- Publication number
- CN207346987U CN207346987U CN201721268122.4U CN201721268122U CN207346987U CN 207346987 U CN207346987 U CN 207346987U CN 201721268122 U CN201721268122 U CN 201721268122U CN 207346987 U CN207346987 U CN 207346987U
- Authority
- CN
- China
- Prior art keywords
- lift ring
- hanger
- frame
- rectangle steel
- type self
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 51
- 239000010959 steel Substances 0.000 claims abstract description 51
- 239000002965 rope Substances 0.000 claims abstract description 29
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000005452 bending Methods 0.000 claims abstract description 5
- 238000000034 method Methods 0.000 abstract description 4
- 239000000725 suspension Substances 0.000 description 6
- 238000010586 diagram Methods 0.000 description 4
- 235000006508 Nelumbo nucifera Nutrition 0.000 description 2
- 240000002853 Nelumbo nucifera Species 0.000 description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 230000000875 corresponding Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006011 modification reaction Methods 0.000 description 1
- 230000000630 rising Effects 0.000 description 1
Abstract
The utility model discloses a kind of frame-type self-balancing hanger, it is related to a kind of hoisting fixture, including lifting rope, upper lift ring, hanger body and lower lift ring, hanger body is rectangle steel construction, long side is provided with a row upper lift ring and a row lower lift ring in two long sides of rectangle steel construction, and upper lift ring is arranged on the upper surface of rectangle steel structural plan, lower lift ring is arranged on the lower surface of rectangle steel structural plan, an isometric lifting rope is installed with two row lower lift rings independently of one another, the lifting rope is used to be connected with the component lifted by crane and can be along lower lift ring slidable adjustment, some lifting ropes are connected with two row upper lift rings independently of one another, the lifting rope is used to be connected with derricking gear.The utility model ensures PC lifting components safety and quality, avoids component in hoisting process from producing distortion, bending because of unbalance stress.
Description
Technical field
The utility model is related to a kind of hoisting fixture, more particularly to the production of PC components, the demoulding, pile, entrucking and design
Special tooling.
Background technology
PC components can all be related to lifting operation during production, the demoulding, pile, entrucking, therefore need to design a kind of special
Frock, meet in the design, standard requirement and hoisting process of PC lifting components to prevent PC components because of each suspension centre unbalance stress and
Distortion, bending, play the role of self balancing.
Utility model content
The purpose of this utility model is that:It is proposed a kind of frame-type self-balancing hanger, it is ensured that PC lifting components safety and matter
Amount, avoids component in hoisting process from producing distortion, bending because of unbalance stress.
The purpose of this utility model is realized by following technical proposals:
A kind of frame-type self-balancing hanger, including lifting rope, upper lift ring, hanger body and lower lift ring, hanger body are rectangle
Steel construction, a row upper lift ring and a row lower lift ring are provided with two long sides of rectangle steel construction along long side, and upper lift ring is set
Put in the upper surface of rectangle steel structural plan, lower lift ring is arranged on the lower surface of rectangle steel structural plan, each on two row lower lift rings
From an isometric lifting rope is independently installed with, which, which is used to be connected with the component lifted by crane and can be slided along lower lift ring, adjusts
Save, be connected with some lifting ropes on two row upper lift rings independently of one another, which is used to be connected with derricking gear.
The lifting rope of the utility model can horizontally slip adjusting, play balanced action, beneficial to lifting safety and quality.Top and the bottom
The PC scantlings and design hoisting point position selection that hanging ring can lift by crane as needed use.Hanger body is welded by formed steel construction and tied
Form, the lotus that lifting PC components (gravity) generation is mainly undertaken by self structure stress deformation deforms.
Alternatively, the lifting rope on lower lift ring is in " Z " font between some lower lift rings and the component tie point lifted by crane
Ground bending extension.
Alternatively, the hanger body of rectangle steel construction includes two long sides of outer edge and the channel steel of two short sides, parallel to
Short side and some short channel-section steels being evenly arranged between two short sides, and parallel to long side and two length that are arranged between two long sides
Channel steel.
As further selection, two long channel steels between two long sides are arranged in each close to adjacent long side.
Alternatively, upper lift ring is the steel plate for being provided with lifting rope pilot hole.
Alternatively, upper lift ring is uniformly and symmetrically distributed in two long sides of rectangle steel construction.
Alternatively, lower lift ring is the steel plate for being provided with lifting rope pilot hole.
Alternatively, lower lift ring is uniformly and symmetrically distributed in two long sides of rectangle steel construction.
