CN207204547U - Separate screen assembly - Google Patents

Separate screen assembly Download PDF

Info

Publication number
CN207204547U
CN207204547U CN201721104011.XU CN201721104011U CN207204547U CN 207204547 U CN207204547 U CN 207204547U CN 201721104011 U CN201721104011 U CN 201721104011U CN 207204547 U CN207204547 U CN 207204547U
Authority
CN
China
Prior art keywords
bolter
discharging
screen assembly
separation screen
assembly according
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721104011.XU
Other languages
Chinese (zh)
Inventor
刘长如
钱月起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Jiahe Kuntai Technology Co ltd
Original Assignee
Heilongjiang Like Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Heilongjiang Like Technology Co Ltd filed Critical Heilongjiang Like Technology Co Ltd
Priority to CN201721104011.XU priority Critical patent/CN207204547U/en
Application granted granted Critical
Publication of CN207204547U publication Critical patent/CN207204547U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of separation screen assembly.The separation screen assembly includes bolter and the conveying mechanism being connected with the bolter, it is characterized in that, the first end connection feeding spiral conveyer structure of the bolter, second end of the bolter connects the first discharging spiral conveyor structure, the second discharging spiral conveyor structure is also connected with below the bolter, the junction of the bolter and the feeding spiral conveyer structure, the first discharging spiral conveyor structure and the second discharging spiral conveyor structure is seal attachment structure.The utility model separation screen assembly can realize effective dust and can realize higher automaticity and production efficiency.

