CN207310209U - The production line of building beam column concrete prefabricated element - Google Patents

The production line of building beam column concrete prefabricated element Download PDF

Info

Publication number
CN207310209U
CN207310209U CN201720862355.0U CN201720862355U CN207310209U CN 207310209 U CN207310209 U CN 207310209U CN 201720862355 U CN201720862355 U CN 201720862355U CN 207310209 U CN207310209 U CN 207310209U
Authority
CN
China
Prior art keywords
concrete
die station
beam column
prefabricated element
production line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720862355.0U
Other languages
Chinese (zh)
Inventor
陈佛生
肖鸿韬
赵沃洲
植开生
区兆琪
彭玉城
李汉文
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Co Ltd Of Guangdong Construction Machinery Factory
Original Assignee
Co Ltd Of Guangdong Construction Machinery Factory
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Co Ltd Of Guangdong Construction Machinery Factory filed Critical Co Ltd Of Guangdong Construction Machinery Factory
Priority to CN201720862355.0U priority Critical patent/CN207310209U/en
Application granted granted Critical
Publication of CN207310209U publication Critical patent/CN207310209U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of production line of building beam column concrete prefabricated element, including concrete mixing plant, concrete transportation system, distribution device, die station, the vibrating device being located at below material distributing machine and the mould being located in die station, concrete transportation system is by concrete transportation to distribution device, distribution device is used to be arranged into automatically in the mould in die station above concrete transportation to shake table and by concrete, and vibrating device carries out ram-jolt to the material in the mould in die station.The overall flow of production line is in the utility model:Concrete stirring-transportation system's transport-material distributing machine cloth-vibrating device carries out ram-jolt-concrete curing to the armored concrete in mould and condenses into concrete prefabricated element.The whole production process of above-mentioned building beam column concrete prefabricated element is combined together by the utility model, therefore, machine can be utilized to replace being accomplished manually most of operation, the efficiency with higher, can use manpower and material resources sparingly.

Description

The production line of building beam column concrete prefabricated element
Technical field
A kind of production field of building concrete prefabricated components is the utility model is related to, more particularly to a kind of building beam column mixes The production line of solidifying soil prefabricated components.
Background technology
Building beam column concrete prefabricated element is a kind of manufactured prefabricated component after utilizing reinforcing bar and concrete coagulation, existing Building beam column concrete prefabricated element would generally use following apparatus and method to make, first by concrete mixing plant by coagulation Soil carries out mix, then by artificial cloth and utilizes vibrating head will by concrete transportation to fixed die station using crane Concrete and reinforcing bar ram-jolt, are finally made concrete prefabricated element, during above-mentioned making concrete prefabricated element, The processes such as cloth, ram-jolt must all be relied on and are accomplished manually, and labor intensity is big, efficiency is low, the matter of manufactured concrete prefabricated element Measure unstable.
Meanwhile there are following defect for the apparatus and method of above-mentioned making beam column concrete prefabricated element:Each process institute Device is all independent, is not provided with together, without systematicness, causing making concrete prefabricated element efficiency low, And need manually by concrete transportation at die station, spend human and material resources.
Utility model content
The utility model provides a kind of production line of building beam column concrete prefabricated element, to solve above-mentioned technical problem It is at least one.
One side according to the present utility model, there is provided a kind of production line of building beam column concrete prefabricated element, bag Include concrete mixing plant, concrete transportation system, distribution device, die station, the vibrating device being located at below material distributing machine and be located at mould Mould on platform, concrete mixing plant are used for mixed concrete, and the concrete after mix is directed into coagulation by concrete mixing plant In native transportation system, concrete transportation system is used for transport concrete, and distribution device is located at the lower section of concrete transportation system, mixes Ning Tu transportation systems are by concrete transportation to distribution device, and distribution device is for concrete transportation to shake table top and to be incited somebody to action Concrete is arranged into the mould in die station automatically, vibrating device to the material in the mould in die station (such as:Reinforcing bar and Concrete) carry out ram-jolt.
In the utility model, concrete mixing plant is consistent with the function of existing concrete mixing plant, i.e.,:Concrete stirs Station is to drive agitating device by motor so that water, sandstone and cement, which carry out mix, becomes concrete, concrete stirring Stand and concrete imported into concrete transportation system, concrete transportation system by concrete transportation to above distribution device, cloth Material device is located at vibrating device, and (vibrating device is referred to as shake table, and shake table is mounted below vibrating motor, and die station is placed In the top of shake table) top, and concrete is poured into the mould in die station, so as to complete the process of cloth, coagulation After soil enters mould, the vibrating device below die station is by vibrating the concrete ram-jolt in mould, and concrete is by after ram-jolt Being sent into maintenance position, (maintenance position falls within working region, can be carried out by follow-up die station running gear and ferry bus Transport die station is to conserving position) conserved, after concrete initial set intensity reaches 70% or more, it is only necessary to remove mould i.e. It can obtain building beam column concrete prefabricated element.
The overall flow of production line is in the utility model:Concrete stirring-transportation system's transport (is synchronously completed with this It is that reinforcing bar and installation of embedded parts are completed on mould)-material distributing machine cloth-vibrating device carries out the armored concrete in mould Ram-jolt-concrete curing condenses into concrete prefabricated element.The utility model is by above-mentioned building beam column concrete prefabricated element Whole production process is combined together, and therefore, machine can be utilized to replace being accomplished manually most of operation, the effect with higher Rate, can use manpower and material resources sparingly.
In some embodiments, die station running gear is further included, die station running gear includes wheel device and driving Device, wheel device are resisted against on the downside of die station, and driving device output shaft is equipped with friction pulley, and friction pulley is resisted against mould On platform downside, when driving device starts, driving device drives die station to be moved in wheel device.Thus, die station can be with It is automatically transferred in die station running gear, so as to ensure the continuity of work, it is not necessary to manually carry the mould that cloth is crossed Platform.
In some embodiments, distribution device includes cloth stent, the material distributing machine being located on cloth stent and big garage Walking apparatus, cloth stent are equipped with cloth track, and cart traveling device is located in material distributing machine, and cart traveling device drives material distributing machine Moved on cloth track.Thus, when cart traveling device starts, drive material distributing machine to be moved along cloth track, work as material distributing machine The position specified is moved to, subsequent cart traveling device is stopped, and concrete therein is poured into die station by material distributing machine In mould, so as to complete whole cloth process, after the completion of cloth, reinforcing bar and concrete in vibrating device driven mold carry out Vibration, ram-jolt is carried out by the reinforcing bar in mould and concrete.
The concrete structure of cart traveling device is as follows:Cart traveling device can include motor, transmission device and traveling wheel Deng, electric motor starting when, motor drives actuator movement, and transmission device then drives material distributing machine to be moved, and transmitting device can be with It is sprocket wheel or gear reducer, the motor in cart traveling device drives transmission device and traveling wheel to rotate, and traveling wheel is then installed on The underface of material distributing machine, drives material distributing machine to be moved on cloth stent in traveling wheel rotation process, so as to complete cloth process. In other embodiment, the structure of cart traveling device can also be other structures, it is only necessary to which cart traveling device can drive Material distributing machine is mobile on cloth stent.
In some embodiments, material distributing machine includes cloth locomotive frame, carriage walking device and automatic open-close hopper, trolley Running gear is located on automatic open-close hopper, and automatic open-close hopper is located on cloth locomotive frame, and carriage walking device drives automatic Folding hopper moves up dynamic in cloth locomotive frame.Thus, cart traveling device drives material distributing machine to be moved on cloth track specified During position, cart traveling device is stopped, and then carriage walking device starts, and drives automatic open-close hopper to be moved, from And the concrete in material distributing machine is uniformly poured into mould, without labor intensive or only need to expend and lack Amount manually can be so that the concrete in mould be uniformly distributed.
The concrete structure of carriage walking device is as follows:Carriage walking device can include motor, transmission device and traveling wheel Deng, electric motor starting when, motor drives actuator movement, and transmission device then drives automatic open-close hopper to be moved, transmission dress It can be sprocket wheel or gear reducer to put, and the motor in carriage walking device drives to be rotated by transmission device and traveling wheel, walking Wheel is then installed on the underface on automatic open-close hopper, drives in traveling wheel rotation process on automatic open-close hopper and is moved up in vehicle frame It is dynamic, so as to complete cloth process.In other embodiments, the structure of carriage walking device can also be other structures, only need Want carriage walking device that automatic open-close hopper can be driven to be moved up in cloth vehicle frame and move and carry out uniform distribution.
In some embodiments, concrete transportation system includes conveying track and transport vehicle, and transport vehicle is equipped with walking Motor, transport vehicle are located on conveying track, and transport vehicle is moved by movable motor along conveying track.Thus, walking is passed through Motor can cause transport vehicle to be moved on conveying track, and (certainly, transport motor is to drive transport vehicle to move by transmission device It is dynamic), when transport vehicle reaches the surface of material distributing machine, concrete is poured into material distributing machine by transport vehicle, so as to complete concrete Transmitting procedure.
In some embodiments, die station descaling machine is further included, die station descaling machine is equipped with cleaning motor and cleaning brush, clearly Manage motor and drive cleaning brush cleaning die station.Thus, die station descaling machine plays the role of clearing up die station, at the beginning of the concrete in mould After solidifying intensity reaches 70% or more, it is only necessary to mould is removed, by the beam column after concrete coagulation (after being molded Building beam column concrete prefabricated element) take away, then die station is cleared up using die station descaling machine.
In some embodiments, oil-injection machine is further included, oil-injection machine includes oil spout motor and nozzle, and oil spout motor drives spray Head carries out oil spout.Thus, oil-injection machine can carry out oil spout to die station, so that die station is after concrete coagulation, can be more preferable The beam column (be molded after building beam column concrete prefabricated element) after condensation is removed out of mould.
In some embodiments, ferry bus is further included, die station running gear there are multiple passages, and ferry bus is equipped with walking Device and die station lifting gear, ferry bus are located at below die station, and lifting gear controls the lifting of die station, and running gear drives ferry-boat Car translates.Thus, ferry bus plays translocation when die station becomes track, and ferry bus can be moved die station so that mould Platform is moved to from one of die station walking passageway on another die station walking passageway.
In some embodiments, control system is further included, control system includes multiple switch, control module and multiple senses Device is answered, sensing device sensing external information, generates inductive signal, inductive signal is sent to by sensing device according to external information Control module, control module generate control signal according to inductive signal and are sent to switch, and switch is turned off or closed.By This, control system and switch play the role of the above-mentioned all parts of control and device work or are stopped, such as:Switch The transport vehicle that can include in the startup of control concrete mixing plant or the switch being stopped, control concrete transportation system opens Move switch, the control that the cart traveling device in the switch being either stopped, control distribution device starts or is stopped Carriage walking device in distribution device starts the switch being either stopped, control vibrating device starts or is stopped Switch that switch, control die station descaling machine start the switch being either stopped, control ferry bus starts or are stopped etc., Above-mentioned each switch is connected with control module, and the operation principle of each switch is as follows:When a switch is on, then switch is sent Open signal then controls corresponding module to work to control module, control module, and when the switches are opened, then switch sends disconnected For ON signal to control module, control module then controls corresponding module from service, and above-mentioned switch can be switch tangible elements, It can also be logical order.
The utility model by operate control module can reach control above-mentioned modules or device operation or Person is out of service, meanwhile, above-mentioned each switch can be arranged on same position, convenient operation, can improve overall effect Rate.
Brief description of the drawings
Fig. 1 is a kind of structural representation of the production line of the building beam column concrete prefabricated element of embodiment of the utility model Figure;
Fig. 2 be Fig. 1 shown in building beam column concrete prefabricated element production line in distribution device partial enlargement structure Schematic diagram;
Fig. 3 be Fig. 1 shown in building beam column concrete prefabricated element production line in die station running gear partial enlargement Structure diagram;
Fig. 4 be building beam column concrete prefabricated element shown in Fig. 1 production line in die station running gear and die station match somebody with somebody Close structure diagram;
Fig. 5 is the enlarged structure schematic diagram of ferry bus in the production line of building beam column concrete prefabricated element shown in Fig. 1;
Fig. 6 is the schematic diagram of the production line of building beam column concrete prefabricated element shown in Fig. 1.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Fig. 1~Fig. 5 schematically shows a kind of building beam column concrete prefabricated element of embodiment of the utility model Production line structure.
Fig. 6 schematically shows a kind of production of the building beam column concrete prefabricated element of embodiment of the utility model The principle of line.
As shown in Figure 1, a kind of production line of building beam column concrete prefabricated element, including concrete mixing plant 1, concrete Transportation system 2, distribution device 3, die station 4, the vibrating device 5 for being located at the lower section of distribution device 3 and the mould 6 in die station 4, Concrete mixing plant 1 is used for mixed concrete, and the concrete after mix is directed into concrete transportation system by concrete mixing plant 1 In 2, concrete transportation system 2 is used to transport the concrete after mix, and distribution device 3 is located at the lower section of concrete transportation system 2, By on concrete transportation to distribution device 3, distribution device 3 is used for concrete transportation to mould 6 concrete transportation system 2, Reinforcing bar in mould 6 and concrete ram-jolt, the standard of wherein ram-jolt be by vibrating device 5:Concrete will not significantly sink again, and Bubble is occurred without, concrete surface starts bleeding.
In the present embodiment, the vibration frequency of vibrating device 5 should be 3000Hz~6000Hz, and vibration frequency is arranged on this area Between can have more preferable effect:As can preferably ram-jolt reinforcing bar and concrete, concrete can completely be filled in steel substantially In muscle, if vibration frequency is excessive, concrete may be caused to be overflowed from mould 6, if vibration frequency is too small, possibly can not Ram-jolt.Remaining vibrations parameter is for example:Vibration amplitude need according to mould 6 and pour into the amount of concrete in mould 6 come into Row change.
As shown in Figure 1, in the present embodiment, in order to transport die station 4, the utility model can also include die station and walk System 7.
Find out that the concrete structure of die station running gear 7 is as follows from Fig. 3 and Fig. 4, die station running gear 7 can include support Wheel apparatus 71 and driving device 72, wheel device 71 include column and the scroll wheel on column, and column plays support The effect of scroll wheel, scroll wheel of the scroll wheel then in the top of column, wheel device 71 are resisted against the downside of die station 4 On face, the output shaft of driving device 72 is equipped with friction pulley 721, and friction pulley 721 is then resisted against on 4 downside of die station.At other In embodiment, die station running gear 7 can also be other structures, such as:Die station running gear 7 includes supporting table, roller and electricity Machine, roller are installed on the lower section of supporting table, and motor drives roller to rotate, and roller drives supporting table movement, and supporting table, which drives, places Die station movement on it, can also complete the walking movement of die station, no matter which kind of structure is die station running gear 7 be, it is only necessary to mould Platform running gear 7 can play the role of transmission and mobile die station.
In the present embodiment, the process that die station running gear 7 specifically drives die station 4 to be movably walking is as follows, and die station 4 can lead to Cross die station running gear 7 to be movably walking, when die station 4 needs walking, it is only necessary to start driving device 72, driving device 72 Output shaft can be driven to rotate, output shaft then drives friction pulley 721 to be rotated, since friction pulley 721 is resisted against under die station 4 On side, when friction pulley 721 rotates, friction pulley 721 drives die station 4 to be moved by the frictional force between die station 4, mould When platform 4 moves, scroll wheel can be driven together to rotate, scroll wheel plays the role of Auxiliary support die station 4, while will not hinder mould Platform 4 moves.In the present embodiment, driving device 72 can be driving motor, drive electrical power after, can drive output shaft into Row rotates, final to drive die station 4 to be moved.
In the present embodiment, it can start to work after being powered due to driving device 72, driving device 72 drives friction pulley 721 Rotated, be eventually converted into the movement of die station 4, die station 4 automatic in die station running gear 7 (can only need to close driving 72 place circuit of device, i.e., need not manually carry operation, use manpower and material resources sparingly) it is mobile, so as to ensure the continuity of work, no The die station 4 for needing manually to cross cloth carries.
As shown in Figure 1, in the present embodiment, die station running gear 7 shares three passages, each die station running gear 7 Can including 71 and one row's driving device 72 of two rows of wheel devices, (certainly in other embodiments, driving device 72 can also It is two rows of, two rows of driving devices 72 can also play the same role) so that under normal circumstances, die station 4 can be in a die station Running gear 7 is movably walking.In other embodiments, the passage of die station running gear 7 can also have two or four, The quantity of die station running gear 7 can be set according to use demand (i.e. required production quantity).
As depicted in figs. 1 and 2, in the present embodiment, distribution device 3 includes cloth stent 31, installed in cloth stent 31 On material distributing machine 32 and cart traveling device 33, as shown in Fig. 2, on cloth stent 31 installation (such as:Can by bolt or The mode of welding is installed) there is cloth track, cart traveling device 33 is installed in material distributing machine 32, and cart traveling device 33 can To drive material distributing machine 32 to be moved on cloth track, therefore, when cart traveling device 33 starts, material distributing machine 32 can be driven to exist Moved on cloth track, when material distributing machine 32 is moved to position (being typically the top that material distributing machine 32 is moved to shake table) specified, Then cart traveling device 33 is stopped, and concrete therein is poured into mould 6 by material distributing machine 32, so as to complete whole cloth Process.
In the present embodiment, the concrete structure of cart traveling device 33 is as follows:Cart traveling device can include motor, pass Dynamic device and traveling wheel etc., during electric motor starting, motor drives actuator movement, and transmission device then drives material distributing machine to be moved Dynamic, transmitting device can be sprocket wheel or gear reducer, and the motor in cart traveling device drives transmission device and traveling wheel to rotate, Traveling wheel is then installed on the underface of material distributing machine 32, drives material distributing machine 32 to be moved up in cloth stent 31 in traveling wheel rotation process It is dynamic, so as to complete cloth process.In other embodiments, the structure of cart traveling device 33 can also be other structures, only Need cart traveling device 33 that material distributing machine 32 can be driven mobile on cloth stent 31.
As shown in Fig. 2, in the present embodiment, in order to reach more preferable cloth effect, i.e., so that concrete is evenly distributed on mould In tool 6 (uniform distribution), material distributing machine 32 can have the following structure:Material distributing machine 32 includes vehicle frame 321, carriage walking device 322 With automatic open-close hopper 323, carriage walking device 322 is located on automatic open-close hopper 323, and automatic open-close hopper 323 is located at cloth Expect on locomotive frame 321, carriage walking device 322 drive automatic open-close hopper 323 moved on cloth locomotive frame 321 (i.e. Fig. 1 with Automatic open-close hopper 323 can move back and forth in Fig. 2, and moving direction is consistent with the moving direction of transport vehicle 22).Large vehicle walking fills 33 drive material distributing machines 32 are put when being moved to designated position on cloth track, cart traveling device 33 is stopped, carriage walking Device 322 starts, and automatic open-close hopper 323 moves, so that the concrete on automatic open-close hopper 323 can uniformly fall Enter to mould 6, without manually or only need it is a small amount of manually can be so that the concrete in mould 6 be uniformly distributed.
In the present embodiment, the concrete structure of carriage walking device 322 is as follows:Carriage walking device can include motor, Transmission device and traveling wheel etc., during electric motor starting, motor drives actuator movement, and transmission device then drives material distributing machine to be moved Dynamic, transmission device can be sprocket wheel or gear reducer, and the motor in carriage walking device drives transmission device and traveling wheel to rotate, Traveling wheel is then installed on the underface on automatic open-close hopper 323, is driven in traveling wheel rotation process on automatic open-close hopper 323 Moved on vehicle frame 321, so as to complete cloth process.In other embodiments, the structure of carriage walking device 322 can also be Other structures, it is only necessary to which carriage walking device 322 can drive automatic open-close hopper 323 to be moved simultaneously on cloth vehicle frame 321 Carry out uniform distribution.
As shown in Figure 1, in the present embodiment, concrete transportation system 2 includes 22 (transport vehicle of conveying track 21 and transport vehicle 22 can move to the underface of concrete mixing plant 1, after concrete mixing plant 1 completes concrete mixing, concrete stirring Stand and 1 concrete imported into transport vehicle 22), transport vehicle 22 is equipped with transport motor, and transport vehicle 22 is located on conveying track 21, And transport vehicle 22 is moved by transporting motor along conveying track 21.By transport motor can transport vehicle 22 in transport rail Moved on road 21, so that when transport vehicle 22 reaches the surface of material distributing machine 32, concrete is poured into material distributing machine by transport vehicle 22 In 32.Transport vehicle 22 is as follows by transporting the concrete mode that motor is moved along conveying track 21:Row is installed on transport vehicle 22 Motor is walked, movable motor drives transport vehicle 22 to be moved on conveying track 21 by transmission device.In the present embodiment, transmission dress Putting can be that either either gear reducer movement sprocket wheel or gear reducer drive transport to gear reducer movable motor band movable sprocket to sprocket wheel The traveling wheel of car 22 rotates, so that transport vehicle 22 is moved on conveying track 21.
As shown in Figure 1, in the present embodiment, further include die station descaling machine 8, die station descaling machine 8 be equipped with cleaning motor and Cleaning brush, cleaning motor drive cleaning brush cleaning die station 4.Thus, die station descaling machine 8 plays the role of clearing up die station 4, works as mould After concrete initial set intensity in 6 reaches 70% or more, it is only necessary to mould 6 will be dismantled, by the beam column shape after concrete coagulation Thing (the building beam column concrete prefabricated element after being molded) is taken away, and then die station 4 is cleared up i.e. using die station descaling machine 8 Can.Cleaning brush can be the devices such as hairbrush, and cleaning motor drives cleaning brush to be moved left and right by drive link, and cleaning brush can be with The materials such as the dust in die station 4 are swept from die station 4, so as to complete whole cleaning process.In other embodiments, can also Die station cleaning, such as sprinkler are carried out using other devices, no matter which kind of clears up or clean the device of die station 4, only needs It is wanted to have the function that cleaning or cleaning die station 4.
As shown in Figure 1, in the present embodiment, further including oil-injection machine 9, oil-injection machine 9 includes oil spout motor and nozzle, oil spout electricity Machine drives nozzle to carry out oil spout.In die station 4 before use, oil-injection machine 9 can carry out oil spout to die station 4, mould 6, so that mould Tool 6, can be preferably by beam column thing (the concrete prefabricated structure of building beam column after being molded after condensation after concrete coagulation Part) removed from mould 6.The structure of oil-injection machine 9 in the present embodiment is consistent with the structure of oil-injection machine 9 of the prior art, In other embodiment, oil-injection machine 9 can also replace with other devices, only need to reach so that beam column thing (building after being molded Build beam column concrete prefabricated element) come off from mould 6.
In the present embodiment, in order to allow die station 4 to replace die station running gear 7 as needed or by die station 4 The transport of mould 6 to maintenance region condensed, as shown in figure 5, ferry bus 10 can be increased, due in the present embodiment, mould Platform running gear 6 has three passages, and die station lifting gear 101 and running gear (not illustrating in figure) are then installed on ferry bus 10, As needed, ferry bus 10 can be placed on to the lower section of die station 4, when 101 (in the present embodiment, die station of die station lifting gear Lifting gear 101 can be hydraulic cylinder) when starting, die station lifting gear 101 can promote the component of the top of ferry bus 10 to It is raised, when the component of the top of ferry bus 10 is raised above, die station 4 can be supported upwards, and running gear band movable pendulum Cross car 10 and translate (in the present embodiment, traveling wheel and motor and transmission of the running gear including being installed on the lower section of ferry bus 10 Device, motor can drive traveling wheel to be rotated by transmission device, so as to drive ferry bus 10 to translate).Therefore, exist In the present embodiment, ferry bus 10 plays the role of transporting die station 4, and ferry bus 10 can be moved die station 4 so that die station 4 It is moved to from one of die station walking passageway on another die station walking passageway, as shown in Figure 1, can make it that die station 4 is left Move right, so as to replace 4 walking passageway of die station, transport die station 4 without manually, use manpower and material resources sparingly.
In the present embodiment, follow-up control for convenience, the utility model can also include control system, control system Equipped with multiple switch 113 and control module 112, signal is cut-off in switch generation, and will be cut-off signal and be sent to control module 112. Control system and switch 113 play the role of the above-mentioned all parts of control and device work or are stopped, such as:Switch 113 can include the transport in the startup of control concrete mixing plant or the switch being stopped, control concrete transportation system Car start either be stopped switch, control distribution device in cart traveling device start or be stopped switch, Carriage walking device in control distribution device starts the switch being either stopped, control vibrating device starts or stop work Switch, the control die station descaling machine of work start the switch being either stopped, control ferry bus starts or what is be stopped opens Close etc., above-mentioned each switch is electrically connected with control module 112, and the operation principle of each switch is as follows:When a switch is on, Then switch transmission open signal then controls corresponding module to work to control module 112, control module 112, when switch is disconnected When opening, then switch sends cut-off signal and then controls corresponding module from service to control module 112, control module 112.
The utility model can reach the operation of the above-mentioned modules of control or device by operating control module 112 Or it is out of service, meanwhile, above-mentioned each switch can be arranged on same position, convenient operation, can improve entirety Efficiency.
Each switch is voluntarily controlled in order to reach (such as:Can be electronic switch) close or disconnect, so as to control Each device starts or is stopped, can be set at each device sensing device 111 (such as:Can approach switch Or travel switch), such as:By taking the sensing device 111 being located on conveying track 21 as an example, when transport vehicle 22 is along conveying track 21 (designated position can be preset, and in the present embodiment, designated position is positioned at distribution device when being moved to designated position Top), sensing device 111 can sense the positional information of transport vehicle 22, generate corresponding location information signal, sensing device Location information signal is sent to control module 112 by 111, after control module 112 receives the location information signal, generation control Signal, so that, the switch closure of 112 cart traveling device of control module, so as to control the cart traveling device in distribution device Start, when cart traveling device walking afterwards is to designated position, then control module 112 controls the carriage walking dress in distribution device The switch closure put, carriage walking device carry out walking to designated position, and follow-up control principle is same as described above, no longer superfluous State.
Above-mentioned switch is not limited solely to specific tangible switch element or logical order, meanwhile, sensing Device 111 can be position sensor or scanning recognition instrument.
In the utility model, concrete mixing plant 1 is consistent with the function of existing concrete mixing plant 1, and passes through electricity Machine drives agitating device so that water, sandstone and cement, which carry out mix, becomes concrete, and concrete mixing plant 1 is by concrete Imported into the travelling bogie 22 of concrete transportation system 2, travelling bogie 22 then by concrete transportation to distribution device 3 just on Concrete, is then poured into distribution device 3, the cart traveling device 33 on distribution device 3 can be by concrete transportation by side To the top of shake table 5, concrete can be uniformly poured into by the carriage walking device 322 on distribution device 3 by mould 6 Interior, after concrete is poured into mould 6 completely, whole cloth process terminates;At this time, it is only necessary to by switching and controlling mould Block 112, the vibrating device 5 of the lower section of die station 4 is started, when vibrating device 5 is vibrated, by the reinforcing bar and concrete in mould 6 Die station 4 is removed in ram-jolt, then, die station running gear 7, and die station can be transported to maintenance condensing zone finally by ferry bus 10 Domain, after concrete initial set intensity reaches 70% or more, it is only necessary to remove mould 6 and using die station descaling machine 8 by mould 6 The materials such as remaining concrete dust, which are swept, to fall, and finally, oil spout is carried out to mould 6 using oil-injection machine 9.
The overall flow of the utility model production line is:Concrete stirring-transportation system's transport (synchronously completes steel with this Muscle and installation of embedded parts)-material distributing machine cloth-vibrating device in mould armored concrete carry out ram-jolt-concrete curing Condense into concrete prefabricated element.The utility model combines the whole production process of above-mentioned building beam column concrete prefabricated element Together, it can utilize and its instead of being accomplished manually most of operation, and compact overall structure, all devices are in uniform location Work, there is the efficiency of higher, can use manpower and material resources sparingly.
Above-described is only some embodiments of the utility model.For those of ordinary skill in the art, On the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these belong to this practicality New protection domain.

Claims (10)

1. a kind of production line of building beam column concrete prefabricated element, it is characterised in that including concrete mixing plant(1), coagulation Native transportation system(2), distribution device(3), die station(4), be located at the distribution device(3)The vibrating device of lower section(5)Be located at The die station(4)On mould(6),
The concrete mixing plant(1)For mixed concrete, the concrete mixing plant(1)Concrete after mix is imported To the concrete transportation system(2)In,
The concrete transportation system(2)For transporting the concrete, the distribution device(3)It is located at the concrete transportation System(2)Lower section, the concrete transportation system(2)By concrete transportation to the distribution device(3)On,
The distribution device(3)For by concrete transportation to mould(6)On, the vibrating device(5)To the mould(6)On Material carry out ram-jolt.
2. the production line of building beam column concrete prefabricated element according to claim 1, it is characterised in that further include die station Running gear(7), the die station running gear(7)Including wheel device(71)And driving device(72), the support wheel dress Put(71)It is resisted against the die station(4)Downside on, the driving device(72)Output shaft be equipped with friction pulley(721), The friction pulley(721)It is resisted against the die station(4)On downside, when the driving device(72)During startup, the friction pulley (721)Drive the die station(4)In wheel device(71)Upper movement.
3. the production line of building beam column concrete prefabricated element according to claim 2, it is characterised in that the cloth dress Put(3)Including cloth stent(31), be located at the cloth stent(31)On material distributing machine(32)And cart traveling device(33), institute State cloth stent(31)It is equipped with cloth track, the cart traveling device(33)It is located at the material distributing machine(32)On, it is described big Garage's walking apparatus(33)Drive the material distributing machine(32)Moved on the cloth track.
4. the production line of building beam column concrete prefabricated element according to claim 3, it is characterised in that the material distributing machine (32)Including cloth locomotive frame(321), carriage walking device(322)With automatic open-close hopper(323), the carriage walking device (322)It is located at the automatic open-close hopper(323)On, the automatic open-close hopper(323)It is located at the cloth locomotive frame(321) On, the carriage walking device(322)Drive the automatic open-close hopper(323)In the cloth locomotive frame(321)Upper movement.
5. the production line of building beam column concrete prefabricated element according to claim 4, it is characterised in that concrete transportation System(2)Including conveying track(21)And transport vehicle(22), the transport vehicle(22)Movable motor and traveling wheel are equipped with, it is described Transport vehicle(22)It is located at the conveying track(21)On, and the transport vehicle(22)Traveling wheel is driven along institute by movable motor State conveying track(21)It is mobile.
6. the production line of the building beam column concrete prefabricated element according to any one of claim 2 ~ 5, it is characterised in that Further include die station descaling machine(8), the die station descaling machine(8)Cleaning motor and cleaning brush are equipped with, the cleaning motor drives The cleaning brush clears up the die station(4).
7. the production line of building beam column concrete prefabricated element according to claim 1, it is characterised in that further include die station Descaling machine(8), the die station descaling machine(8)Cleaning motor and cleaning brush are equipped with, the cleaning motor drives the cleaning brush Clear up the die station(4).
8. the production line of the building beam column concrete prefabricated element according to any one of claim 1 ~ 5, it is characterised in that Further include oil-injection machine(9), the oil-injection machine(9)Including oil spout motor and nozzle, the oil spout motor drives the nozzle to carry out Oil spout.
9. the production line of building beam column concrete prefabricated element according to claim 6, it is characterised in that further include ferry-boat Car(10), the die station running gear(7)There are multiple passages, the ferry bus(10)It is equipped with lifting gear(101)And walking Device, the ferry bus(10)For being located at the die station(4)Lower section, the lifting gear(101)Promote the die station(4)Rise Drop, the running gear drive the ferry bus(10)With the die station(4)Integral translation.
10. the production line of building beam column concrete prefabricated element according to claim 9, it is characterised in that further include control System processed(11), the control system(11)Including multiple switch(113), control module(112)With multiple sensing devices (111), the sensing device(111)Sense external information, inductive signal, the sensing device are generated according to external information (111)The inductive signal is sent to the control module(112), the control module(112)Generated according to inductive signal Control signal is simultaneously sent to the switch(113), the switch(113)Turn off or close.
CN201720862355.0U 2017-07-14 2017-07-14 The production line of building beam column concrete prefabricated element Active CN207310209U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720862355.0U CN207310209U (en) 2017-07-14 2017-07-14 The production line of building beam column concrete prefabricated element

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720862355.0U CN207310209U (en) 2017-07-14 2017-07-14 The production line of building beam column concrete prefabricated element

Publications (1)

Publication Number Publication Date
CN207310209U true CN207310209U (en) 2018-05-04

Family

ID=62434458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720862355.0U Active CN207310209U (en) 2017-07-14 2017-07-14 The production line of building beam column concrete prefabricated element

Country Status (1)

Country Link
CN (1) CN207310209U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175759A (en) * 2017-07-14 2017-09-19 广东省建筑机械厂有限公司 The production line of building beam column concrete prefabricated element
CN108958188A (en) * 2018-07-03 2018-12-07 中联重科股份有限公司 Concrete information transmission and management equipment, system and method
CN109396088A (en) * 2018-12-05 2019-03-01 江苏科技大学 PC component die station clearing apparatus and its working method
CN110815513A (en) * 2019-11-28 2020-02-21 安庆米锐智能科技有限公司 Heat-insulation concrete block preparation forming machine and preparation method
CN111113657A (en) * 2020-01-21 2020-05-08 河南致远住工科技有限公司 Concrete PC component material distribution equipment
CN115122492A (en) * 2022-07-18 2022-09-30 浙江坚塔商砼构件有限公司 Reinforcing steel bar positioning equipment for commercial concrete prefabricated part

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107175759A (en) * 2017-07-14 2017-09-19 广东省建筑机械厂有限公司 The production line of building beam column concrete prefabricated element
CN108958188A (en) * 2018-07-03 2018-12-07 中联重科股份有限公司 Concrete information transmission and management equipment, system and method
CN108958188B (en) * 2018-07-03 2021-04-27 中联重科股份有限公司 Concrete information transmission and management equipment, system and method
CN109396088A (en) * 2018-12-05 2019-03-01 江苏科技大学 PC component die station clearing apparatus and its working method
CN110815513A (en) * 2019-11-28 2020-02-21 安庆米锐智能科技有限公司 Heat-insulation concrete block preparation forming machine and preparation method
CN110815513B (en) * 2019-11-28 2021-01-05 山东铭城环保新材料科技有限公司 Heat-insulation concrete block preparation forming machine and preparation method
CN111113657A (en) * 2020-01-21 2020-05-08 河南致远住工科技有限公司 Concrete PC component material distribution equipment
CN115122492A (en) * 2022-07-18 2022-09-30 浙江坚塔商砼构件有限公司 Reinforcing steel bar positioning equipment for commercial concrete prefabricated part

Similar Documents

Publication Publication Date Title
CN207310209U (en) The production line of building beam column concrete prefabricated element
CN107175759A (en) The production line of building beam column concrete prefabricated element
CN101795836B (en) Equipment for producing slabs on same production line
CN107175022A (en) A kind of road and bridge construction raw material blending device
CN105952469A (en) Full-automatic high-frequency vibrating leveling machine for tunnel inverted arch
CN206982969U (en) Automatic storage, transport, pour, the complete set of equipments of vibrated concrete
CN207711039U (en) A kind of pre-stress rail plate tinuous production
CN109262823A (en) Repeat assembling PC component production system and production method
CN104153325B (en) For the heavy thickness concrete automatic pouring machine of the domatic band reinforced mesh of channel
CN204398099U (en) For the cutting waste recovery systems that air entrained concrete is produced
CN103088731B (en) Pouring foaming car
CN103213195B (en) Production system of foaming bricks
CN109176825A (en) A kind of intelligent vibrating method of High Strength Concrete Member
CN109203209A (en) A kind of coarse aggregate Reactive Powder Concrete bridge floor board assembly line and preparation method thereof
CN206030206U (en) Prefab production line
CN202755277U (en) Monolithic track bed construction system
JPH1046507A (en) Roadbed compactor
CN207888889U (en) Prefabricated components integrated production line
CN206186077U (en) Prefab production line
CN209599527U (en) A kind of annular concrete component flow production line
CN102720102B (en) Construction trolley
CN109355983A (en) A kind of trackless construction method of city rail
CN206034465U (en) A integrative equipment for protection of side slope concrete
CN201183934Y (en) Bridge deck system walking charge car
CN206186075U (en) Prefab production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant