CN207226806U - A kind of construction reinforcing bar boom hoisting - Google Patents

A kind of construction reinforcing bar boom hoisting Download PDF

Info

Publication number
CN207226806U
CN207226806U CN201720949850.5U CN201720949850U CN207226806U CN 207226806 U CN207226806 U CN 207226806U CN 201720949850 U CN201720949850 U CN 201720949850U CN 207226806 U CN207226806 U CN 207226806U
Authority
CN
China
Prior art keywords
steel wire
fixed pulley
connecting plate
reinforcing bar
wire rope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720949850.5U
Other languages
Chinese (zh)
Inventor
高辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720949850.5U priority Critical patent/CN207226806U/en
Application granted granted Critical
Publication of CN207226806U publication Critical patent/CN207226806U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model provides a kind of construction reinforcing bar boom hoisting, belongs to building field, including connecting plate and material cartridge;The connecting plate has two pieces, is horizontally set on the left and right sides respectively;The left side connecting plate upper surface is connected with pedestal vertically;The centerline axis parallel of fixed pulley and fixed pulley is connected with the upper surface left side of left side connecting plate by shaft on the pedestal;Double-rope groove is surrounded with the fixed pulley wheel face;The rope pipe of the utility model causes its two between fixed pulley piece, first steel wire rope to be in parastate, consequently facilitating the first steel wire rope drives fixed pulley to rotate, changes the draw direction of the first steel wire rope;Sleeve is used to be sleeved on the reinforcing bar both ends for needing to sling, the first steel wire rope end head on the upside of fixed pulley is pulled then up, the rotation that first steel wire rope passes through fixed pulley, stretching in obliquity is changed into the stretching of horizontal level, so that the front and rear side sleeve of other end connection is drawn close to centre, be locked reinforcing bar, easy to sling.

Description

A kind of construction reinforcing bar boom hoisting
Technical field
A kind of Architectural Equipment is the utility model is related to, is specifically a kind of construction reinforcing bar boom hoisting.
Background technology
In building construction process of today, when some high-storeys are built, some construction materials are manually carried Need to consume a large amount of manpowers above to floor, and efficiency is also low, delays the whole duration, so general can all take lifting machine will Material, which is hung, to be higher by, and construction material has many kinds, for the material of stock class, such as reinforcing bar, as common construction material Decisive role is played to Construction Quality, the lifting in building construction process for reinforcing bar at present is usually present certain Security risk, is typically all that traverse, is then tied up with rope, then toward hanging oneself, so dangerous hidden danger is too big, and reinforcing bar easily takes off Fall, and be also not easy to lift for the square material of general length, it is necessary to using container, and the container used also needs to Being tied up with rope can just hang, very unstable, also troublesome, and since the loosening of clamping device causes the generation of security incident, Job schedule is not only have impact on, also result in certain economic loss, so needing a kind of boom hoisting of safe ready.
Utility model content
In view of the above shortcomings of the prior art, the technical problem to be solved by the present invention is to provide a kind of building field Construction reinforcing bar boom hoisting.
In order to solve the above technical problems, the utility model provides following technical solution:
A kind of construction reinforcing bar boom hoisting, including connecting plate and material cartridge;The connecting plate has two pieces, respectively water It is flat to be arranged on the left and right sides;The left side connecting plate upper surface is connected with pedestal vertically;It is connected with the pedestal by shaft The centerline axis parallel of fixed pulley and fixed pulley is in the upper surface left side of left side connecting plate;It is surround on the wheel face of the fixed pulley It is provided with Double-rope groove;Card is placed with two first steel wire ropes in the Double-rope groove and the first steel wire rope is bypassed from the left side of fixed pulley; Above-mentioned connecting element on the left side connecting plate symmetrically there are another group on the connecting plate of right side;In two pieces of connecting plates Between position front and rear side be each provided with a sleeve and sleeve port it is facing each other;In fixed sliding on the left and right connecting plates Two first steel wire ropes of wheel downside respectively separate one end and join on the sleeve of front and rear sides;On the upside of the left and right sides fixed pulley The termination handing-over of first steel wire rope has contiguous block;The upper side wall of former and later two sleeves is respectively connected with second steel wire rope; The rear and front end lower horizontal of the contiguous block is connected with becket bridle;Hook is connected with the movable end of second steel wire rope; Contiguous block rear and front end upper horizontal is connected with stripe board and two pieces of stripe boards are on same straight line;Two pieces of bar shapeds Plate lower face is equidistantly connected with link from front to back;Level is connected with inserted link at left and right sides of the material cartridge;The material cartridge is left The vertical frame that right both sides are vertically arranged with U-frame and two U-frames passes through the bottom plate of material cartridge;The vertical frame side of the U-frame Screw thread is surrounded with wall and is cased with the matched nut of screw thread therewith, nut is in the downside of material cartridge.
As the further improvement project of the utility model:The right side level of the left side connecting plate is connected with rope pipe and determines Two first steel wire penetrating rope pipes on the downside of pulley.
As the utility model further improvement project:Card frame is connected with the left of the left side connecting plate upper surface And card mask is in the left side of fixed pulley Double-rope groove.
As the utility model further improvement project:The upper surface of the contiguous block is connected with hanging ring.
As the utility model further improvement project:The becket bridle madial wall is shiny surface.
Compared with prior art, the beneficial effects of the utility model are:
The rope pipe of the utility model is so that its two between fixed pulley piece, first steel wire rope is in parastate, so that just Drive fixed pulley to rotate in the first steel wire rope, change the draw direction of the first steel wire rope;Card frame is used to cover in Double-rope groove First steel wire rope, prevents the first steel wire rope from departing from fixed pulley;Sleeve is used to be sleeved on the reinforcing bar both ends for needing to sling, and draws then up The termination of dynamic the first steel wire rope on the upside of fixed pulley, the first steel wire rope is by the rotation of fixed pulley, by obliquity Stretching is changed into the stretching of horizontal level, so that the front and rear side sleeve of other end connection is drawn close to centre, be locked reinforcing bar, just In slinging;Hanging ring is easy to use lifting machine to sling whole device;Two becket bridles are easy to the second steel wire penetrating of front and rear homonymy, and And the second steel wire rope between sleeve and contiguous block is tightened, easy to keep the reinforcing bar sling all around to balance, in water Prosposition is put;Becket bridle madial wall is shiny surface, reduces abrasion during the second steel wire penetrating;When the second steel wire rope through becket bridle stretches tight When tight, by the link for hanging over correspondence position at the second steel wire rope end head, the tight state of the second steel wire rope is kept;Insert Bar is used to be inserted in the sleeve of front and rear sides, so that material cartridge is fixed between sleeve, other construction materials are hung easy to fill Article;U-frame is used to push down the material being placed in material cartridge, prevents from dropping;When U-frame is pressed on the material in material cartridge When, nut is rotated up, it is fitted at material box plate lower face, prevents U-frame from departing from material cartridge.
Brief description of the drawings
Fig. 1 is the top view that construction reinforcing bar boom hoisting is connected with material cartridge;
Fig. 2 is the structure diagram of construction reinforcing bar boom hoisting;
Fig. 3 is the structure diagram of contiguous block in construction reinforcing bar boom hoisting;
Fig. 4 is the structure diagram of fixed pulley in construction reinforcing bar boom hoisting
Fig. 5 is the structure diagram of material cartridge in construction reinforcing bar boom hoisting
In figure:1- sleeves, the first steel wire ropes of 2-, 3- ropes pipe, 4- connecting plates, 5- pulleys, 6- cards frame, 7- stripe boards, 8- are hung Ring, 9- contiguous blocks, the second steel wire ropes of 10-, 11- pedestals, 12- links, 13- becket bridles, 14- hooks, 15- Double-rope grooves, 16- materials Box, 17-U shapes frame, 18- nuts, 19- inserted links.
Embodiment
The technical solution of this patent is described in more detail with reference to embodiment.
The embodiment of this patent is described below in detail, the example of the embodiment is shown in the drawings, wherein from beginning to end Same or similar label represents same or similar element or has the function of same or like element.Below with reference to attached The embodiment of figure description is exemplary, and is only used for explaining this patent, and it is not intended that limitation to this patent.
In the description of this patent, it is to be understood that term " " center ", " on ", " under ", "front", "rear", " left side ", The orientation or position relationship of the instruction such as " right side ", " vertical ", " level ", " top ", " bottom ", " interior ", " outer " are based on shown in the drawings Orientation or position relationship, are for only for ease of description this patent and simplify and describe, rather than instruction or imply signified device or Element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that limitation to this patent.
, it is necessary to illustrate in the description of this patent, unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection ", " setting " should be interpreted broadly, for example, it may be being fixedly linked, setting or be detachably connected, set Put, or be integrally connected, set.For the ordinary skill in the art, it can understand that above-mentioned term exists with concrete condition Concrete meaning in this patent.
- 5 are please referred to Fig.1, present embodiments provides a kind of construction reinforcing bar boom hoisting, including connecting plate 4 and material Magazine 16;The connecting plate 4 has two pieces, is horizontally set on the left and right sides respectively;4 upper surface of left side connecting plate is solid vertically It is connected to pedestal 11;The centerline axis parallel for being connected with fixed pulley 5 and fixed pulley 5 on the pedestal 11 by shaft is connected in left side The upper surface left side of plate 4;Double-rope groove 15 is surrounded with the wheel face of the fixed pulley 5;Card is placed with the Double-rope groove 15 Two first steel wire ropes 2 and the first steel wire rope 2 is bypassed from the left side of fixed pulley 5;The right side level of the left side connecting plate 4 is affixed There is rope pipe 3 and two first steel wire ropes 2 of the downside of fixed pulley 5 are through rope pipe 3, rope pipe 3 is so that its two between fixed pulley 5 piece First steel wire rope 2 is in parastate, consequently facilitating the first steel wire rope 2 drives fixed pulley 5 to rotate, changes the first steel wire rope 2 Draw direction;Card frame 6 is connected with the left of 4 upper surface of left side connecting plate and card frame 6 covers on a left side for 5 Double-rope groove 15 of fixed pulley Side, card frame 6 are used to cover the first steel wire rope 2 in Double-rope groove 15, prevent the first steel wire rope 2 from departing from fixed pulley 5;The left side Above-mentioned connecting element on connecting plate 4 symmetrically there are another group on right side connecting plate 4;Two pieces of connecting plates, 4 interposition The port that the front and rear side put is each provided with a sleeve 1 and sleeve 1 is facing each other;In fixed sliding on the left and right connecting plates 4 Two first steel wire ropes 2 of the downside of wheel 5 respectively separate one end handing-over on the sleeve 1 of front and rear sides, and sleeve 1 is used to be sleeved on needs The reinforcing bar both ends sling, pull the termination of the first steel wire rope 2 in the upside of fixed pulley 5 then up, and the first steel wire rope 2 passes through Stretching in obliquity, is changed into the stretching of horizontal level by the rotation of fixed pulley 5, so that other end connection is front and rear Side sleeve 1 is drawn close to centre, and be locked reinforcing bar, easy to sling;The termination of first steel wire rope 2 of the upside of left and right sides fixed pulley 5 Handing-over has contiguous block 9;The upper surface of the contiguous block 9 is connected with hanging ring 8, and hanging ring 8 is easy to use lifting machine to sling whole device; The upper side wall of former and later two sleeves 1 is respectively connected with second steel wire rope 10;Water on the downside of the rear and front end of the contiguous block 9 Flat to be connected with becket bridle 13, two becket bridles 13 pass through easy to the second steel wire rope 10 of front and rear homonymy, and tighten in sleeve 1 with connecting The second steel wire rope 10 between block 9 is connect, easy to keep the reinforcing bar sling all around to balance, is horizontal;The becket bridle 13 madial walls are shiny surface, reduce abrasion when the second steel wire rope 10 passes through;Consolidate at the movable end of second steel wire rope 10 It is connected to hook 14;The 9 rear and front end upper horizontal of contiguous block is connected with stripe board 7 and two pieces of stripe boards 7 are in same straight line On;Two pieces of stripe boards, 7 lower face is equidistantly connected with link 12 from front to back, when the second steel wire rope 10 through becket bridle 13 is taut When tight, the hook 14 of 10 end point of the second steel wire rope is hung on the link 12 of correspondence position, keeps the tight of the second steel wire rope 10 Taut state;16 left and right sides level of material cartridge is connected with inserted link 19, and inserted link 19 is used to be inserted in the sleeve 1 of front and rear sides, So that material cartridge 16 is fixed between sleeve 1, other construction material articles are hung easy to fill;The left and right sides of material cartridge 16 The vertical frame of U-frame 17 and two U-frames 17 is vertically arranged with through the bottom plate of material cartridge 16, U-frame 17 is for pushing down placement Material in material cartridge 16, prevents from dropping;Screw thread is surrounded with the vertical frame side wall of the U-frame 17 and is cased with spiral shell therewith The matched nut 18 of line, nut 18 are in the downside of material cartridge 16, when U-frame 17 is pressed on the material in material cartridge 16 When, nut 18 is rotated up, it is fitted at 16 bottom plate lower face of material cartridge, prevents U-frame 17 from departing from material cartridge 16.
Specifically used mode:The sleeve 1 of front and rear side is sleeved on to the reinforcing bar both ends for needing to lift by crane first, then by lifting machine Suspension hook is hooked on the hanging ring 8 of contiguous block 9, is connected to the first steel wire rope 2 of the left and right sides of contiguous block 9 due to reinforcing bar gravity, So that the fixed pulley 5 bypassed rotates, so that the upward extended state of obliquity is changed into the stretching of horizontal level, so that The front and rear side sleeve 1 that the connection of 5 other end of fixed pulley must be bypassed is drawn close to centre, and be locked reinforcing bar, is then keeping the first steel wire rope 2 During the state tightened so that the second steel wire rope 10 on front and rear sleeve 1 passes through the becket bridle 13 of side before and after contiguous block 9, and tightens The second steel wire rope 10 between sleeve 1 and contiguous block 9, easy to keep the reinforcing bar sling all around to balance, in level Position, then hangs over the hook 14 of 10 end point of the second steel wire rope on the link 12 in correspondence position stripe board 7, keeps second Sleeve 1, when needing to lift by crane other materials article, is sleeved on the inserted link 19 of 16 both sides of material cartridge by the tight state of steel wire rope 10 On, the first steel wire rope 2 and the second steel wire rope 10 are then tightened, then material is put into, use the U-frame through 16 bottom plate of material cartridge 17 compress, and rotate up the nut 18 on 17 vertical frame of U-frame, it is fitted at 16 bottom plate lower face of material cartridge, prevent Only U-frame 17 departs from material cartridge 16.
The better embodiment of this patent is explained in detail above, but this patent is not limited to above-mentioned embodiment party Formula, can also be on the premise of this patent objective not be departed from the knowledge that one skilled in the relevant art possesses Make a variety of changes.

Claims (5)

1. a kind of construction reinforcing bar boom hoisting, including connecting plate (4) and material cartridge (16);It is characterized in that the connection Plate (4) has two pieces, is horizontally set on the left and right sides respectively;Left side connecting plate (4) upper surface is connected with pedestal (11) vertically; The centerline axis parallel of fixed pulley (5) and fixed pulley (5) is connected with left side connecting plate (4) by shaft on the pedestal (11) Upper surface left side;Double-rope groove (15) is surrounded with the wheel face of the fixed pulley (5);Card is put in the Double-rope groove (15) There are two first steel wire ropes (2) and the first steel wire rope (2) is bypassed from the left side of fixed pulley (5);On the left side connecting plate (4) Above-mentioned connecting element is symmetrically present on another group of right side connecting plate (4);The front and rear side in two pieces of connecting plates (4) centre position The port for being each provided with a sleeve (1) and sleeve (1) is facing each other;Fixed pulley (5) is on the left and right connecting plates (4) Two first steel wire ropes (2) of downside respectively separate one end handing-over on the sleeve (1) of front and rear sides;The left and right sides fixed pulley (5) the termination handing-over of the first steel wire rope of upside (2) has contiguous block (9);The upper side wall of former and later two sleeves (1) is respectively connected with Piece second steel wire rope (10);The rear and front end lower horizontal of the contiguous block (9) is connected with becket bridle (13);Second steel wire Hook (14) is connected with the movable end of rope (10);Contiguous block (9) rear and front end upper horizontal is connected with stripe board (7) And two pieces of stripe boards (7) are on same straight line;Two pieces of stripe boards (7) lower face is equidistantly connected with link from front to back (12);Level is connected with inserted link (19) at left and right sides of the material cartridge (16);It is vertically arranged at left and right sides of the material cartridge (16) There is U-frame (17) and the vertical frame of two U-frames (17) passes through the bottom plate of material cartridge (16);The vertical frame of the U-frame (17) Screw thread is surrounded with side wall and is cased with the matched nut of screw thread therewith (18), nut (18) is in the downside of material cartridge (16).
2. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, the left side connecting plate (4) Two first steel wire ropes (2) that right side level is connected with the downside of rope pipe (3) and fixed pulley (5) manage (3) through rope.
3. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, side connecting plate (4) upper surface Left side is connected with card frame (6) and card frame (6) covers on the left side of fixed pulley (5) Double-rope groove (15).
4. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, the upper end of the contiguous block (9) Face is connected with hanging ring (8).
5. construction according to claim 1 reinforcing bar boom hoisting, it is characterized in that, becket bridle (13) madial wall is Shiny surface.
CN201720949850.5U 2017-08-01 2017-08-01 A kind of construction reinforcing bar boom hoisting Expired - Fee Related CN207226806U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720949850.5U CN207226806U (en) 2017-08-01 2017-08-01 A kind of construction reinforcing bar boom hoisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720949850.5U CN207226806U (en) 2017-08-01 2017-08-01 A kind of construction reinforcing bar boom hoisting

Publications (1)

Publication Number Publication Date
CN207226806U true CN207226806U (en) 2018-04-13

Family

ID=61856220

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720949850.5U Expired - Fee Related CN207226806U (en) 2017-08-01 2017-08-01 A kind of construction reinforcing bar boom hoisting

Country Status (1)

Country Link
CN (1) CN207226806U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723161A (en) * 2020-12-29 2021-04-30 李金龙 Material overhead hoist is used in bridge construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112723161A (en) * 2020-12-29 2021-04-30 李金龙 Material overhead hoist is used in bridge construction
CN112723161B (en) * 2020-12-29 2023-09-29 李金龙 Material overhead hoist for bridge construction

Similar Documents

Publication Publication Date Title
CN209337970U (en) Three-jaw self-supporting suspender
CN102060232B (en) Transportation method for refractory brick for stove construction
CN207312948U (en) A kind of material transportation bucket for building
CN202346599U (en) Combined neck mouth lifting appliance
CN102001583A (en) Semi-automatic brick hanging fixture
CN107738981A (en) A kind of flexible adjustable suspender of machinery
CN209455923U (en) Detachable rectangular elements hoisting structure
CN218579417U (en) A balancing unit for building material hoist and mount
CN207934465U (en) A kind of construction material suspender
CN210558996U (en) Assembled building model platform double-limb column lifting appliance
CN209242493U (en) A kind of aluminium bar grapple
CN201980854U (en) Semi-automatic brick-suspending clamp
CN208648559U (en) Cover plate for side ditch lifting frame
CN219792141U (en) Lifting appliance with bidirectional leveling capability
CN213679444U (en) Counter weight hoist for hoist and mount
CN207046648U (en) A kind of construction boost container
CN218145303U (en) Lifting appliance for lifting web clamping plates in pre-assembly process
CN214989686U (en) A steel bundle hoisting fixture
CN222574037U (en) A wall panel hanger for construction
CN220131679U (en) Large-scale titanium ingot hoisting device
CN218619841U (en) A large bag spreader with automatic decoupling structure
CN212668985U (en) Spring lifting appliance capable of improving lifting safety
CN204079250U (en) There is the lifting hook special for steel tube of adsorption plant
CN210311840U (en) Waste concrete treatment device for building
CN214653005U (en) Automatic change control hoist and mount machinery

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20190801