The foregoing main scheme of the utility model and its each further selection scheme can be freely combined to form multiple schemes,
The scheme that can be used and be claimed for the utility model;And the utility model, (each non conflicting selection) selection between and
It can also be freely combined between other selections.Those skilled in the art are after the present invention program is understood according to the prior art and public affairs
Know that general knowledge can understand there are multiple combinations, be the claimed technical solution of the utility model, do not do exhaustion herein.
The effect of each part is as follows in the utility model:Lifting rope and upper lift ring form a big suspension centre, easy to a 10t dragon
Gantry crane steadily lifts by crane self-balancing hanger.Hanger body mainly undertakes lifting PC components (gravity) by self structure stress deformation and produces
Raw lotus deformation.Lower suspension centre main function is by hanging PC components, it is ensured that PC components do not deform during lifting.
The workflow of the utility model:Self-balancing hanger is filled during PC component handlings with 10t gantry to lift by crane, then by PC
Each column suspension centre lower lift ring corresponding with hanger body in component length direction is connected with a lifting rope, and by adjusting lifting rope and lower lift ring
Link position is to reach balanced action.Suspension centre can make choice according to PC scantlings and design suspension centre under hanger, it is ensured that meet
Design and standard requirement, safety and steady lifting.
The beneficial effects of the utility model:The fabulous more specification PC components that solve that design and produce of self-balancing hanger are rising
Stress deformation problem during hanging, meets design and standard requirement, it is ensured that component lifts by crane safety and quality.Solve more rule
The problem of lattice PC lifting components, is applicable to the PC components lifting of plurality of specifications model, without frequently replacing hanger, reduces work
The sequence time, so as to improve work efficiency.
Brief description of the drawings
Fig. 1 is the overlooking the structure diagram of the utility model embodiment;
Fig. 2 is the main structure diagram of the utility model embodiment;
Fig. 3 is the enlarged structure schematic diagram of upper lower lift ring;
Fig. 4 is the use state diagram of the utility model;
In figure, 1 is lifting rope, and 2 be upper lift ring, and 3 be hanger body, and 31 be long side, and 32 be short side, and 33 be short channel-section steel, and 34 are
Long channel steel, 4 be lower lift ring, and 5 be the PC components lifted by crane.
Embodiment
The utility model is further described with reference to specific embodiments and the drawings.
With reference to shown in figure 1-4, a kind of frame-type self-balancing hanger, including lifting rope 1, upper lift ring 2, hanger body 3 and under hang
Ring 4, hanger body 3 are rectangle steel construction, and long side is provided with 2 He of a row upper lift ring in two long sides 31 of rectangle steel construction
One row lower lift ring 4, and upper lift ring 2 is arranged on the upper surface of rectangle steel structural plan, lower lift ring 4 is arranged on rectangle steel structural plan
Lower surface, the lifting rope 1 of an isometric steel wire rope is installed with two row lower lift rings 4 independently of one another, which is used for being risen
The connection of PC components 5 hung simultaneously can be connected with some steel independently of one another along 4 slidable adjustment of lower lift ring on two row upper lift rings 2
The lifting rope 1 of cord, the lifting rope 1 are used to be connected with derricking gear.Lifting rope 1 on lower lift ring 4 is in some lower lift rings 4 and is lifted by crane
Between 5 tie point of PC components extension is bent in " Z " font.The hanger body 3 of rectangle steel construction includes two long sides of outer edge
31 and two short side 32 channel steel, parallel to short side 32 and some short channel-section steels 33, Yi Jiping for being evenly arranged between two short sides 32
Row is in long side 31 and the two long channel steels 34 that are arranged between two long sides 31, and the two long channel steel 34 is each close to adjacent long side 31.
Can also further be set as needed on two short sides 32 and some short channel-section steels 33 being arranged between two short sides 32 it is some under
Hanging ring 4.The hanger body 3 of rectangle steel construction can also use angle steel to process as needed.Upper and lower hanging ring 2,4 is in rectangle steel
It is uniformly and symmetrically distributed in two long sides 31 of structure, upper and lower hanging ring 2,4 is the steel plate for being provided with steel wire rope pilot hole, and heat can be selected
Press general steel plate.As shown in drawings, each column upper lift ring 2 sets 7, and each column lower lift ring 4 sets 11.Self-balancing hanger is with unification
Platform 10t gantry cranes can once lift by crane one block of PC component, and can Automatic Levelling, make each portion's uniform force of component, do not produce distortion, curved
Folding, ensures product safety and quality.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model
Protection domain within.
Claims (8)
- A kind of 1. frame-type self-balancing hanger, it is characterised in that:Including lifting rope, upper lift ring, hanger body and lower lift ring, hanger master Body is rectangle steel construction, and long side is provided with a row upper lift ring and a row lower lift ring in two long sides of rectangle steel construction, and Upper lift ring is arranged on the upper surface of rectangle steel structural plan, and lower lift ring is arranged on the lower surface of rectangle steel structural plan, under two arrange An isometric lifting rope is installed with hanging ring independently of one another, which is used to be connected with the component lifted by crane and can be along lower lift ring Slidable adjustment, some lifting ropes are connected with two row upper lift rings independently of one another, which is used to be connected with derricking gear.
- 2. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:Lifting rope on lower lift ring is in some lower lift rings With bending extension in " Z " font between the component tie point that is lifted by crane.
- 3. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:The hanger body of rectangle steel construction includes outer Two long sides at edge and the channel steel of two short sides, parallel to short side and some short channel-section steels for being evenly arranged between two short sides, and Parallel to long side and the two long channel steels that are arranged between two long sides.
- 4. frame-type self-balancing hanger as claimed in claim 3, it is characterised in that:Two long channel steels being arranged between two long sides Each close to adjacent long side.
- 5. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:Upper lift ring is the steel for being provided with lifting rope pilot hole Plate.
- 6. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:Two long sides of the upper lift ring in rectangle steel construction On be uniformly and symmetrically distributed.
- 7. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:Lower lift ring is the steel for being provided with lifting rope pilot hole Plate.
- 8. frame-type self-balancing hanger as claimed in claim 1, it is characterised in that:Two long sides of the lower lift ring in rectangle steel construction On be uniformly and symmetrically distributed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721268122.4U CN207346987U (en) | 2017-09-29 | 2017-09-29 | Frame-type self-balancing hanger |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721268122.4U CN207346987U (en) | 2017-09-29 | 2017-09-29 | Frame-type self-balancing hanger |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207346987U true CN207346987U (en) | 2018-05-11 |
Family
ID=62357797
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721268122.4U Active CN207346987U (en) | 2017-09-29 | 2017-09-29 | Frame-type self-balancing hanger |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207346987U (en) |
-
2017
- 2017-09-29 CN CN201721268122.4U patent/CN207346987U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103663142B (en) | Tailing mechanism and translation tailing hoisting method | |
CN107161857B (en) | The Lift-on/Lift-off System and method upright suitable for flat thin-wall member | |
CN204342250U (en) | A kind of multi-state hoisting balance beam | |
CN203382365U (en) | Lifting appliance system for lifting thin, long and thin-wall equipment integrally | |
CN206088728U (en) | Novel large -scale gallows of taking a trial run | |
CN207346987U (en) | Frame-type self-balancing hanger | |
CN205916895U (en) | But chain hoist that multiple spot hung | |
CN208182486U (en) | Construction lifting mechanical device | |
CN204371545U (en) | A kind of power station impeller apparatus for examination and repair | |
CN206665952U (en) | A kind of novel hanging tool | |
CN205662256U (en) | High rises pergola side and hangs a semi -portal bridge crane | |
CN109095343A (en) | Assembled hanger | |
CN206188205U (en) | Hoist device is used in prefabricated piping lane upset | |
CN211004168U (en) | Trolley lifting appliance | |
CN201962679U (en) | Lifting bracket used for vertically and aswirl lifting steel reinforcement cage and lifting system | |
CN210825081U (en) | Be suitable for multi-functional hoist of finite space hoist and mount steel reinforcement cage | |
CN204251194U (en) | A kind of Novel hanging tool | |
CN208791020U (en) | Lifting device is used in a kind of lifting of last furnace shell | |
CN203319508U (en) | Hoisting auxiliary element for large thin-wall steel containment vessel | |
CN203159036U (en) | Line-shaped lifting appliance | |
CN203187370U (en) | Inner mast hoisting device | |
CN206255759U (en) | A kind of handling apparatus for refrigerator box body | |
CN202214131U (en) | Three-point lifting beam | |
CN202575762U (en) | Electric lifting rod for construction elevator | |
CN207192589U (en) | A kind of dual-purpose gantry lifting tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Qinghua East Road in Qingbaijiang District of Chengdu City, Sichuan Province, No. 173 610300 Patentee after: No.7 Engineering Co., Ltd. of China Railway No.8 Engineering Group Co., Ltd Address before: Qinghua East Road in Qingbaijiang District of Chengdu City, Sichuan Province, No. 173 610300 Patentee before: BRIDGE ENGINEERING COMPANY OF CHINA RAILWAY NO.8 ENGINEERING GROUP Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |