CN207317512U - A kind of heating stove of aluminium bar processing - Google Patents

A kind of heating stove of aluminium bar processing Download PDF

Info

Publication number
CN207317512U
CN207317512U CN201721032020.2U CN201721032020U CN207317512U CN 207317512 U CN207317512 U CN 207317512U CN 201721032020 U CN201721032020 U CN 201721032020U CN 207317512 U CN207317512 U CN 207317512U
Authority
CN
China
Prior art keywords
cooling chamber
aluminium bar
level
partition plate
preheating cavity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721032020.2U
Other languages
Chinese (zh)
Inventor
蒋斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Thai Nonferrous Metals (suzhou) Co Ltd
Original Assignee
Thai Nonferrous Metals (suzhou) Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Thai Nonferrous Metals (suzhou) Co Ltd filed Critical Thai Nonferrous Metals (suzhou) Co Ltd
Priority to CN201721032020.2U priority Critical patent/CN207317512U/en
Application granted granted Critical
Publication of CN207317512U publication Critical patent/CN207317512U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Resistance Heating (AREA)

Abstract

A kind of heating stove of aluminium bar processing, including level-one preheating cavity, partition plate A, the first cooling chamber, two level preheating cavity and final stage cooling chamber;Spiral helicine heating tube is provided among the inner cavity of the level-one preheating cavity, and the both ends of heating tube are respectively equipped with aluminium bar support plate and partition plate A;First cooling chamber is connected to the end of level-one preheating cavity, and the inner cavity top of the first cooling chamber is provided with cooling fan;The partition plate B is arranged on the end side of the first cooling chamber;The two level preheating cavity is connected to the end of the first cooling chamber, and the centre of two level preheating cavity is also provided with heating tube;The partition plate D is located at the end of final stage cooling chamber.The utility model can cool down the aluminium bar after level-one preheats by the first cooling chamber reheating again, improve the effect of aluminium bar heating, the utility model level-one preheating cavity is ramp-like configuration with two level preheating cavity and the first cooling chamber and final stage cooling chamber, is conducive to the aluminium bar after preheating and slides to next stage chamber.

Description

A kind of heating stove of aluminium bar processing
Technical field
It the utility model is related to aluminium bar processing technique field, more particularly to a kind of heating stove of aluminium bar processing.
Background technology
Aluminium is a kind of excellent conductive material, and the bauxite resource in China is quite abundant, but aluminium easily aoxidizes in atmosphere, shadow Ring the electric conductivity of faying face.Copper aluminium meets exclusive outer layer and uses copper, inner core so both to maintain copper surface oxidation-resistant for aluminium Can be strong, the good characteristic of contact performance, and take full advantage of the advantages of aluminium emphasis is light, cheap.Therefore, the system of Copper-Aluminum compound row Standby, it is all very big contribution to realize the comprehensive utilization of resources of " borrowing copper with aluminium " to return home or even the world, meets national industry political affairs The direction of the long-range support of plan.Aluminum-bar heating furnace is that aluminium bar is evenly heated by one kind, to reach the mechanical property for changing aluminium bar, is improved The equipment of the quality of converted products.
The inventors discovered that existing aluminum-bar heating furnace exists when in use:
1. aluminium bar uses single preheating method in particular during a heating process, second-rate after heating;
2. the aluminium bar heated needs to take out using artificial or machinery, waste of resource, influences efficiency;
3. it is higher to heat stove holistic cost, it is not easy to promote the use of.
Then, inventor in view of this, adhere to that the relevant industries for many years enrich design and develop and the experience of actual fabrication, Improvement is studied for existing structure and missing, there is provided a kind of heating stove of aluminium bar processing, has more to reach The more purpose of practical value.
Utility model content
The purpose of this utility model is to provide a kind of heating stove of aluminium bar processing, to solve in above-mentioned background technology It is proposed using single preheating chamber, the effect of heating is poor, the mode waste of resource taken out after heating, holistic cost The problem of higher.
The purpose and effect of the heating stove of the utility model aluminium bar processing, are reached by technological means in detail below:
A kind of heating stove of aluminium bar processing, wherein, heating furnace of the aluminium bar processing includes:
It is furnace body, control panel, observation window, electric cylinder, level-one preheating cavity, aluminium bar support plate, heating tube, partition plate A, first cold But chamber, cooling fan, partition plate B, two level preheating cavity, partition plate C, final stage cooling chamber, partition plate D, scallop hole and auxiliary feeding roller;
The control panel is embedded on the outer wall of furnace body;It is provided among the inner cavity of the level-one preheating cavity spiral helicine Heating tube, and the both ends of heating tube are respectively equipped with aluminium bar support plate and partition plate A, and partition plate A is connected to electric cylinder by shaft coupling Lower end;First cooling chamber is connected to the end of level-one preheating cavity, and the inner cavity top of the first cooling chamber is provided with cooling Fan;The partition plate B is arranged on the end side of the first cooling chamber, and partition plate B is connected to the lower end of electric cylinder by shaft coupling;Institute The end that two level preheating cavity is connected to the first cooling chamber is stated, and the centre of two level preheating cavity is also provided with heating tube, and the heating The both ends of pipe are also respectively equipped with aluminium bar support plate, partition plate C;The final stage cooling chamber is located at the end of two level preheating cavity, and final stage The inner cavity top of cooling chamber is also equipped with cooling fan;The partition plate D is located at the end of final stage cooling chamber, and partition plate D also by Shaft coupling is connected to the lower end of electric cylinder;The scallop hole is opened in the centre of aluminium bar support plate, and the lower end both sides of scallop hole It is respectively equipped with auxiliary feeding roller;The level-one preheating cavity, the first cooling chamber, two level preheating cavity and the outer end of final stage cooling chamber are surveyed It is inlaid with observation window.
Further, the top of the furnace body is step structure.
Further, the angle of inclination of the level-one preheating cavity and two level preheating cavity is 45 °.
Further, first cooling chamber and final stage cooling chamber also be the ramp-like structure of Right deviation, and the first cooling chamber with it is last The angle of inclination of level cooling chamber is 10 °.
Further, the heating tube is helicoidal structure, and the center line of heating tube and two groups of two sides aluminium bar support The line of centres of plate is on same straight line.
With existing structure in comparison, the utility model has the following advantages that:
1. the utility model can cool down the aluminium bar after level-one preheats by the first cooling chamber, afterwards by two The reheating of level preheating cavity, can improve the effect of aluminium bar heating.
2. the setting of the utility model final stage cooling chamber, easy to be dropped by cooling fan to the aluminium bar after heating Temperature, avoids the temperature after aluminium bar outflow higher and scalds staff.
3. the utility model level-one preheating cavity is to tilt with final stage cooling chamber with two level preheating cavity and the first cooling chamber Shape structure, is conducive to the aluminium bar after preheating and slides to next stage chamber, while it is pre- by aluminium bar after cooling to slide into two level Secondary preheating or heating stove is skidded off in hot chamber, can avoid taking out aluminium bar using mechanical device.
4. the setting of the transparent fireproof glass material observation window of the utility model, easy to preheated, cooled down to aluminium bar During observed, while there is preferable fire line, can effectively prevent scattering and disappearing for heating furnace heat.
5. the setting of the utility model aluminium bar support plate, can be supported aluminium bar by two groups of aluminium bar support plates, make aluminium Rod is at the center of heating tube, aluminium bar can be avoided to touch heating tube, be caused heating tube to be damaged.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model internal structure schematic diagram;
Fig. 3 is the utility model aluminium bar supporting plate structure schematic diagram.
In figure:1st, furnace body, 2, control panel, 3, observation window, 4, electric cylinder, 5, level-one preheating cavity, 6, aluminium bar support plate, 7, Heating tube, 8, partition plate A, the 9, first cooling chamber, 10, cooling fan, 11, partition plate B, 12, two level preheating cavity, 13, partition plate C, 14, end Level cooling chamber, 15, partition plate D, 16, scallop hole, 17, auxiliary feeding roller.
