CN207268342U - A kind of device for reinforcing the connection of ductile iron pipeline socket joint - Google Patents
A kind of device for reinforcing the connection of ductile iron pipeline socket joint Download PDFInfo
- Publication number
- CN207268342U CN207268342U CN201721194327.2U CN201721194327U CN207268342U CN 207268342 U CN207268342 U CN 207268342U CN 201721194327 U CN201721194327 U CN 201721194327U CN 207268342 U CN207268342 U CN 207268342U
- Authority
- CN
- China
- Prior art keywords
- ductile iron
- connection
- iron pipe
- reinforcing
- socket joint
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Joints With Sleeves (AREA)
Abstract
本实用新型涉及球墨铸铁管道的连接设备技术领域,公开了一种加固球墨铸铁管道承插连接的装置,包括依次连接的至少两根球墨铸铁管以及加固相邻两根球墨铸铁管连接的加固组件,所述加固组件包括法兰构件、P型夹以及与P型夹配合的橡胶套垫,所述P型夹和橡胶套垫依次从外向内套设并卡在球墨铸铁管靠近尾端的外周壁上。本实用新型加固球墨铸铁管道承插连接的装置简单易操作,可快速安装施工,提高了球墨管的辐射时的安装效率;且装置牢固可靠的,提高了球墨管连接位置的敷设质量,具有省时省力、节约人力和机械成本等优点。
The utility model relates to the technical field of connection equipment for ductile iron pipes, and discloses a device for strengthening the socket connection of ductile iron pipes, which comprises at least two ductile iron pipes connected in sequence and a reinforcement assembly for reinforcing the connection between two adjacent ductile iron pipes , the reinforcement assembly includes a flange member, a P-clamp, and a rubber gasket matched with the P-clip, and the P-clip and the rubber gasket are sequentially sleeved from outside to inside and clamped on the outer peripheral wall of the ductile iron pipe near the tail end superior. The device for strengthening the socket connection of ductile iron pipes of the utility model is simple and easy to operate, can be quickly installed and constructed, and improves the installation efficiency when the ductile tubes are irradiated; and the device is firm and reliable, improving the laying quality of the joints of the ductile tubes, and has the advantages of saving It has the advantages of saving time and labor, saving manpower and mechanical costs.
Description
技术领域technical field
本实用新型涉及球墨铸铁管道的连接设备技术领域,尤其涉及一种加固球墨铸铁管道承插连接的装置。The utility model relates to the technical field of connection equipment for ductile iron pipes, in particular to a device for strengthening the socket connection of ductile iron pipes.
背景技术Background technique
目前在国内各类市政管道工程、机电安装工程以及室外管线安装工程项目上,球墨铸铁管道被广泛的应用。尤其,由于球墨铸铁管是自来水管道理想的选择用料,所以在我国很多地区,其被广泛应用在自来水中、小口径的给水管与管之间的连接中。At present, ductile iron pipes are widely used in various domestic municipal pipeline projects, electromechanical installation projects, and outdoor pipeline installation projects. In particular, since the ductile iron pipe is an ideal material for tap water pipes, it is widely used in tap water and the connection between small-diameter water supply pipes and pipes in many areas of our country.
现有的球墨铸铁管道的安装如图1所示:其主要采用混凝土之墩13配合U形卡14的形式进行连接位置的加固。具体的施工为:施工现场根据沟槽土质、地下水、开槽断面,来确定混凝土支墩13的大小尺寸、强度灰度标号等,沿着图纸设计方向,每根管道的承插口端设置一座混凝土支墩13,同时根据所敷设管道的外径大小来确定基础凹槽的弧度。待所有混凝土支墩13完成后,下铺C30细石以及细沙,沿水流方向将球墨铸铁管11a的承插口15迎水流方向安装,并用U形卡14固定,待第一根球墨铸铁管11a安装完成后,将专用的密封圈12成“心形”放入承插口的凹槽内,再将另一根球墨铸铁管11缓慢挤入承插口,并使密封圈12将管道完全包住,最后用U形卡14将管道固定于混凝土支墩13上,完成安装,做好防腐处理,最后进行回填、覆盖。The installation of the existing ductile iron pipeline is shown in Figure 1: it mainly adopts the form of concrete pier 13 and U-shaped clip 14 to reinforce the connection position. The specific construction is as follows: the construction site determines the size and strength gray scale of the concrete buttress 13 according to the soil quality of the trench, groundwater, and the slotted section. The buttress 13, at the same time, the radian of the foundation groove is determined according to the outer diameter of the pipeline to be laid. After all the concrete buttresses 13 are completed, lay C30 fine stones and fine sand, install the socket 15 of the ductile iron pipe 11a along the direction of water flow, and fix it with U-shaped clips 14. After the first ductile iron pipe 11a After the installation is completed, put the special sealing ring 12 into the groove of the socket in a "heart shape", and then slowly squeeze another ductile iron pipe 11 into the socket, and make the sealing ring 12 completely wrap the pipe, Finally, the pipeline is fixed on the concrete pier 13 with the U-shaped clip 14, the installation is completed, anti-corrosion treatment is done, and finally backfilling and covering are carried out.
现有的承插加固结构存在以下缺陷:首先,在沟槽开挖后,底部黏土均已夯实后,再进行混凝土支墩13的浇筑,浇筑过程出现浇筑水平面不统一、高低不齐的比例非常大,且需要对混凝土养护,待混凝土支墩13的强度达到要求才可进行管道安装,延长了施工工期。其次,采用混凝土基础,目前大多数现场施工作业不规范,采用混凝土材料以及施工工艺,达不到标准,往往为赶进度,会在基础未达标时就进行安装作业,使得管道安装的质量得不到保证;一旦混凝土支墩13之间的砂石未做好填充,且上方有较大机械经过或较大外力则会产生应力变形,造成不良后果。再次,由于采用U形卡14进行刚性固定,需要使用锚栓紧固,因此需要电钻钻孔,从而增加了施工工序,提高了成本,若施工场地周边无外接电源,需带发电机进行临时发电,浪费了能源,污染环境,产生噪音,影响对周边居民的生产生活。The existing socket reinforcement structure has the following defects: First, after the excavation of the trench and the clay at the bottom has been compacted, the concrete buttress 13 is poured, and the pouring level is not uniform and the proportion of uneven height is very high during the pouring process. Large, and need to concrete curing, until the strength of the concrete buttress 13 meets the requirements, the pipeline installation can be carried out, prolonging the construction period. Secondly, the concrete foundation is used. At present, most of the on-site construction operations are not standardized. The use of concrete materials and construction techniques cannot meet the standards. Often, in order to catch up with the progress, the installation work will be carried out when the foundation is not up to standard, which makes the quality of pipeline installation unacceptable. To guarantee; once the gravel between the concrete buttresses 13 is not well filled, and there is a large mechanical process or a large external force above, stress deformation will occur, resulting in adverse consequences. Thirdly, since U-shaped clips 14 are used for rigid fixing, anchor bolts are required for fastening, so electric drills are required to drill holes, thereby increasing the construction process and increasing the cost. If there is no external power supply around the construction site, a generator is required for temporary power generation , wasting energy, polluting the environment, generating noise, and affecting the production and life of surrounding residents.
实用新型内容Utility model content
(一)要解决的技术问题(1) Technical problems to be solved
本实用新型提供一种加固球墨铸铁管道承插连接的装置,以解决现有承插加固费时费力且施工繁琐的问题。The utility model provides a device for strengthening socket connections of nodular cast iron pipes to solve the problems of time-consuming, laborious and cumbersome construction for socket reinforcement in the prior art.
(二)技术方案(2) Technical solutions
为了解决上述技术问题,本实用新型提供了一种加固球墨铸铁管道承插连接的装置,包括依次连接的至少两根球墨铸铁管以及加固相邻两根球墨铸铁管连接的加固组件;In order to solve the above technical problems, the utility model provides a device for strengthening the socket connection of ductile iron pipes, which includes at least two ductile iron pipes connected in sequence and a reinforcement assembly for strengthening the connection between two adjacent ductile iron pipes;
所述球墨铸铁管的迎水端设置有承插口,上一根球墨铸铁管的尾端插入相邻下一根球墨铸铁管的迎水端的承插口内,所述至少两根球墨铸铁管依次连接;The water-facing end of the ductile iron pipe is provided with a socket, the tail end of the previous ductile iron pipe is inserted into the socket of the water-facing end of the adjacent next ductile iron pipe, and the at least two ductile iron pipes are connected in sequence ;
所述加固组件包括法兰构件、P型夹以及与P型夹配合的橡胶套垫,所述橡胶套垫和P型夹依次从内向外套设并卡在球墨铸铁管靠近尾端的外周壁上,所说法兰构件包括靠近P型夹并套设在P型夹上游的球墨铸铁管外周壁上的第一法兰盘、紧邻承插口并套设在承插口下游的球墨铸铁管的外周壁上的第二法兰盘以及与所述第一法兰盘和第二法兰盘配套的第一螺栓,其中,上一根球墨铸铁管上的第一法兰盘与其相邻的下一根球墨铸铁管上的第二法兰盘配套通过所述第一螺栓紧固。The reinforcement assembly includes a flange member, a P-shaped clip, and a rubber gasket matched with the P-shaped clip. The rubber gasket and the P-shaped clip are sequentially arranged from the inside to the outside and clamped on the outer peripheral wall of the ductile iron pipe near the tail end, The flange member includes a first flange that is close to the P-type clamp and sleeved on the outer peripheral wall of the ductile iron pipe upstream of the P-type clamp, and is adjacent to the socket and sleeved on the outer peripheral wall of the ductile iron pipe downstream of the socket. The second flange and the first bolts matched with the first flange and the second flange, wherein the first flange on the last ductile iron pipe and the next adjacent ductile iron The second flange on the pipe is matched and fastened by the first bolts.
