CN207211167U - Latch steel pipe and reinforced concrete combination pile cofferdam - Google Patents

Latch steel pipe and reinforced concrete combination pile cofferdam Download PDF

Info

Publication number
CN207211167U
CN207211167U CN201720511423.9U CN201720511423U CN207211167U CN 207211167 U CN207211167 U CN 207211167U CN 201720511423 U CN201720511423 U CN 201720511423U CN 207211167 U CN207211167 U CN 207211167U
Authority
CN
China
Prior art keywords
steel
pile
reinforced concrete
purlin
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720511423.9U
Other languages
Chinese (zh)
Inventor
刘继文
王迎军
张洪鹏
罗小新
郭炜欣
易中平
曹新宝
罗肖
高兵
高永河
吕磊
王世兴
艾波浪
周苗
鲁凡
吴道明
张传林
唐新锋
余建华
李钧周
王隽夫
杨闯辉
荣迪
宋春雨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway Seventh Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway Seventh Group Co Ltd
Priority to CN201720511423.9U priority Critical patent/CN207211167U/en
Application granted granted Critical
Publication of CN207211167U publication Critical patent/CN207211167U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses one kind lock steel pipe and reinforced concrete combination pile cofferdam, including bottom concrete, lock steel-pipe pile, reinforced concrete pile, the lock steel-pipe pile is anchored at the edge of bottom concrete and end to end successively, latches the bottom of steel-pipe pile 50cm at least below inserting piling bottom concrete;The upper socket of reinforced concrete pile is to the bottom of lock steel-pipe pile, and the inside of lower anchor to the bottom concrete of reinforced concrete pile exceeds and bottom concrete bottom;If the inner side that some lock steel-pipe piles surround region is provided with arterial highway steel purlin from top to bottom, inner support is installed in each steel purlin, vertical supporting bar is provided between the adjacent two layers inner support.The utility model solves underwater demolition and excavates hardly possible, the uncontrollable problem of Blasting Excavation quantities, lock steel-pipe pile reduce bottoming concrete thickness because designing armored concrete anchoring stake increase cofferdam anti-floating ability in stake, groove milling workload is reduced, while reduces construction cost.

Description

Latch steel pipe and reinforced concrete combination pile cofferdam
Technical field
Cofferdam technical field is the utility model is related to, more particularly to a kind of lock steel pipe and reinforced concrete combination pile cofferdam.
Background technology
Support of Foundation Pit Excavation has steel jacket box, steel lifted trunk, steel sheet-pile cofferdam and steel pipe pile cofferdam in water traditional at present, in depth The engineering project of the embedding rock of water, it is general to use double-wall steel cofferdam, but had the disadvantages that using double-wall steel cofferdam:
1st, first underwater demolition must be taken to excavate, then sunk, so increase the quantities of excavation of foundation pit, while double-wall steel The anti-floating ability of cofferdam is poor, increases the thickness of bottom concrete.
2nd, for double-wall steel cofferdam after excavation of foundation pit is complete, time-consuming for the assembled sinking of Double-Wall Steel Boxed Cofferdam, has spun out the construction period. The problem of how solving the above problems as workmen's urgent need to resolve.
Utility model content
In view of the shortcomings of the prior art, the utility model provides a kind of lock steel pipe and reinforced concrete combination pile cofferdam, can Difficult, the problems such as anti-floating ability of double-wall steel cofferdam is poor, and the thickness of bottom concrete is excessive is excavated to solve underwater demolition, simultaneously Reduce construction cost, save the construction period.
Technical scheme is used by the utility model:
One kind lock steel pipe and reinforced concrete combination pile cofferdam, including bottom concrete, lock steel-pipe pile, armored concrete Stake, the lock steel-pipe pile are anchored at the edge of bottom concrete and end to end successively, and the bottom for latching steel-pipe pile is extremely 50cm below few inserting piling bottom concrete;The upper socket of the reinforced concrete pile mixes to the bottom of lock steel-pipe pile, reinforcing bar The inside of lower anchor to the bottom concrete of solidifying native stake exceeds and bottom concrete bottom;Some lock steel-pipe piles are enclosed If being provided with arterial highway steel purlin from top to bottom into the inner side in region, inner support is installed in each steel purlin, it is described adjacent Vertical supporting bar is provided between two layers of inner support;Mixed with the reinforced concrete pile of the lock steel-pipe pile socket section for the first reinforcing bar Native stake is coagulated, the reinforced concrete pile of its underpart is the second reinforced concrete pile, and the stake section of first reinforced concrete pile is big In the stake section of the second reinforced concrete pile, and the first reinforced concrete pile stake it is long be more than the second armored concrete stake it is long; The stake section of first reinforced concrete pile is 1000mm, and the stake section of the second reinforced concrete pile is 800mm, the second reinforcing bar The effective anchorage depth of concrete-pile is not less than 4.5m.
Preferably, the steel purlin and inner support include five layers successively from top to bottom, respectively the first steel purlin and the Propped up in one inner support, the second steel purlin and the second inner support, the 3rd steel purlin and the 3rd inner support, the 4th steel purlin and the 4th Support, the 5th steel purlin and my the 5th inner support, the first steel purlin, the second steel purlin, the 3rd steel purlin, the 4th steel purlin are equal Lock steel-pipe pile and the top on the inside of reinforced concrete pile socket section are welded on, the 5th steel purlin is welded on lock steel-pipe pile With the inner side of reinforced concrete pile socket section.
Preferably, the first steel purlin and the second steel purlin use the H profile steel of 2HN700 × 300, propped up in first Support and the second inner support use 630 × 10mm of φ steel pipe;3rd steel purlin, the 4th steel purlin and the 5th steel purlin are adopted With the H profile steel of 3HN700 × 300, the 3rd inner support, the 4th bracing members and the 5th bracing members are using 820 × 12mm's of φ Steel pipe.
Preferably, being provided with construction bearing platform at the top of the bottom concrete, the construction bearing platform bottom is provided with stake Base, the pile foundation pass from the bottom of bottom concrete.
Preferably, the specification of the lock steel-pipe pile is 1000*12mm, using Q345 material steel.
The utility model has the advantages that compared with prior art:
1st, the utility model combines pile cofferdam using lock steel pipe and reinforced concrete, solves underwater demolition and excavates hardly possible, quick-fried Break and dig the uncontrollable problem of quantities, lock steel-pipe pile is because designing armored concrete anchoring stake increase cofferdam anti-floating energy in stake Power, reduce bottoming concrete thickness, reduce groove milling workload, lock steel pipe pile cofferdam installation is (containing armored concrete in stake Anchor pile driving construction, purlin construction) sink and (construct containing purlin) than Double-Wall Steel Boxed Cofferdam assembly to saving 50~60 days, while reduce and apply Work cost, has saved the construction period.
2nd, the utility model in the inside and outside reinforced concrete pile using piles with different section of lock steel-pipe pile by both having increased The ability of armored concrete anchoring pile cofferdam anti-floating, while reduce construction cost, save the time sunk.
Brief description of the drawings
Fig. 1 is the structural representation of the lock steel pipe and reinforced concrete combination pile cofferdam described in the utility model sheet;
Shown in figure:1st, bottom concrete;2nd, steel-pipe pile is latched;3rd, reinforced concrete pile;3.1st, the first armored concrete Stake;3.2nd, the second reinforced concrete pile;4th, the first inner support;5th, the second inner support;6th, the 3rd inner support;7th, the 4th inner support; 8th, the 5th inner support;9th, the first steel purlin;10th, the second steel purlin;11st, the 3rd steel purlin;12nd, the 4th steel purlin;13rd, the 5th Steel purlin, 14, vertical supporting bar;15th, construction bearing platform;16th, pile foundation.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in figure 1, the utility model embodiment provides a kind of lock steel pipe and reinforced concrete combination pile cofferdam, including envelope Base concrete 1, lock steel-pipe pile 2, reinforced concrete pile 3, the lock steel-pipe pile 2 are anchored at the edge of bottom concrete 1 simultaneously It is end to end successively, bottom at least inserting piling bottom concrete 50cm below 1 of the lock steel-pipe pile 2;The armored concrete To the bottom of lock steel-pipe pile 2, the inside of lower anchor to the bottom concrete 1 of reinforced concrete pile 3 surpasses the upper socket of stake 3 Go out and the bottom of bottom concrete 2;If the inner side that some lock steel-pipe piles 2 surround region is provided with arterial highway from top to bottom Steel purlin (including the first steel purlin 9, the second steel purlin 10, the 3rd steel purlin 11, the 4th steel purlin 12 and the 5th steel purlin 13), inner support (including the first inner support 4, the second inner support 5, the 3rd inner support the 6, the 4th are installed in each steel purlin The inner support 8 of inner support 7 and the 5th), vertical supporting bar 14 is provided between the adjacent two layers inner support.
As the preferred structure of the present embodiment, the reinforced concrete pile 3 that section is socketed with lock steel-pipe pile 2 is the first reinforcing bar Concrete-pile 3.1, the reinforced concrete pile 3 of its underpart are the second reinforced concrete pile 3.2, first reinforced concrete pile 3.1 stake section is more than the stake section of the second reinforced concrete pile 3.2, and the stake of the first reinforced concrete pile 3.1 long is more than the The stake of two armored concrete 3.2 is long, and in the present embodiment, the specification of lock steel-pipe pile 2 is 1000*12mm, using Q345 material steel Material, the stake section of the first reinforced concrete pile 3.1 is 1000mm, and the stake section of the second reinforced concrete pile 3.2 is 800mm, the Effective anchorage depth of two reinforced concrete piles 3.2 is not less than 4.5m.
Shown in Figure 1, as the preferred structure of the present embodiment, steel purlin and inner support include five successively from top to bottom Layer, respectively the first steel purlin 9 and the first inner support 4, the second steel purlin 10 and the second inner support 5, the 3rd steel purlin 11 and the Three inner supports 6, the 4th steel purlin 12 and the 4th inner support 7, the 5th steel purlin 13 and my the 5th inner support 8, wherein, the first steel Purlin 9, the second steel purlin 10, the 3rd steel purlin 11, the 4th steel purlin 12 are welded on lock steel-pipe pile 2 and reinforced concrete pile Top on the inside of 3 socket sections, the 5th steel purlin 13 are welded on lock steel-pipe pile 2 and are socketed the interior of section with reinforced concrete pile 3 Side.Further, the first steel purlin 9 and the second steel purlin 10 use the H profile steel of 2HN700 × 300, the first inner support 4 Used with the second inner support 5Steel pipe, the 3rd steel purlin 11, the 4th steel purlin 12 and the 5th steel enclose Purlin 13 uses the H profile steel of 3HN700 × 300, and the 3rd inner support 6, the 4th bracing members 7 and the 5th bracing members 8 useSteel pipe.Construction bearing platform 15 is provided with the top of bottom concrete 1, the bottom of construction bearing platform 15 is provided with Pile foundation 16, the pile foundation 16 pass from the bottom of bottom concrete 1.
In work progress, lock steel-pipe pile 2 uses following 0.5m at the top of churning driven drilling groove milling to bottom concrete 1, Squeezed into steel-pipe pile 2 is latched to notch bottom journey with vibration hammer, bored using 360 churning drivens by rootHole milling is native except thick circle gravel, Lock steel-pipe pile 2 is installed by root, and bored in fore shaft steel-pipe pile 2Hole, irrigate reinforced concrete pile 3.In lock steel The direction across bridge spacing 1.26m of pile tube 2, along bridge to spacing 1.254m.The supervisor of fore shaft steel-pipe pile 2 usesSteel pipe, First and second steel purlin (9,10) level is 2HN700 × 300H shaped steel, and first and second inner support (4,5) isSteel Pipe.Th, three, four, five purlins (111,12,13) level be 3HN700 × 300H shaped steel, third and fourth, five inner supports (6,7,8) For φ 820 × 12mm steel pipes.
The utility model embodiment carries the lock steel pipe and concrete combined pile cofferdam construction method, including following step Suddenly:
Step S1:Construction lock steel-pipe pile 2, the installation lock steel around groove milling construction in the construction platform at the top of steel pile casting Pile tube 2, and inserting piling is carried out to lock steel-pipe pile 2, until squeezing into rock stratum untill inserting piling is motionless, then construct and bore in steel-pipe pile Hole carries out reinforced concrete pile 3 and irrigated, and the filling C30 concrete latched in steel-pipe pile 2 must be higher by riverbed face 50cm.
Step S2:The clear base of low water level, after the interior filling concrete of lock steel-pipe pile reaches intensity, clear base is carried out in low water level, clearly To ensure that head difference is no more than 50cm inside and outside cofferdam during base, inner side water level is+158.5m, and riverbed is cleared up to back cover concrete bottom Portion, to ensure that the attached soil in stake is cleaned out during clear base, to ensure that the cohesive force of stake and bottom concrete meets to require.
Step S3:Bottom concrete is poured, is taken out in low water level underwater casting C30 back cover concretes, casting process to outside cofferdam Water, it is ensured that head difference is no more than 50cm inside and outside cofferdam.
Step S4:Purlin and inner support are installed, after bottom concrete reaches design strength, cut steel pile casting, low water level exists Bracket is welded on pile tube, assembled purlin and inner support on bracket, ensures that head difference is no more than 50cm inside and outside cofferdam;
In step s 4, purlin is installed and the process of inner support is as follows:
S4.1, the first purlin of installation and the first inner support, cut steel pile casting, are welded below low water level+158m water levels on pile tube Bracket is connect, assembled first purlin and the first inner support on bracket;
S4.2, the second purlin and the second inner support are installed, are drawn water in cofferdam to absolute altitude+155.5, steel pile casting is cut off, in pipe Bracket is welded in stake, assembled second purlin and the second inner support on bracket;
S4.3, the 3rd purlin and the 3rd inner support are installed, are drawn water in cofferdam to absolute altitude+152.5, steel pile casting is cut off, in pipe Bracket is welded in stake, assembled 3rd purlin and the 3rd inner support on bracket;
S4.4, the 4th purlin and the 4th inner support are installed, are drawn water in cofferdam to absolute altitude+149.5, steel pile casting is cut off, in pipe Bracket is welded in stake, assembled 4th purlin and the 4th inner support on bracket;
S4.5, the 5th purlin and the 5th inner support are installed, are drawn water in cofferdam to absolute altitude+146.5, steel pile casting is cut off, in pipe Bracket is welded in stake, assembled 5th purlin and the 5th inner support on bracket.
Certainly, in step S4.1, low water level+158m water levels, be for working water level+160m, wherein, step The absolute altitude that draws water in S4.2, S4.3, S4.4, S4.5 be for low water level+158m, reality work progress in, can root According to the absolute altitude for needing each stage in set-up procedure S4 of construction.
Step S5:Draw water to back cover concrete top, drawn water in cofferdam to back cover concrete top, cut off steel pile casting, cut pile crown, clear base;
Step S6:Construction bearing platform, assembling reinforcement, one-time-concreting cushion cap, Delta of entertaining is to after intensity, to cushion cap and steel-pipe pile Between recharge sand fill closely knit, recharge sand height 4m, then to pour C30 concrete 0.5m high;
Step S7:In low water level, in the case of the inside and outside no head difference in cofferdam, cofferdam is cut and disassembled.
The utility model is solved underwater demolition and is excavated difficult, explosion using lock steel pipe and reinforced concrete combination pile cofferdam The uncontrollable problem of excavation project amount, lock steel-pipe pile increase cofferdam anti-floating ability because designing armored concrete anchoring stake in stake, Reduce bottoming concrete thickness, reduce groove milling workload, the installation of lock steel pipe pile cofferdam is (containing armored concrete anchoring in stake Pile driving construction, purlin construction) sink and (construct containing purlin) than Double-Wall Steel Boxed Cofferdam assembly to saving 50~60 days, while reduce and be constructed into This, has saved the construction period.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in Protection domain within.

Claims (5)

1. one kind lock steel pipe and reinforced concrete combination pile cofferdam, including bottom concrete, lock steel-pipe pile, armored concrete Stake, it is characterised in that:The lock steel-pipe pile is anchored at the edge of bottom concrete and end to end successively, the lock steel pipe The bottom of stake 50cm at least below inserting piling bottom concrete;The upper socket of the reinforced concrete pile to lock steel-pipe pile under Portion, the inside of lower anchor to the bottom concrete of reinforced concrete pile exceeds and bottom concrete bottom;Some locks If the inner side that steel-pipe pile surrounds region is provided with arterial highway steel purlin from top to bottom, interior branch is installed in each steel purlin Support, vertical supporting bar is provided between the adjacent two layers inner support;With the reinforced concrete pile of the lock steel-pipe pile socket section For the first reinforced concrete pile, the reinforced concrete pile of its underpart is the second reinforced concrete pile, first armored concrete The stake section of stake is more than the stake section of the second reinforced concrete pile, and long second reinforcing bar that is more than of stake of the first reinforced concrete pile mixes The stake for coagulating soil is long;The stake section of first reinforced concrete pile is 1000mm, and the stake section of the second reinforced concrete pile is 800mm, the effective anchorage depth of the second reinforced concrete pile are not less than 4.5m.
2. lock steel pipe according to claim 1 and reinforced concrete combination pile cofferdam, it is characterised in that:The steel purlin and Inner support includes five layers successively from top to bottom, is propped up in respectively the first steel purlin and the first inner support, the second steel purlin and second Support, the 3rd steel purlin and the 3rd inner support, the 4th steel purlin and the 4th inner support, the 5th steel purlin and my the 5th inner support, institute State the first steel purlin, the second steel purlin, the 3rd steel purlin, the 4th steel purlin and be welded on lock steel-pipe pile and reinforced concrete pile The top being socketed on the inside of section, the 5th steel purlin are welded on lock steel-pipe pile and the inner side of reinforced concrete pile socket section.
3. lock steel pipe according to claim 2 and reinforced concrete combination pile cofferdam, it is characterised in that:First steel encloses Purlin and the second steel purlin use the H profile steel of 2HN700 × 300, and the first inner support and the second inner support use 630 × 10mm of φ Steel pipe;3rd steel purlin, the 4th steel purlin and the 5th steel purlin use 3HN700 × 300 H profile steel, the described 3rd Inner support, the 4th bracing members and the 5th bracing members use 820 × 12mm of φ steel pipe.
4. lock steel pipe according to claim 1 and reinforced concrete combination pile cofferdam, it is characterised in that:The back cover coagulation The top of soil is provided with construction bearing platform, and the construction bearing platform bottom is provided with pile foundation, and the pile foundation is from the bottom of bottom concrete Pass.
5. lock steel pipe according to claim 1 and reinforced concrete combination pile cofferdam, it is characterised in that:The lock steel pipe The specification of stake is 1000*12mm, using Q345 material steel.
CN201720511423.9U 2017-05-08 2017-05-08 Latch steel pipe and reinforced concrete combination pile cofferdam Expired - Fee Related CN207211167U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720511423.9U CN207211167U (en) 2017-05-08 2017-05-08 Latch steel pipe and reinforced concrete combination pile cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720511423.9U CN207211167U (en) 2017-05-08 2017-05-08 Latch steel pipe and reinforced concrete combination pile cofferdam

Publications (1)

Publication Number Publication Date
CN207211167U true CN207211167U (en) 2018-04-10

Family

ID=61810020

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720511423.9U Expired - Fee Related CN207211167U (en) 2017-05-08 2017-05-08 Latch steel pipe and reinforced concrete combination pile cofferdam

Country Status (1)

Country Link
CN (1) CN207211167U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958254A (en) * 2017-05-08 2017-07-18 中铁七局集团第四工程有限公司 Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106958254A (en) * 2017-05-08 2017-07-18 中铁七局集团第四工程有限公司 Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN106958254A (en) Latch steel pipe and reinforced concrete combination pile cofferdam and its construction method
CN104264688B (en) Manually digging hole non-uniform pile support construction process
CN100510281C (en) Semi-inverse construction method of super large diameter, ultra-burial depth storage pond
CN105649090A (en) Construction method for support combining steel sheet piles and stirring piles
CN102134853A (en) CT sealed steel pipe pile foundation pit water stop supporting device and construction method thereof
CN103758132B (en) The construction technology of the cantilever soldier pile retaining structure on slope is put in a kind of combination
CN207484290U (en) The hollow clump of piles anchorage of super-large diameter
CN207003421U (en) A kind of steel plate pilework for being seated hard rock top surface
CN108729457A (en) A kind of steel pipe pile cofferdam and its construction method for bridge deepwater foundation
CN207211167U (en) Latch steel pipe and reinforced concrete combination pile cofferdam
CN105040707A (en) Combined densely-arrayed pile deep foundation pit supporting and enclosure structure used as basement external wall
JP2015183364A (en) Method for preventing soil structure from sliding at slope surface layer with geocell fixing operation auxiliary means
CN207109842U (en) A kind of rock foundation pole and tower foundation structure
CN214530750U (en) Bridge pile foundation structure suitable for rock mass abrupt slope
CN105484270A (en) Reinforcement protection construction method of high steep old rubble retaining wall adjacent to deep foundation pit
CN212656252U (en) Novel transmission line tower foundation
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN112942377A (en) Novel support shear-resistant structure and construction method thereof
CN111576469A (en) Novel power transmission line tower foundation and construction method
CN206368375U (en) A kind of electric power pylon basis
CN109989346A (en) Bridge major diameter precast concrete tubular column basis and its construction method
CN109653193A (en) Inversion underground continuous wall construction method
CN109898515A (en) Support of Foundation Pit Excavation method of the slope in conjunction with tubular pole
KR101052363B1 (en) Freestanding Digging Method for Deep Excavation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180410

Termination date: 20210508

CF01 Termination of patent right due to non-payment of annual fee