Description

Separate screen assembly
Technical field
It the utility model is related to feed separation technical field, and in particular to one kind separation screen assembly.
Background technology
Bolter is common feed separation equipment, is widely used in numerous industries.For example, in paper industry, straw The particle that the forages such as stalk are ground into through pulverizer is the mixture of fiber material and non-fiber material, and wherein fiber material is used as paper technology In raw material, should enter in latter procedure, and non-fiber material is waste material, it should not enter into latter procedure.Therefore, it is It is easy to conveying fiber material in a procedure backward, it is necessary to be separated using bolter to particle mixture.Set in bolter Screen cloth is equipped with, the separation of fiber material and non-fiber material can be achieved by the screening of screen cloth for particle.However, due to pulverizer and separation The work of sieve is all carried out continuously, and non-fiber material constantly drops from screen cloth, it usually needs artificial periodically or continuously right It is purged to prevent accumulation, is taken time and effort very much.Simultaneously as non-fiber material is powdered particle, using bolter to broken After material mixture is separated, when the non-fiber material isolated is fallen from screen cloth, if fallen in an open space, at this The phenomenon for airborne dust occur is easy to during individual so that the environment of workshop is more bad, or even fire safety evaluating hidden danger be present, Need periodically to carry out cleaning and tidying to workshop, take time and effort;Airborne dust can also cause certain pollution to atmospheric environment simultaneously, not be inconsistent The requirement that cyclization is protected;Similarly, since fiber material is also particle, the fiber material isolated from the discharging opening of bolter fall when, such as Fruit is fallen in an open space, and there is also above mentioned problem during blanking;In addition, open space is also easily lead to Material is dropped on ground from discharge outlet, causes to waste.
Utility model content
In view of this, main purpose of the present utility model, which is to provide, a kind of is capable of effective dust, automaticity and life Produce all higher separation screen assembly of efficiency.
To reach above-mentioned purpose, the technical solution of the utility model is as follows:
One kind separation screen assembly, including bolter and the conveying mechanism that is connected with the bolter, wherein, the separation The first end connection feeding spiral conveyer structure of sieve, the second end of the bolter connects the first discharging spiral conveyor structure, institute State and the second discharging spiral conveyor structure is also connected with below bolter, the bolter and the feeding spiral conveyer structure, institute The junction for stating the first discharging spiral conveyor structure and the second discharging spiral conveyor structure is seal attachment structure.
Preferably, the bolter is drum screen, including housing and the screen cloth that is arranged in housing, and the screen cloth being capable of phase For the housing into rotation.
Preferably, the screen cloth is individual layer, bilayer or three layers.
Preferably, the axis of the bolter is inclined relative to horizontal setting, and the first end of the bolter is higher than Second end.
Preferably, the second discharging connection knot is provided between the bolter and the second discharging spiral conveyor structure Structure, for connecting the bolter and the second discharging spiral conveyor structure.
Preferably, the cross-sectional area of the second discharging attachment structure is sieved to the second discharging spiral conveyor along from separation The direction of structure is gradually reduced.
Preferably, the second discharging spiral conveyor structure includes the first-level transport mechanism and secondary conveyor of series connection, Wherein described primary conveyor structure is connected with the bolter.
Preferably, the feeding mouth of the first-level transport mechanism is located at the lower section of the bolter.
Preferably, the first-level transport mechanism with respect to the horizontal plane be arranged in parallel, and the secondary conveyor is relative to water Planar tilt is set.
Preferably, the first discharging connection knot is provided between the bolter and the first discharging spiral conveyor structure Structure, for connecting the bolter and the first discharging spiral conveyor structure.
Preferably, the first discharging attachment structure includes interconnected top half and the latter half, top half Bolter is connected, the latter half connects the first discharging spiral conveyor structure, wherein, the cross-sectional area edge discharging of top half Direction gradually increases.
Preferably, the first discharging attachment structure includes the first baffle being obliquely installed, and the first baffle is positioned at described point Below the discharging opening of sieve, for material to be directed to the charging of the first discharging spiral conveyor structure from the discharging opening of bolter Mouthful.
Preferably, it is provided with deironing apparatus on the first baffle.
Preferably, the deironing apparatus includes permanent magnet or electromagnet.
Preferably, the first discharging attachment structure includes the first side wall parallel with the first baffle, the iron removaling Device is arranged between the first side wall and the first baffle.
Preferably, it is provided with window able to turn on or off in the side wall of the first discharging attachment structure.
Multiple spiral conveying mechanisms are connected with the utility model, on bolter, it is respectively:Feeding spiral conveyer Structure, the first discharging spiral conveyor structure and the second discharging spiral conveyor structure, wherein the second discharging spiral conveyor structure is preferred For two-stage delivery mechanism, so as to realize the charging of bolter, separation and the coarse fodder (fiber material) and fines (non-fibre to separation Dimension material) Automatic Conveying, especially for the non-fiber material isolated in bolter, by be arranged on below bolter the Two discharging spiral conveyor structures realize the Automatic Conveying to non-fiber material, avoid accumulation of the non-fiber material below screen cloth, Also eliminate the trouble of manual cleaning.First charging attachment structure, the first discharging attachment structure and the second discharging connection are set Structure, it is possible to prevente effectively from bolter the airborne dust during feeding, discharging and falling waste material the problem of, both protects environment, again The trouble of cleaning is eliminated, while can also prevent particle from dropping on ground, is easy to the conveying of particle.