进一步地,所述橡胶套垫的外周呈锯齿形。Further, the outer periphery of the rubber sleeve is zigzag.
进一步地,所述橡胶套垫的轴向宽度大于所述P型夹的轴向宽度,且所述橡胶套垫紧靠下一根球墨铸铁管的承插口设置。Further, the axial width of the rubber sleeve is larger than the axial width of the P-shaped clamp, and the rubber sleeve is arranged close to the socket of the next ductile iron pipe.
进一步地,所述P型夹距离下一根球墨铸铁管的承插口的距离为5-20mm。Further, the distance between the P-shaped clip and the socket of the next ductile iron pipe is 5-20mm.
进一步地,所述P型夹为通过第二螺栓对合的两半圆形结构。Further, the P-shaped clip is two semicircular structures joined by second bolts.
进一步地,所述第一螺栓的仅两端设置有螺纹。Further, only two ends of the first bolt are provided with threads.
进一步地,所述第一螺栓设在第一法兰盘的两侧、第二法兰盘的两侧均设置有适配的螺母,其中,两法兰盘相对面上对应的螺母为防松螺母,两法兰盘相背面上对应的螺母为紧固螺母。Further, the first bolts are arranged on both sides of the first flange, and both sides of the second flange are provided with suitable nuts, wherein the corresponding nuts on the opposite surfaces of the two flanges are anti-loosening Nuts, the corresponding nuts on the opposite sides of the two flanges are fastening nuts.
进一步地,所述螺栓上涂有粘度沥青。Further, the bolts are coated with viscous asphalt.
进一步地,所述第一法兰盘、第二法兰盘和第一螺栓均为304不锈钢材质;Further, the first flange, the second flange and the first bolts are all made of 304 stainless steel;
所述P型夹的材质为热镀锌材料。The material of the P-shaped clip is hot-dip galvanized material.
进一步地,所述橡胶套垫的厚度不小于10mm。Further, the thickness of the rubber sleeve is not less than 10mm.
(三)有益效果(3) Beneficial effects
本实用新型提供的加固球墨铸铁管道承插连接的装置,通过P型夹将橡胶套垫牢固地固定于上一根球墨管的靠近下一根球墨管承插口的端部,保证P型夹不会在球墨铸铁管轴向滑动,然后通过高强度螺栓将承插口两侧已安装好的第一法兰盘和第二法兰盘连接,使其成为一个整体装置,进而固定两条相邻的球墨铸铁管。本实用新型加固球墨铸铁管道承插连接的装置简单易操作,可快速安装施工,提高了球墨管的辐射时的安装效率;且装置牢固可靠的,提高了球墨管连接位置的敷设质量,具有省时省力、节约人力和机械成本等优点。The utility model provides a device for strengthening the socket connection of ductile iron pipes. The rubber sleeve pad is firmly fixed on the end of the previous ductile tube close to the socket of the next ductile tube through the P-type clamp, so as to ensure that the P-type clamp does not It will slide axially on the ductile iron pipe, and then connect the installed first flange and the second flange on both sides of the socket through high-strength bolts to make it a whole device, and then fix two adjacent flanges. Ductile iron pipe. The device for strengthening the socket connection of ductile iron pipes of the utility model is simple and easy to operate, can be quickly installed and constructed, and improves the installation efficiency when the ductile tubes are irradiated; and the device is firm and reliable, improving the laying quality of the joints of the ductile tubes, and has the advantages of saving It has the advantages of saving time and labor, saving manpower and mechanical costs.
除了上面所描述的本实用新型解决的技术问题、构成的技术方案的技术特征以及有这些技术方案的技术特征所带来的优点之外,本实用新型的其他技术特征及这些技术特征带来的优点,将结合附图作出进一步说明。In addition to the technical problems solved by the utility model described above, the technical features of the technical solutions formed and the advantages brought by the technical features of these technical solutions, other technical features of the utility model and the advantages brought by these technical features The advantages will be further explained in conjunction with the accompanying drawings.
附图说明Description of drawings
图1是现有球墨铸铁管道的安装示意图;Fig. 1 is the installation sketch map of existing nodular cast iron pipeline;
图2是本实用新型实施例加固球墨铸铁管道承插连接的装置的示意图;Fig. 2 is the schematic diagram of the device for strengthening the socket connection of ductile iron pipelines according to the embodiment of the present invention;
图3是本实用新型实施例加固球墨铸铁管道承插连接的装置沿P型夹位置的纵向剖面图;Fig. 3 is a longitudinal sectional view of the device for strengthening the socket connection of ductile iron pipes according to the embodiment of the present invention along the position of the P-shaped clamp;
图4是P型夹、橡胶套垫与球墨铸铁管的卡接示意剖面图。Fig. 4 is a schematic cross-sectional view of the clamping connection between the P-shaped clip, the rubber sleeve and the ductile iron pipe.
图中:11:第二球墨铸铁管,11a:第一球墨铸铁管;12:密封圈,13:混凝土支墩,14:U形卡,15:承插口;21:第一法兰盘,22:第二法兰盘;3:P型夹;4:橡胶套垫;5:第二螺栓;6:法兰孔;7:第一螺栓;8:紧固螺母。In the figure: 11: the second ductile iron pipe, 11a: the first ductile iron pipe; 12: sealing ring, 13: concrete buttress, 14: U-shaped card, 15: socket; 21: the first flange, 22 : second flange; 3: P-shaped clamp; 4: rubber gasket; 5: second bolt; 6: flange hole; 7: first bolt; 8: fastening nut.
具体实施方式Detailed ways
为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动的前提下所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purpose, technical solutions and advantages of the embodiments of the utility model more clear, the technical solutions in the embodiments of the utility model will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the utility model. Obviously, the described The embodiments are some embodiments of the present utility model, but not all embodiments. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.
在本实用新型的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本实用新型中的具体含义。In the description of the present utility model, it should be noted that, unless otherwise clearly stipulated and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a flexible connection. Detachable connection, or integral connection; it can be mechanical connection or electrical connection; it can be direct connection or indirect connection through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present utility model in specific situations.
此外,在本实用新型的描述中,除非另有说明,“多个”、“多根”、“多组”的含义是两个或两个以上,“若干个”、“若干根”、“若干组”的含义是一个或一个以上。In addition, in the description of the present utility model, unless otherwise specified, the meanings of "multiple", "multiple roots" and "multiple groups" are two or more, "several", "several roots", "several "Several groups" means one or more than one.
图1、2中的箭头方向表示的是水流方向,球墨铸铁管的首端指的是迎着水流的一端;上一根下一根以水流的方向进行描述,即靠近水流上游的为上一根,靠近水流下游的为下一根;具体安装是逆水流方向依次安装各条管道。The direction of the arrow in Figures 1 and 2 indicates the direction of the water flow. The head end of the ductile iron pipe refers to the end facing the water flow; The root is the next one near the downstream of the water flow; the specific installation is to install each pipe in sequence against the direction of the water flow.
如图2所示,本实用新型实施例提供的加固球墨铸铁管道承插连接的装置,包括多根(图中为了方便画出了3根的形式)依次连接的球墨铸铁管以及加固相邻两根球墨铸铁管连接的加固组件。As shown in Figure 2, the device for strengthening the socket connection of ductile iron pipes provided by the embodiment of the present utility model includes a plurality of ductile iron pipes connected in sequence (three are drawn for convenience in the figure) and two adjacent reinforcement pipes are reinforced. Reinforcement components for ductile iron pipe connections.
所述球墨铸铁管的迎水端设置有承插口15,上一根球墨铸铁管的尾端插入相邻下一根球墨铸铁管的首端的承插口15内依次连接。为了方便描述,定义上一根球墨铸铁管为第一球墨铸铁管11,与第一球墨铸铁管11连接的下游的相邻管为第二球墨铸铁管11a。The water-facing end of the ductile iron pipe is provided with a socket 15, and the tail end of the previous ductile iron pipe is inserted into the socket 15 at the head end of the adjacent next ductile iron pipe to connect in sequence. For convenience of description, the last ductile iron pipe is defined as the first ductile iron pipe 11, and the downstream adjacent pipe connected to the first ductile iron pipe 11 is the second ductile iron pipe 11a.
所述加固组件包括法兰构件、P型夹3以及与P型夹配合的橡胶套垫4,所述橡胶套垫4和P型夹3依次从内向外套设并卡在球墨铸铁管靠近尾端的外周壁上,所说法兰构件包括靠近P型夹3并套设在P型夹3上游的球墨铸铁管外周壁上的第一法兰盘21、紧邻承插口15并套设在承插口15下游的球墨铸铁管的外周壁上的第二法兰盘22以及与所述第一法兰盘21和第二法兰盘22上的法兰孔6配套的第一螺栓7,其中,上一根球墨铸铁管(第一球墨铸铁管11)上的第一法兰盘21与其相邻的下一根球墨铸铁管(第二球墨铸铁管11a)上的第二法兰盘22配套通过所述第一螺栓7紧固。The reinforcement assembly includes a flange member, a P-type clip 3 and a rubber gasket 4 that cooperates with the P-type clip. The rubber gasket 4 and the P-type clip 3 are sequentially arranged from the inside to the outside and are stuck on the end of the ductile iron pipe near the end. On the peripheral wall, the flange member includes a first flange 21 close to the P-type clamp 3 and sleeved on the peripheral wall of the ductile iron pipe upstream of the P-type clamp 3, adjacent to the socket 15 and sleeved downstream of the socket 15 The second flange 22 on the outer peripheral wall of the ductile iron pipe and the first bolt 7 matched with the flange holes 6 on the first flange 21 and the second flange 22, wherein the last one The first flange 21 on the ductile iron pipe (the first ductile iron pipe 11) is matched with the second flange 22 on the next ductile iron pipe (the second ductile iron pipe 11a) adjacent to it through the first flange 21. A bolt 7 is fastened.
本实用新型的加固球墨铸铁管道承插连接的装置的法兰盘可由两片304不锈钢法兰盘(其直径根据实际情况定制)组成,并通过304不锈钢螺栓/和螺母配合连接,可有效避免外界腐蚀性物质对装置的破坏。The flange plate of the device for strengthening the socket connection of ductile iron pipes of the utility model can be composed of two 304 stainless steel flange plates (the diameter of which is customized according to the actual situation), and is connected by 304 stainless steel bolts/nuts, which can effectively prevent external Damage to devices by corrosive substances.
作为一种优选方案,所述第一螺栓的为两端带螺纹,中间不带螺纹的结构,两端螺纹长度各为50mm;且所述第一螺栓7在第一法兰盘21的两侧、第二法兰盘22的两侧均设置有适配的螺母,其中,两法兰盘相对面上对应的螺母为防松螺母,两法兰盘相背面上对应的螺母为紧固螺母8。As a preferred solution, the first bolt has a structure with threads at both ends and no thread in the middle, and the thread length at both ends is 50mm; and the first bolt 7 is on both sides of the first flange 21 1. Both sides of the second flange 22 are provided with suitable nuts, wherein the corresponding nuts on the opposite faces of the two flanges are lock nuts, and the corresponding nuts on the opposite sides of the two flanges are fastening nuts 8 .
同时可在第一螺栓上可涂设粘度沥青,增加“紧固螺母8”以及内测防松螺母的阻尼系数。Simultaneously, the viscosity asphalt can be coated on the first bolt to increase the damping coefficient of the "tightening nut 8" and the internally measured locknut.
所述橡胶套垫4的外周可为天然橡胶材质的锯齿形(或者说是W形)、厚度在10mm以上的橡胶垫,其宽度根据P型夹3的宽度定制,且略大于P型夹3的宽度5-20mm,顶承插口15安装,也即所述P型夹3距离下一根球墨铸铁管的距离为5-20mm。The outer circumference of the rubber sleeve pad 4 can be a zigzag (or W-shaped) rubber pad with a thickness of more than 10mm made of natural rubber, and its width is customized according to the width of the P-type clip 3, and slightly larger than the P-type clip 3 Width 5-20mm, the jack socket 15 is installed, that is, the distance between the P-shaped clamp 3 and the next ductile iron pipe is 5-20mm.
橡胶套垫4耐腐蚀性强,材料力学性能好、强度大,提高了咬合力,使得管道在P型夹3不易滑动;同时P型夹3要承受两片法兰盘受到螺栓紧固时的拉力,橡胶套垫4略宽于P型夹,可以在轴向上对两根承接管的刚性连接起到缓冲作用。The rubber sleeve 4 has strong corrosion resistance, good mechanical properties and high strength of the material, which improves the bite force, making it difficult for the pipe to slide in the P-type clamp 3; at the same time, the P-type clamp 3 has to bear the stress of the two flanges when they are fastened by bolts. Pulling force, the rubber sleeve pad 4 is slightly wider than the P-shaped clip, which can play a buffering role in the rigid connection of the two receiving pipes in the axial direction.
本实施例加固球墨铸铁管道承插连接的装置的P型夹可采用热镀锌材料制作而成,其为通过第二螺栓5对合的两半圆形结构。The P-shaped clamp of the device for strengthening the socket connection of ductile iron pipes in this embodiment can be made of hot-dip galvanized material, which is a two-semicircular structure that is joined by the second bolt 5 .
使用时,首先当下游的第二球墨铸铁管11a就位后,将第二法兰盘22从尾端套入,直至承插口15勃颈处,接下来将专用的密封圈12成“心形”放入承插口15的凹槽内,同时将第一法兰盘21套入上游的第一球墨铸铁管11的尾端,随后将第一球墨铸铁管11尾端对准第二球墨铸铁管11a的承插口,承插之前,检查好密封圈是否放稳放正,在确认无误后,用力将第一球墨铸铁管11挤入第二球墨铸铁管11a的承插口内,保证密封圈将管道完全包住。后续管道重复以上内容,继续敷设。When in use, first when the downstream second ductile iron pipe 11a is in place, insert the second flange 22 from the tail end until the neck of the socket 15, and then place the special sealing ring 12 into a "heart-shaped "Put it into the groove of the socket 15, and at the same time put the first flange 21 into the tail end of the upstream first ductile iron pipe 11, and then align the tail end of the first ductile iron pipe 11 with the second ductile iron pipe 11a socket, before socketing, check whether the sealing ring is stable and upright. After confirming that it is correct, forcefully squeeze the first ductile iron pipe 11 into the socket of the second ductile iron pipe 11a to ensure that the sealing ring seals the pipe Completely encased. Repeat the above content for subsequent pipelines and continue laying.
如图3、图4所示,当第一球墨铸铁管11完全挤入第二球墨铸铁管11a的承插口内后,根据管道管径大小剪裁合适的橡胶套垫4”,宽度略大于P型夹3的尺寸10mm左右,在距第二球墨铸铁管承插口约10mm位置,将P型夹3紧扣于橡胶套垫4表面并拧紧第二螺栓5,使得整个P型夹紧紧抱住第一球墨铸铁管11。最后,通过“304不锈钢材质的第一螺栓7把两侧法兰盘紧固,并锁紧紧固螺母8如图2。同时,应保证左侧法兰盘立面与P型夹立面充分接触,然后将第一螺栓7内侧的防松动螺母紧固,防止螺栓窜动导致紧固失效的现象发生。As shown in Figure 3 and Figure 4, when the first ductile iron pipe 11 is completely squeezed into the socket of the second ductile iron pipe 11a, a suitable rubber gasket 4" is cut according to the diameter of the pipe, and the width is slightly larger than that of the P type The size of the clamp 3 is about 10mm. At a position about 10mm away from the socket of the second ductile iron pipe, fasten the P-type clamp 3 to the surface of the rubber sleeve 4 and tighten the second bolt 5 so that the entire P-type clamp tightly embraces the first A ductile iron pipe 11. Finally, the flanges on both sides are fastened by the first bolt 7 made of 304 stainless steel, and the fastening nut 8 is locked as shown in Figure 2. At the same time, it should be ensured that the elevation of the flange on the left is in full contact with the elevation of the P-clamp, and then the anti-loosening nuts inside the first bolt 7 should be tightened to prevent bolt movement from causing fastening failure.
综上所述,本实施例加固球墨铸铁管道承插连接的装置具有以下优点:In summary, the device for strengthening the socket connection of ductile iron pipes in this embodiment has the following advantages:
1、其材料要求不高,可就地取材,易采购,各元件在各大小五金材料店均可购买,不必进行混凝土配料、搅拌。1. Its material requirements are not high, and it can be obtained locally, and it is easy to purchase. All components can be purchased in hardware material stores of all sizes, and there is no need for concrete batching and mixing.
2、本装置使用简单、快捷,易操作,针对中小型给水球墨管道敷设的使用效果尤为明显。其安装牢固,一劳永逸,提高安装效率,不必等待混凝土养护期满,可随时随地现场施工,减少施工工序,避免了大量电动工具,以及临时配电箱、线缆等工具或材料的携带,作业人员轻装上阵即可解决问题。2. The device is simple, quick and easy to operate, especially for the laying of small and medium-sized water supply ball ink pipelines. Its installation is firm, once and for all, improving installation efficiency, without waiting for the concrete curing period to expire, and can be constructed on site anytime, anywhere, reducing construction procedures, avoiding a large number of electric tools, temporary distribution boxes, cables and other tools or materials, and operators Going light will do the trick.
3、本装置的结构稳定,施工快速,操作门槛较低,容易上手,后期维修故障率小,不易爆管跑水,在系统打压试验的过程中安全牢固,保障了系统的稳定性,无跑冒滴漏现象发生。3. The structure of this device is stable, the construction is fast, the operating threshold is low, easy to use, the failure rate of later maintenance is small, and it is not easy to burst the pipe and run out of water. It is safe and firm during the system pressure test process, ensuring the stability of the system and no running out. Drip phenomenon occurs.
4、本装置可在城市轨道交通室外给水管道、消防供水管道中使用,大大降低人力成本,机械成本,施工工艺的改变,提高工作效率,具有可观的经济效益以及广泛推广的实用价值。4. This device can be used in urban rail transit outdoor water supply pipelines and fire-fighting water supply pipelines, greatly reducing labor costs, machinery costs, changes in construction techniques, improving work efficiency, and has considerable economic benefits and practical value for widespread promotion.
最后应说明的是:以上实施例仅用以说明本实用新型的技术方案,而非对其限制;尽管参照前述实施例对本实用新型进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本实用新型各实施例技术方案的精神和范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present utility model, and are not intended to limit it; although the utility model has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions recorded in the foregoing embodiments, or perform equivalent replacements for some of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the spirit of the technical solutions of the various embodiments of the present invention. and range.
Claims (10)
- A kind of 1. device for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:Including sequentially connected at least two balls Graphite cast iron pipe and the reinforcement assembly for reinforcing adjacent two balls graphite cast iron pipe connection;The end facing water of the ductile iron pipe is provided with bell and spigot, and the tail end of upper ball graphite cast iron pipe is inserted into adjacent next ball In the bell and spigot of the end facing water of graphite cast iron pipe, at least two ball graphite cast iron pipes are sequentially connected;The reinforcement assembly includes flange component, p-type folder and the rubber sleeve gasket coordinated with p-type folder, the rubber sleeve gasket and p-type Folder is arranged and is stuck in ductile iron pipe by the periphery wall of caudal part, described flange component is included close to p-type from inside to outside successively The first flange disk that presss from both sides and be set on the ductile iron pipe periphery wall of p-type folder upstream, close to bell and spigot and be set in bell and spigot Second flange disk on the periphery wall of the ductile iron pipe in downstream and supporting with the first flange disk and second flange disk First bolt, wherein, on first flange disk on upper ball graphite cast iron pipe next ball graphite cast iron pipe adjacent thereto Two ring flanges are supporting to be fastened by first bolt.
- 2. the device according to claim 1 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:The rubber sleeve The periphery indention of pad.
- 3. the device according to claim 1 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:The rubber sleeve The axial width of pad is more than the axial width of p-type folder, and the rubber sleeve gasket abuts the socket joint of next ball graphite cast iron pipe Mouth is set.
- 4. the device according to claim 3 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:The p-type folder Distance apart from the bell and spigot of next ball graphite cast iron pipe is 5-20mm.
- 5. the device according to claim 1 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:The p-type folder To pass through the two halves circular configuration of the second bolt pairing.
- 6. the device of ductile iron pipeline socket joint connection is reinforced according to claim 1-5 any one of them, it is characterised in that:Institute That states the first bolt is only provided at both ends with screw thread.
