CN207277841U - A kind of detachable service sleeve positioning fixed frame - Google Patents

A kind of detachable service sleeve positioning fixed frame Download PDF

Info

Publication number
CN207277841U
CN207277841U CN201720913300.8U CN201720913300U CN207277841U CN 207277841 U CN207277841 U CN 207277841U CN 201720913300 U CN201720913300 U CN 201720913300U CN 207277841 U CN207277841 U CN 207277841U
Authority
CN
China
Prior art keywords
steel plate
service sleeve
nut
fixed frame
screw
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720913300.8U
Other languages
Chinese (zh)
Inventor
赵强
刘浩
张小伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Group Co Ltd
Tianjin Engineering Co Ltd of China Railway Construction Group Co Ltd
Original Assignee
China Railway Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Group Co Ltd filed Critical China Railway Construction Group Co Ltd
Priority to CN201720913300.8U priority Critical patent/CN207277841U/en
Application granted granted Critical
Publication of CN207277841U publication Critical patent/CN207277841U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)

Abstract

本实用新型公开了一种可拆卸式预埋套管定位固定架,包括多根钢板限位条,多根所述钢板限位条交叉设置,并且所述钢板限位条的中心点为交叉点,所述钢板限位条的长度与预埋套管内径相对应,所述钢板限位条上设置有若干固定孔,所述钢板限位条的中心处固定连接有螺帽,所述螺帽螺纹连接有螺杆,所述螺杆向上穿出位于所述预埋套管顶部的盖板,并且所述螺杆通过其上设置的限位螺帽压紧所述盖板。本实用新型的有益效果:制作简单,便于加工;机电、水暖预留洞成型效果好,可多次循环周转使用,有效的解决了机电、水暖预留洞的精确定位和因为预留不精确导致楼层预留洞不在一条垂线上而产生的后期剔凿、修补、吊洞等不必要的费用增加。

The utility model discloses a detachable pre-embedded casing positioning and fixing frame, which comprises a plurality of steel plate limiting strips, the plurality of steel plate limiting strips are intersected, and the center point of the steel plate limiting strips is an intersection point , the length of the steel plate limit bar corresponds to the inner diameter of the embedded casing, the steel plate limit bar is provided with a number of fixing holes, the center of the steel plate limit bar is fixedly connected with a nut, and the nut A screw is threaded, and the screw goes upward through the cover plate at the top of the pre-embedded casing, and the screw presses the cover plate through a limit nut provided thereon. Beneficial effects of the utility model: simple manufacture and convenient processing; electromechanical and plumbing reserved holes have a good forming effect and can be used in multiple cycles, effectively solving the problem of precise positioning of electromechanical and plumbing reserved holes and problems caused by inaccurate reservations. Unnecessary costs such as cutting, repairing, and hanging holes in the later stage caused by the reserved holes on the floor are not on a vertical line will increase.

Description

一种可拆卸式预埋套管定位固定架A detachable pre-embedded casing positioning and fixing frame

技术领域technical field

本实用新型涉及预埋套管固定装置领域,具体来说,涉及一种可拆卸式预埋套管定位固定架。The utility model relates to the field of pre-embedded sleeve fixing devices, in particular to a detachable pre-embedded sleeve positioning and fixing frame.

背景技术Background technique

平常混凝土浇筑后,机电、水暖预埋套管都是直接安放在顶板上,用钉子或者铁丝绑扎套筒进行简单固定,但在混凝土浇筑预埋中,会由于固定不牢固造成不同程度的扰动套筒位置,从而最终影响机电、水暖洞孔等的精确定位,使其定位无法得到有效保障,后期拆除常常出现定位不准确导致楼层预留洞不在一条垂线上,不同程度出现错位,增加后期剔凿、修补、吊洞等费用,影响预留洞一次成型质量。Usually, after concrete pouring, the electromechanical and plumbing pre-embedded casings are directly placed on the roof, and the sleeves are simply fixed with nails or iron wires. The position of the tube will eventually affect the precise positioning of the electromechanical, plumbing holes, etc., so that the positioning cannot be effectively guaranteed. In the later demolition, the positioning is often inaccurate and the reserved holes on the floor are not on a vertical line. The cost of chiseling, repairing, and hanging holes will affect the quality of the one-time molding of the reserved holes.

针对相关技术中的问题,目前尚未提出有效的解决方案。Aiming at the problems in the related technologies, no effective solution has been proposed yet.

实用新型内容Utility model content

针对相关技术中的上述技术问题,本实用新型提出一种可拆卸式预埋套管定位固定架,预埋套管固定效果好,可循环使用,多次周转。Aiming at the above-mentioned technical problems in the related art, the utility model proposes a detachable pre-embedded sleeve positioning and fixing frame, which has a good fixing effect of the pre-embedded sleeve and can be recycled and turned over many times.

为实现上述技术目的,本实用新型的技术方案是这样实现的:For realizing above-mentioned technical purpose, technical scheme of the present utility model is realized like this:

一种可拆卸式预埋套管定位固定架,包括多根钢板限位条,多根所述钢板限位条交叉设置,并且所述钢板限位条的中心点为交叉点,所述钢板限位条的长度与预埋套管内径相对应,所述钢板限位条上设置有若干固定孔,所述钢板限位条的中心处固定连接有螺帽,所述螺帽螺纹连接有螺杆,所述螺杆向上穿出位于所述预埋套管顶部的盖板,并且所述螺杆通过其上设置的限位螺帽压紧所述盖板。A detachable pre-embedded casing positioning and fixing frame, comprising a plurality of steel plate limit bars, the plurality of steel plate limit bars are arranged crosswise, and the center point of the steel plate limit bars is the intersection point, and the steel plate limit bars The length of the position bar corresponds to the inner diameter of the embedded casing, and several fixing holes are arranged on the steel plate limit bar, and the center of the steel plate limit bar is fixedly connected with a nut, and the nut is threadedly connected with a screw rod, The screw goes upward through the cover plate located at the top of the embedded casing, and the screw presses the cover plate through a limit nut provided thereon.

进一步地,所述钢板限位条的数量为两根,两根所述钢板限位条呈十字形交叉设置。Further, the number of the steel plate limiting strips is two, and the two steel plate limiting strips are arranged in a cross shape.

进一步地,所述固定孔为销钉固定孔或螺栓固定孔。Further, the fixing holes are pin fixing holes or bolt fixing holes.

进一步地,所述螺杆为14#螺杆。Further, the screw is a 14# screw.

进一步地,所述螺杆的顶部固定连接有手柄。Further, a handle is fixedly connected to the top of the screw.

进一步地,所述盖板的材质为铁质或木质。Further, the material of the cover plate is iron or wood.

进一步地,所述限位螺帽与所述盖板之间设置有垫片。Further, a gasket is provided between the limit nut and the cover plate.

本实用新型的有益效果:制作简单,便于加工;机电、水暖预留洞成型效果好,可多次循环周转使用,有效的解决了机电、水暖预留洞的精确定位和因为预留不精确导致楼层预留洞不在一条垂线上而产生的后期剔凿、修补、吊洞等不必要的费用增加。Beneficial effects of the utility model: simple manufacture, easy processing; electromechanical and plumbing reserved holes have a good forming effect and can be used in multiple cycles, effectively solving the problem of precise positioning of electromechanical and plumbing reserved holes and problems caused by inaccurate reservations. Unnecessary costs such as cutting, repairing, and hanging holes in the later stage will increase due to the fact that the reserved holes on the floors are not on a vertical line.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例或现有技术中的技术方案,下面将对实施例中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the accompanying drawings required in the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only the present invention. For some embodiments of the present invention, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

图1是根据本实用新型实施例所述的可拆卸式预埋套管定位固定架的剖视图。Fig. 1 is a cross-sectional view of a detachable embedded casing positioning and fixing frame according to an embodiment of the present invention.

图中:In the picture:

1、手柄;2、限位螺帽;3、螺杆;4、垫片;5、螺帽;6、钢板限位条;7、固定孔;8、盖板;9、预埋套管;10、模板。1. Handle; 2. Limit nut; 3. Screw; 4. Gasket; 5. Nut; 6. Steel plate limit strip; 7. Fixing hole; 8. Cover plate; 9. Embedded casing; 10 ,template.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. All other embodiments obtained by persons of ordinary skill in the art based on the embodiments of the present invention belong to the protection scope of the present invention.

如图1所示,根据本实用新型实施例所述的一种可拆卸式预埋套管定位固定架,包括多根钢板限位条6,多根所述钢板限位条6交叉设置,并且所述钢板限位条6的中心点为交叉点,所述钢板限位条6的长度与预埋套管9内径相对应,所述钢板限位条6上设置有若干固定孔7,所述钢板限位条6的中心处固定连接有螺帽5,所述螺帽5螺纹连接有螺杆3,所述螺杆3向上穿出位于所述预埋套管9顶部的盖板8,并且所述螺杆3通过其上设置的限位螺帽2压紧所述盖板8。As shown in Figure 1, a detachable pre-embedded casing positioning and fixing frame according to an embodiment of the present invention includes a plurality of steel plate limiting strips 6, and a plurality of said steel plate limiting strips 6 are arranged crosswise, and The center point of the steel plate limiting strip 6 is an intersection point, the length of the steel plate limiting strip 6 corresponds to the inner diameter of the embedded casing 9, and the steel plate limiting strip 6 is provided with several fixing holes 7, the The center of the steel plate limiting bar 6 is fixedly connected with a nut 5, and the nut 5 is threadedly connected with a screw 3, and the screw 3 passes upwards through the cover plate 8 at the top of the embedded casing 9, and the The screw 3 presses the cover plate 8 through the limit nut 2 provided thereon.

在本实用新型的一个具体实施例中,所述钢板限位条6的数量为两根,两根所述钢板限位条6呈十字形交叉设置。In a specific embodiment of the present invention, the number of the steel plate limiting strips 6 is two, and the two steel plate limiting strips 6 are intersected in a cross shape.

在本实用新型的一个具体实施例中,所述固定孔7为销钉固定孔或螺栓固定孔。In a specific embodiment of the present utility model, the fixing hole 7 is a pin fixing hole or a bolt fixing hole.

在本实用新型的一个具体实施例中,所述螺杆3为14#螺杆。In a specific embodiment of the present utility model, the screw 3 is a 14# screw.

在本实用新型的一个具体实施例中,所述螺杆3的顶部固定连接有手柄1。In a specific embodiment of the present invention, a handle 1 is fixedly connected to the top of the screw rod 3 .

在本实用新型的一个具体实施例中,所述盖板8的材质为铁质或木质。In a specific embodiment of the present utility model, the material of the cover plate 8 is iron or wood.

在本实用新型的一个具体实施例中,所述限位螺帽2与所述盖板8之间设置有垫片4。In a specific embodiment of the present utility model, a gasket 4 is provided between the limit nut 2 and the cover plate 8 .

为了方便理解本实用新型的上述技术方案,以下通过具体使用方式上对本实用新型的上述技术方案进行详细说明。In order to facilitate the understanding of the above-mentioned technical solution of the present utility model, the above-mentioned technical solution of the present utility model will be described in detail below through specific usage modes.

本实用新型所述的固定连接方式可用焊接、螺栓连接等常规技术手段替换。The fixed connection mode described in the utility model can be replaced by conventional technical means such as welding and bolt connection.

本实用新型所述的可拆卸式预埋套管定位固定架,包括手柄1、14#限位螺帽2、14#螺杆3、垫片4、14#螺帽5、20mm*10mm厚的钢板限位条6、固定孔7、盖板8。The detachable pre-embedded casing positioning and fixing frame described in the utility model includes a handle 1, a 14# limit nut 2, a 14# screw rod 3, a gasket 4, a 14# nut 5, and a steel plate with a thickness of 20mm*10mm Limiting bar 6, fixing hole 7, cover plate 8.

手柄1与螺杆3整体焊接,为一体式结构。The handle 1 and the screw rod 3 are integrally welded to form an integral structure.

钢板限位条6的长度等于预埋套管9的内径,两端设置定位端头,两根钢板限位条6对中十字焊接,十字形交叉设置的两根钢板限位条6的交叉点即为钢板限位条6的中心点,且两根钢板限位条6上共留设4个固定孔7,用于安装销钉或螺栓,每个固定孔7位于距离钢板限位条6中心点5cm的位置处。The length of the steel plate limit strip 6 is equal to the inner diameter of the pre-embedded casing 9, the two ends are provided with positioning ends, the two steel plate limit strips 6 are centered cross welded, and the intersection point of the two steel plate limit strips 6 arranged in a cross That is, the center point of the steel plate limit bar 6, and four fixing holes 7 are reserved on the two steel plate limit bars 6 for installing pins or bolts. Each fixing hole 7 is located at a distance from the center point of the steel plate limit bar 6. 5cm position.

螺帽5与钢板限位条6整体焊接,为一体式结构,螺帽5的中心与十字形交叉设置的两根钢板限位条6的交叉点严格重合。The nut 5 and the steel plate limiting strip 6 are integrally welded to form an integral structure, and the center of the nut 5 is strictly coincident with the intersection of the two steel plate limiting strips 6 arranged in a cross shape.

两根钢板限位条6和盖板8的中心点处均留设与螺杆3直径相同的孔洞。A hole with the same diameter as the screw rod 3 is left at the center point of the two steel plate limit strips 6 and the cover plate 8 .

具体使用时,先把十字形交叉设置两根钢板限位条6通过固定孔7固定在模板10上,模板10与固定孔7通过销钉或螺栓连接,并在模板10上与螺帽5相对应的位置处留设与螺杆3直径相同的孔洞,然后安装预埋套管9,应保证每根钢板限位条6的两端顶紧预埋套管9的内壁,即完成了预埋套管9水平方向上的固定,预埋套管9安装完成后将盖板8垫片4依次放置在预埋套管9上方,然后旋转手柄1,将带有限位螺帽2的螺杆3旋入螺帽5中,直到限位螺帽2压紧盖板8后即可完成预埋套管9的竖向固定,通过上述步骤就实现了预埋套管9的固定,在混凝土浇筑完毕后,将手柄1拧松,依次拆下相关元件,即可实现整个装置的周转循环使用。During specific use, first set two steel plate limit strips 6 in a cross shape and fix them on the formwork 10 through the fixing holes 7, and the formwork 10 and the fixing holes 7 are connected by pins or bolts, and correspond to the nuts 5 on the formwork 10 Leave a hole with the same diameter as the screw rod 3, and then install the embedded casing 9. It should be ensured that the two ends of each steel plate limit bar 6 are pressed against the inner wall of the embedded casing 9, that is, the embedded casing is completed. 9 Fixation in the horizontal direction, after the installation of the embedded casing 9 is completed, place the cover plate 8 gasket 4 on the top of the embedded casing 9 in sequence, then rotate the handle 1, and screw the screw 3 with the limit nut 2 into the screw. In the cap 5, the vertical fixing of the embedded casing 9 can be completed until the limit nut 2 presses the cover plate 8, and the fixing of the embedded casing 9 is realized through the above steps. After the concrete pouring is completed, the The handle 1 is unscrewed, and the relevant components are removed in sequence, so that the turnover cycle of the whole device can be realized.

在可拆卸式预埋套管定位固定架固定好预埋套管9后,可在不影响后期处理的前提下有效的防止混凝土浇筑过程中的扰动。待混凝土强度达到要求后,方可拆除,定期对其修补养护,以免锈蚀,为循环多次周转使用创造条件。After the pre-embedded casing 9 is fixed by the detachable pre-embedded casing positioning and fixing frame, the disturbance in the concrete pouring process can be effectively prevented without affecting the post-processing. After the concrete strength meets the requirements, it can be dismantled, and it should be repaired and maintained regularly to avoid corrosion and create conditions for repeated use.

综上,借助于本实用新型的上述技术方案,制作简单,便于加工;机电、水暖预留洞成型效果好,可多次循环周转使用,有效的解决了机电、水暖预留洞的精确定位和因为预留不精确导致楼层预留洞不在一条垂线上而产生的后期剔凿、修补、吊洞等不必要的费用增加。To sum up, with the help of the above technical solution of the utility model, the production is simple and easy to process; the electromechanical and plumbing reserved holes have a good forming effect and can be used in multiple cycles, effectively solving the problem of precise positioning of the electromechanical and plumbing reserved holes. Due to the imprecise reservation, the reserved holes on the floor are not on a vertical line, and unnecessary costs such as cutting, repairing, and hanging holes in the later stage will increase.

以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the utility model, and are not intended to limit the utility model. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the utility model shall be included in the utility model. within the scope of the new protection.

Claims (7)

1. a kind of detachable service sleeve positioning fixed frame, it is characterised in that including more steel plate positive stop strips(6), more institutes State steel plate positive stop strip(6)It is arranged in a crossed manner, and the steel plate positive stop strip(6)Central point be crosspoint, the steel plate positive stop strip (6)Length and service sleeve(9)Internal diameter is corresponding, the steel plate positive stop strip(6)On be provided with some mounting holes(7), it is described Steel plate positive stop strip(6)Center at be fixedly connected with nut(5), the nut(5)It is threaded with screw rod(3), the screw rod (3)It is pierced by upwards positioned at the service sleeve(9)The cover board at top(8), and the screw rod(3)It is spacing by what is set thereon Nut(2)Compress the cover board(8).
2. detachable service sleeve positioning fixed frame according to claim 1, it is characterised in that the steel plate positive stop strip (6)Quantity be two, two steel plate positive stop strips(6)Set in decussation.
3. detachable service sleeve positioning fixed frame according to claim 1, it is characterised in that the mounting hole(7) For pin mounting hole or bolt fixing hole.
4. detachable service sleeve positioning fixed frame according to claim 3, it is characterised in that the screw rod(3)For 14# screw rods.
5. detachable service sleeve positioning fixed frame according to claim 4, it is characterised in that the screw rod(3)'s Top is fixedly connected with handle(1).
6. detachable service sleeve positioning fixed frame according to claim 5, it is characterised in that the cover board(8)'s Material is irony or wooden.
7. detachable service sleeve positioning fixed frame according to claim 5, it is characterised in that the limit screw cap (2)With the cover board(8)Between be provided with gasket(4).
CN201720913300.8U 2017-07-26 2017-07-26 A kind of detachable service sleeve positioning fixed frame Expired - Fee Related CN207277841U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720913300.8U CN207277841U (en) 2017-07-26 2017-07-26 A kind of detachable service sleeve positioning fixed frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720913300.8U CN207277841U (en) 2017-07-26 2017-07-26 A kind of detachable service sleeve positioning fixed frame

Publications (1)

Publication Number Publication Date
CN207277841U true CN207277841U (en) 2018-04-27

Family

ID=61985539

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720913300.8U Expired - Fee Related CN207277841U (en) 2017-07-26 2017-07-26 A kind of detachable service sleeve positioning fixed frame

Country Status (1)

Country Link
CN (1) CN207277841U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025278A (en) * 2018-07-26 2018-12-18 重庆新久融科技有限公司 A kind of fixed device of the pre-buried orifice of aluminum alloy mould plate and its application method
CN109616970A (en) * 2018-11-19 2019-04-12 中国二冶集团有限公司 A kind of PVC lintel spool construction method
CN110670490A (en) * 2019-10-28 2020-01-10 中国葛洲坝集团第三工程有限公司 Pore-forming device and pore-forming method for prestressed pipeline
CN111236641A (en) * 2020-01-17 2020-06-05 江苏省苏中建设集团股份有限公司 Aluminum alloy template top plate water supply and drainage reserved hole die and construction method thereof
CN111519901A (en) * 2020-04-20 2020-08-11 上海建工一建集团有限公司 Tool for reserving holes in concrete floor and construction method
CN112727086A (en) * 2020-12-31 2021-04-30 惠亚科技(东台)有限公司 Molding device
CN112727085A (en) * 2020-12-31 2021-04-30 惠亚科技(东台)有限公司 Molding device
CN113530214A (en) * 2021-09-02 2021-10-22 中建八局第二建设有限公司 Pre-embedded device and construction method reserved for fair-faced concrete structure
CN115306149A (en) * 2022-08-12 2022-11-08 中交第四公路工程局有限公司 Pre-embedded casing for reserving pipeline holes in cast-in-place concrete floor

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109025278A (en) * 2018-07-26 2018-12-18 重庆新久融科技有限公司 A kind of fixed device of the pre-buried orifice of aluminum alloy mould plate and its application method
CN109025278B (en) * 2018-07-26 2021-07-06 重庆新久融科技有限公司 Aluminum alloy template pre-buried hole piece fixing device and using method thereof
CN109616970A (en) * 2018-11-19 2019-04-12 中国二冶集团有限公司 A kind of PVC lintel spool construction method
CN110670490A (en) * 2019-10-28 2020-01-10 中国葛洲坝集团第三工程有限公司 Pore-forming device and pore-forming method for prestressed pipeline
CN111236641A (en) * 2020-01-17 2020-06-05 江苏省苏中建设集团股份有限公司 Aluminum alloy template top plate water supply and drainage reserved hole die and construction method thereof
CN111519901A (en) * 2020-04-20 2020-08-11 上海建工一建集团有限公司 Tool for reserving holes in concrete floor and construction method
CN112727086A (en) * 2020-12-31 2021-04-30 惠亚科技(东台)有限公司 Molding device
CN112727085A (en) * 2020-12-31 2021-04-30 惠亚科技(东台)有限公司 Molding device
CN113530214A (en) * 2021-09-02 2021-10-22 中建八局第二建设有限公司 Pre-embedded device and construction method reserved for fair-faced concrete structure
CN115306149A (en) * 2022-08-12 2022-11-08 中交第四公路工程局有限公司 Pre-embedded casing for reserving pipeline holes in cast-in-place concrete floor

Similar Documents

Publication Publication Date Title
CN207277841U (en) A kind of detachable service sleeve positioning fixed frame
CN103255840A (en) Combined built-in fitting for concrete walls and column tie bars and installation construction method thereof
CN107217790A (en) A kind of prefabricated assembling type reinforced concrete framework open tubular column and its construction method
CN204139596U (en) Reserving hole sleeve pipe and get pipe device
CN205444456U (en) Precast concrete lotus root roof beam rebar positioning board
CN205189136U (en) Removable type embedded anchor
CN107338956A (en) A kind of hole to be provided sleeve pipe and its application method
CN106884505A (en) A kind of adjustable frame post reinforcing bar spacer ferrule and its installation and method for dismounting
CN211172423U (en) Precise positioning device for embedded board
CN206329032U (en) Template suitable for pouring section after assembled beam-column
CN206091009U (en) Anti fixing device that floats of hollow floor
CN204139600U (en) Switchbox inner support mould
CN209653365U (en) Tool type wall fitting
CN207063499U (en) A kind of detachable lossless template climbing frame is encorbelmented channel-section steel fixing device
CN207620504U (en) A kind of Fabricated railing
CN207211767U (en) A kind of strip thickness control instrument for concrete floor slab placement construction
CN206752855U (en) A kind of adjustable frame post reinforcing bar spacer ferrule
CN206016071U (en) Frame column reinforcement installation positioning auxiliary device
CN108896371A (en) A kind of oblique scissor test part production tooling in conjunction old and new concret face and production method
CN204475843U (en) A kind of fast early stripping formwork system support for building
CN209556406U (en) A steel grouting sleeve fixing bracket
CN207144478U (en) A kind of hole to be provided sleeve pipe
CN205531285U (en) Scaffold frame is encorbelmented shaped steel and is reserved bolt hole and establish structure
CN205369914U (en) Positioner at existing circular reservation entrance to a cave of deposit concrete floor
CN104712139B (en) Construction method for radian column formwork erection

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200429

Address after: 100043 No. 20, Shijingshan Road, Beijing, Shijingshan District

Co-patentee after: China Railway Construction Group Tianjin Engineering Co.,Ltd.

Patentee after: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

Address before: 100131 No. 20, Shijingshan Road, Beijing, Shijingshan District

Patentee before: CHINA RAILWAY CONSTRUCTION GROUP Co.,Ltd.

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

CF01 Termination of patent right due to non-payment of annual fee