Embodiment
In the following, will be explained in the embodiment of the utility model, the example is shown in the accompanying drawings and the description below.Although will The utility model is described with reference to exemplary embodiment, it is to be understood that the description does not really want the utility model to be limited to this to show The embodiment of example property.On the contrary, the utility model will not only cover the exemplary embodiment, but also cover various replacements, Change, equivalent and other embodiment, it can be included in the spirit of the utility model that appended claims are limited and model In enclosing.
Referring to Fig. 1 to attached drawing 3, a kind of heating stove of aluminium bar processing, includes:
Furnace body 1, control panel 2, observation window 3, electric cylinder 4, level-one preheating cavity 5, aluminium bar support plate 6, heating tube 7, partition plate A8, the first cooling chamber 9, cooling fan 10, partition plate B11, two level preheating cavity 12, partition plate C13, final stage cooling chamber 14, partition plate D15, Scallop hole 16 and auxiliary feeding roller 17;
Control panel 2 is embedded on the outer wall of furnace body 1;Spiral helicine heating is provided among the inner cavity of level-one preheating cavity 5 Pipe 7, and the both ends of heating tube 7 are respectively equipped with aluminium bar support plate 6 and partition plate A8, and partition plate A8 is connected to electric cylinder by shaft coupling 4 lower end;First cooling chamber 9 is connected to the end of level-one preheating cavity 5, and the inner cavity top of the first cooling chamber 9 is provided with cooling Fan 10;Partition plate B11 is arranged on the end side of the first cooling chamber 9, and partition plate B11 is connected under electric cylinder 4 by shaft coupling End;Two level preheating cavity 12 is connected to the end of the first cooling chamber 9, and the centre of two level preheating cavity 12 is also provided with heating tube 7, and The both ends of the heating tube 7 are also respectively equipped with aluminium bar support plate 6, partition plate C13;Final stage cooling chamber 14 is located at the end of two level preheating cavity 12 End, and the inner cavity top of final stage cooling chamber 14 is also equipped with cooling fan 10;Partition plate D15 is located at the end of final stage cooling chamber 14, And partition plate D15 is connected to the lower end of electric cylinder 4 also by shaft coupling;Scallop hole 16 is opened in the centre of aluminium bar support plate 6, and fans The lower end both sides in shape hole 16 are respectively equipped with auxiliary feeding roller 17;Level-one preheating cavity 5, the first cooling chamber 9, two level preheating cavity 12 and end The outer end of level cooling chamber 14, which is surveyed, is inlaid with observation window 3, and the material of observation window 3 is transparent fireproof glass, and such a material is closed Property it is strong, impact resistance is big, can effectively prevent heating furnace heat scatter and disappear.
It is that moderate electrical connects between control panel 2 and electric cylinder 4, heating tube 7, cooling fan 10, physical circuit structure As existing mature technology, do not do to tire out herein and state, electric cylinder 4, heating tube 7, cooling fan 10 can be carried out by control panel 2 Control.
The preferred embodiment of the heating stove of aluminium bar processing as described above, wherein, the top of furnace body 1 is stepped Structure, can be effectively cost-effective compared to the heating stove of overall square structure;
The preferred embodiment of the heating stove of aluminium bar processing as described above, wherein, level-one preheating cavity 5 and two level are pre- The angle of inclination of hot chamber 12 is 45 °, is slided into easy to the aluminium bar after preheating in next stage chamber;
The preferred embodiment of the heating stove of aluminium bar processing as described above, wherein, the first cooling chamber 9 and final stage are cold But chamber 14 is also the ramp-like structure of Right deviation, and the angle of inclination of the first cooling chamber 9 and final stage cooling chamber 14 is 10 °, can make by Aluminium bar after cooling slides into secondary preheating in two level preheating chamber 12 or skids off heating stove;
The preferred embodiment of the heating stove of aluminium bar processing as described above, wherein, heating tube 7 is helical form knot Structure, and the center line of heating tube 7 and the line of centres of the two two groups of aluminium bar support plates 6 in side are on same straight line, can be passed through Two groups of aluminium bar support plates 6 are supported aluminium bar, aluminium bar is at the center of heating tube 7, aluminium bar can be avoided to touch heating tube 7, cause heating tube 7 to be damaged.
The operation principle of the present embodiment:
In the heating furnace period of the day from 11 p.m. to 1 a.m using the aluminium bar processing, connect external power supply, respectively by electric cylinder 4 by partition plate A8, Partition plate B11, partition plate C13, partition plate D15 are closed, and then aluminium bar is put into level-one preheating cavity 5, and one is opened by control panel 2 Heating tube 7 among level preheating cavity 5 is heated, and the situation for the observation preheating of observation window 3 for passing through outside, after the completion of preheating, Partition plate A8 is opened by electric cylinder 4, aluminium bar is slided into the first cooling chamber 9, is then shut off partition plate A8, opens the first cooling chamber 9 The cooling fan 10 at top cools down the aluminium bar after once preheating, and partition plate B11 is opened after the completion of cooling, slides aluminium bar Enter into two level preheating chamber 12 and secondary preheating is carried out by heating tube 7, partition plate B11 is simultaneously closed off, after the completion of secondary preheating Partition plate C13 is opened, aluminium bar is slided into final stage cooling chamber 14 and is cooled down again, partition plate C11 is simultaneously closed off, after the completion of cooling Open partition plate D15, aluminium bar is skidded off heating furnace, in practical application experiment, the design relative to market this area other products, The performance higher than its 90% or so.
In conclusion although the utility model is described in detail with reference to the foregoing embodiments, for this area For technical staff, it can still modify the technical solution described in foregoing embodiments, or to which part Technical characteristic carries out equivalent substitution, where within the spirit and principles of the present invention, any modification for being made, equivalent substitution, Improve etc., it should be included within the scope of protection of this utility model.

Claims (5)

  1. A kind of 1. heating stove of aluminium bar processing, it is characterised in that:Heating furnace of the aluminium bar processing includes:
    Furnace body, control panel, observation window, electric cylinder, level-one preheating cavity, aluminium bar support plate, heating tube, partition plate A, the first cooling Chamber, cooling fan, partition plate B, two level preheating cavity, partition plate C, final stage cooling chamber, partition plate D, scallop hole and auxiliary feeding roller;
    The control panel is embedded on the outer wall of furnace body;Spiral helicine heating is provided among the inner cavity of the level-one preheating cavity Pipe, and the both ends of heating tube are respectively equipped with aluminium bar support plate and partition plate A, and partition plate A is connected under electric cylinder by shaft coupling End;First cooling chamber is connected to the end of level-one preheating cavity, and the inner cavity top of the first cooling chamber is provided with cooling fan; The partition plate B is arranged on the end side of the first cooling chamber, and partition plate B is connected to the lower end of electric cylinder by shaft coupling;Described two Level preheating cavity is connected to the end of the first cooling chamber, and the centre of two level preheating cavity is also provided with heating tube, and the heating tube Both ends are also respectively equipped with aluminium bar support plate, partition plate C;The final stage cooling chamber is located at the end of two level preheating cavity, and final stage cools down The inner cavity top of chamber is also equipped with cooling fan;The partition plate D is located at the end of final stage cooling chamber, and partition plate D is also by shaft coupling Device is connected to the lower end of electric cylinder;The scallop hole is opened in the centre of aluminium bar support plate, and the lower end both sides difference of scallop hole Equipped with auxiliary feeding roller;The level-one preheating cavity, the first cooling chamber, the outer end of two level preheating cavity and final stage cooling chamber are surveyed and are inlayed There is observation window.
  2. 2. the heating stove of aluminium bar processing according to claim 1, it is characterised in that:The top of the furnace body is ladder Shape structure.
  3. 3. the heating stove of aluminium bar processing according to claim 1, it is characterised in that:The level-one preheating cavity and two level The angle of inclination of preheating cavity is 45 °.
  4. 4. the heating stove of aluminium bar processing according to claim 1, it is characterised in that:First cooling chamber and final stage Cooling chamber is also the ramp-like structure of Right deviation, and the angle of inclination of the first cooling chamber and final stage cooling chamber is 10 °.
  5. 5. the heating stove of aluminium bar processing according to claim 1, it is characterised in that:The heating tube is helical form knot Structure, and the center line of heating tube and the line of centres of the two two groups of aluminium bar support plates in side are on same straight line.
CN201721032020.2U 2017-08-17 2017-08-17 A kind of heating stove of aluminium bar processing Expired - Fee Related CN207317512U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721032020.2U CN207317512U (en) 2017-08-17 2017-08-17 A kind of heating stove of aluminium bar processing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721032020.2U CN207317512U (en) 2017-08-17 2017-08-17 A kind of heating stove of aluminium bar processing

Publications (1)

Publication Number Publication Date
CN207317512U true CN207317512U (en) 2018-05-04

Family

ID=62432710

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721032020.2U Expired - Fee Related CN207317512U (en) 2017-08-17 2017-08-17 A kind of heating stove of aluminium bar processing

Country Status (1)

Country Link
CN (1) CN207317512U (en)

Similar Documents

Publication Publication Date Title
CN205217907U (en) A cabinet -type electric furnace for isothermal forging
CN210926807U (en) Box-type substation convenient to heat dissipation
CN108151522A (en) A kind of paddy electricity accumulation of heat energy saving type baking oven and its heating means
CN205209268U (en) Dual interlocking heating temperature control system of heating furnace
CN207317512U (en) A kind of heating stove of aluminium bar processing
CN207607114U (en) A kind of preheating device for selective laser melting technology
CN105403062A (en) Heating temperature control system for heating furnace
CN205161006U (en) Whole rack heat transfer device of bottom formula of arranging based on two cooling second grades refrigeration
CN203999686U (en) A kind of isothermal normalizing furnace of energy optimization
CN204007135U (en) A kind of bottom construction of heating furnace
CN203380366U (en) Quick-cooling type hydrogen crushing furnace
CN207797740U (en) Chamber type electric resistance furnace rapid temperature rise and drop auxiliary device
CN207797709U (en) Energy-saving electrical furnace system
CN205043117U (en) Hot chamber machine sandwich heating crucible
CN204923892U (en) Electrometallurgy stove unloading mouth cooling device
CN205119838U (en) Sintering furnace heat recovery system
CN208720320U (en) A kind of water floor heating heater structure
CN110421161A (en) A kind of multi chamber vacuum continuous oven for the preparation of samarium cobalt permanent magnet body
CN203967567U (en) Outdoor cabinet type transformer station
CN202482215U (en) Preheating chamber of glass reinforcing furnace
CN207378320U (en) Low-temperature resistant explosion prevention type PE feed pipes
CN107816891A (en) A kind of energy comprehensive utilization system for kiln
CN207050226U (en) A kind of novel energy-saving environment-friendly heat-conducting oil furnace
CN105202772B (en) Multi-chamber solar water heater
CN201828137U (en) Vertical type high temperature spheroidizing furnace

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180504

Termination date: 20200817