CN207221668U - A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting - Google Patents

A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting Download PDF

Info

Publication number
CN207221668U
CN207221668U CN201721015030.5U CN201721015030U CN207221668U CN 207221668 U CN207221668 U CN 207221668U CN 201721015030 U CN201721015030 U CN 201721015030U CN 207221668 U CN207221668 U CN 207221668U
Authority
CN
China
Prior art keywords
heat pipe
heat
pipe bundle
type
desulfurizing tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721015030.5U
Other languages
Chinese (zh)
Inventor
凌波
凌忠钱
曾宪阳
崔璨
豆红飞
吴春潮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Jiliang University
Original Assignee
China Jiliang University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Jiliang University filed Critical China Jiliang University
Priority to CN201721015030.5U priority Critical patent/CN207221668U/en
Application granted granted Critical
Publication of CN207221668U publication Critical patent/CN207221668U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of wet desulfurization system to condense the anti-gypsum rain integrated apparatus of demisting, including gas approach, A types heat pipe bundle, dirt waste water collection device, desulfurizing tower gas approach, desulfurizing tower, desulfurizing tower exhaust pass, Type B heat pipe bundle, condensed water outlet device, intermediate flue, scale removal nozzle and exhaust pass.Between gas approach and exhaust pass, its heat absorbing end is located in gas approach A type heat pipe bundles, and release end of heat is located in exhaust pass;Between desulfurizing tower exhaust pass and intermediate flue, its heat absorbing end is located in desulfurizing tower exhaust pass Type B heat pipe bundle, and release end of heat is located in intermediate flue.A types heat pipe bundle and Type B heat pipe bundle heat absorbing end top are provided with scale removal nozzle;The bottom of A type heat pipe bundles is provided with dirt waste water collection device;The bottom of Type B heat pipe bundle is provided with condensed water outlet device, is provided with agitating unit inside it.Tthe utility model system cost is low, and desulfuration efficiency is high, and good antiscale property, easy cleaning, effectively prevent the generation of gypsum rain.

Description

A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting
Technical field
Desulfurizing tower inlet and outlet flue gas heat pipe type heat exchange system is the utility model is related to, while is related to desulfurizing tower outlet condensation and removes Mist system, and in particular to a kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting.
Background technology
With the fast development of China's industrialization and urbanization, resource consumption also fast lifting therewith is at the same time environmentally friendly Pressure also increasingly increases.In recent years, the atmosphere pollution health of serious threat people and daily life, and boiler smoke Gas is the main source of air environmental pollution.
With《Coal electricity energy-saving and emission-reduction upgrading and transformation plan》It is elevated Deng the appearance of serial regulation, the control of sulfur dioxide To new height.At present, use Limestone-gypsum Wet Flue Gas Desulfurization Process technology during most of power plant desulfurizations, thus improve lime stone- The efficiency of gypsum wet desulfurization technology has good Social benefit and economic benefit.
When using Limestone-gypsum Wet Flue Gas Desulfurization Process technology, gas-to-gas heat exchanger(Gas-gas Heater, abbreviation GGH)It is One of capital equipment, but GGH costs of investment are big, and operating cost is high, is also easy to produce corrosion and blocking.Therefore, at present using lime stone- During gypsum wet desulfurization, most of GGH has been cancelled, and desulfurization wet flue gas is discharged into air using in line mode.Since desulfurization is wet Contain substantial amounts of vapor in flue gas, when chimney breast temperature is relatively low, " gypsum rain " problem of generation is given birth to the neighbouring common people Work brings very big influence.
The content of the invention
The purpose of this utility model is to overcome the problems of background technology, so as to provide a kind of wet desulphurization The anti-gypsum rain integrated apparatus of system condensing demisting.
To solve the above-mentioned problems, a kind of anti-gypsum rain of wet desulfurization system condensation demisting of the utility model is integrally disguised Put, including gas approach, A types heat pipe bundle, dirt waste water collection device, desulfurizing tower gas approach, desulfurizing tower, desulfurizing tower outlet cigarette Road, Type B heat pipe bundle, condensed water outlet device, intermediate flue, scale removal nozzle and exhaust pass.The A types heat pipe bundle is located at entrance Between flue and exhaust pass, its heat absorbing end is located in gas approach, and release end of heat is located in exhaust pass;The Type B heat pipe Beam is between desulfurizing tower exhaust pass and intermediate flue, its heat absorbing end is located in desulfurizing tower exhaust pass, during release end of heat is located at Between in flue.
Further, the A types heat pipe bundle and Type B heat pipe bundle, form by more circular gravity assisted heat pipes;Described Single heat pipe radius in A type heat pipe bundles is 50mm, and the single heat pipe radius in Type B heat pipe bundle is 40mm;Each column heat pipe bundle it Between spacing be 0.3-0.8 times of caliber, be staggeredly arranged between pipe row.
Further, the material of the A types heat pipe bundle and Type B heat pipe bundle is industrially pure titanium.
Further, the heat absorbing end top of the A types heat pipe bundle and Type B heat pipe bundle is provided with scale removal nozzle.
Further, the floor installation of the A type heat pipe bundles has dirt waste water collection device.
Further, the floor installation of the Type B heat pipe bundle has condensed water outlet device, and it is single that stirring is provided with inside it Member.
Further, the release end of heat of the A types heat pipe bundle and Type B heat pipe bundle is respectively arranged with fin, its heat absorbing end is smooth Pipe.
The utility model is by using such scheme, and before flue gas enters tower, A type heat pipe bundle heat absorbing ends inhale flue gas Heat, reduces flue-gas temperature, is conducive to improve desulfuration efficiency, reduces the water content of flue gas.Flue gas after desulfurization goes out in desulfurizing tower Mouth flue absorbs heat by Type B heat pipe bundle, reduces temperature, so that the vapor in saturated flue gas is largely recycled, and through Type B heat pipe The condensed water outlet device discharge condensation water that beam bottom is equipped with, being reduced from source may existing for gypsum rain.Then, water content Low flue gas successively carries the release end of heat of fin by Type B heat pipe bundle and A types heat pipe bundle, and flue gas is heated twice, is improved Flue-gas temperature, improves atmosphere hoist height, technically reduces the formation of gypsum rain.
The utility model replaces GGH using A types heat pipe bundle, both reduces cost, turn avoid the easy foulings of GGH so as to machine The influence that group operation produces.Exchanged heat using Type B heat pipe bundle, remove a large amount of vapor that desulfurizing tower exiting flue gas carries.By In gas inlet there are flying dust, exhanst gas outlet is there are water mist, therefore the heat absorbing end in heat pipe is not added with fin, with good antiscale property and corrosion, And the release end of heat in heat pipe is evenly equipped with fin reinforcement heat exchange, be conducive to the lifting of flue-gas temperature.A types heat pipe bundles, Type B heat pipe bundle Scale removal nozzle is arranged on top, easy to rinse dirt.
Brief description of the drawings
Fig. 1 is that a kind of wet desulfurization system of the utility model condenses the structural representation of the anti-gypsum rain integrated apparatus of demisting Figure.
Description of reference numerals:1- gas approach;2-A type heat pipe bundles;3- dirt waste water collection devices;4- desulfurizing tower entrance cigarettes Road;5- desulfurizing towers;6- desulfurizing tower exhaust pass;7-B type heat pipe bundles;8- condensed water outlet devices;9- intermediate flues;10- scale removal is sprayed Mouth;11- exhaust pass.
Specific embodiment
In order to enable the technical solution of the utility model to be preferably understood, this reality is described in detail below in conjunction with attached drawing With new performance.
Fig. 1 show a kind of wet desulfurization system condensation anti-gypsum rain integrated apparatus schematic diagram of demisting, including entrance cigarette Road 1, A types heat pipe bundle 2, dirt waste water collection device 3, desulfurizing tower gas approach 4, desulfurizing tower 5, desulfurizing tower exhaust pass 6, Type B Heat pipe bundle 7, condensed water outlet device 8, intermediate flue 9, scale removal nozzle 10 and exhaust pass 11;The A types heat pipe bundle 2 be located at into Between mouth flue 1 and exhaust pass 11, its heat absorbing end is located in gas approach 1, and release end of heat is located in exhaust pass 11;Described Between desulfurizing tower exhaust pass 6 and intermediate flue 9, its heat absorbing end is located in desulfurizing tower exhaust pass 6 Type B heat pipe bundle 7, puts Hot junction is located in intermediate flue 9.
Involving great expense since most of heat exchanger such as GGH exists, operating cost is high, perishable, the problems such as easy fouling, Therefore the utility model employs heat pipe.The operation principle of heat pipe is the common knowledge of this area, its principle is not retouched in detail State, the phase transition process mainly condensed using medium in heat absorbing end evaporation, condensation end, makes heat quickly conduct, its resistance is small, connects It is big to touch heat exchange area, there is preferable heat transfer effect.In the utility model, heat pipe uses circular gravity assisted heat pipe, more heat pipe heats Into heat pipe bundle.Wherein, the single heat pipe radius in A types heat pipe bundle 2 is 50mm, and the single heat pipe radius in Type B heat pipe bundle 7 is 40mm;Spacing between each column heat pipe bundle is 0.3-0.8 times of caliber, is staggeredly arranged between pipe row, prevents that flue gas is short-circuit, so as to be lifted Heat transfer effect.
In the utility model, the material of heat pipe is industrially pure titanium, can be with good antiscale property, anticorrosion.
In the utility model, boiler tail flue gas is via gas approach 1, A types heat pipe bundle 2, desulfurizing tower 5, Type B heat pipe bundle 7 Afterwards, flue gas is purified processing, therefore the release end of heat of A types heat pipe bundle 2 and Type B heat pipe bundle 7 is equipped with substantial amounts of fin, so as to improve Heat exchange efficiency, lifts flue-gas temperature;In the heat absorbing end of A types heat pipe bundle 2 and Type B heat pipe bundle 7 since there are more flying dust and water steaming The impurity such as gas, be easy to cause heat pipe wall and block and corrode, therefore the heat absorbing end of A types heat pipe bundle 2 and Type B heat pipe bundle 7 does not install wing Piece, using smooth tube.
In the utility model, condensed water outlet device 8 is installed on the bottom of Type B heat pipe bundle 7, since temperature is relatively low herein, SO2Below dew-point temperature, therefore condensation water has higher corrosivity, selects industrially pure titanium herein, also can basis GB2100-80 selects suitable stainless acid resistant steel.It can be adsorbed when water vapor condensation on the impurity such as dust, Hg, Mg, it is last miscellaneous Matter is fallen on the bottom plate of Type B heat pipe bundle 7, and is come together in condensed water outlet device 8, is excluded automatically by condensed water outlet device 8.
In the utility model, the heat absorbing end top of A types heat pipe bundle 2 and Type B heat pipe bundle 7 is equipped with scale removal nozzle 10, by controlling Unit controls, and when fouling and clogging is serious, opens nozzle scale removal 10;Dirt waste water collection device is equipped with 2 bottom of A types heat pipe bundle 3。
In the utility model, thermal insulation material is equipped with outside system flue, reduces thermal loss.
A types heat pipe bundle 2, the release end of heat operation principle of Type B heat pipe bundle 7 and effect are as follows:When boiler tail flue gas is by entrance Flue 1, A types heat pipe bundle 2, desulfurizing tower gas approach 4 enter desulfurizing tower 5, after the purified treatments such as desulfurization, desulfurizing tower outlet cigarette Flue gas in road 6 flows into intermediate flue 9, and first time heating is carried out to the release end of heat of Type B heat pipe bundle 7;Then, by once heating Flue gas carry out second when flowing through the release end of heat of A types heat pipe bundle 2 and heat.Due to the heat release of A types heat pipe bundle 2 and Type B heat pipe bundle 7 End is respectively arranged with fin, and heat pipe heat exchanging performance is good, by heating twice, flue-gas temperature can be lifted 15-25 DEG C.At this time, flue gas The density of density ratio air is low, therefore the buoyancy lift increase of flue gas, flue gas have the trend of rising.Flue-gas temperature is higher, flue gas with The density contrast of air is bigger, and flue gas buoyancy lift is also bigger, so as to improve the rising height of flue gas, technically reduces stone The formation of cream rain.
The operation principle and effect of 2 heat absorbing end of A types heat pipe bundle are as follows:When boiler tail flue gas enter gas approach 1 in, A The heat absorbing end of type heat pipe bundle 2 is carried out after fully exchanging heat with tail flue gas, and flue gas realizes desulfurization into desulfurizing tower 5.With Wanzhou prefecture of Chongqing Exemplified by certain power plant, when the flue-gas temperature of desulfurizing tower gas approach 4 is 85 DEG C, the exiting flue gas of desulfurizing tower exhaust pass 6 is aqueous Amount reaches 339000Nm3/ h, SO2Content is 50Nm3/h;When the flue gas of desulfurizing tower gas approach 4 is reduced to 60 DEG C, desulfurizing tower outlet The flue gas water content of flue 6 reaches 289420Nm3/ h, SO2Content is 41Nm3/h.Therefore, flue gas is reduced when exchanging heat by heat pipe bundle During temperature, exiting flue gas water content can be not only reduced, desulfuration efficiency can also be improved.
The operation principle and effect of 7 heat absorbing end of Type B heat pipe bundle are as follows:When the flue gas purified by desulfurizing tower 5 is by desulfurizing tower When exhaust pass 6 enters intermediate flue 9, the heat absorbing end of Type B heat pipe bundle 7 fully exchanges heat with neat stress.By taking above-mentioned power plant as an example, when When the flue-gas temperature of desulfurizing tower exhaust pass 6 is 50 DEG C, its exhaust gas volumn is 3234980Nm3/h;When desulfurizing tower exhaust pass 6 After heat absorbing end heat exchange of the flue gas by Type B heat pipe bundle 7, the flue-gas temperature in intermediate flue 9 often reduces by one degree Celsius, in theory often Hour condensable goes out 1.92 tons of water.This condensed water can enter recycling in desulfurizing tower 5 after treatment, to reach water-saving effect Fruit.
In conclusion the utility model due to using gravity assisted heat pipe beam twice, in the case where exterior energy consumption is not required, reaches To it is efficient, water-saving, eliminate gypsum rain this effect.
Above description and the cardinal principle for explaining the utility model, essential characteristic and its advantage, it is impossible to which this is limited with this The scope that utility model is implemented.The principle and feature of simply the utility model described in description above, are not departing from this reality On the premise of new spirit and scope, the utility model also has many change and improvement, these are all in protection domain.

Claims (5)

1. a kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting, including gas approach, A types heat pipe bundle, dirt Waste water collection device, desulfurizing tower gas approach, desulfurizing tower, desulfurizing tower exhaust pass, Type B heat pipe bundle, condensed water outlet device, centre Flue, scale removal nozzle and exhaust pass;The A type heat pipe bundles are between gas approach and exhaust pass, its heat absorbing end position In gas approach, release end of heat is located at exhaust pass;The Type B heat pipe bundle be located at desulfurizing tower exhaust pass and intermediate flue it Between, its heat absorbing end is located at desulfurizing tower exhaust pass, and release end of heat is located at intermediate flue.
2. a kind of wet desulfurization system condensation anti-gypsum rain integrated apparatus of demisting according to claim 1, its feature exist In:The release end of heat of A types heat pipe bundle and Type B heat pipe bundle is respectively arranged with fin, its heat absorbing end is smooth tube.
3. a kind of wet desulfurization system condensation anti-gypsum rain integrated apparatus of demisting according to claim 1, its feature exist In:The top of A types heat pipe bundle and Type B heat pipe bundle heat absorbing end is provided with scale removal nozzle.
4. a kind of wet desulfurization system condensation anti-gypsum rain integrated apparatus of demisting according to claim 1, its feature exist In:The bottom of A type heat pipe bundles is provided with dirt waste water collection device.
5. a kind of wet desulfurization system condensation anti-gypsum rain integrated apparatus of demisting according to claim 1, its feature exist In:The bottom of Type B heat pipe bundle is provided with condensed water outlet device, is provided with agitating unit inside it.
CN201721015030.5U 2017-08-15 2017-08-15 A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting Expired - Fee Related CN207221668U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721015030.5U CN207221668U (en) 2017-08-15 2017-08-15 A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721015030.5U CN207221668U (en) 2017-08-15 2017-08-15 A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting

Publications (1)

Publication Number Publication Date
CN207221668U true CN207221668U (en) 2018-04-13

Family

ID=61857979

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721015030.5U Expired - Fee Related CN207221668U (en) 2017-08-15 2017-08-15 A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting

Country Status (1)

Country Link
CN (1) CN207221668U (en)

Similar Documents

Publication Publication Date Title
CN102087021B (en) Integrated system for utilizing residual heat of boiler smoke and removing sulfur
CN204923035U (en) Processing system is synthesized to coal fired boiler's flue gas
CN104100994A (en) Boiler energy saving and emission reduction system based on flue gas waste heat recovery and reheating technology
CN207379110U (en) A kind of energy-saving and water-saving type coal-burning boiler wet flue gas depth total system
CN202927864U (en) Waste-heat utilization system for desulfuration smoke dehumidification
CN105536484B (en) A kind of pollutant pre-corrosion tower based on flue gas condensing
CN105509492B (en) A kind of Alumina Rotary Kiln fume afterheat and CO2 recovery systems and method
CN206935061U (en) A kind of wet desulfurization flue gas processing unit
CN108434922A (en) The water-saving flue gas of low energy consumption takes off white device and method
CN102980198A (en) Washing condensing smoke triple recovery device
CN107376617A (en) Wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting
CN202942807U (en) Water-washing condensing-type smoke triple-recovery device
CN208742284U (en) A kind of single column washing Wet fume sweetening dust remover of no stock tank secondary cycle
CN203963990U (en) A kind of based on flue gas waste heat recovery and the boiler energy-saving emission-reduction system of thermal technology again
CN203737036U (en) Device for cooperatively reinforcing PM2.5 removing and deep utilization of flue gas residual heat
CN205412650U (en) Purifier is retrieved to latent heat
CN208097718U (en) A kind of device for the discharge outlet white haze steam that removes smoke
CN204611733U (en) The recycling system of boiler afterheat
CN204042943U (en) Desulfurization system for thermal power plant
CN207221668U (en) A kind of wet desulfurization system condenses the anti-gypsum rain integrated apparatus of demisting
CN208620331U (en) A kind of boiler energy recovery system
CN208493801U (en) A kind of desulfurization and dedusting disappears white device for deep cleaning
CN110272082A (en) Desulfurization wastewater evaporative crystallization couples flue gas reheat integral system
CN202933506U (en) Wet gas flue condensate collecting device
CN206867964U (en) A kind of device for eliminating the wet misty rain of wet desulphurization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180413

Termination date: 20190815