CN207226806U - A kind of construction reinforcing bar boom hoisting - Google Patents
A kind of construction reinforcing bar boom hoisting Download PDFInfo
- Publication number
- CN207226806U CN207226806U CN201720949850.5U CN201720949850U CN207226806U CN 207226806 U CN207226806 U CN 207226806U CN 201720949850 U CN201720949850 U CN 201720949850U CN 207226806 U CN207226806 U CN 207226806U
- Authority
- CN
- China
- Prior art keywords
- steel wire
- fixed pulley
- connecting plate
- reinforcing bar
- wire rope
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003014 reinforcing effect Effects 0.000 title claims abstract description 32
- 238000010276 construction Methods 0.000 title claims abstract description 18
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 62
- 239000010959 steel Substances 0.000 claims abstract description 62
- 239000000463 material Substances 0.000 claims abstract description 42
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 10
- 239000004035 construction material Substances 0.000 description 5
- 238000010586 diagram Methods 0.000 description 4
- 230000000149 penetrating effect Effects 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000005299 abrasion Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000001934 delay Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model provides a kind of construction reinforcing bar boom hoisting, belongs to building field, including connecting plate and material cartridge;The connecting plate has two pieces, is horizontally set on the left and right sides respectively;The left side connecting plate upper surface is connected with pedestal vertically;The centerline axis parallel of fixed pulley and fixed pulley is connected with the upper surface left side of left side connecting plate by shaft on the pedestal;Double-rope groove is surrounded with the fixed pulley wheel face;The rope pipe of the utility model causes its two between fixed pulley piece, first steel wire rope to be in parastate, consequently facilitating the first steel wire rope drives fixed pulley to rotate, changes the draw direction of the first steel wire rope;Sleeve is used to be sleeved on the reinforcing bar both ends for needing to sling, the first steel wire rope end head on the upside of fixed pulley is pulled then up, the rotation that first steel wire rope passes through fixed pulley, stretching in obliquity is changed into the stretching of horizontal level, so that the front and rear side sleeve of other end connection is drawn close to centre, be locked reinforcing bar, easy to sling.
Description
Technical field
A kind of Architectural Equipment is the utility model is related to, is specifically a kind of construction reinforcing bar boom hoisting.
Background technology
In building construction process of today, when some high-storeys are built, some construction materials are manually carried
Need to consume a large amount of manpowers above to floor, and efficiency is also low, delays the whole duration, so general can all take lifting machine will
Material, which is hung, to be higher by, and construction material has many kinds, for the material of stock class, such as reinforcing bar, as common construction material
Decisive role is played to Construction Quality, the lifting in building construction process for reinforcing bar at present is usually present certain
Security risk, is typically all that traverse, is then tied up with rope, then toward hanging oneself, so dangerous hidden danger is too big, and reinforcing bar easily takes off
Fall, and be also not easy to lift for the square material of general length, it is necessary to using container, and the container used also needs to
Being tied up with rope can just hang, very unstable, also troublesome, and since the loosening of clamping device causes the generation of security incident,
Job schedule is not only have impact on, also result in certain economic loss, so needing a kind of boom hoisting of safe ready.
Utility model content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to provide a kind of building field
Construction reinforcing bar boom hoisting.
In order to solve the above technical problems, the utility model provides following technical solution:
A kind of construction reinforcing bar boom hoisting, including connecting plate and material cartridge;The connecting plate has two pieces, respectively water
It is flat to be arranged on the left and right sides;The left side connecting plate upper surface is connected with pedestal vertically;It is connected with the pedestal by shaft
The centerline axis parallel of fixed pulley and fixed pulley is in the upper surface left side of left side connecting plate;It is surround on the wheel face of the fixed pulley
It is provided with Double-rope groove;Card is placed with two first steel wire ropes in the Double-rope groove and the first steel wire rope is bypassed from the left side of fixed pulley;
Above-mentioned connecting element on the left side connecting plate symmetrically there are another group on the connecting plate of right side;In two pieces of connecting plates
Between position front and rear side be each provided with a sleeve and sleeve port it is facing each other;In fixed sliding on the left and right connecting plates
Two first steel wire ropes of wheel downside respectively separate one end and join on the sleeve of front and rear sides;On the upside of the left and right sides fixed pulley
The termination handing-over of first steel wire rope has contiguous block;The upper side wall of former and later two sleeves is respectively connected with second steel wire rope;
The rear and front end lower horizontal of the contiguous block is connected with becket bridle;Hook is connected with the movable end of second steel wire rope;
Contiguous block rear and front end upper horizontal is connected with stripe board and two pieces of stripe boards are on same straight line;Two pieces of bar shapeds
Plate lower face is equidistantly connected with link from front to back;Level is connected with inserted link at left and right sides of the material cartridge;The material cartridge is left
The vertical frame that right both sides are vertically arranged with U-frame and two U-frames passes through the bottom plate of material cartridge;The vertical frame side of the U-frame
Screw thread is surrounded with wall and is cased with the matched nut of screw thread therewith, nut is in the downside of material cartridge.
As the further improvement project of the utility model:The right side level of the left side connecting plate is connected with rope pipe and determines
Two first steel wire penetrating rope pipes on the downside of pulley.
As the utility model further improvement project:Card frame is connected with the left of the left side connecting plate upper surface
And card mask is in the left side of fixed pulley Double-rope groove.
As the utility model further improvement project:The upper surface of the contiguous block is connected with hanging ring.
As the utility model further improvement project:The becket bridle madial wall is shiny surface.
Compared with prior art, the beneficial effects of the utility model are:
The rope pipe of the utility model is so that its two between fixed pulley piece, first steel wire rope is in parastate, so that just
Drive fixed pulley to rotate in the first steel wire rope, change the draw direction of the first steel wire rope;Card frame is used to cover in Double-rope groove
First steel wire rope, prevents the first steel wire rope from departing from fixed pulley;Sleeve is used to be sleeved on the reinforcing bar both ends for needing to sling, and draws then up
The termination of dynamic the first steel wire rope on the upside of fixed pulley, the first steel wire rope is by the rotation of fixed pulley, by obliquity
Stretching is changed into the stretching of horizontal level, so that the front and rear side sleeve of other end connection is drawn close to centre, be locked reinforcing bar, just
In slinging;Hanging ring is easy to use lifting machine to sling whole device;Two becket bridles are easy to the second steel wire penetrating of front and rear homonymy, and
And the second steel wire rope between sleeve and contiguous block is tightened, easy to keep the reinforcing bar sling all around to balance, in water
Prosposition is put;Becket bridle madial wall is shiny surface, reduces abrasion during the second steel wire penetrating;When the second steel wire rope through becket bridle stretches tight
When tight, by the link for hanging over correspondence position at the second steel wire rope end head, the tight state of the second steel wire rope is kept;Insert
Bar is used to be inserted in the sleeve of front and rear sides, so that material cartridge is fixed between sleeve, other construction materials are hung easy to fill
Article;U-frame is used to push down the material being placed in material cartridge, prevents from dropping;When U-frame is pressed on the material in material cartridge
When, nut is rotated up, it is fitted at material box plate lower face, prevents U-frame from departing from material cartridge.
Brief description of the drawings
Fig. 1 is the top view that construction reinforcing bar boom hoisting is connected with material cartridge;
Fig. 2 is the structure diagram of construction reinforcing bar boom hoisting;
Fig. 3 is the structure diagram of contiguous block in construction reinforcing bar boom hoisting;
Fig. 4 is the structure diagram of fixed pulley in construction reinforcing bar boom hoisting
Fig. 5 is the structure diagram of material cartridge in construction reinforcing bar boom hoisting
In figure:1- sleeves, the first steel wire ropes of 2-, 3- ropes pipe, 4- connecting plates, 5- pulleys, 6- cards frame, 7- stripe boards, 8- are hung
Ring, 9- contiguous blocks, the second steel wire ropes of 10-, 11- pedestals, 12- links, 13- becket bridles, 14- hooks, 15- Double-rope grooves, 16- materials
Box, 17-U shapes frame, 18- nuts, 19- inserted links.
Embodiment
The technical solution of this patent is described in more detail with reference to embodiment.
The embodiment of this patent is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end
Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached
The embodiment of figure description is exemplary, and is only used for explaining this patent, and it is not intended that limitation to this patent.
In the description of this patent, it is to be understood that term " " center ", " on ", " under ", "front", "rear", " left side ",
The orientation or position relationship of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are based on shown in the drawings
Orientation or position relationship, are for only for ease of description this patent and simplify and describe, rather than instruction or imply signified device or
Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.
, it is necessary to illustrate in the description of this patent, unless otherwise clearly defined and limited, term " installation ", " phase
Even ", " connection ", " setting " should be interpreted broadly, for example, it may be being fixedly linked, setting or be detachably connected, set
Put, or be integrally connected, set.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition
Concrete meaning in this patent.
- 5 are please referred to Fig.1, present embodiments provides a kind of construction reinforcing bar boom hoisting, including connecting plate 4 and material
Magazine 16;The connecting plate 4 has two pieces, is horizontally set on the left and right sides respectively;4 upper surface of left side connecting plate is solid vertically
It is connected to pedestal 11;The centerline axis parallel for being connected with fixed pulley 5 and fixed pulley 5 on the pedestal 11 by shaft is connected in left side
The upper surface left side of plate 4;Double-rope groove 15 is surrounded with the wheel face of the fixed pulley 5;Card is placed with the Double-rope groove 15
Two first steel wire ropes 2 and the first steel wire rope 2 is bypassed from the left side of fixed pulley 5;The right side level of the left side connecting plate 4 is affixed
There is rope pipe 3 and two first steel wire ropes 2 of the downside of fixed pulley 5 are through rope pipe 3, rope pipe 3 is so that its two between fixed pulley 5 piece
First steel wire rope 2 is in parastate, consequently facilitating the first steel wire rope 2 drives fixed pulley 5 to rotate, changes the first steel wire rope 2
Draw direction;Card frame 6 is connected with the left of 4 upper surface of left side connecting plate and card frame 6 covers on a left side for 5 Double-rope groove 15 of fixed pulley
Side, card frame 6 are used to cover the first steel wire rope 2 in Double-rope groove 15, prevent the first steel wire rope 2 from departing from fixed pulley 5;The left side
Above-mentioned connecting element on connecting plate 4 symmetrically there are another group on right side connecting plate 4;Two pieces of connecting plates, 4 interposition
The port that the front and rear side put is each provided with a sleeve 1 and sleeve 1 is facing each other;In fixed sliding on the left and right connecting plates 4
Two first steel wire ropes 2 of the downside of wheel 5 respectively separate one end handing-over on the sleeve 1 of front and rear sides, and sleeve 1 is used to be sleeved on needs
The reinforcing bar both ends sling, pull the termination of the first steel wire rope 2 in the upside of fixed pulley 5 then up, and the first steel wire rope 2 passes through
Stretching in obliquity, is changed into the stretching of horizontal level by the rotation of fixed pulley 5, so that other end connection is front and rear
Side sleeve 1 is drawn close to centre, and be locked reinforcing bar, easy to sling;The termination of first steel wire rope 2 of the upside of left and right sides fixed pulley 5
Handing-over has contiguous block 9;The upper surface of the contiguous block 9 is connected with hanging ring 8, and hanging ring 8 is easy to use lifting machine to sling whole device;
The upper side wall of former and later two sleeves 1 is respectively connected with second steel wire rope 10;Water on the downside of the rear and front end of the contiguous block 9
Flat to be connected with becket bridle 13, two becket bridles 13 pass through easy to the second steel wire rope 10 of front and rear homonymy, and tighten in sleeve 1 with connecting
The second steel wire rope 10 between block 9 is connect, easy to keep the reinforcing bar sling all around to balance, is horizontal;The becket bridle
13 madial walls are shiny surface, reduce abrasion when the second steel wire rope 10 passes through;Consolidate at the movable end of second steel wire rope 10
It is connected to hook 14;The 9 rear and front end upper horizontal of contiguous block is connected with stripe board 7 and two pieces of stripe boards 7 are in same straight line
On;Two pieces of stripe boards, 7 lower face is equidistantly connected with link 12 from front to back, when the second steel wire rope 10 through becket bridle 13 is taut
When tight, the hook 14 of 10 end point of the second steel wire rope is hung on the link 12 of correspondence position, keeps the tight of the second steel wire rope 10
Taut state;16 left and right sides level of material cartridge is connected with inserted link 19, and inserted link 19 is used to be inserted in the sleeve 1 of front and rear sides,
So that material cartridge 16 is fixed between sleeve 1, other construction material articles are hung easy to fill;The left and right sides of material cartridge 16
The vertical frame of U-frame 17 and two U-frames 17 is vertically arranged with through the bottom plate of material cartridge 16, U-frame 17 is for pushing down placement
Material in material cartridge 16, prevents from dropping;Screw thread is surrounded with the vertical frame side wall of the U-frame 17 and is cased with spiral shell therewith
The matched nut 18 of line, nut 18 are in the downside of material cartridge 16, when U-frame 17 is pressed on the material in material cartridge 16
When, nut 18 is rotated up, it is fitted at 16 bottom plate lower face of material cartridge, prevents U-frame 17 from departing from material cartridge 16.
Specifically used mode:The sleeve 1 of front and rear side is sleeved on to the reinforcing bar both ends for needing to lift by crane first, then by lifting machine
Suspension hook is hooked on the hanging ring 8 of contiguous block 9, is connected to the first steel wire rope 2 of the left and right sides of contiguous block 9 due to reinforcing bar gravity,
So that the fixed pulley 5 bypassed rotates, so that the upward extended state of obliquity is changed into the stretching of horizontal level, so that
The front and rear side sleeve 1 that the connection of 5 other end of fixed pulley must be bypassed is drawn close to centre, and be locked reinforcing bar, is then keeping the first steel wire rope 2
During the state tightened so that the second steel wire rope 10 on front and rear sleeve 1 passes through the becket bridle 13 of side before and after contiguous block 9, and tightens
The second steel wire rope 10 between sleeve 1 and contiguous block 9, easy to keep the reinforcing bar sling all around to balance, in level
Position, then hangs over the hook 14 of 10 end point of the second steel wire rope on the link 12 in correspondence position stripe board 7, keeps second
Sleeve 1, when needing to lift by crane other materials article, is sleeved on the inserted link 19 of 16 both sides of material cartridge by the tight state of steel wire rope 10
On, the first steel wire rope 2 and the second steel wire rope 10 are then tightened, then material is put into, use the U-frame through 16 bottom plate of material cartridge
17 compress, and rotate up the nut 18 on 17 vertical frame of U-frame, it is fitted at 16 bottom plate lower face of material cartridge, prevent
Only U-frame 17 departs from material cartridge 16.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party
Formula, can also be on the premise of this patent objective not be departed from the knowledge that one skilled in the relevant art possesses
Make a variety of changes.
Claims (5)
1. a kind of construction reinforcing bar boom hoisting, including connecting plate (4) and material cartridge (16);It is characterized in that the connection
Plate (4) has two pieces, is horizontally set on the left and right sides respectively;Left side connecting plate (4) upper surface is connected with pedestal (11) vertically;
The centerline axis parallel of fixed pulley (5) and fixed pulley (5) is connected with left side connecting plate (4) by shaft on the pedestal (11)
Upper surface left side;Double-rope groove (15) is surrounded with the wheel face of the fixed pulley (5);Card is put in the Double-rope groove (15)
There are two first steel wire ropes (2) and the first steel wire rope (2) is bypassed from the left side of fixed pulley (5);On the left side connecting plate (4)
Above-mentioned connecting element is symmetrically present on another group of right side connecting plate (4);The front and rear side in two pieces of connecting plates (4) centre position
The port for being each provided with a sleeve (1) and sleeve (1) is facing each other;Fixed pulley (5) is on the left and right connecting plates (4)
Two first steel wire ropes (2) of downside respectively separate one end handing-over on the sleeve (1) of front and rear sides;The left and right sides fixed pulley
(5) the termination handing-over of the first steel wire rope of upside (2) has contiguous block (9);The upper side wall of former and later two sleeves (1) is respectively connected with
Piece second steel wire rope (10);The rear and front end lower horizontal of the contiguous block (9) is connected with becket bridle (13);Second steel wire
Hook (14) is connected with the movable end of rope (10);Contiguous block (9) rear and front end upper horizontal is connected with stripe board (7)
And two pieces of stripe boards (7) are on same straight line;Two pieces of stripe boards (7) lower face is equidistantly connected with link from front to back
(12);Level is connected with inserted link (19) at left and right sides of the material cartridge (16);It is vertically arranged at left and right sides of the material cartridge (16)
There is U-frame (17) and the vertical frame of two U-frames (17) passes through the bottom plate of material cartridge (16);The vertical frame of the U-frame (17)
Screw thread is surrounded with side wall and is cased with the matched nut of screw thread therewith (18), nut (18) is in the downside of material cartridge (16).
2. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, the left side connecting plate (4)
Two first steel wire ropes (2) that right side level is connected with the downside of rope pipe (3) and fixed pulley (5) manage (3) through rope.
3. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, side connecting plate (4) upper surface
Left side is connected with card frame (6) and card frame (6) covers on the left side of fixed pulley (5) Double-rope groove (15).
4. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, the upper end of the contiguous block (9)
Face is connected with hanging ring (8).
5. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, becket bridle (13) madial wall is
Shiny surface.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720949850.5U CN207226806U (en) | 2017-08-01 | 2017-08-01 | A kind of construction reinforcing bar boom hoisting |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720949850.5U CN207226806U (en) | 2017-08-01 | 2017-08-01 | A kind of construction reinforcing bar boom hoisting |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN207226806U true CN207226806U (en) | 2018-04-13 |
Family
ID=61856220
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720949850.5U Expired - Fee Related CN207226806U (en) | 2017-08-01 | 2017-08-01 | A kind of construction reinforcing bar boom hoisting |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN207226806U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112723161A (en) * | 2020-12-29 | 2021-04-30 | 李金龙 | Material overhead hoist is used in bridge construction |
-
2017
- 2017-08-01 CN CN201720949850.5U patent/CN207226806U/en not_active Expired - Fee Related
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112723161A (en) * | 2020-12-29 | 2021-04-30 | 李金龙 | Material overhead hoist is used in bridge construction |
| CN112723161B (en) * | 2020-12-29 | 2023-09-29 | 李金龙 | Material overhead hoist for bridge construction |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN209337970U (en) | Three-jaw self-supporting suspender | |
| CN102060232B (en) | Transportation method for refractory brick for stove construction | |
| CN207312948U (en) | A kind of material transportation bucket for building | |
| CN202346599U (en) | Combined neck mouth lifting appliance | |
| CN102001583A (en) | Semi-automatic brick hanging fixture | |
| CN107738981A (en) | A kind of flexible adjustable suspender of machinery | |
| CN209455923U (en) | Detachable rectangular elements hoisting structure | |
| CN218579417U (en) | A balancing unit for building material hoist and mount | |
| CN207934465U (en) | A kind of construction material suspender | |
| CN210558996U (en) | Assembled building model platform double-limb column lifting appliance | |
| CN209242493U (en) | A kind of aluminium bar grapple | |
| CN201980854U (en) | Semi-automatic brick-suspending clamp | |
| CN208648559U (en) | Cover plate for side ditch lifting frame | |
| CN219792141U (en) | Lifting appliance with bidirectional leveling capability | |
| CN213679444U (en) | Counter weight hoist for hoist and mount | |
| CN207046648U (en) | A kind of construction boost container | |
| CN218145303U (en) | Lifting appliance for lifting web clamping plates in pre-assembly process | |
| CN214989686U (en) | A steel bundle hoisting fixture | |
| CN222574037U (en) | A wall panel hanger for construction | |
| CN220131679U (en) | Large-scale titanium ingot hoisting device | |
| CN218619841U (en) | A large bag spreader with automatic decoupling structure | |
| CN212668985U (en) | Spring lifting appliance capable of improving lifting safety | |
| CN204079250U (en) | There is the lifting hook special for steel tube of adsorption plant | |
| CN210311840U (en) | Waste concrete treatment device for building | |
| CN214653005U (en) | Automatic change control hoist and mount machinery |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180413 Termination date: 20190801 |