CN207245127U - Mountain area sight spot pin-connected panel substation sets up scaffold - Google Patents
Mountain area sight spot pin-connected panel substation sets up scaffold Download PDFInfo
- Publication number
- CN207245127U CN207245127U CN201720955087.7U CN201720955087U CN207245127U CN 207245127 U CN207245127 U CN 207245127U CN 201720955087 U CN201720955087 U CN 201720955087U CN 207245127 U CN207245127 U CN 207245127U
- Authority
- CN
- China
- Prior art keywords
- scaffold
- column
- babinet
- mountain area
- sight spot
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 37
- 239000010959 steel Substances 0.000 claims abstract description 37
- 241000282326 Felis catus Species 0.000 claims abstract description 13
- 238000010276 construction Methods 0.000 abstract description 18
- 238000009434 installation Methods 0.000 description 5
- 230000000007 visual effect Effects 0.000 description 4
- 150000001875 compounds Chemical class 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000001681 protective effect Effects 0.000 description 2
- 208000027418 Wounds and injury Diseases 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 210000000988 bone and bone Anatomy 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 230000006378 damage Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012938 design process Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 208000014674 injury Diseases 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000011017 operating method Methods 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
Landscapes
- Ladders (AREA)
Abstract
The utility model is related to mountain area sight spot pin-connected panel substation sets up scaffold, it includes more root posts, frame structure is fixed into by the inclined support bar of intersection between the column, middle deck structure is fixedly arranged in the middle of in frame structure, the side of the column is fixed with the first cat ladder and the second cat ladder, the first operation babinet and the second operation babinet are installed with by the first inclined support bar and the second inclined support bar respectively at the top of column, the first intersection bracing piece and second is respectively fixed between the supreme column of middle deck structure and intersects bracing piece.This scaffold can be suitable for Mountainous Scenic Areas substation construction, and improve steel construction substation sets up efficiency, ensure that job safety, ensure that work quality.
Description
Technical field
The utility model belongs to substation and sets up device field, more particularly to setting up for mountain area sight spot pin-connected panel substation
Scaffold.
Background technology
With the continuous development of tourist industry, the mountainous region of ecosystem is used to promote a tourist business by continuous exploitation, in mountainous region scape
Need to use power supply facilities in the building course in area, wherein mostly important one just substation, need to put inside substation
Transformer equipment is put, the lighting installation all for regulating and controlling scenic spot, since mountain area is not readily transportable, and does not possess large area construction
The place of workshop, therefore, by using the steel construction substation of quick-assembling, the room frame overall structure of this substation uses steelframe
Material is assembled, and since the size of steelframe is bigger, and heavier-weight to it, it is necessary to aloft carry out assembly, it is necessary to
Two people coordinate working at height, and traditional hanging device can not use, and therefore, it is necessary to design a kind of new type scaffold, come
Adapt to building for substation.
Utility model content
The purpose of this utility model is aiming at above-mentioned technological deficiency, there is provided a kind of mountain area sight spot pin-connected panel substation is taken
If scaffold, this scaffold can be suitable for Mountainous Scenic Areas substation construction, and improve steel construction substation sets up effect
Rate, ensure that job safety, ensure that work quality.
To reach above-mentioned purpose, the designing scheme of the utility model is:Mountain area sight spot pin-connected panel substation sets up foot hand
Frame, it includes more root posts, frame structure is fixed into by the inclined support bar of intersection between the column, in frame structure
Portion is fixed with middle deck structure, and the side of the column is fixed with the first cat ladder and the second cat ladder, passes through at the top of column
First inclined support bar and the second inclined support bar are installed with the first operation babinet and the second operation babinet respectively, in middle deck
The first intersection bracing piece and second is respectively fixed between the supreme column of structure and intersects bracing piece.
The middle deck structure includes transverse support bar and vertical supporting bar, the transverse support bar and vertical supporting bar
Termination be provided with hook, overlap joint is hooked by linking up between adjacent supports bar, on the platform upper berth that four supporting rods are formed
Equipped with bottom steel protecting wire net.
The first operation babinet includes babinet steel skeleton, and the side of the babinet steel skeleton is fixedly welded with reinforcement bone
Frame, is enclosed with side steel wire protection network on the web frame.
The structure of the first operation babinet and the second operation babinet is identical.
The termination of the column is provided with steel pipe bell and spigot joint, and the column that the steel pipe bell and spigot joint can be described in spreading, is adjusted
The height of scaffold.
The bottom steel protecting wire net uses small-bore steel protecting wire net.
The utility model has the advantages that:
1st, above-mentioned scaffold can be used in building for mountain area workshop, and during setting up, operator passes through described
Cat ladder climbs to the first operation babinet and the second operation babinet at the top of column, is incited somebody to action by two people's work compounds, quality and length
All larger steel construction will carry out assembled and riveting, and then form the skeleton structure of substation, then re-lay corresponding prefabricated
Board wall body, carries out the construction operation of the next position, is finally completed whole substation again after the wall construction of the position is completed
Build.
2nd, above-mentioned scaffold is built conveniently, and personnel easy to operation stand, and operating personnel can be played well
Protective effect, improves the security of construction, and by two people operation at the same time, the installation requirement and construction requirement of satisfaction, improve
Work efficiency.
3rd, it can be played a very good protection by the small-bore steel protecting wire net, prevent the danger of falling object from high altitude
Danger, ensure that the peace peace of operation.
4th, operating personnel is facilitated by installing cat ladder structure to be climbed up to job platform by cat ladder.
5th, it ensure that structural strength by using the scaffold of steel construction, improve security.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and examples.
Fig. 1 is the first visual angle of the utility model graphics.
Fig. 2 is the second visual angle of the utility model graphics.
Fig. 3 is the 3rd visual angle graphics of the utility model.
Fig. 4 is the 4th visual angle graphics of the utility model.
In figure:First cat ladder 1, column 2, the first inclined support bar 3, inclined support bar 4, the second cat ladder 5, transverse support bar 6, extension
Hook 7, vertical supporting bar 8, first intersect bracing piece 9, babinet steel skeleton 10, side steel wire protection network 11, web frame 12, second
Intersect bracing piece 13, second and operate babinet 14, the second inclined support bar 15, the operation babinet 17 of bottom steel protecting wire net 16, first.
Embodiment
The embodiment of the utility model is described further below in conjunction with the accompanying drawings.
Fig. 1-4 are participated in, mountain area sight spot pin-connected panel substation sets up scaffold, it includes more root posts 2, the column 2
Between frame structure is fixed into by the inclined support bar 4 of intersection, be fixedly arranged in the middle of middle deck structure in frame structure, it is described
The side of column 2 is fixed with the first cat ladder 1 and the second cat ladder 5, oblique by the first inclined support bar 3 and second at the top of column 2
Supporting rod 15 is installed with the first operation babinet 17 and the second operation babinet 14 respectively, in the supreme column of middle deck structure
The first intersection bracing piece 9 and second is respectively fixed between 2 and intersects bracing piece 13.By using above-mentioned scaffold, Yushan Hill is used
The installation of the steel construction substation on ground, and then installation effectiveness is improved, construction period is shortened, while also ensure that operation is pacified
Entirely, its it is easy to use spirit and, it is easy to remove.
Further, the middle deck structure includes transverse support bar 6 and vertical supporting bar 8, the transverse support bar 6
The termination of vertical supporting bar 8 is provided with hook 7, is hooked and overlapped by hook 7 between adjacent supports bar, in four supporting rod institutes
Bottom steel protecting wire net 16 is equipped with the platform of formation.By the middle deck structure, on the one hand it can be used in operating personnel
Standing, on the other hand its can be used in playing a very good protection to the pedestrian of bottom, prevent falling object from high altitude from being made to pedestrian
Into injury, security is improved.
Further, the first operation babinet 17 includes babinet steel skeleton 10, and the side of the babinet steel skeleton 10 is consolidated
Surely web frame 12 is welded with, side steel wire protection network 11 is enclosed with the web frame 12.In operation process, operating personnel
By standing in the box house, it can be played a protective role by the steel wire protection network 11 of its side to it, prevent it
The danger fallen from high altitude, improves the security of construction.
Further, the first operation babinet 17 is identical with the structure of the second operation babinet 14.By using identical
Structure, simplifies design process, reduces design cost.
Further, the termination of the column 2 is provided with steel pipe bell and spigot joint, and the steel pipe bell and spigot joint can be described in spreading
Column 2, adjusts the height of scaffold.After assembly, the height of scaffold can be adjusted, adapts it to different height
Installation requirements, enhance its adaptability.
Further, the bottom steel protecting wire net 16 uses small-bore steel protecting wire net.Can by the small-bore steel protecting wire net
Play a very good protection, prevent the danger of falling object from high altitude, ensure that the peace peace of operation.
The specific work process and operation principle of the utility model be:
When needing to use this scaffold, first, more root posts 2 are subjected to assembly, form it into frame structure, and then shape
Into the frame structure of scaffold, middle deck structure is then set up, catch net is formed by middle deck structure, to its bottom
Pedestrian is effectively protected;During operation, operating personnel climb to the first operation babinet 17 at the top of column by the cat ladder
With the second operation babinet 14, by two people's work compounds will, quality and all larger steel construction of length will carry out assembled and riveting
Connect, and then form the skeleton structure of substation, then re-lay corresponding prefabricated wall body, when the wall construction of the position is completed
Carry out the construction operation of the next position again afterwards, be finally completed building for whole substation.
The embodiment of the utility model is explained in detail with reference to attached drawing, but the utility model be not limited to it is above-mentioned
Embodiment.Technical staff can be in the innovative point and operating procedure without prejudice to the utility model, in claims
It is interior, modify to above-described embodiment.The scope of protection of the utility model, should cover such as claims of the utility model.
Claims (6)
1. mountain area sight spot pin-connected panel substation sets up scaffold, it is characterised in that:It includes more root posts(2), the column
(2)Between pass through the inclined support bar of intersection(4)Frame structure is fixed into, middle deck knot is fixedly arranged in the middle of in frame structure
Structure, the column(2)Side be fixed with the first cat ladder(1)With the second cat ladder(5), in column(2)Top it is oblique by first
Supporting rod(3)With the second inclined support bar(15)The first operation babinet is installed with respectively(17)With the second operation babinet(14),
In the supreme column of middle deck structure(2)Between be respectively fixed with the first intersection bracing piece(9)Intersect bracing piece with second
(13).
2. mountain area sight spot pin-connected panel substation according to claim 1 sets up scaffold, it is characterised in that:The middle part
Platform structure includes transverse support bar(6)And vertical supporting bar(8), the transverse support bar(6)And vertical supporting bar(8)End
Head is provided with hook(7), pass through hook between adjacent supports bar(7)Overlap joint is hooked, on the platform that four supporting rods are formed
It is equipped with bottom steel protecting wire net(16).
3. mountain area sight spot pin-connected panel substation according to claim 1 sets up scaffold, it is characterised in that:Described first
Operate babinet(17)Including babinet steel skeleton(10), the babinet steel skeleton(10)Side be fixedly welded with web frame
(12), the web frame(12)On be enclosed with side steel wire protection network(11).
4. mountain area sight spot pin-connected panel substation according to claim 3 sets up scaffold, it is characterised in that:Described first
Operate babinet(17)With the second operation babinet(14)Structure it is identical.
5. mountain area sight spot pin-connected panel substation according to claim 1 sets up scaffold, it is characterised in that:The column
(2)Termination steel pipe bell and spigot joint is installed, the column that the steel pipe bell and spigot joint can be described in spreading(2), adjust the height of scaffold
Degree.
6. mountain area sight spot pin-connected panel substation according to claim 2 sets up scaffold, it is characterised in that:The bottom
Steel protecting wire net(16)Using small-bore steel protecting wire net.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720955087.7U CN207245127U (en) | 2017-08-02 | 2017-08-02 | Mountain area sight spot pin-connected panel substation sets up scaffold |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720955087.7U CN207245127U (en) | 2017-08-02 | 2017-08-02 | Mountain area sight spot pin-connected panel substation sets up scaffold |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207245127U true CN207245127U (en) | 2018-04-17 |
Family
ID=61879675
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720955087.7U Expired - Fee Related CN207245127U (en) | 2017-08-02 | 2017-08-02 | Mountain area sight spot pin-connected panel substation sets up scaffold |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207245127U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117947933A (en) * | 2024-02-05 | 2024-04-30 | 中国十九冶集团有限公司 | A construction operation platform and installation method suitable for large-span high-altitude cantilevered steel structures |
-
2017
- 2017-08-02 CN CN201720955087.7U patent/CN207245127U/en not_active Expired - Fee Related
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN117947933A (en) * | 2024-02-05 | 2024-04-30 | 中国十九冶集团有限公司 | A construction operation platform and installation method suitable for large-span high-altitude cantilevered steel structures |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206053274U (en) | The external scaffolding device of the perpendicular BAIYE outer visor of skyscraper and glass curtain wall dual-purpose | |
| CN105226560B (en) | A kind of crossing frame and its construction method | |
| CN207079828U (en) | A kind of oblique outer reverse erecting device of eaves panel of large cantilever | |
| CN104278828B (en) | A kind of concrete chimney dismantling operation platform | |
| CN107761961A (en) | A kind of electronic climbing frame monolithic construction method of high-rise building | |
| CN108979131A (en) | A kind of high-building construction steel form and operation frame integral hoisting stage apparatus | |
| CN103321399B (en) | The outer eaves gable place's suspension scaffold of highrise building Sloping roof and construction method thereof | |
| CN207393107U (en) | A kind of communication iron tower with anti-climbing high security | |
| CN207553565U (en) | A kind of crosshead of truss | |
| CN207296350U (en) | Detachable operating platform for steel pipe column | |
| CN113944108A (en) | Supporting device for bridge tower construction and construction method applying supporting device | |
| CN208578156U (en) | Fast assembling-disassembling can plug-type heat preservation steel structure | |
| CN205617762U (en) | A platform truck that is used for waterproof and reinforcing bar of side wall to execute work | |
| CN206800965U (en) | A kind of high-rise balcony tailgate construction operating platform | |
| CN206957179U (en) | A kind of cladding panel construction protector | |
| CN207144440U (en) | A kind of integrated Construction of Supporting security platform | |
| CN106088638A (en) | A kind of special building method for high-voltage line protection safety frame | |
| CN207700665U (en) | A kind of operation platform and safety protection structure of electric hydaulic climbing frame | |
| CN207079893U (en) | Outstanding ladder scaffolding for the installation of water-cooling wall spiral section | |
| CN206397097U (en) | A kind of interior decoration scaffold | |
| CN206815782U (en) | A kind of door-type scaffold | |
| CN206366277U (en) | Construction tower crane and adjustable height spraying and dust-removing system | |
| CN206681467U (en) | A kind of steel tower for being easy to track laying | |
| CN204590553U (en) | Semi-automaticly climb formula exterior wall safeguard structure | |
| CN213204918U (en) | High altitude eaves construction protector that encorbelments |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180417 Termination date: 20190802 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |