CN207276078U - Portable hoisting device - Google Patents

Portable hoisting device Download PDF

Info

Publication number
CN207276078U
CN207276078U CN201721299646.XU CN201721299646U CN207276078U CN 207276078 U CN207276078 U CN 207276078U CN 201721299646 U CN201721299646 U CN 201721299646U CN 207276078 U CN207276078 U CN 207276078U
Authority
CN
China
Prior art keywords
channel steel
pulleys
horizontal shaft
portable
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721299646.XU
Other languages
Chinese (zh)
Inventor
胡向辉
张宏
许宁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Original Assignee
State Grid Hebei Electric Power Co Ltd
Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Hebei Electric Power Co Ltd, Cangzhou Power Supply Co of State Grid Hebei Electric Power Co Ltd, State Grid Corp of China SGCC filed Critical State Grid Hebei Electric Power Co Ltd
Priority to CN201721299646.XU priority Critical patent/CN207276078U/en
Application granted granted Critical
Publication of CN207276078U publication Critical patent/CN207276078U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

本实用新型公开了一种便携式吊装器,涉及电力系统辅助设备技术领域,包括槽钢、两个滑轮、横轴、若干条拉线和倒链,槽钢固定安装在电杆上的熔断器横担的中间位置上,拉线的一端与槽钢的一端连接,拉线的另一端固定在电杆上,槽钢的两个侧板分别设有滑轮轨道,两个滑轮分别位于槽钢两侧的滑轮轨道中,两个滑轮依靠轴承连接固定安装在横轴的两端,横轴中间设有挂钩,倒链安装在挂钩上。通过此技术手段实现变压器或JP柜的吊装,不在需要起重机械,降低了安装的成本,同时由于便携式吊装器体积小、便于携带,可以在很小的空间内完成作业,不受环境因素的制约,提高变压器或JP柜安装的效率。

The utility model discloses a portable hoisting device, which relates to the technical field of electric power system auxiliary equipment, and comprises channel steel, two pulleys, a horizontal shaft, several pull wires and chains, and the channel steel is fixedly installed on the cross arm of the fuse on the electric pole. In the middle position, one end of the stay wire is connected to one end of the channel steel, and the other end of the stay wire is fixed on the pole. The two side plates of the channel steel are respectively equipped with pulley tracks, and the two pulleys are respectively located on the pulley tracks on both sides of the channel steel. Among them, two pulleys are connected and fixedly installed at both ends of the horizontal shaft by means of bearings, a hook is arranged in the middle of the horizontal shaft, and the inverted chain is installed on the hook. The hoisting of transformers or JP cabinets is realized by this technical means, and lifting machinery is no longer needed, which reduces the cost of installation. At the same time, because the portable hoisting device is small in size and easy to carry, it can complete the work in a small space and is not affected by environmental factors. Constraints, improve the efficiency of transformer or JP cabinet installation.

Description

便携式吊装器portable hanger

技术领域technical field

本实用新型涉及电力系统辅助设备技术领域,特别是涉及一种便携式吊装器。The utility model relates to the technical field of electric power system auxiliary equipment, in particular to a portable hoisting device.

背景技术Background technique

在架设或更换变压器及JP柜的施工过程中,施工队需要利用吊车或大型机械进行作业,有的现场因施工场地或环境的限制,不能使用吊车或大型机械进行吊装困难,给施工造成了不少的麻烦,影响施工效率,再一个是动用吊车和大型机械费用高昂,增加施工费用。During the construction process of erecting or replacing transformers and JP cabinets, the construction team needs to use cranes or large-scale machinery to carry out operations. Due to the restrictions of the construction site or environment, it is difficult to use cranes or large-scale machinery for hoisting, which has caused inconvenience to the construction. Less trouble will affect the construction efficiency, and the other is the high cost of using cranes and large machinery, which will increase the construction cost.

实用新型内容Utility model content

本实用新型要解决的技术问题是针对上述现有技术的不足,提供一种便携式吊装器,解决电力系统变压器及JP柜安装受环境因素影响大、安装效率低的问题,具有电力系统变压器及JP柜安装不受环境因素影响、安装效率高的特点。The technical problem to be solved by the utility model is to provide a portable hoisting device for the deficiencies of the above-mentioned prior art to solve the problems that the installation of power system transformers and JP cabinets is greatly affected by environmental factors and the installation efficiency is low. The cabinet installation is not affected by environmental factors and has the characteristics of high installation efficiency.

为解决上述技术问题,本实用新型所采取的技术方案是:一种便携式吊装器,包括槽钢、两个滑轮、横轴、若干条拉线和倒链,所述槽钢固定安装在电杆上的熔断器横担的中间位置上,所述拉线的一端与所述槽钢的一端连接,所述拉线的另一端固定在电杆上,所述槽钢的两个侧板分别设有滑轮轨道,两个滑轮分别位于槽钢两侧的滑轮轨道中,两个滑轮依靠轴承连接固定安装在所述横轴的两端,所述横轴中间设有挂钩,所述倒链安装在所述挂钩上。In order to solve the above technical problems, the technical solution adopted by the utility model is: a portable hoisting device, including a channel steel, two pulleys, a horizontal shaft, several pull wires and an inverted chain, and the channel steel is fixedly installed on the pole In the middle position of the cross arm of the fuse, one end of the stay wire is connected to one end of the channel steel, the other end of the stay wire is fixed on the pole, and the two side plates of the channel steel are respectively provided with pulley tracks The two pulleys are respectively located in the pulley tracks on both sides of the channel steel. The two pulleys are fixedly installed at both ends of the horizontal shaft by means of bearings. A hook is arranged in the middle of the horizontal shaft, and the inverted chain is installed on the hook superior.

优选地,所述拉线为2条,2条拉线的一端均与所述槽钢的一端连接,2条拉线的另一端分别固定在两个电杆上。Preferably, there are two stay wires, one end of the two stay wires is connected to one end of the channel steel, and the other ends of the two stay wires are respectively fixed on two electric poles.

优选地,所述拉线选用油丝绳。Preferably, the pull wire is oil silk rope.

优选地,所述槽钢的中间位置设有两个螺孔,两个夹板上设有与槽钢上两个螺孔位置对应的螺孔,两个夹板将所述槽钢和熔断器横担夹在中间,两个夹板通过螺栓连接将槽钢固定在熔断器横担上。Preferably, two screw holes are provided in the middle of the channel steel, screw holes corresponding to the positions of the two screw holes on the channel steel are provided on the two splints, and the two splints hold the channel steel and the fuse across Sandwiched in the middle, two splints are bolted to secure the channel to the crossarm of the fuse.

优选地,所述倒链为2吨倒链。Preferably, the chain hoist is a 2-ton hoist.

优选地,所述槽钢长度为3米。Preferably, the length of the channel steel is 3 meters.

采用上述技术方案所产生的有益效果在于:本实用新型通过设计便携式吊装器,包括槽钢、两个滑轮、横轴、若干条拉线和倒链,槽钢固定安装在电杆上的熔断器横担的中间位置上,拉线的一端与槽钢的一端连接,拉线的另一端固定在电杆上,槽钢的两个侧板分别设有滑轮轨道,两个滑轮分别位于槽钢两侧的滑轮轨道中,两个滑轮依靠轴承连接固定安装在横轴的两端,横轴中间设有挂钩,倒链安装在挂钩上。在安装变压器及JP柜时,将便携式吊装器与熔断器横担和电杆完成配合连接后,将倒链的升降链与变压器或JP柜固定连接,然后利用倒链将变压器或JP柜升到规定的高度,然后推动变压器或JP柜水平运动到达预定位置,将升降链与变压器或JP柜分离完成安装,通过此技术手段实现变压器或JP柜的吊装,不在需要起重机械,降低了安装的成本,同时由于便携式吊装器体积小、便于携带,可以在很小的空间内完成作业,不受环境因素的制约,提高变压器或JP柜安装的效率。The beneficial effects produced by adopting the above-mentioned technical solution are: the utility model designs a portable hoisting device, including channel steel, two pulleys, a horizontal shaft, several pull wires and an inverted chain. In the middle position of the load, one end of the stay wire is connected to one end of the channel steel, and the other end of the stay wire is fixed on the pole. The two side plates of the channel steel are respectively equipped with pulley tracks, and the two pulleys are respectively located on the pulleys on both sides of the channel steel. In the track, two pulleys are connected and fixedly installed at both ends of the horizontal shaft by means of bearings, a hook is arranged in the middle of the horizontal shaft, and the inverted chain is installed on the hook. When installing the transformer and JP cabinet, after the portable hoist is connected with the fuse cross arm and the pole, the lifting chain of the down chain is fixedly connected with the transformer or JP cabinet, and then the transformer or JP cabinet is lifted to the The specified height, and then push the transformer or JP cabinet to move horizontally to the predetermined position, separate the lifting chain from the transformer or JP cabinet to complete the installation, and realize the hoisting of the transformer or JP cabinet through this technical means, without the need for lifting machinery, which reduces the installation cost At the same time, because the portable hoist is small in size and easy to carry, it can complete the work in a small space without being restricted by environmental factors, and improves the efficiency of transformer or JP cabinet installation.

附图说明Description of drawings

图1是本实用新型提供实施例便携式吊装器使用时的结构示意图;Fig. 1 is a schematic structural view of the utility model providing an embodiment of the portable hoist when in use;

图2是图1的左视图;Fig. 2 is the left view of Fig. 1;

图3是槽钢的截面图。Fig. 3 is a sectional view of the channel steel.

图中:1、电杆;2、槽钢;3、拉线;4、倒链;5、挂钩;6、变压器或JP柜;7、熔断器横担;8、滑轮;9、横轴。In the figure: 1. Pole; 2. Channel steel; 3. Pull wire; 4. Back chain; 5. Hook; 6. Transformer or JP cabinet; 7. Cross arm of fuse; 8. Pulley;

具体实施方式Detailed ways

下面结合附图和具体实施方式对本实用新型作进一步详细的说明,但本实用新型的保护范围不局限于以下所述。The utility model will be further described in detail below in conjunction with the accompanying drawings and specific embodiments, but the protection scope of the utility model is not limited to the following description.

如图1-3所示,便携式吊装器包括槽钢2、两个滑轮8、横轴9、若干条拉线3和倒链4,槽钢2固定安装在电杆1上的熔断器横担7的中间位置上,拉线3的一端与槽钢2的一端连接,拉线3的另一端固定在电杆1上,槽钢2的两个侧板分别设有滑轮轨道,两个滑轮8分别位于槽钢2两侧的滑轮轨道中,两个滑轮8依靠轴承连接固定安装在横轴9的两端,横轴9中间设有挂钩5,倒链4安装在挂钩5上。As shown in Figure 1-3, the portable hoist includes a channel steel 2, two pulleys 8, a horizontal shaft 9, several stay wires 3 and an inverted chain 4, and the channel steel 2 is fixedly installed on the fuse cross arm 7 on the pole 1 In the middle position, one end of the stay wire 3 is connected to one end of the channel steel 2, the other end of the stay wire 3 is fixed on the pole 1, the two side plates of the channel steel 2 are provided with pulley tracks respectively, and the two pulleys 8 are respectively located in the groove In the pulley track on both sides of the steel 2, two pulleys 8 are fixedly installed on the two ends of the cross shaft 9 by means of bearings.

在安装变压器及JP柜时,将便携式吊装器与熔断器横担7和电杆1完成配合连接后,将倒链4的升降链与变压器或JP柜(6)固定连接,然后利用倒链4将变压器或JP柜(6)升到规定的高度,然后推动变压器或JP柜(6)水平运动到达预定位置,将升降链与变压器或JP柜(6)分离完成安装,通过此技术手段实现变压器或JP柜(6)的吊装,不在需要起重机械,降低了安装的成本,同时由于便携式吊装器体积小、便于携带,可以在很小的空间内完成作业,不受环境因素的制约,提高变压器或JP柜(6)安装的效率。When installing the transformer and JP cabinet, after the portable hoist is connected with the fuse cross arm 7 and the pole 1, the lifting chain of the down chain 4 is fixedly connected with the transformer or the JP cabinet (6), and then the down chain 4 is used to Raise the transformer or JP cabinet (6) to the specified height, then push the transformer or JP cabinet (6) to move horizontally to the predetermined position, separate the lifting chain from the transformer or JP cabinet (6) to complete the installation, and realize the transformer through this technical means Or the hoisting of the JP cabinet (6) does not require lifting machinery, which reduces the cost of installation. At the same time, because the portable hoist is small in size and easy to carry, it can complete the work in a small space without being restricted by environmental factors, and improves Efficiency of transformer or JP cabinet (6) installation.

