CN207376796U - A kind of water tower blow-off line - Google Patents
A kind of water tower blow-off line Download PDFInfo
- Publication number
- CN207376796U CN207376796U CN201721328437.3U CN201721328437U CN207376796U CN 207376796 U CN207376796 U CN 207376796U CN 201721328437 U CN201721328437 U CN 201721328437U CN 207376796 U CN207376796 U CN 207376796U
- Authority
- CN
- China
- Prior art keywords
- pipeline body
- water
- inlet end
- fixedly connected
- sludge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 112
- 239000010865 sewage Substances 0.000 claims abstract description 50
- 239000010802 sludge Substances 0.000 claims abstract description 27
- 239000010426 asphalt Substances 0.000 claims abstract description 20
- 238000002955 isolation Methods 0.000 claims abstract description 6
- 230000006872 improvement Effects 0.000 abstract description 7
- 230000009467 reduction Effects 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 5
- 230000008859 change Effects 0.000 description 4
- 239000000356 contaminant Substances 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 238000005086 pumping Methods 0.000 description 2
- 239000010782 bulky waste Substances 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000007599 discharging Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
Landscapes
- Jet Pumps And Other Pumps (AREA)
Abstract
The utility model discloses a kind of water tower blow-off lines, including pipeline body, the surface of the pipeline body is equipped with bitumen layer, the water inlet end of the pipeline body is fixedly connected by retainer ring with the water outlet of discharge funnel for sludge, the side surface of the discharge funnel for sludge offers isolation port, the top of the pipeline body side surface and support plate, and the top of support plate through the bottom of bitumen layer madial wall and extends to its top, the top of the support plate is fixedly connected with the bottom of aspiration pump side surface.The utility model passes through the improvement to aspiration pump, aspiration pump before use discharges the air in pipeline body, so that the pressure in blow-off line is less than the pressure at discharge funnel for sludge, so that the sewage at discharge funnel for sludge quickly enters pipeline body, with the operation of aspiration pump, increase into the sewage quantity in pipeline body with the reduction of pressure in pipeline body, so as to add the flow of blowdown, improve the efficiency of blowdown.
Description
Technical field
The utility model is related to blow-off line technical fields, are specially a kind of water tower blow-off line.
Background technology
Engineering can consider sewage discharge when founding the factory, therefore the sewage that discharged in factory can be collected in discharge funnel for sludge
Place, using pipeline body uniform effluent, since some enterprises are when founding the factory, restricted be subject to landform, is needed in sewage discharge
Sewage to be extracted out with water pump, long-time is using water pump, it is necessary to consume substantial amounts of cost, and the discharge capacity of water pump is smaller, because
This, some enterprise's considerations discharge sewage with siphon principle.
Using the method for discharging pollution of siphon principle, effectively solve the problems, such as that water pump needs to expend and largely hold grace, still
The problem of blowdown flow rate can not be increased, and the water time of factory's blowdown depending on the sewage quantity at discharge funnel for sludge, existing skill
In blowdown, flow is unable to control pipeline in art, and the time started is long, and contaminant removal effectiveness is relatively low.
Utility model content
(One)The technical issues of solution
In view of the deficiencies of the prior art, the utility model provides a kind of water tower blow-off line, solves existing pipeline
Contaminant removal effectiveness is low and the smaller problem of blowdown flow when using siphonage blowdown.
(Two)Technical solution
To achieve the above object, the utility model provides following technical solution:A kind of water tower blow-off line, including pipeline
Body, the surface of the pipeline body are equipped with bitumen layer, and the water inlet end of the pipeline body passes through retainer ring and discharge funnel for sludge
Water outlet is fixedly connected, and the side surface of the discharge funnel for sludge offers isolation port, the top of the pipeline body side surface with
Support plate, and the top of support plate through the bottom of bitumen layer madial wall and extends to its top, the top of the support plate and aspiration pump
The bottom of side surface is fixedly connected, and the inlet end of the aspiration pump is fixedly connected with the outlet side of connecting tube, the connecting tube
Inlet end at the top of pipeline body side surface downward through bitumen layer and with being fixedly connected, the top of the pipeline body side surface
It is communicated with the inlet end of connecting tube, the outlet side of the aspiration pump is fixedly connected with the inlet end of outer tube, the side table of the outer tube
Face is provided with air door, and the water outlet of the pipeline body is fixedly connected with the one side in siphon pond, and the one side in siphon pond with
The water outlet of pipeline body communicates, and the top in the siphon pond is fixedly connected with the bottom of fixed plate, the top of the fixed plate
It is fixedly connected with the bottom of water pump side surface, the water outlet of the water pump is fixedly connected with the water inlet end of water inlet pipe, the water pump
Water inlet end be fixedly connected with the water outlet of extension tube attached, the top in siphon pond, the siphon are interted in the water outlet of the water inlet pipe
The opposite side in pond is fixedly connected with the water inlet end of sewage outlet pipe, and the opposite side in the siphon pond is communicated with the water inlet end of sewage outlet pipe, institute
It states and sewage valve is provided on sewage outlet pipe.
Preferably, the water inlet end of the pipeline body is fixedly connected with the water outlet of discharge funnel for sludge, and pipeline body is intake
The diameter at end is equal with the diameter of discharge funnel for sludge water outlet.
Preferably, the water outlet of the discharge funnel for sludge is socketed in retainer ring, and the water inlet end of pipeline body is socketed in admittedly
Determine in ring.
Preferably, the midpoint of the support plate bottom is located on the horizontal line where at the top of pipeline body side surface, and is evacuated
Pump side surface bottom portion is overlapped with support plate top center.
Preferably, the one side of the bitumen layer and the bottom of retainer ring overlap, and the opposite side of bitumen layer and siphon pond
One side.
Preferably, the water outlet of the pipeline body is located at the middle part above the one side of siphon pond, and the water inlet end of sewage outlet pipe
Middle part below the opposite side of siphon pond.
(Three)Advantageous effect
The utility model provides a kind of water tower blow-off line.Possesses following advantageous effect:
(1), the utility model by the improvement to water pump, before blowdown, sewage valve is closed, and water pump takes out external water
Into in siphon pond, sewage valve is opened, the water in siphon pond is discharged in sewage outlet pipe, internal so as under the flowing of current
Pressure change, so as to which sewage is quickly discharged out of sewage conduct.
(2), the utility model by the improvement to aspiration pump, aspiration pump before use arranges the air in pipeline body
Go out, so that the pressure in blow-off line is less than the pressure at discharge funnel for sludge, so that the sewage at discharge funnel for sludge
Quickly into pipeline body, with the operation of aspiration pump, into the sewage quantity in pipeline body with pressure in pipeline body
Reduction and increase, so as to add the flow of blowdown, improve the efficiency of blowdown.
Description of the drawings
Fig. 1 is the front view of the utility model structure;
Fig. 2 is the side sectional view of the utility model structural pipeline body.
In figure:1 pipeline body, 2 bitumen layers, 3 discharge funnel for sludge, 4 isolation ports, 5 retainer rings, 6 support plates, 7 aspiration pumps, 8 connect
Take over, 9 outer tubes, 10 air doors, 11 siphon ponds, 12 fixed plates, 13 water pumps, 14 water inlet pipes, 15 extension tube attacheds, 16 sewage outlet pipes, 17
Sewage valve.
Specific embodiment
The following is a combination of the drawings in the embodiments of the present utility model, and the technical scheme in the embodiment of the utility model is carried out
It clearly and completely describes, it is clear that the described embodiments are only a part of the embodiments of the utility model rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are without making creative work
All other embodiments obtained shall fall within the protection scope of the present invention.