Brief description of the drawings
By the description to the utility model embodiment referring to the drawings, of the present utility model above-mentioned and other mesh , feature and advantage will be apparent from, in the accompanying drawings:
Fig. 1 is the overall structure diagram of the separation screen assembly of preferred embodiment of the present utility model;
Fig. 2 is Fig. 1 A direction views;
Fig. 3 is Fig. 1 B direction views;
Fig. 4 a are the sectional view at Fig. 3 D-D;
Fig. 4 b are the partial enlarged drawing at E in Fig. 4 a;
Fig. 5 is Fig. 3 C direction views;
Fig. 6 a are that the structure in separation screen assembly of the present utility model at the charging aperture of first discharging spiral conveyor structure is shown It is intended to;
Fig. 6 b are the cross-sectional view of the flared section in Fig. 6 a;
Fig. 7 and Fig. 8 is Fig. 6 alternate embodiments schematic diagram.
In figure:Bolter -1;Housing -11;Feeding mouth -111;Screen cloth -12;Connecting rod -121;Screen axis -13;Motor- 132;First support member -133;Feeding spiral conveyer structure -2;Feed barrel -21;Blanking port -211;First discharging helical feed Mechanism -3;Discharge cylinder -31;Charging aperture -311;Second discharging spiral conveyor structure -4;First-level transport mechanism -41;Two-stage conveying Mechanism -42;First charging attachment structure -5;First discharging attachment structure -6;Top half -61;First baffle -611;Lower half Divide -62;Observation panel -621;Second discharging attachment structure -7.
Embodiment
Various embodiments of the present utility model are more fully described hereinafter with reference to accompanying drawing.In various figures, identical Element is represented using same or similar reference.For the sake of clarity, the various pieces in accompanying drawing are not drawn to paint System.Unless the context clearly requires otherwise, otherwise entire disclosure word similar with the " comprising " in claims, "comprising" etc. should When the implication rather than exclusive or exhaustive implication that are construed to include;That is, it is the implication of " including but is not limited to ".
In the description of the utility model separation screen assembly, it is to be understood that term " first ", " second " etc. are only used for Purpose is described, and it is not intended that instruction or hint relative importance.In addition, in description of the present utility model, unless otherwise Illustrate, " multiple " are meant that two or more.
It should be noted that in context of the present utility model, illustrated often by taking paper industry as an example, however, this The separation screen assembly of utility model is not limited to use in paper industry, but can make in any suitable industry With.
In papermaking process flow, the forage such as stalk carries out size degradation through pulverizer, such as size degradation turns into the grass of cms long Expect section, the particle after pulverizer crushes is fiber material and the mixture of non-fiber material, and wherein fiber material is used as in paper technology Raw material, afterwards can be with as shown in figure 1, particle mixture be transported in bolter 1 through feeding spiral conveyer structure 2 is sieved Choosing, the fiber material (coarse fodder) after screening are transported in follow-up equipment (such as feed bin) through the first discharging spiral conveyor structure 3, isolated The designated area that is conveyed through the second discharging spiral conveyor structure 4 of non-fiber material (fines).
In the utility model, separation screen assembly includes bolter 1 and the conveying mechanism being connected with bolter 1.Bolter 1 First end be pan feeding one end connection feeding spiral conveyer structure 2, the second end of bolter 1 discharges the discharging of one end connection first Spiral conveying mechanism 3, is also connected with the second discharging spiral conveyor structure 4 in the lower section of bolter 1, the bolter 1 with it is described enter Expect the connection of spiral conveying mechanism 2, the first discharging spiral conveyor structure 3 and the second discharging spiral conveyor structure 4 Place is seal attachment structure.
Preferably, as shown in Figure 2 and Figure 3, bolter 1 is drum screen, and bolter 1 includes housing 11, is arranged in housing 11 The screen cloth 12 in portion, screen cloth 21 can rotate relative to housing 11, and housing 11 is approximately columnar structured, be provided with housing 11 point From the feeding mouth 111 and discharging opening (not shown) of sieve 1, feeding mouth 111 and the blanking port on feeding spiral conveyer structure 2 211 is corresponding, and discharging opening is corresponding with the charging aperture 311 of the first discharging spiral conveyor structure 3, is additionally provided with inside housing 11 The screen axis 13 extended along its axial direction, one end of screen axis 13 is provided with motor 132, for driving screen axis 13 to rotate, the drive Dynamic motor 132 is located at the outside of housing 11.The outside of housing 11 is provided with the first support member 133, housing 11 and drive around housing 11 Dynamic motor 132 is all secured to the first support member 133.Preferably, the axis of the bolter 1 is inclined relative to horizontal setting, And its first end is higher than its second end, in order to the conveying and discharging of particle.
As shown in figures 4 a and 4b, screen axis 13 is similarly disposed at the centre of screen cloth 12, in order to realize screen cloth 12 in housing 11 Interior installation, is provided with connecting rod 121 between screen axis 13 and the inwall of screen cloth 12, and one end of connecting rod 121 is fixedly attached to sieve Axle 13, the other end of connecting rod 121 are fixedly connected with the inwall of screen cloth 12, it is preferable that connecting rod 121 has more, radial row Cloth, on the one hand it is easy to keep the shape of screen cloth 12, is on the other hand easy to transmit to screen cloth 12 and moves.
Preferably, the radial structure of connecting rod 121 is y-type structure, and y-type structure is by three identical rod-like structures Composition, rod-like structure can be the spline-like formations of square-section, and rod-like structure is not limited to above-mentioned form, such as in order to reduce bar Rod-like structure, can also be designed to cylindrical rod-like structure by the barrier effect that shape structure is moved to the particle in bolter 1, excellent Selection of land, the diameter of cylindrical rod-like structure can be 5-30mm, avoid it is excessive particle is moved to form obstruction, or it is too small to sieve Net 12 does not have good supporting role.Preferably, the rod-like structure can also be the rod-like structure of convex lens tee section, The inhibition to particle motion can be reduced well.It is further preferred that connecting rod 121 is uniform along the axial direction of screen axis 13 There are three groups, three groups of connecting rods 121 are located at the opening position close to two ends of screen cloth 12 and the centre close to screen cloth 12 respectively Opening position, such a distribution form make it that fixation of the screen cloth 12 on screen axis 13 is relatively reliable.
Preferably, as shown in Fig. 2, Fig. 3, Fig. 5, in order that the wire side of screen cloth 12 is smoother, to improve particle in screen cloth The continuity moved in 12, screen cloth 12 is designed as columnar structured.Screen cloth 12 is, for example, 3-6 mesh.Screen cloth 12 could be arranged to Individual layer screen cloth or multilayer screen cloth.In actual use, the coarse fodder that the screen cloth 12 of individual layer is sometimes prone to through elongated shape is for example fine Material etc. is tieed up, for paper industry, fibre material is useful material, and individual layer screen cloth causes fibre material with non-fiber material Fallen from the bottom of screen cloth, cause the loss of fibre material, cause the increase of cost;And for other application field, when When fines is useful material, then the problem of causing easily to adulterate coarse fodder in fines.Therefore, in order to avoid the hair of above mentioned problem It is raw, preferably screen cloth 12 is arranged to two layers or more than three layers, the coarse fodder of such elongated shape, which just compares, to be difficult to penetrate screen cloth.Example As shown in Figure 4 b, screen cloth 12 is arranged to three layers, is set gradually along the radial direction of housing 11, and between adjacent screen mesh 12 between Away from identical.Specifically, the screen cloth of innermost layer can be metal cylinder, such as the tubular structure rolled by metallic plate, uniform on barrel There is hole, and its aperture can be more than outer layer, the sieve aperture in middle level;And outer layer and the screen cloth in middle level can use wire netting, and wind In the metal cylinder of internal layer.Wherein, the main function of metal cylinder includes:The shape and intensity of screen cloth are maintained, is easy to transmit moment of torsion Arrive screen cloth, etc..
As Figure 1-3, particle is dropped into the feeding mouth of bolter 1 by the blanking port 211 of feeding spiral conveyer structure 2 At 111, if between blanking port 211 and feeding mouth 111 being open space, it will cause during the pan feeding of bolter 1 Generation dust raising phenomenon, while also easily cause particle to fall to the ground.To avoid above mentioned problem, in the utility model, feeding First charging attachment structure 5 is set between the blanking port 211 of spiral conveying mechanism 2 and the feeding mouth 111 of bolter 1, and first enters Material attachment structure 5 is formed as Integral sealing with the feed barrel 21 of feeding spiral conveyer structure 2 and the housing 11 of bolter 1 Structure, so that when particle drops into feeding mouth 111 by blanking port 211, it can effectively prevent to raise outside the impurity such as dust, avoid The problem of environment or air pollution, save the trouble of artificial dedusting, it is time saving and energy saving, efficiency is improved, has saved cost;Together When closed structure it also avoid particle and dropped to by blanking port 211 on ground, caused by waste problem.Specifically, first Charging attachment structure 5 is shell-like structure, and one end of the first charging attachment structure 5 connects the blanking port of feeding spiral conveyer structure 2 211, the other end connects the feeding mouth of bolter 1.
Preferably, deironing apparatus such as electromagnet or permanent magnetism can also be set between blanking port 211 and feeding mouth 111 Body, so as to be adsorbed to the metal impurities in particle, to prevent metal impurities from entering among later procedure.Further preferably Ground, deironing apparatus are arranged on the inwall of the first charging attachment structure 5.It is further preferred that in the first charging attachment structure 5 Observation panel (not shown) is provided with shell-like structure corresponding with deironing apparatus, observation panel can be opened and closed, is used for It is artificial to take out the irony article that is adsorbed on deironing apparatus and as observation window.
Preferably due to pulverizer can produce substantial amounts of dust, powder or solid particulate matter during crushing forage, These dusts or solid particulate matter are entered in bolter 1 with particle, are unfavorable for the separation of bolter 1, in order to keep away Exempt from above mentioned problem, dedusting removal of impurities is carried out to it first before particle enters bolter 1.Specifically, can be defeated in feed auger Setting dedusting knot screen in mechanism 2 is sent, such as the dedusting with feeding spiral conveyer structure 2 for Integral sealing structure is set Case.
Preferably, as shown in figure 1, feeding spiral conveyer structure 2 is inclined relative to horizontal setting in the utility model, and Its one end that discharges is higher than pan feeding one end.
Material enters inside screen cloth 12 from the feeding mouth 111 of the first end of bolter 1, and the rotating band animal material of screen cloth 12 is together Rolling flip, fines such as fiber material fall on the lower section of bolter 1 through screen cloth 12, and coarse fodder such as non-fiber material then continues to roll, Until reach the discharging opening at the second end.
As shown in Figures 2 and 3, the discharging opening of fiber material from bolter 1 enters entering for the first discharging spiral conveyor structure 3 At material mouth 311, if between the charging aperture 311 of the discharging opening of bolter 1 and the first discharging spiral conveyor structure 3 being open sky Between, it will cause dust raising phenomenon occurs during bolter 1 discharges, while also easily cause material to fall to the ground.For Above mentioned problem is avoided, in the utility model, in the discharging opening of bolter 1 and the charging aperture 311 of the first discharging spiral conveyor structure 3 Between set first discharging attachment structure 6.Preferably, the first discharging attachment structure 6 is shell-like structure, the first discharging connection Structure 6 includes interconnected top half 61 and the latter half 62, and top half 61 connects the shell of the discharge outlet of bolter 1 Body, the latter half 62 connect the discharging cylinder 31 at the charging aperture 311 of the first discharging spiral conveyor structure 3, the housing of bolter 1 11st, top half 61, the latter half 62 and discharging cylinder 31 form Integral sealing structure, so as to effectively prevent bolter 1 The airborne dust problem of discharge outlet, at the same can also avoid fiber material from discharge outlet drop to ground the problem of.
Preferably, the cross-sectional area of top half 61 gradually increases along discharging direction.Preferably, the first discharging attachment structure 6 also include the first baffle 611 that is obliquely installed, and first baffle 611 be located at the discharging opening lower section of bolter 1, for by material from The discharging opening of bolter 1 is directed at the charging aperture 311 of the first discharging spiral conveyor structure 3.Preferably, the first baffle 611 can be that the position of first baffle 611 and incline direction cause thing close to a side wall of bolter 1 in top half 61 Material can be first fallen on first baffle 611, then taken advantage of a situation and be slipped in the latter half 62, eventually fall in the first discharging helical feed At the charging aperture 311 of mechanism 3.Preferably, deironing apparatus such as electromagnetism can be set on the inwall or outer wall of first baffle 611 Iron or permanent magnet, the fiber material for the discharge outlet to bolter 1 carries out the absorption of the metal impurities such as iron, in the latter half Observation panel 621 can also be set in 62 side wall, and observation panel 621 can open and close, for manually taking out deironing apparatus The irony article of absorption and as observation window.Preferably, first baffle 611 can not also be served as by the side wall of top half 61, But single baffle plate can be abreast set in the inside sidewalls of relevant position, now, deironing apparatus can be arranged on the list Between only baffle plate and corresponding side wall, so as to fully hide deironing apparatus so that it is neither exposed to the external world, is also not exposed to The inside of first discharging attachment structure 6.
Preferably, the cross-sectional area of the latter half 62 is gradually reduced along discharging direction, such as its general shape is in Taper, so that the fiber material that must disperse was assembled before falling on the first discharging spiral conveyor structure 3 so that fiber material energy It is enough accurately to drop on helical blade therein, in order to the conveying of fiber material.
Cylinder at the charging aperture 311 of first discharging spiral conveyor structure 3 is connected to the bottom of the latter half 62, specifically Ground, the screw rod of the first discharging spiral conveyor structure 3 inserts into the inner portion by a side wall of the latter half 62, and extends to lower half The lower section of part 62, discharging cylinder 31 intersect with the side wall of the latter half 62, and the charging aperture 311 for the cylinder 31 that discharges is located at lower half The lower section of part 62, it is possibility to have effect avoids airborne dust, while the material being also convenient in the latter half 62 falls into the first of lower section and gone out Expect in spiral conveying mechanism 3.
Preferably, the first discharging spiral conveyor structure 3 is inclined relative to horizontal setting, and it feeds one end and gone out less than it Expect one end.
Preferably, as shown in Fig. 6 a- Fig. 8, in order to avoid the fiber material isolated by the discharging opening of bolter 1 goes out first The problem of expecting accumulated plugging occurs at the charging aperture 311 of spiral conveying mechanism 3, in the close of the first discharging spiral conveyor structure 3 Flared section 312 is provided with cylinder at charging aperture 311, flared section 312 connects the housing and discharging cylinder of the latter half 62 31 other parts.The cross-sectional area of flared section 312 is more than the cross-sectional area of other parts on discharging cylinder 31, so, is expanding A cushion space is formed in mouth section 312, by setting flared section 312 can the charging aperture of the first discharging spiral conveyor structure 3 Cross-sectional area increase at 311, when material is accumulated at charging aperture 311, the material of accumulation will enter above-mentioned buffering In space, the problem of effectively avoiding feed blocking at charging aperture 311, ensure the normal operation of spiral conveying mechanism, eliminate people The trouble of work dredging, improves efficiency, has saved cost;Meanwhile flared section 312 is set, solid accumulation can also be avoided to lump Problem, material is kept soft fluffy state in course of conveying, be easy to the conveying of material.
Preferably, as shown in Figure 6 b, the flared section 312 is along at least one of horizontal stroke on the screw axis direction Area of section is gradually reduced, to be transitioned into the discharging other parts of cylinder 31.That is, in the defeated of the first discharging spiral conveyor structure 3 Send on direction, the cross-sectional area of at least back segment of flared section 312 is gradually reduced, up to the other parts with the cylinder 31 that discharges Cross-sectional area is identical, so as to the feed blocking problem that avoids the unexpected reduction of cylinder cross-sectional area and may bring.Flared section The cross-sectional area of 312 leading portion (i.e. close to one section of its first end, wherein first end is close to one end of charging aperture 311) can be with Keep constant, gradual change can also be remained.
Specifically, as shown in Figure 6 b, the flared section 312 includes the enlarging shell structure 3121 for forming a cushion space, The enlarging shell structure 3121 be positioned close at the charging aperture 311 of the first discharging spiral conveyor structure 3 and with discharge cylinder 31 Other parts and it is described first discharging attachment structure side wall on opening connection, to cause the first discharging helical feed The discharging attachment structure of charging aperture 311 and first of mechanism 3 forms the connection of closing.As shown in Figure 6 a in the axle along discharging cylinder 31 Upwards, at least a portion of the enlarging shell structure 3121 is formed as the axis relative to the first discharging spiral conveyor structure 3 313 inclined structures.The incline structure as shown in Fig. 6 a, Fig. 7 can be the inclination of gradual change type, or multisection type inclines Tiltedly, such as shown in fig. 7, first set one section and the part of the diameter parallel of the first discharging spiral conveyor structure 3, then one section is set Inclined part, or multistage continuous tilt, each section of inclined angle difference (not shown) are set;Or it is curve Shape, such as arc-shaped recliner as shown in Figure 8, enlarging shell structure 3121 are arranged on the axis of the first discharging spiral conveyor structure 3 313 top, namely positioned at the top of conveying screw rod, but both lateral sides or the side of conveying screw rod can also be arranged on.
Preferably, in order to further prevent material from being blocked in the cylinder 31 that entirely discharges the problem of, discharge cylinder 31 Cross section it is U-shaped, U-shaped cross section causes the gap between the screw rod of the first discharging spiral conveyor structure 3 and discharging cylinder 31 Space increases, and when material is accumulated in transmitting procedure, material can move into above-mentioned clearance space, avoid material from entering one The accumulated plugging of step so that screw rod continues normal rotation.Material into the clearance space will not be by the helical blade on screw rod Forward, therefore, while avoiding blocking, mixing effect can also be presented.The cross section of discharging cylinder 31 is by positioned at upper The Π shapes part and underlying semi-circular portion of side combine, the semi-circular portion and the described first discharging spiral transferring Send the screw coaxial of mechanism 3.
Non-fiber material is fallen in the presence of self gravitation from the bottom of screen cloth 12, and constantly in the lower section heap of screen cloth 12 Product, in order to realize the Automatic Conveying of non-fiber material, substitutes the mode of existing manual cleaning, in the housing 11 of bolter 1 Lower section is provided with the second discharging spiral conveyor structure 4, and the non-fiber material fallen from the lower section of screen cloth 12 drops into the second discharging spiral On conveying mechanism 4, motor is provided with the second discharging spiral conveyor structure 4, by motor, the fines constantly fallen is for example Non-fiber material is entered under the drive of the second discharging spiral conveyor structure 4 in the fines such as handling process of non-fiber material, real Now to the Automatic Conveying for the fines isolated, the problem of fines is accumulated below screen cloth 12 is avoided, while also eliminate people The trouble of work cleaning.As shown in Figures 2 and 3, it is preferable that the second discharging spiral conveyor structure 4 includes two-stage delivery mechanism, respectively For first-level transport mechanism 41 and secondary conveyor 42, first-level transport mechanism 41 is arranged at the lower section of the housing 11 of bolter 1, and two The discharging opening of the charging aperture and the one-level cylinder of first-level transport mechanism 41 of the two level cylinder of level conveying mechanism 42 is correspondingly arranged, so that Obtaining the fines that first-level transport mechanism 41 conveys can enter in secondary conveyor 42, be continued by two-stage conveying structure defeated Send.Preferably, first-level transport mechanism 41 is with respect to the horizontal plane be arranged in parallel, and secondary conveyor 42, which is inclined relative to horizontal, to be set Put.Preferably, secondary conveyor 42 is substantially vertical with first-level transport mechanism 41, realizes that the conveying direction of non-fiber material changes Become so that whole structure for conveying is compacter, saves the occupancy in place.
Preferably, first-level transport mechanism 41 one-level cylinder and secondary conveyor 42 two level cylinder junction Settable closed dust guard, you can to prevent fines from dropping on ground, raising in fines course of conveying can be prevented again Dirt problem.
As shown in Figures 2 and 3, in order that the fines isolated can preferably drop into the second discharging spiral conveyor structure 4 On, the second attachment structure 7 is provided between the discharging spiral conveyor structure 4 of bolter 1 and second, for connecting the He of bolter 1 The second discharging spiral conveyor structure 4.Preferably, the one end of the second attachment structure 7 is fixedly attached to the housing 11 of bolter 1 Bottom, the other end are connected on the one-level cylinder of first-level transport mechanism 41.Preferably, the cross-sectional area of the second attachment structure 7 It is gradually reduced along the direction of the discharging spiral conveyor of bolter 1 to the second structure 4, such as the second attachment structure 7 can be with V-shaped channel-shaped Structure, so that the fines that must disperse goes forward to be assembled falling on the second discharging spiral conveyor structure 4 so that fines can be fallen into Onto corresponding conveying screw rod, in order to the conveying of fines.Preferably, the upper end notch of the second attachment structure 7 and bolter 1 Housing 11 is in smoothing junction, and lower end notch is connected with the feeding mouth of the second discharging spiral conveyor structure 4, and the second attachment structure 7 It is approximately equal to the length to the projected length of bolter 1 in the horizontal plane.
Preferably, the cylinder-shaped of the housing 11 of bolter 1, the second attachment structure 7 and the second discharging spiral conveyor structure 4 Integral structure, it is further preferred that above-mentioned overall structure is seal structure, so as to avoid dropping to the second discharging in fines There is the problem of airborne dust during in spiral conveying mechanism 4.
Multiple spiral conveying mechanisms are connected with the utility model, on bolter, it is respectively:Feeding spiral conveyer structure 2nd, the first discharging spiral conveyor structure 3 and the second discharging spiral conveyor structure 4, wherein the second discharging spiral conveyor structure 4 is excellent Choosing includes two-stage delivery mechanism, so as to realize the charging of bolter 1, separate and automation to the coarse fodder and fines of separation is defeated Send, especially for the fines isolated in bolter 1, by the second discharging spiral conveyor for being arranged on the lower section of bolter 1 Structure 4 realizes Automatic Conveying, avoids accumulation of the fines below screen cloth 12, also eliminates the trouble of manual cleaning.In addition, set The first charging attachment structure 5, first discharging discharging attachment structure 7 of attachment structure 6 and second is put, it is possible to prevente effectively from bolter 1 charging, separation, discharging during airborne dust the problem of, both protect environment, eliminate the trouble of cleaning again, while can also prevent Only particle is dropped on ground, is easy to the conveying of particle.Still further, flared section is set on the first discharging spiral conveyor structure 3 312, it is possible to prevente effectively from by the coarse fodder that the discharging opening of bolter 1 is isolated the first discharging spiral conveyor structure 3 charging aperture The problem of accumulated plugging, occurs for place, ensure that the continuity of equipment operation.
The utility model is described based on embodiment above, but the utility model is not restricted to these implementations Example.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this area For technical staff, the utility model can have various changes and change.All institutes within spirit of the present utility model and principle Any modification, equivalent substitution and improvements of work etc., should be included within the scope of protection of the utility model.

Claims (16)

1. one kind separation screen assembly, including bolter and the conveying mechanism that is connected with the bolter, it is characterised in that described The first end connection feeding spiral conveyer structure of bolter, the second end of the bolter connects the first discharging spiral conveyor Structure, the second discharging spiral conveyor structure, the bolter and the feeding spiral conveyer are also connected with below the bolter The junction of structure, the first discharging spiral conveyor structure and the second discharging spiral conveyor structure is seal connection Structure.
2. separation screen assembly according to claim 1, it is characterised in that the bolter is drum screen, including housing and The screen cloth being arranged in housing, the screen cloth can be relative to the housing into rotation.
3. separation screen assembly according to claim 2, it is characterised in that the screen cloth is individual layer, bilayer or three layers.
4. separation screen assembly according to claim 2, it is characterised in that the axis of the bolter with respect to the horizontal plane inclines Tiltedly set, and the first end of the bolter is higher than the second end.
5. separation screen assembly according to claim 1, it is characterised in that the bolter and the described second discharging spiral transferring Send and be provided with the second discharging attachment structure between mechanism, for connecting the bolter and second discharging spiral conveyor Structure.
6. separation screen assembly according to claim 5, it is characterised in that the cross section face of the second discharging attachment structure Product is gradually reduced along the direction that the second discharging spiral conveyor structure is sieved to from separation.
7. according to any described separation screen assemblies of claim 1-6, it is characterised in that the second discharging spiral conveyor structure First-level transport mechanism and secondary conveyor including series connection, wherein the primary conveyor structure is connected with the bolter.
8. separation screen assembly according to claim 7, it is characterised in that the feeding mouth of the first-level transport mechanism is located at institute State the lower section of bolter.
9. separation screen assembly according to claim 8, it is characterised in that the first-level transport mechanism is with respect to the horizontal plane put down Row is set, and the secondary conveyor is inclined relative to horizontal setting.
10. according to any described separation screen assemblies of claim 1-6, it is characterised in that the bolter goes out with described first The first discharging attachment structure is provided between material spiral conveying mechanism, for connecting the bolter and the first discharging spiral Conveying mechanism.
11. separation screen assembly according to claim 10, it is characterised in that the first discharging attachment structure includes mutual The top half of connection and the latter half, top half connection bolter, the latter half connection the first discharging helical feed Mechanism, wherein, the cross-sectional area of top half gradually increases along discharging direction.
12. separation screen assembly according to claim 10, it is characterised in that the first discharging attachment structure includes being obliquely installed First baffle, the first baffle is located at below the discharging opening of the bolter, for the discharging opening by material from bolter It is directed to the charging aperture of the first discharging spiral conveyor structure.
13. separation screen assembly according to claim 12, it is characterised in that iron removaling dress is provided with the first baffle Put.
14. separation screen assembly according to claim 13, it is characterised in that the deironing apparatus includes permanent magnet or electromagnetism Iron.
15. separation screen assembly according to claim 13, it is characterised in that the first discharging attachment structure includes and institute The parallel the first side wall of first baffle is stated, the deironing apparatus is arranged between the first side wall and the first baffle.
16. separation screen assembly according to claim 13, it is characterised in that in the side wall of the first discharging attachment structure It is provided with window able to turn on or off.
CN201721104011.XU 2017-08-30 2017-08-30 Separate screen assembly Active CN207204547U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721104011.XU CN207204547U (en) 2017-08-30 2017-08-30 Separate screen assembly

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721104011.XU CN207204547U (en) 2017-08-30 2017-08-30 Separate screen assembly

Publications (1)

Publication Number Publication Date
CN207204547U true CN207204547U (en) 2018-04-10

Family

ID=61826169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721104011.XU Active CN207204547U (en) 2017-08-30 2017-08-30 Separate screen assembly

Country Status (1)

Country Link
CN (1) CN207204547U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109420607A (en) * 2017-08-30 2019-03-05 黑龙江如柏科技有限公司 Separate screen assembly
CN111031310A (en) * 2019-12-30 2020-04-17 重庆盛泰光电有限公司 Sand dust test device for mobile phone camera module

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109420607A (en) * 2017-08-30 2019-03-05 黑龙江如柏科技有限公司 Separate screen assembly
CN111031310A (en) * 2019-12-30 2020-04-17 重庆盛泰光电有限公司 Sand dust test device for mobile phone camera module

Similar Documents

Publication Publication Date Title
CN207204547U (en) Separate screen assembly
EP2632598B2 (en) Roller mill
CN207204548U (en) One kind separation screen assembly
CN109676143A (en) Multi-stage, efficient cleaning type scrap steel crusher
JP2013158667A (en) Vertical type crushing device
CN112452763A (en) Efficient screening device for rice processing and using method thereof
CN109420606A (en) A kind of separation screen assembly
CN103170452A (en) Rotary screening machine
CN114248951B (en) Feed production is screw feeder for processing
CN106944186A (en) A kind of granular mill of caking fertiliser
CN209810661U (en) Fly ash grinding screening machine
CN109420607A (en) Separate screen assembly
CN216987830U (en) A multi-stage reduction device for preparation of water-soluble fertile
EP2196408B1 (en) Flexible silo
CN207324941U (en) A kind of closed crusher
CN207446665U (en) A kind of mash feed cleaning sieve
CN108745855A (en) Vanadium slag multilayer screening plant
CN210914475U (en) Anti-blocking coal bunker
CN211070866U (en) Mineral powder impurity separation device
CN203136576U (en) Grain separator
CN105944796A (en) Pulverizer for fodder raw materials
CN109174653B (en) Seed sieving mechanism is used to agricultural
CN109985810A (en) Mortar raw material stoving screening plant
CN206897612U (en) A kind of broken lifting device
EP3126066B1 (en) Sieve mechanism for unloading silo vehicles

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20221103

Address after: 101121 998-Shang37, 1st to 3rd floors, No. 998, Jiukeshu Middle Road, Tongzhou District, Beijing

Patentee after: Beijing Jiahe Kuntai Technology Co.,Ltd.

Address before: 154100 group 10, 51 Committee, Dongshan District, Hegang City, Heilongjiang Province

Patentee before: HEILONGJIANG RUBAI TECHNOLOGY CO.,LTD.