本实用新型的一个实施例中,拉线3为2条,2条拉线3的一端均与槽钢2的一端连接,2条拉线3的另一端分别固定在两个电杆1上。通过此种设计能够保证在吊装变压器或JP柜(6)时,保证槽钢2的稳定,增强装置整体的稳定性能,同时根据实际要求,拉线3条数的设计可变。In one embodiment of the present utility model, there are two backguy wires 3, one end of the two backguy wires 3 is connected to one end of the channel steel 2, and the other ends of the two backguy wires 3 are respectively fixed on two poles 1. This design can ensure the stability of the channel steel 2 when hoisting the transformer or JP cabinet (6), and enhance the overall stability of the device. At the same time, according to actual requirements, the design of the number of 3 pull wires can be changed.

本实用新型的一个实施例中,拉线3选用油丝绳。In one embodiment of the present utility model, backguy 3 selects oil silk rope for use.

本实用新型的一个实施例中,槽钢2的中间位置设有两个螺孔,两个夹板上设有与槽钢2上两个螺孔位置对应的螺孔,两个夹板将槽钢2和熔断器横担7夹在中间,两个夹板通过螺栓连接将槽钢2固定在熔断器横担7上。In one embodiment of the present utility model, the middle position of channel steel 2 is provided with two screw holes, and two splints are provided with the screw holes corresponding to two screw hole positions on channel steel 2, two splints are provided with channel steel 2 It is clamped in the middle with the fuse cross arm 7, and the two splints are connected by bolts to fix the channel steel 2 on the fuse cross arm 7.

本实用新型的一个实施例中,倒链4为2吨倒链4。In one embodiment of the present utility model, the inverted chain 4 is a 2-ton inverted chain 4 .

本实用新型的一个实施例中,槽钢2长度为3米,也可根据实际情况设定槽钢2的长度。In one embodiment of the present utility model, the length of the channel steel 2 is 3 meters, and the length of the channel steel 2 can also be set according to actual conditions.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above descriptions are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model shall be included in this utility model. within the scope of protection of utility models.

Claims (6)

1.一种便携式吊装器,其特征在于,包括槽钢(2)、两个滑轮(8)、横轴(9)、若干条拉线(3)和倒链(4),所述槽钢(2)固定安装在电杆(1)上的熔断器横担(7)的中间位置上,所述拉线(3)的一端与所述槽钢(2)的一端连接,所述拉线(3)的另一端固定在电杆(1)上,所述槽钢(2)的两个侧板分别设有滑轮轨道,两个滑轮(8)分别位于槽钢(2)两侧的滑轮轨道中,两个滑轮(8)依靠轴承连接固定安装在所述横轴(9)的两端,所述横轴(9)中间设有挂钩(5),所述倒链(4)安装在所述挂钩(5)上。1. A portable hoist, characterized in that it includes a channel steel (2), two pulleys (8), a horizontal shaft (9), several stay wires (3) and an inverted chain (4), the channel steel ( 2) Fixedly installed on the middle position of the fuse crossarm (7) on the pole (1), one end of the stay wire (3) is connected to one end of the channel steel (2), and the stay wire (3) The other end is fixed on the pole (1), and the two side plates of the channel steel (2) are respectively provided with pulley tracks, and the two pulleys (8) are respectively located in the pulley tracks on both sides of the channel steel (2), Two pulleys (8) are fixedly installed at both ends of the horizontal shaft (9) by means of bearing connections, a hook (5) is provided in the middle of the horizontal shaft (9), and the inverted chain (4) is installed on the hook (5) up. 2.根据权利要求1所述的便携式吊装器,其特征在于,所述拉线(3)为2条,2条拉线(3)的一端均与所述槽钢(2)的一端连接,2条拉线(3)的另一端分别固定在两个电杆(1)上。2. The portable hanger according to claim 1, characterized in that there are two stay wires (3), and one end of the two stay wires (3) is connected to one end of the channel steel (2), and the two stay wires (3) are connected to one end of the channel steel (2). The other ends of the stay wires (3) are respectively fixed on the two poles (1). 3.根据权利要求1所述的便携式吊装器,其特征在于,所述拉线(3)选用油丝绳。3. The portable hanger according to claim 1, characterized in that the pull wire (3) is an oil silk rope. 4.根据权利要求1所述的便携式吊装器,其特征在于,所述槽钢(2)的中间位置设有两个螺孔,两个夹板上设有与槽钢(2)上两个螺孔位置对应的螺孔,两个夹板将所述槽钢(2)和熔断器横担(7)夹在中间,两个夹板通过螺栓连接将槽钢(2)固定在熔断器横担(7)上。4. The portable hanger according to claim 1, characterized in that two screw holes are provided in the middle of the channel steel (2), and two screw holes on the two splints are provided on the channel steel (2). The screw hole corresponding to the hole position, two splints clamp the channel steel (2) and the fuse cross arm (7) in the middle, and the two splints fix the channel steel (2) to the fuse cross arm (7) through bolt connection )superior. 5.根据权利要求1所述的便携式吊装器,其特征在于,所述倒链(4)为2吨倒链。5. The portable hoist according to claim 1, characterized in that, the chain hoist (4) is a 2-ton hoist. 6.根据权利要求1所述的便携式吊装器,其特征在于,所述槽钢(2)长度为3米。6. The portable hanger according to claim 1, characterized in that the length of the channel steel (2) is 3 meters.
CN201721299646.XU 2017-10-10 2017-10-10 Portable hoisting device Expired - Fee Related CN207276078U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721299646.XU CN207276078U (en) 2017-10-10 2017-10-10 Portable hoisting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721299646.XU CN207276078U (en) 2017-10-10 2017-10-10 Portable hoisting device

Publications (1)

Publication Number Publication Date
CN207276078U true CN207276078U (en) 2018-04-27

Family

ID=61987796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721299646.XU Expired - Fee Related CN207276078U (en) 2017-10-10 2017-10-10 Portable hoisting device

Country Status (1)

Country Link
CN (1) CN207276078U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110937519A (en) * 2019-11-20 2020-03-31 国网江西省电力有限公司南昌供电分公司 Portable pole-mounted transformer rapid transportation lifting device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110937519A (en) * 2019-11-20 2020-03-31 国网江西省电力有限公司南昌供电分公司 Portable pole-mounted transformer rapid transportation lifting device

Similar Documents

Publication Publication Date Title
CN202014054U (en) Overhaul tool for dead end insulator on +/- 660kV DC power transmission line
CN201864516U (en) Lifting appliance special for overhauling isolating switch
CN102040166A (en) Hoisting tool for equipment on pillar
CN202967920U (en) Hanging overhaul device of load switch of transformer
CN207276078U (en) Portable hoisting device
CN201758338U (en) Motor stator lifting fixture
CN101814707A (en) Tool for live replacement of 220kV line 'V' string insulator and method
CN207303796U (en) One kind is used for electric power apparatus examination Portable lifting device
CN202545121U (en) Wind generating set with crane
CN105133916A (en) Auxiliary hanging bracket for mounting of upper frame on telegraph pole
CN201778531U (en) Fixing base of auxiliary embraced bar
CN204361576U (en) Split-type six-split wire lifter for power failure and live work on transmission lines
CN201932878U (en) Detachable distribution transform core lifting device
CN203728448U (en) Light mounting and dismounting frame for tower crane
CN209276035U (en) A kind of self-supporting superelevation Lift-on/Lift-off System
CN202594599U (en) Tool special for hoisting casing
CN202967922U (en) Simple hoisting device for mounting steel structural bridge
CN206014242U (en) A kind of aid for lifting insulator
CN105305316B (en) A kind of mountain region effort-saving circuit line lifter
CN204760824U (en) Small -size assembled hoist device
CN102923600A (en) Reverse pulley fixing device
CN204967142U (en) Join in marriage comprehensive electrified maintenance of net and carry lineman's utensil
CN203497976U (en) High-altitude installation clamping device for large electric hoists
CN203582376U (en) Slidably mounting and lifting structure
CN203474223U (en) Hoisting tool for steam generator of nuclear power plant

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180427

Termination date: 20191010

CF01 Termination of patent right due to non-payment of annual fee