As shown in Figs. 1-2, the utility model provides a kind of technical solution:A kind of water tower blow-off line, including pipeline sheet
Body 1, the surface of pipeline body 1 are equipped with bitumen layer 2, and by being equipped with bitumen layer 2 on the surface of pipeline body 1, bitumen layer 2 is modification
Pitch can play pipeline body 1 anti-corrosion and prevent the purpose got rusty, and the water inlet end of pipeline body 1 passes through retainer ring 5 and row
The water outlet of dirty funnel 3 is fixedly connected, and the water inlet end of pipeline body 1 is fixedly connected with the water outlet of discharge funnel for sludge 3, and pipeline sheet
The diameter of 1 water inlet end of body is equal with the diameter of 3 water outlet of discharge funnel for sludge, by the use to retainer ring 5, adds discharge funnel for sludge
The stationarity connected between 1 water inlet end of 3 water outlets and pipeline body so that pipeline body 1 can stablize and long-term use, row
The water outlet of dirty funnel 3 is socketed in retainer ring 5, and the water inlet end of pipeline body 1 is socketed in retainer ring 5, discharge funnel for sludge 3
Side surface offers isolation port 4, by being provided with isolation port 4, prevents bulky refuse from entering in pipeline body 1 and influencing row
Dirt, top and the support plate 6 of 1 side surface of pipeline body, and the top of support plate 6 through the bottom of 2 madial wall of bitumen layer and extends to
Its top, the top of support plate 6 are fixedly connected with the bottom of 7 side surface of aspiration pump, and the midpoint of 6 bottom of support plate is located at pipeline body 1
On horizontal line where at the top of side surface, and 7 side surface bottom of aspiration pump is overlapped with 6 top center of support plate, by by 6 bottom of support plate
The midpoint in portion is located on the horizontal line where at the top of 1 side surface of pipeline body, and 7 side surface bottom of aspiration pump is pushed up with support plate 6
Portion midpoint overlaps, and ensure that the operation that aspiration pump 7 can be stablized, adds 7 service life of aspiration pump, the inlet end of aspiration pump 7
Be fixedly connected with the outlet side of connecting tube 8, the inlet end of connecting tube 8 downward through bitumen layer 2 and with 1 side surface of pipeline body
Top is fixedly connected, and the top of 1 side surface of pipeline body is communicated with the inlet end of connecting tube 8, the outlet side of aspiration pump 7 and outer tube
9 inlet end is fixedly connected, and the side surface of outer tube 9 is provided with air door 10, and by the improvement to aspiration pump 7, aspiration pump 7 exists
It is discharged using the preceding air by pipeline body 1, so that the pressure in pipeline body 1 is less than the pressure at discharge funnel for sludge 3
By force, so that the sewage at discharge funnel for sludge 3 is quickly into pipeline body 1, with the operation of aspiration pump 7, into pipe
Sewage quantity in road body 1 increases with the reduction of pressure in pipeline body 1, so as to add the flow of blowdown, improves
The efficiency of blowdown, the water outlet of pipeline body 1 are fixedly connected with the one side in siphon pond 11, and the one side in siphon pond 11 and pipeline sheet
The water outlet of body 1 communicates, and the one side of bitumen layer 2 is overlapped with the bottom of retainer ring 5, and the opposite side of bitumen layer 2 and siphon pond 11
One side, the top in siphon pond 11 is fixedly connected with the bottom of fixed plate 12, top and 13 side surface of water pump of fixed plate 12
Bottom is fixedly connected, and the water outlet of water pump 13 is fixedly connected with the water inlet end of water inlet pipe 14, the water inlet end and extension tube attached of water pump 13
15 water outlet is fixedly connected, and the top in siphon pond 11 is interted in the water outlet of water inlet pipe 14, and the opposite side in siphon pond 11 is with going out dirt
The water inlet end of pipe 16 is fixedly connected, and the opposite side in siphon pond 11 is communicated with the water inlet end of sewage outlet pipe 16, the water outlet of pipeline body 1
Middle part above 11 one side of siphon pond, and the water inlet end of sewage outlet pipe 16 is located at the middle part below 11 opposite side of siphon pond, goes out
Sewage valve 17 is provided on dirty pipe 16, it is dirty by closing when being vented to pipeline body 1 by being provided with sewage valve 17
Penstock 17 quickly can quickly drain the air in pipeline body 1, by the improvement to water pump 13, before blowdown,
Sewage valve 17 is closed, and external water is pumped into siphon pond 11 by water pump 13, opening sewage valve 17, and the water in siphon pond 11 exists
Discharge in sewage outlet pipe 16, so as under the flowing of current, internal pressure change, so as to sewage out of sewage pipe 16 quick quilt
Discharge.
Operation principle:Sewage valve 17 to be closed, aspiration pump 7 starts, and the air in pipeline body 1 is discharged, and by water
Pump 13 is opened, and draws water into siphon pond 11, sewage valve 17 is opened and closes aspiration pump 7, air door 10 is tightened, siphon
Water outflow out of sewage outlet pipe 16 in pond 11, under siphon principle, sewage inlet pipe road body 1, and the discharge out of sewage outlet pipe 16.
The electric elements occurred in this article are electrically connected with extraneous main controller and 220V alternating currents, and main controller can be meter
Calculation machine etc. plays the conventionally known equipment of control.
It can to sum up obtain, the water tower blow-off line, by the improvement to water pump 13, before blowdown, sewage valve 17 is closed,
External water is pumped into siphon pond 11 by water pump 13, opening sewage valve 17, water discharge in sewage outlet pipe 16 in siphon pond 11,
Thus under the flowing of current, internal pressure change, so as to which sewage is quickly discharged out of sewage pipe 16, by pumping
The improvement of pump 7, aspiration pump 7 before use discharges the air in pipeline body 1, so that the pressure in pipeline body 1
Less than the pressure at discharge funnel for sludge 3, so that the sewage at discharge funnel for sludge 3 quickly enters pipeline body 1, with pumping
The operation of air pump 7 increases into the sewage quantity in pipeline body 1 with the reduction of pressure in pipeline body 1, so as to add
The flow of blowdown improves the efficiency of blowdown, so as to solve existing pipeline using siphonage blowdown when contaminant removal effectiveness it is low and
The smaller problem of blowdown flow.
It should be noted that herein, relational terms such as first and second and the like are used merely to a reality
Body or operation are distinguished with another entity or operation, are deposited without necessarily requiring or implying between these entities or operation
In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to
Non-exclusive inclusion, so that process, method, article or equipment including a series of elements not only will including those
Element, but also including other elements that are not explicitly listed or further include as this process, method, article or equipment
Intrinsic element.
While there has been shown and described that the embodiment of the utility model, for the ordinary skill in the art,
It is appreciated that in the case where not departing from the principle of the utility model and spirit can these embodiments be carried out with a variety of variations, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (6)
1. a kind of water tower blow-off line, including pipeline body(1), it is characterised in that:The pipeline body(1)Surface be equipped with
Bitumen layer(2), the pipeline body(1)Water inlet end pass through retainer ring(5)With discharge funnel for sludge(3)Water outlet be fixedly connected,
The discharge funnel for sludge(3)Side surface offer isolation port(4), the pipeline body(1)The top of side surface and support plate
(6), and support plate(6)Top run through bitumen layer(2)The bottom of madial wall simultaneously extends to its top, the support plate(6)Top
With aspiration pump(7)The bottom of side surface is fixedly connected, the aspiration pump(7)Inlet end and connecting tube(8)Outlet side fix
Connection, the connecting tube(8)Inlet end downward through bitumen layer(2)And and pipeline body(1)The top of side surface, which is fixed, to be connected
It connects, the pipeline body(1)The top of side surface and connecting tube(8)Inlet end communicate, the aspiration pump(7)Outlet side with
Outer tube(9)Inlet end be fixedly connected, the outer tube(9)Side surface be provided with air door(10), the pipeline body(1)
Water outlet and siphon pond(11)One side be fixedly connected, and siphon pond(11)One side and pipeline body(1)Water outlet phase
It is logical, the siphon pond(11)Top and fixed plate(12)Bottom be fixedly connected, the fixed plate(12)Top and water pump
(13)The bottom of side surface is fixedly connected, the water pump(13)Water outlet and water inlet pipe(14)Water inlet end be fixedly connected, institute
State water pump(13)Water inlet end and extension tube attached(15)Water outlet be fixedly connected, the water inlet pipe(14)Water outlet intert siphon
Pond(11)Top, the siphon pond(11)Opposite side and sewage outlet pipe(16)Water inlet end be fixedly connected, the siphon pond
(11)Opposite side and sewage outlet pipe(16)Water inlet end communicate, the sewage outlet pipe(16)On be provided with sewage valve(17).
2. a kind of water tower blow-off line according to claim 1, it is characterised in that:The pipeline body(1)Water inlet
End and discharge funnel for sludge(3)Water outlet be fixedly connected, and pipeline body(1)The diameter and discharge funnel for sludge of water inlet end(3)Water outlet
Diameter it is equal.
3. a kind of water tower blow-off line according to claim 1, it is characterised in that:The discharge funnel for sludge(3)Water outlet
End cap is connected on retainer ring(5)It is interior, and pipeline body(1)Water inlet end be socketed in retainer ring(5)It is interior.
4. a kind of water tower blow-off line according to claim 1, it is characterised in that:The support plate(6)The midpoint of bottom
Positioned at pipeline body(1)On horizontal line where at the top of side surface, and aspiration pump(7)Side surface bottom and support plate(6)In top
Point overlaps.
5. a kind of water tower blow-off line according to claim 1, it is characterised in that:The bitumen layer(2)One side with
Retainer ring(5)Bottom overlap joint, and bitumen layer(2)Opposite side and siphon pond(11)One side.
6. a kind of water tower blow-off line according to claim 1, it is characterised in that:The pipeline body(1)Water outlet
End is located at siphon pond(11)Middle part above one side, and sewage outlet pipe(16)Water inlet end be located at siphon pond(11)Below opposite side
Middle part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721328437.3U CN207376796U (en) | 2017-10-16 | 2017-10-16 | A kind of water tower blow-off line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721328437.3U CN207376796U (en) | 2017-10-16 | 2017-10-16 | A kind of water tower blow-off line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207376796U true CN207376796U (en) | 2018-05-18 |
Family
ID=62338564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721328437.3U Expired - Fee Related CN207376796U (en) | 2017-10-16 | 2017-10-16 | A kind of water tower blow-off line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207376796U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026893A (en) * | 2021-03-25 | 2021-06-25 | 中广核工程有限公司 | Fuel water pool rapid drainage device and fuel water pool rapid drainage method |
-
2017
- 2017-10-16 CN CN201721328437.3U patent/CN207376796U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113026893A (en) * | 2021-03-25 | 2021-06-25 | 中广核工程有限公司 | Fuel water pool rapid drainage device and fuel water pool rapid drainage method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203066182U (en) | Modular water saving device for drainage on same floor for high-rise building | |
CN207376796U (en) | A kind of water tower blow-off line | |
CN202390284U (en) | Compound microbial digestion tank | |
CN202322425U (en) | Dissolved air flotation device | |
CN206888138U (en) | A kind of sewage treatment pot backwashed | |
CN210507607U (en) | Environment-friendly rainwater collection device for hydraulic engineering | |
CN206359288U (en) | A kind of counter-infiltration multistage exchanges adverse current water-saving system | |
CN212081420U (en) | Sewage discharging device of central heating system | |
CN209523273U (en) | A kind of comprehensive temporary drainage pipe-line system | |
CN201826387U (en) | Sewage and wastewater pressure discharge device | |
CN207750641U (en) | Automatic fitration mussel valve | |
CN204849997U (en) | Sewage treatment apparatus | |
CN2573047Y (en) | Backflush filter | |
CN208104042U (en) | A kind of efficient circulation domestic water clarifier | |
CN205590483U (en) | Intelligent energy -conserving sewage treatment plant | |
CN203049706U (en) | Modularized same-floor drainage water-saving device | |
CN221322474U (en) | Centralized water drainage device for gas extraction pipeline | |
CN205569851U (en) | Seawater desalination uses horizontal filter for installation | |
CN209367963U (en) | A kind of high-efficiency sewage processing is corrugated not to block up film | |
CN208363255U (en) | A kind of slag cleaning device and sewage lifting system | |
CN202096793U (en) | Cylindrical filler for water treatment | |
CN201731662U (en) | Self-cleaning solar water heater | |
CN114146486B (en) | Geothermal water recharging treatment system and method | |
CN204850003U (en) | Rainwater sinks mud inspection shaft | |
CN216174675U (en) | Coarse grid machine bottom washing unit of sewage treatment plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190225 Address after: 255414 Qilu Chemical Industrial Park, Linzi District, Zibo City, Shandong Province Patentee after: Huaneng Xindian Power Generation Co., Ltd. Address before: 255414 Huaneng Xindian Power Plant, Linzi District, Zibo City, Shandong Province Patentee before: Zhao Zilong |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180518 Termination date: 20181016 |
|
CF01 | Termination of patent right due to non-payment of annual fee |