- 7. the device according to claim 6 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:First spiral shell Bolt is located at the both sides of first flange disk, the both sides of second flange disk and is both provided with the nut of adaptation, wherein, two ring flange opposite faces Upper corresponding nut is stop nut, and corresponding nut is clamp nut in two ring flange back.
- 8. the device according to claim 6 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:On the bolt Scribble viscosity asphalt.
- 9. the device according to claim 1 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:First method Blue disk, second flange disk and the first bolt are 304 stainless steels;The material of the p-type folder is hot dip Zinc material.
- 10. the device according to claim 1 for reinforcing the connection of ductile iron pipeline socket joint, it is characterised in that:The rubber The thickness of sleeve gasket is not less than 10mm.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721194327.2U CN207268342U (en) | 2017-09-18 | 2017-09-18 | A kind of device for reinforcing the connection of ductile iron pipeline socket joint |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201721194327.2U CN207268342U (en) | 2017-09-18 | 2017-09-18 | A kind of device for reinforcing the connection of ductile iron pipeline socket joint |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207268342U true CN207268342U (en) | 2018-04-24 |
Family
ID=61961366
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201721194327.2U Expired - Fee Related CN207268342U (en) | 2017-09-18 | 2017-09-18 | A kind of device for reinforcing the connection of ductile iron pipeline socket joint |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207268342U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109024841A (en) * | 2018-08-21 | 2018-12-18 | 中国十七冶集团有限公司 | A kind of construction method of highway engineering buried concrete pipeline reinforcement by connection |
| CN111706729A (en) * | 2020-07-01 | 2020-09-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Flexible structure with fixed water delivery nodular cast iron pipe connector |
-
2017
- 2017-09-18 CN CN201721194327.2U patent/CN207268342U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN109024841A (en) * | 2018-08-21 | 2018-12-18 | 中国十七冶集团有限公司 | A kind of construction method of highway engineering buried concrete pipeline reinforcement by connection |
| CN111706729A (en) * | 2020-07-01 | 2020-09-25 | 中国电建集团贵阳勘测设计研究院有限公司 | Flexible structure with fixed water delivery nodular cast iron pipe connector |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN204267915U (en) | Strengthen the two rubber sealing reinforced concrete sewer pipe of jacking construction corrosion protection | |
| CN110311343A (en) | A prefabricated steel cylinder concrete circular power pipe gallery with pipe seat | |
| CN207268342U (en) | A kind of device for reinforcing the connection of ductile iron pipeline socket joint | |
| CN201795223U (en) | In-pipe crack repair expansion device | |
| CN201739673U (en) | Tray expansion bend | |
| CN206299921U (en) | Pipeline | |
| CN210092836U (en) | Prefabricated steel cylinder concrete circular power pipe gallery with pipe seat | |
| CN112555522A (en) | Steel socket composite reinforced concrete lining glass fiber reinforced plastic drain pipe and preparation method thereof | |
| CN119196438A (en) | Water supply pipeline repair reinforcement structure and combined pipeline | |
| CN216952236U (en) | Device suitable for concrete water delivery pipeline maintenance is consolidated | |
| CN218818901U (en) | Municipal old pipeline repairing device | |
| CN110541433A (en) | A prefabricated underground pipe gallery | |
| CN205991235U (en) | A kind of GRP pipe installation tool | |
| CN110629686A (en) | Thick-walled fiberglass corrugated pipe for culvert passage and its construction method | |
| CN213776704U (en) | Anticorrosive steel pipe fixed knot of socket joint formula constructs | |
| CN223895461U (en) | Urban water supply network elbow water leakage emergency repair device | |
| CN204459502U (en) | Prestress steel cylinder concrete electric power piping lane | |
| CN211396853U (en) | A kind of construction structure of anti-leakage slurry for transmission tower flange of concrete-filled steel tubular structure | |
| CN204062205U (en) | A kind of Novel composite pipe | |
| CN104154324B (en) | Anchor block integrally mixes Method for Installation with valve well | |
| CN202660078U (en) | Embedded prestressed concrete cylinder pipe with combined hot zinc immersion and epoxy coal tar corrosion prevention | |
| CN217874655U (en) | Pipeline and inspection shaft connection structure | |
| CN206617705U (en) | One kind feedwater, intermediate water pipeline water pressure test closure bracing means | |
| CN206337562U (en) | A kind of corrugated steel pipe is strengthened and grouting device | |
| CN222163839U (en) | Anti-skid thrust device for uphill and downhill sections of pressure water supply pipeline |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180424 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |