CN207261818U - Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline - Google Patents
Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline Download PDFInfo
- Publication number
- CN207261818U CN207261818U CN201721101959.XU CN201721101959U CN207261818U CN 207261818 U CN207261818 U CN 207261818U CN 201721101959 U CN201721101959 U CN 201721101959U CN 207261818 U CN207261818 U CN 207261818U
- Authority
- CN
- China
- Prior art keywords
- pipeline
- assembling
- type compound
- long fiber
- fiber reinforcement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004698 Polyethylene (PE) Substances 0.000 title claims abstract description 28
- 239000000835 fiber Substances 0.000 title claims abstract description 28
- -1 polyethylene Polymers 0.000 title claims abstract description 28
- 229920000573 polyethylene Polymers 0.000 title claims abstract description 28
- 150000001875 compounds Chemical class 0.000 title claims abstract description 27
- 230000002787 reinforcement Effects 0.000 title claims abstract description 27
- 210000000988 Bone and Bones Anatomy 0.000 claims description 3
- 238000004026 adhesive bonding Methods 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 8
- 238000000034 method Methods 0.000 abstract description 5
- 238000010586 diagram Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005260 corrosion Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000002708 enhancing Effects 0.000 description 1
- VGGSQFUCUMXWEO-UHFFFAOYSA-N ethene Chemical compound data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 C=C VGGSQFUCUMXWEO-UHFFFAOYSA-N 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 229920000098 polyolefin Polymers 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances data:image/svg+xml;base64,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 data:image/svg+xml;base64,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 O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Abstract
The utility model provides the assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline.The assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline includes pillar, lateral frame, guide rail, moving cart, electric pushrod, fixed block, spacing ring, rubber strip, hook, the first pipeline, the first orifice plate, second pipe, the second orifice plate, first sleeve, strut, the second casing, gag lever post and push plate.Worker provided by the utility model for polyethylene long fiber reinforcement type compound pipeline complex pipeline when mounted can be by the bottom of the rubber strip bypass pipeline, then two tunnel synchronizations are lifted by the electric pushrod, so that lifting process is more easy, the hanging pipeline worker that is more convenient for adjusts angle;In a pre-installation, can be spacing to pipeline progress, worker need not just rotate after two tube fits and adjust again, adjust resistance smaller, be more convenient;The amount of labour of worker is effectively reduced, improves assembling speed.
Description
Technical field
It the utility model is related to technical field of building construction, more particularly, to polyethylene long fiber reinforcement type compound pipeline complex pipeline
Assembling structure.
Background technology
With the fast development of China's science and technology, the research for material is also in deepening continuously, polyethylene long fibre
Reinforced composite pipe road is the pipeline often used in current construction, it, which is used, is back and forth layered hot winding process and is made, and maximum is born
The pressure of 1.6MPa, enhancing polyethylene pressure pipe have good toughness, light weight, pollution-free, water as other polyolefin pipes
Hinder the advantages that small, corrosion-resistant, pollution-free.
But polyethylene long fiber reinforcement type compound pipeline complex pipeline is mostly all relatively large, man-made assembly get up it is very laborious,
When ground is assembled, apply that external force is very inconvenient two pipelines is combined together, it is necessary to move pipeline location repeatedly,
And, it is necessary to which rotated pipe is so that the bolt hole on two pipelines can be aligned, but just be turned after engagement after cooperation
Dynamic pipeline, can cause the frictional resistance of pipeline to become larger, and adjust very inconvenient.
Therefore, it is necessary to providing the new assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline solves above-mentioned skill
Art problem.
Utility model content
The technical problem that the utility model solves is to provide that easy to operate, installation speed is fast, installation accuracy is high is used to gather
The assembling structure of ethene long fiber reinforcement type compound pipeline complex pipeline.
In order to solve the above technical problems, the utility model provides the assembling for polyethylene long fiber reinforcement type compound pipeline complex pipeline
Structure includes:Pillar;Lateral frame, the lateral frame are fixed on the top of the pillar;Guide rail, the guide rail are located at the horizontal branch
The inside of frame;Moving cart, is slidably connected between the moving cart and the guide rail;Electric pushrod, the electric pushrod position
In the bottom of the moving cart;Fixed block, the fixed block are fixed on the bottom of the electric pushrod;Spacing ring, the limit
Position boxing is connected to the bottom surface of the fixed block;Rubber strip, one end gluing of the rubber strip are fixed on the bottom surface of the fixed block;
Hook, it is described to link up with the other end for being fixed on the rubber strip;First pipeline, first Pipe installing is in the rubber strip
It is internal;First orifice plate, first orifice plate are welded in the end of first pipeline;Second pipe, the second pipe installation
In the inside of the rubber strip;Second orifice plate, second orifice plate are welded in the end of the second pipe.
Preferably, first sleeve is equipped with the bottom centre of the lateral frame, and the inside of the first sleeve is socketed with
Strut;The bottom of the strut is welded with the second casing, and the inside of second casing is socketed with gag lever post;The gag lever post
Outer wall be welded with push plate.
Preferably, the strut is arranged in a mutually vertical manner with second casing.
Preferably, structure is identical between first orifice plate and second orifice plate, and the inside of first orifice plate is in
Annular spread has several through-hole structures.
Preferably, the gag lever post coordinates and is fixed in the interior bone structure of first orifice plate, second orifice plate.
Preferably, first pipeline is located at same centerline with the second pipe.
Preferably, it is parallel to each other between the gag lever post and first pipeline.
Preferably, the guide rail is arranged with two, and the inside of two guide rails is equipped with least two shiftings
Dynamic trolley.
Preferably, the rubber strip is individually fixed in the both ends of first pipeline.
Preferably, it is fastened and connected between the hook and the spacing ring.
Compared with correlation technique, the assembling provided by the utility model for polyethylene long fiber reinforcement type compound pipeline complex pipeline
Structure has the advantages that:
The utility model provides the assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline, and worker when mounted may be used
By the bottom of the rubber strip bypass pipeline, then two tunnel synchronizations are lifted by the electric pushrod so that lifted
Cheng Gengwei is easy, and the hanging pipeline worker that is more convenient for adjusts angle;In a pre-installation, the angle of pipeline is adjusted so that two holes
Plate can coordinate, and then the gag lever post is inserted into the through hole on two orifice plates respectively, realize for the spacing of pipeline, work
People need not just rotate after two tube fits and adjust again, adjust resistance smaller, be more convenient;Band of the pipeline in the moving cart
Mutually draw close and assembled under dynamic, effectively reduce the amount of labour of worker, improve assembling speed.
Brief description of the drawings
Fig. 1 is the preferable reality of the assembling structure provided by the utility model for polyethylene long fiber reinforcement type compound pipeline complex pipeline
Apply the structure diagram of example;
Fig. 2 is the rubber belt mounting structure schematic diagram shown in Fig. 1;
Fig. 3 is the gag lever post structure diagram shown in Fig. 1.
Figure label:1st, pillar, 2, lateral frame, 201, guide rail, 3, moving cart, 4, electric pushrod, 5, fixed block, 501,
Spacing ring, 6, rubber strip, 601, hook, the 7, first pipeline, the 701, first orifice plate, 8, second pipe, the 801, second orifice plate, 9, the
Sleeve, 10, strut, the 11, second casing, 12, gag lever post, 1201, push plate.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Fig. 1, Fig. 2 and Fig. 3 are please referred to, wherein, Fig. 1 is used for polyethylene long fiber reinforcement to be provided by the utility model
The structure diagram of the preferred embodiment of the assembling structure of type compound pipeline complex pipeline;Fig. 2 is the rubber belt mounting structure signal shown in Fig. 1
Figure;Fig. 3 is the gag lever post structure diagram shown in Fig. 1.Assembling structure bag for polyethylene long fiber reinforcement type compound pipeline complex pipeline
Include:Pillar 1;Lateral frame 2, the lateral frame 2 are fixed on the top of the pillar 1;Guide rail 201, the guide rail 201 is positioned at described
The inside of lateral frame 2;Moving cart 3, is slidably connected between the moving cart 3 and the guide rail 201, the moving cart 3
Equipped with several, the moving cart 3 can horizontally slip along the guide rail 201, adjusting position;Electric pushrod 4, it is described electronic
Push rod 4 is located at the bottom of the moving cart 3;Fixed block 5, the fixed block 5 are fixed on the bottom of the electric pushrod 4;Limit
Position ring 501, the spacing ring 501 are welded in the bottom surface of the fixed block 5;Rubber strip 6, one end of the rubber strip 6 are glued solid
Due to the bottom surface of the fixed block 5;Hook 601, the hook 601 are fixed on the other end of the rubber strip 6;First pipeline 7,
First pipeline 7 is installed on the inside of the rubber strip 6;First orifice plate 701, first orifice plate 701 are welded in described
The end of one pipeline 7;Second pipe 8, the second pipe 8 are installed on the inside of the rubber strip 6;Second orifice plate 801, it is described
Second orifice plate 801 is welded in the end of the second pipe 8.
In the present embodiment, first sleeve 9, and the inside of the first sleeve 9 are equipped with the bottom centre of the lateral frame 2
It is socketed with strut 10;The bottom of the strut 10 is welded with the second casing 11, and the inside of second casing 11 is socketed with limit
Position bar 12;The outer wall of the gag lever post 12 is welded with push plate 1201, can adjust the strut 10 when in use to suitable height,
The gag lever post 12 front and rear can be pulled by the push plate 1201.
The strut 10 is arranged in a mutually vertical manner with second casing 11 so that second casing 11 can be adjusted vertically
Section.
Structure is identical between first orifice plate 701 and second orifice plate 801, and the inside of first orifice plate 701
Several through-hole structures are distributed with a ring, when two tube fits are together, it is necessary to two orifice plates be fixed using bolt
Together.
The gag lever post 12, which coordinates, is fixed on first orifice plate 701, the interior bone structure of second orifice plate 801
In, in a pre-installation, adjust the angle of pipeline so that two orifice plates can coordinate, then by the push plate 1201 by described in
Gag lever post 12 is inserted into the through hole on two orifice plates respectively, is realized for the spacing of pipeline, and the subsequent moving cart 3 drives
Two pipelines are drawn close, and when that will draw close, pull out the gag lever post 12 by the push plate 1201, then the gag lever post 12 is received
Return back to top portion, and the moving cart 3 can drive two tube fits together, and worker directly can be pacified Bolt through holes plate
Dress.
In order to improve installation effectiveness, first pipeline 7 is located at same centerline with the second pipe 8.
In order to enable limit effect is more preferable, it is parallel to each other between the gag lever post 12 and first pipeline 7.
The guide rail 201 is arranged with two, and the inside of two guide rails 201 is equipped with least two movements
Trolley 3 is, it can be achieved that at the same time get up two Pipeline lifts.
The rubber strip 6 is individually fixed in the both ends of first pipeline 7, and user can be by 6 bypass pipeline of rubber strip
The hook 601, is then buckled together, electric pushrod 4 described in subsequent start-up by bottom with the spacing ring 501 again, can incite somebody to action
Pipeline lift gets up.
It is fastened and connected between the hook 601 and the spacing ring 501 so that the lifting of pipeline is more convenient.
Compared with correlation technique, the assembling provided by the utility model for polyethylene long fiber reinforcement type compound pipeline complex pipeline
Structure has the advantages that:
The utility model provides the assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline, and worker when mounted may be used
By the bottom of 6 bypass pipeline of rubber strip, then two tunnel synchronizations are lifted by the electric pushrod 4 so that lifting
Process is more easy, hanging pipeline be more convenient for worker adjust angle;In a pre-installation, the angle of pipeline is adjusted so that two
Orifice plate can coordinate, and be then inserted into the through hole on two orifice plates the gag lever post 12 respectively, realize the limit for pipeline
Position, worker need not just rotate after two tube fits and adjust again, adjust resistance smaller, be more convenient;Pipeline is small in the movement
Mutually draw close and assembled under the drive of car 3, effectively reduce the amount of labour of worker, improve assembling speed.
The above description is only the embodiments of the present invention, and it does not limit the scope of the patent of the present invention, every
Equivalent structure or equivalent flow shift made based on the specification and figures of the utility model, is directly or indirectly used in
Other relevant technical fields, are equally included in the patent within the scope of the utility model.
Claims (10)
1. the assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that including:
Pillar;
Lateral frame, the lateral frame are fixed on the top of the pillar;
Guide rail, the guide rail are located at the inside of the lateral frame;
Moving cart, is slidably connected between the moving cart and the guide rail;
Electric pushrod, the electric pushrod are located at the bottom of the moving cart;
Fixed block, the fixed block are fixed on the bottom of the electric pushrod;
Spacing ring, the spacing ring are welded in the bottom surface of the fixed block;
Rubber strip, one end gluing of the rubber strip are fixed on the bottom surface of the fixed block;
Hook, it is described to link up with the other end for being fixed on the rubber strip;
First pipeline, first Pipe installing is in the inside of the rubber strip;
First orifice plate, first orifice plate are welded in the end of first pipeline;
Second pipe, the second pipe are installed on the inside of the rubber strip;
Second orifice plate, second orifice plate are welded in the end of the second pipe.
2. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
First sleeve is equipped with the bottom centre of the lateral frame, and the inside of the first sleeve is socketed with strut;The strut
Bottom is welded with the second casing, and the inside of second casing is socketed with gag lever post;The outer wall of the gag lever post, which is welded with, to be pushed away
Plate.
3. the assembling structure according to claim 2 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
The strut is arranged in a mutually vertical manner with second casing.
4. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
Structure is identical between first orifice plate and second orifice plate, and several are distributed with the inside of first orifice plate in a ring
Through-hole structure.
5. the assembling structure according to claim 2 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
The gag lever post, which coordinates, to be fixed in the interior bone structure of first orifice plate, second orifice plate.
6. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
First pipeline is located at same centerline with the second pipe.
7. the assembling structure according to claim 2 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
It is parallel to each other between the gag lever post and first pipeline.
8. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
The guide rail is arranged with two, and the inside of two guide rails is equipped with least two moving carts.
9. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, it is characterised in that
The rubber strip is individually fixed in the both ends of first pipeline.
10. the assembling structure according to claim 1 for polyethylene long fiber reinforcement type compound pipeline complex pipeline, its feature exists
In described link up with is fastened and connected between the spacing ring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721101959.XU CN207261818U (en) | 2017-08-31 | 2017-08-31 | Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721101959.XU CN207261818U (en) | 2017-08-31 | 2017-08-31 | Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207261818U true CN207261818U (en) | 2018-04-20 |
Family
ID=61922829
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721101959.XU Active CN207261818U (en) | 2017-08-31 | 2017-08-31 | Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207261818U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108940910A (en) * | 2018-07-02 | 2018-12-07 | 江苏众信绿色管业科技有限公司 | A kind of composite bimetal pipe automation machining production line based on Internet of Things |
-
2017
- 2017-08-31 CN CN201721101959.XU patent/CN207261818U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108940910A (en) * | 2018-07-02 | 2018-12-07 | 江苏众信绿色管业科技有限公司 | A kind of composite bimetal pipe automation machining production line based on Internet of Things |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN205675087U (en) | A kind of high-altitude pipe transporting mounting vehicle | |
CN102278131B (en) | Duct piece conveying device for shield construction of tunnel with diameter of less than 6 meters and operation method | |
CN207261818U (en) | Assembling structure for polyethylene long fiber reinforcement type compound pipeline complex pipeline | |
CN202080833U (en) | Mobile pipe hanging car for tunnel | |
CN205407132U (en) | Coaster is carried to cable | |
CN103123016B (en) | Construction method for laying gas pipelines along bridge | |
CN106882702B (en) | Full landform urban sewage pipe is laid with lifting door machine over long distances | |
CN206664655U (en) | A kind of civil construction pipeline rack | |
CN201722618U (en) | Movable rotary hoist for eaves-hung cast-in-place concrete crash barrier of bridge | |
CN103663302A (en) | L-type portal installation frame | |
CN202266295U (en) | Duct piece conveying device for shield construction of tunnels with diameters smaller than six meters | |
CN206455343U (en) | A kind of multi-pipe-diameter seal ring auxiliary welding equipment | |
CN205743770U (en) | A kind of collapsible dynamic catwalk device | |
CN205669156U (en) | A kind of laying road deck | |
CN205823180U (en) | The detection frame assembly of one rig is repaired in a kind of soil sample | |
CN207208266U (en) | A kind of bicycle hanging frame | |
CN208267860U (en) | A kind of mud-water conveying pipeline extension apparatus of Big diameter slurry shield | |
CN203514353U (en) | Glass fiber reinforced plastics inspection well | |
CN203404486U (en) | Hydraulic pipeline installation machine | |
CN206031434U (en) | Large pipe transport vechicle | |
CN206636160U (en) | The reinforcement type multi-layer scaffold of installing/dismounting formula mobile pulley mechanism | |
CN206265872U (en) | A kind of grain absorber containing fixed truss arm | |
CN206156620U (en) | Movable track hoisting trolley of usefulness is demolishd with temporary track to shield tunnel construction | |
CN202863484U (en) | Loading and transportation trolley of ground drilling device | |
CN202231397U (en) | Tool type cable mobile hanging bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |