylinder 501 along vertical side It to movement, goes material head 502 vertically moving described in driving, realizes the processing for removing material handle automatically to product, material handle is removed in realization Automation.
Further, the hold-down mechanism 400 further includes the lead 405 for guiding;The compression cylinder connecting plate 401 be equipped with the first pilot hole, the compact heap installing plate 403 be equipped with the second pilot hole, first pilot hole with it is described Second pilot hole is oppositely arranged, and one end of the lead 405 is connected with first pilot hole, the lead 405 it is another One end is connected with second pilot hole.
As shown in Figure 4 and Figure 5, the compression cylinder connecting plate 401 is equipped with the first pilot hole, the compact heap installing plate 403 are equipped with the second pilot hole, and the upper end of the lead 405 is connected with first pilot hole, under the lead 405 End is connected with second pilot hole, and the quantity of the lead 405 is multiple, and multiple leads 405 are distributed on described On compact heap installing plate 403;The setting of the lead 405 so that the hold-down head 404 vertically upper can move, Be not in the situation for deviateing vertical direction, ensure the accuracy for removing material handle to product.
Further, the hold-down mechanism 400 further includes reinforcing rib 406;The reinforcing rib 406 is connected to the compression On the another side of cylinder connecting plate 401.
As shown in Figure 4 and Figure 5, the upper surface of the compression cylinder connecting plate 401 is equipped with reinforcing rib 406, the reinforcement Muscle 406 enhances the connective stability of the compression cylinder connecting plate 401, improves the connective stability for removing material handle mechanism 500.
Further, the another side of the rack 100 is equipped with connecting rod, and the moving mechanism 300 includes the second cylinder 301st, slide 302 and sliding block 303;Second cylinder 301 is connected to the lower section of the connecting rod, and the slide 302 is connected to The top of the connecting rod, the sliding block 303 are connected on the slide 302, and the one side of the sliding block 303 passes through the slide 302 are connected with second cylinder 301, and the another side of the sliding block 303 is connected with the first product mounting table 200, described Second cylinder 301 does stretching motion, and the sliding block 303 is driven to be slided along the slide 302, and first product is driven to place Platform 200 is slided along the slide 302.
As shown in fig. 6, the upper surface of the rack 100 is equipped with connecting rod, the left end of second cylinder 301 is connected to The lower section of the connecting rod, the slide 302 are connected to the top of the connecting rod, and the sliding block 303 is connected to the slide 302 tops, the lower face of the sliding block 303 are connected through the slide 302 with the right end of second cylinder 301, the cunning The upper surface of block 303 connects the bottom face of the first product mounting table 200, and second cylinder 301 is done in the horizontal plane to be stretched Contracting movement, drives the sliding block 303 to be slided along the slide 302, and then drives the first product mounting table 200 along described Slide 302 slides so that product can move in the horizontal plane, realize automatically moving for product.
Further, the second product mounting table 700 and saw cutting mechanism 800 are further included;The second product mounting table 700 connects On the another side of the rack 100, the saw cutting mechanism 800 is connected on the another side of the rack 100, the sawing machine Structure 800 is located at the side of the second product mounting table 700.
As shown in Figure 1-Figure 3, the second product mounting table 700 is connected to the upper surface of the rack 100, the saw The upper surface that mechanism 800 is connected to the rack 100 is cut, the saw cutting mechanism 800 is located at the second product mounting table 700 Inside.When product removes material handle, product is placed on the second product mounting table 700 first, using saw cutting mechanism 800 by the production Product is put into the first product mounting table 200 by the material handle removal at the edge of product using robot afterwards, and material handle device is removed in realization Overall process.
Further, support frame as described above 600 further includes saw cutting mechanism installing plate 603 and support plate 604;The sawing machine Structure 800 includes motor mounting plate 801, motor 802, saw disc 803 and locking member 804;The one of the saw cutting mechanism installing plate 603 Face is connected with the another side of the rack 100, one end of the support plate 604 with stating the another of saw cutting mechanism installing plate 603 Face vertical connection, the other end vertical connection of the one side of the motor mounting plate 801 and the support plate 604, the motor peace The another side of loading board 801 is connected with the motor 802, and the locking member 804 is by the output terminal of the motor 802 and the saw disc 803 connections.
As shown in Figure 1, Figure 2, shown in Fig. 3 and Fig. 7, the bottom face of the saw cutting mechanism installing plate 603 is upper with the rack 100 End face connects, the bottom face of the support plate 604 and the lower face vertical connection of saw cutting mechanism installing plate 603, the support plate 604 upper surface and the bottom face vertical connection of the motor mounting plate 801, upper surface and the electricity of the motor mounting plate 801 Machine 802 connects, and the output terminal of the motor 802 is connected by the locking member 804 with the saw disc 803, and the saw disc 803 exists It is rotated under the drive of the motor 802, cuts off the material handle of the product edge.
The locking member 804 is nut, and the output terminal of the motor 802 is equipped with the external screw thread with nut inner thread cooperation, So that the saw disc 803 is locked on the motor 802.
Further, the another side of the rack 100 is equipped with receiver board 101, is equipped in the rack 100 and accommodates storehouse 102;One end of the receiver board 101 is connected with the another side of the rack 100, the other end of the receiver board 101 with it is described It accommodates storehouse 102 to connect, the receiver board 101 is located at the lower section for removing material handle mechanism 500, so that described remove material handle mechanism 500 The material handle of removal is moved to through the receiver board 101 in the receiving storehouse 102.
As shown in Figure 1-Figure 3, the upper surface of the rack 100 is equipped with receiver board 101, and the inside of the rack 100 is set Have and accommodate storehouse 102, the left end of the receiver board 101 is connected with the left side of the upper surface of the rack 100, the receiver board 101 Right end be connected with the receiving storehouse 102, the receiver board 101 is located at the lower section for removing material handle mechanism 500, described to go to expect The material handle that handle mechanism 500 removes directly is moved to through the receiver board 101 in the receiving storehouse 102, and the material handle is received Collection prevents the phenomenon that leaving about everywhere of handle of material.
Described that material handle device is gone to further include protective cover, the protective cover is connected on the upper surface of the rack 100, institute State protective cover four sides be equipped with can open or close door, the door person of being conveniently operated observation is gone inside material handle device, described Protective cover goes material handle device to be closed by described, avoid it is described go material handle device during the work time since material handle disorderly flies, and Operator is damaged.
Specifically, when using material handle device, product is placed on the second product mounting table 700 first, is felt afterwards System is answered to sense the location information of the product, the location information is passed into the control system, the control system The saw cutting mechanism 800 is controlled to move so that saw disc 803 rotates, and removes the material handle of product edge, and material handle removal in edge finishes Afterwards, product is placed on the first product mounting table 200, the induction system senses the location information of the product, by institute It states location information and passes to the control system, the control system controls the moving mechanism 300 to move, when the product moves When moving 400 underface of hold-down mechanism, the induction system sends the location information of product to control system, the control System controls the hold-down mechanism 400 vertically to move, and compresses the product;The sensor and the hold-down mechanism 400 connections, the sensor detect the location information of the hold-down mechanism 400, and by the location information of the hold-down mechanism 400 Send the control system to, when the hold-down mechanism 400 compresses product, the induction system sends hold-down mechanism 400 Location information goes material handle mechanism 500 vertically moving, removes on product to control system described in the control system control Material handle, realize go material handle process automation.After the material handle removal of product, the detected to material handle removal, The control system is sent information to, the control system control robot takes product away, and moving mechanism 300 is controlled to move It to the first station, repeats the above process, realizes that material handle is removed in the automation of product.
The utility model additionally provides one kind and goes material handle equipment, described that material handle equipment is gone to include going as described above for body Expect handle device;Installation position is equipped in the body, it is described that material handle device is gone to be mounted in installation position.
It is provided by the utility model to go to expect handle equipment, it is described that material handle device is gone to be mounted in the installation position of body, use pressure Tight mechanism 400 realizes that product goes the automation of material handle, saves artificial participation, improve production efficiency with removing material handle mechanism 500.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model rather than it is limited System;Although the utility model is described in detail with reference to foregoing embodiments, those of ordinary skill in the art should Understand:It can still modify to the technical solution recorded in foregoing embodiments either to which part or whole Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is not made to depart from this practicality newly The scope of each embodiment technical solution of type.

Claims (10)

1. one kind removes material handle device, which is characterized in that including rack, the first product mounting table, moving mechanism, hold-down mechanism and goes Expect handle mechanism;
The one side of the rack is connected with ground, and one end of the moving mechanism is connected with the another side of the rack, the shifting The other end of motivation structure is connected with the one side of the first product mounting table, and the another side of the first product mounting table is used to put Product is put, one end of the hold-down mechanism is connected with the another side of the rack, and the other end of the hold-down mechanism is located at described The top of rack, it is described that material handle mechanism is gone to be connected with the other end of the hold-down mechanism.
2. according to claim 1 remove material handle device, which is characterized in that further includes the supporting rack of installation hold-down mechanism;
Support frame as described above includes hold-down mechanism installing plate and connecting plate, and the hold-down mechanism includes compression cylinder connecting plate, compresses Cylinder, compact heap installing plate and hold-down head;
The one side of the hold-down mechanism installing plate is connected with the another side of the rack, one end of the connecting plate and the compression The another side vertical connection of mechanism's installing plate, the other end of the connecting plate are vertically connected on the one of the compression cylinder connecting plate End, the compression cylinder are vertically connected on the other end of the compression cylinder connecting plate, and the compression cylinder passes through the compression Cylinder connecting plate is connected with the one side of the compact heap installing plate, and the another side of the compact heap installing plate is equipped with hold-down head;
The quantity of the hold-down head is multiple, and multiple hold-down heads are distributed on the another side of the compact heap installing plate.
3. according to claim 2 remove material handle device, which is characterized in that described that material handle mechanism is gone to include the first cylinder and go Material head;
One end of first cylinder is connected with one end of the compression cylinder connecting plate, the other end of first cylinder and institute One end connection of material head is stated, the other end for removing material head is located at the top of the rack.
4. according to claim 2 remove material handle device, which is characterized in that the hold-down mechanism further includes leading for guiding Xiang Zhu;
The compression cylinder connecting plate is equipped with the first pilot hole, and the compact heap installing plate is equipped with the second pilot hole, described First pilot hole is oppositely arranged with second pilot hole, and one end of the lead is connected with first pilot hole, described The other end of lead is connected with second pilot hole.
5. according to claim 4 remove material handle device, which is characterized in that the hold-down mechanism further includes reinforcing rib;
The reinforcing rib is connected on the another side of the compression cylinder connecting plate.
6. according to claim 1 remove material handle device, which is characterized in that the another side of the rack is equipped with connecting rod, The moving mechanism includes the second cylinder, slide and sliding block;
Second cylinder is connected to the lower section of the connecting rod, and the slide is connected to the top of the connecting rod, the cunning Block is connected on the slide, and the one side of the sliding block is connected through the slide with second cylinder, the sliding block it is another It is connected on one side with the first product mounting table, second cylinder does stretching motion, and the sliding block is driven to be slided along the slide It is dynamic, the first product mounting table is driven to be slided along the slide.
7. according to claim 2 remove material handle device, which is characterized in that further includes the second product mounting table and sawing machine Structure;
The second product mounting table is connected on the another side of the rack, and the saw cutting mechanism is connected in the another side of the rack On, the saw cutting mechanism is located at the side of the second product mounting table.
8. according to claim 7 remove material handle device, which is characterized in that support frame as described above further includes saw cutting mechanism installing plate And support plate;
The saw cutting mechanism includes motor mounting plate, motor, saw disc and locking member;
The one side of the saw cutting mechanism installing plate is connected with the another side of the rack, and one end institute of the support plate is with stating sawing The another side vertical connection of mechanism's installing plate, the other end vertical connection of the one side of the motor mounting plate and the support plate, The another side of the motor mounting plate is connected with the motor, and the locking member connects the output terminal of the motor and the saw disc It connects.
9. according to claim 7 remove material handle device, which is characterized in that the another side of the rack is equipped with receiver board, It is equipped in the rack and accommodates storehouse;
One end of the receiver board is connected with the another side of the rack, and the other end of the receiver board connects with the receiving storehouse It connects, the receiver board is located at the lower section for removing material handle mechanism, so that the material handle for going material handle mechanism removal is through the reception Plate is moved in the receiving storehouse.
10. one kind goes material handle equipment, which is characterized in that removes material handle with as claimed in any one of claims 1-9 wherein including body Device;
Installation position is equipped in the body, it is described that material handle device is gone to be mounted in installation position.
CN201721416604.XU 2017-10-30 2017-10-30 It removes material handle device and goes material handle equipment Expired - Fee Related CN207386518U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721416604.XU CN207386518U (en) 2017-10-30 2017-10-30 It removes material handle device and goes material handle equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721416604.XU CN207386518U (en) 2017-10-30 2017-10-30 It removes material handle device and goes material handle equipment

Publications (1)

Publication Number Publication Date
CN207386518U true CN207386518U (en) 2018-05-22

Family

ID=62327237

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721416604.XU Expired - Fee Related CN207386518U (en) 2017-10-30 2017-10-30 It removes material handle device and goes material handle equipment

Country Status (1)

Country Link
CN (1) CN207386518U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111408953A (en) * 2019-12-10 2020-07-14 广东原点智能技术有限公司 Material handle clearing device and engine cylinder block production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111408953A (en) * 2019-12-10 2020-07-14 广东原点智能技术有限公司 Material handle clearing device and engine cylinder block production line

Similar Documents

Publication Publication Date Title
CN207308673U (en) Anchor ear molding press device and anchor ear die mould system
CN209156838U (en) A kind of feed device of aluminum hull perforating press
CN209635371U (en) Clamp device is used in a kind of production of mould group slide unit
CN106312623A (en) Automatic pressing device for cutting machine
CN209682778U (en) Automatic-feeding heating device and automatic injection production system
CN207386518U (en) It removes material handle device and goes material handle equipment
CN208826124U (en) It is a kind of for processing the fixture of clutch housing
CN211168840U (en) Mechanical automatic unloading equipment
CN210451732U (en) Automatic assembling device for nuts and tooth rods
CN210615325U (en) Cutting device is used in processing of computer fin
CN106025329B (en) A kind of chemical conversion machine
CN219193704U (en) Loading attachment is used in processing of radio frequency cavity
CN205075368U (en) A loading and unloading turnover device for cylindrical winding mandrel
CN208005766U (en) A kind of cutter device for polyurethane thermal insulation board
CN203831028U (en) Graphite removal device in nuke industry
CN207915058U (en) A kind of rack rotary tooling
CN215432272U (en) Automobile part welding forming tool
CN209903112U (en) Dismounting device is used in speed reducer maintenance
CN212372346U (en) Horizontal band saw machine clamping platform that rolls
CN207402839U (en) A kind of industrial automatic gas cutting machine
CN208721040U (en) A kind of dedicated measurement tooling of detection wiring board patch height
CN220744563U (en) Automatic clamping electric control box cover body equipment
CN220296784U (en) Novel foundry goods is polished device
CN220427484U (en) Full-automatic drilling chamfering tapping machine
CN216375823U (en) Anti-oxidation storage equipment is used in tin powder processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180522