CN207376420U - It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude - Google Patents

It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude Download PDF

Info

Publication number
CN207376420U
CN207376420U CN201721384073.0U CN201721384073U CN207376420U CN 207376420 U CN207376420 U CN 207376420U CN 201721384073 U CN201721384073 U CN 201721384073U CN 207376420 U CN207376420 U CN 207376420U
Authority
CN
China
Prior art keywords
absolute altitude
sleeve
water
steady
adjust
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721384073.0U
Other languages
Chinese (zh)
Inventor
谢东
孙伟
张传令
孙延琳
吕浩
黄峻峻
赵坤
陈东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 10 Engineering Group Co Ltd
Overseas Engineering Branch of China Railway No 10 Engineering Group Co Ltd
Original Assignee
China Railway No 10 Engineering Group Co Ltd
Overseas Engineering Branch of China Railway No 10 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway No 10 Engineering Group Co Ltd, Overseas Engineering Branch of China Railway No 10 Engineering Group Co Ltd filed Critical China Railway No 10 Engineering Group Co Ltd
Priority to CN201721384073.0U priority Critical patent/CN207376420U/en
Application granted granted Critical
Publication of CN207376420U publication Critical patent/CN207376420U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

Adjust that water is steady and the instrument of graded broken stone absolute altitude the utility model discloses a kind of.It includes two absolute altitude adjusting brackets (1) and guiding ruler (2), the absolute altitude adjusting bracket (1) includes pedestal (3), montant (4), sleeve (6), two supporting racks (5), screw regulator (7), the montant (4) is vertically fixed on the pedestal (3), the sleeve (6) laterally sets and movable is up and down threaded through on the montant (4), the screw regulator (7) is mounted in one end of the sleeve (6), supporting rack (5) described in two is connected horizontally on the outside of the other end of the sleeve (6), and the upper surface of the supporting rack (5) described in two is located in same level, the guiding ruler (2) is arranged on the supporting rack (5) of two absolute altitude adjusting brackets (1).The utility model is easy to use, can rapidly adjust the absolute altitude of each construction section, can greatly improve construction efficiency.

Description

It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude
Technical field
It adjusts that water is steady and the instrument of graded broken stone absolute altitude the utility model is related to a kind of, belongs to technical field of building construction.
Background technology
In highway or construction of railways, water surely and graded broken stone construction when, since every layer of thickness is different, construct It needs that every layer of thickness is adjusted and controlled in the process, and the construction elevation for adjusting each layer is a very troublesome thing Feelings.Existing construction technology is combined with steel wire rope and drill rod, and drill rod is stamped in defined point, and steel wire rope is drawn into one directly Line is put into the absolute altitude adjusting rod of paver on steel wire rope and carries out operation.There are two drawbacks for this method, on the one hand, this The stability of method be not it is very good,, so can be to work surface it sometimes appear that the situation of steel wire rope looseness with the movement of machinery Absolute altitude has an impact;On the other hand, absolute altitude during different construction surfaces is different, is carried out operating slow, the stand-by period with steel wire rope It is long, construction efficiency is influenced, when there is the too long of situation of construction surface, just has to wait for all steel wire ropes and all adjust to specify It could construct after absolute altitude, make a big impact to time duration.
The content of the invention
In view of the above defects of the prior art, the utility model provides a kind of simple in structure, easy to operate, energy That enough improves construction efficiency adjusts that water is steady and the instrument of graded broken stone absolute altitude.
The utility model is achieved by the following technical solution:It is a kind of to adjust that water is steady and the work of graded broken stone absolute altitude Tool, it is characterized in that:Including two absolute altitude adjusting brackets and guiding ruler, the absolute altitude adjusting bracket includes pedestal, montant, sleeve, two Root supporting rack, screw regulator, the montant are vertically fixed on the pedestal, and the sleeve laterally sets and up and down can Dynamic is threaded through on the montant, and the screw regulator is mounted in one end of the sleeve, the supporting rack water described in two Flushconnection is on the outside of the other end of the sleeve, and the upper surface of the supporting rack described in two is located in same level, described Guiding ruler is arranged on the supporting rack of two absolute altitude adjusting brackets.
The absolute altitude adjusting rod with paver is used cooperatively when the utility model is used, and guiding ruler is placed on two absolute altitudes and adjusts branch On the supporting rack of frame, the absolute altitude adjusting rod of paver, which is placed on the upper surface of guiding ruler, carries out operation.By adjusting screw rod adjuster, Height of the adjustable sleeve on montant, so as to adjust the height of guiding ruler, achievees the purpose that adjusting elevation.
Further, the screw regulator includes nut and the screw rod with nut thread cooperation, and the nut is same Axis is fixed in the sleeve.
Further, for ease of adjusting screw rod adjuster, the tail end of the screw rod carries handle.
Further, for ease of construction, the guiding ruler is aluminum alloy square tube.
The beneficial effects of the utility model are:The utility model is simple in structure, easy to use, can rapidly adjust each The absolute altitude of construction section saves the time of measuring for surveying work, shortens the preparation before construction, and engineering can be allowed to be connected more suitable Freely, construction efficiency can be greatly improved, and can effectively avoid Altitude not to situation, while the utility model also may be used To be used in the engineering construction of freeboard section.
Description of the drawings
Fig. 1 is the structure diagram of the utility model;
Fig. 2 is the front view of the absolute altitude adjusting bracket in the utility model;
Fig. 3 is the left view of Fig. 2;
Fig. 4 is the top view of Fig. 2;
In figure, 1, absolute altitude adjusting bracket, 2, guiding ruler, 3, pedestal, 4, montant, 5, supporting rack, 6, sleeve, 7, screw rod adjusts Device, 71, nut, 72, screw rod, 73, handle.
Specific embodiment
The utility model is further described below by non-limiting embodiment and with reference to attached drawing:
As shown in drawings, it is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude, including two 1 Hes of absolute altitude adjusting bracket The guiding ruler 2 being arranged between two absolute altitude adjusting brackets 1.Wherein, the absolute altitude adjusting bracket 1 includes pedestal 3, montant 4, sleeve 6th, two supporting racks 5, screw regulator 7, the montant 4 are vertically fixed on the pedestal 3, and the sleeve 6 is laterally set It puts and movable is up and down threaded through on the montant 4.The screw regulator 7 is mounted in one end of the sleeve 6, two institutes The supporting rack 5 stated is connected horizontally on the outside of the other end of the sleeve 6, and the upper surface of the supporting rack 5 described in two is located at together On one horizontal plane.The guiding ruler 2 is arranged on the supporting rack 5 of two absolute altitude adjusting brackets 1, and the guiding ruler 2 preferably uses Aluminum alloy square tube.
In the present embodiment, the screw regulator 7 includes nut 71 and the screw rod 72 with 71 thread fitting of nut, institute It states nut 71 to be coaxially fixed in the sleeve 6, the tail end of screw rod 72 is provided with handle 73.It, can band by rotating handles 73 Dynamic screw rod 72 rotates, and makes to lock between sleeve 6 and montant 4 so as to hold out against montant 4 by screw rod 72, and reversely rotating handle 73 can Sleeve 6 is unclamped, is convenient for absolute altitude adjusting.
The absolute altitude adjusting rod with paver is used cooperatively when the utility model is used, and guiding ruler 2 is placed on two absolute altitudes and adjusts 5 top of supporting rack of stent 1, the absolute altitude adjusting rod of paver, which is placed on the upper surface of guiding ruler 2, carries out operation.Pass through adjusting screw rod Adjuster 7 carrys out height of the regulating sleeve 6 on montant 4, so as to adjust the height of guiding ruler 2, achievees the purpose that adjusting elevation.
The utility model is easy to use, can rapidly adjust the absolute altitude of each construction section, can greatly improve construction effect Rate, while the engineering construction of freeboard section can also be used in.
Other parts in the present embodiment are the prior art, and details are not described herein.

Claims (4)

  1. Adjust that water is steady and the instrument of graded broken stone absolute altitude 1. a kind of, it is characterized in that:Including two absolute altitude adjusting brackets (1) and guiding ruler (2), the absolute altitude adjusting bracket (1) includes pedestal (3), montant (4), sleeve (6), two supporting racks (5), screw regulators (7), the montant (4) is vertically fixed on the pedestal (3), and the sleeve (6) laterally sets and movable up and down wears It is located on the montant (4), the screw regulator (7) is mounted in one end of the sleeve (6), the supporting rack described in two (5) it is connected horizontally on the outside of the other end of the sleeve (6), and the upper surface of the supporting rack (5) described in two is located at same water In plane, the guiding ruler (2) is arranged on the supporting rack (5) of two absolute altitude adjusting brackets (1).
  2. Adjust that water is steady and the instrument of graded broken stone absolute altitude 2. according to claim 1, it is characterized in that:The screw regulator (7) nut (71) and the screw rod (72) with the nut (71) thread fitting are included, the nut (71) is coaxially fixed on described In sleeve (6).
  3. Adjust that water is steady and the instrument of graded broken stone absolute altitude 3. according to claim 2, it is characterized in that:The screw rod (72) Tail end carries handle (73).
  4. 4. water is steady and the instrument of graded broken stone absolute altitude for adjusting according to claim 1 or 2 or 3, it is characterized in that:The guiding ruler (2) it is aluminum alloy square tube.
CN201721384073.0U 2017-10-25 2017-10-25 It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude Expired - Fee Related CN207376420U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721384073.0U CN207376420U (en) 2017-10-25 2017-10-25 It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721384073.0U CN207376420U (en) 2017-10-25 2017-10-25 It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude

Publications (1)

Publication Number Publication Date
CN207376420U true CN207376420U (en) 2018-05-18

Family

ID=62336170

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721384073.0U Expired - Fee Related CN207376420U (en) 2017-10-25 2017-10-25 It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude

Country Status (1)

Country Link
CN (1) CN207376420U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110754160A (en) * 2019-10-29 2020-02-07 四川路桥建设集团交通工程有限公司 Slope greening protection method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110754160A (en) * 2019-10-29 2020-02-07 四川路桥建设集团交通工程有限公司 Slope greening protection method

Similar Documents

Publication Publication Date Title
CN107466801B (en) Suspension type tapping device and mechanized tapping method
CN204997644U (en) Frame of reducing expenditure is swapd by pipeline group
CN207376420U (en) It is a kind of to adjust that water is steady and the instrument of graded broken stone absolute altitude
CN206179500U (en) Novel zither frame with adjustable
CN202000727U (en) Steel tube upright column adjusting base
CN210513766U (en) A soil sampling device for geological survey
CN203487786U (en) Height adjustment supporting frame of distribution pipe of concrete pump truck
CN203541623U (en) Novel punching frame
CN206016193U (en) A kind of wall plastering apparatus
CN202591869U (en) Cutting device for steel tube
CN204163356U (en) A kind of equipment installing inner wall panel
CN206445239U (en) A kind of horizontal boring and milling machine
CN206829265U (en) Platform basin lifts fixator
CN209764066U (en) Portable civil engineering construction measuring device
CN203630068U (en) Heating cone device
CN105932633A (en) Pay-off pulley
CN205369921U (en) Template roof beam strutting arrangement with adjustable
CN206873881U (en) A kind of quick ash cake construction tool
CN204330475U (en) The hardness measurement servicing unit of anchor clipper
CN205506580U (en) Mortar piece shear strength test device
CN214882806U (en) Adjusting bracket for arranging steel wire on spreading machine
CN219451265U (en) Steel structure beam capable of being positioned rapidly
CN204902835U (en) Level survey mechanism that house ornamentation furred ceiling was used
CN211104919U (en) Silicon core vertical cutting adjustable stick sticking head
CN203692879U (en) Drawing desk for civil engineering practical teaching

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180518

Termination date: 20211025

CF01 Termination of patent right due to non-payment of annual fee